Loading...
HomeMy WebLinkAbout310033_Compliance Inspection_20180302 ivision of Water Resources Facility Number - E= O Division of Soil and Water Conservation O Other Agency Type of Visit: Com nce Inspection Operation Review O Structure Evaluation O Technical Assistance Reason far VisitCRoouutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Q/J Departure Timer County: Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: / Title: Phone: OnsiteRepresentative: �I ttih/�� G n"J_ Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILayer DairyCow W to Feeder Non-La er I DairyCalf eeder to Finish 7V2P, O - Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Ca taci Pop. Non-Dairy Farrow to Finish Layers I I Beef Stocker Gilts Non-Layers Beef Feeder Boars I I I Pullets lBeefBroodCow Turkeys Other Turkey Poults LA Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 0<0 ED NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑>_C1 NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Ej No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: 71 - Date of Inspection: 2 Waste Collection&Treatment �-2-��1q� 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [ ❑ NA ❑ NE ' a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Z Spillway?: Designed Freeboard(in): Observed Freeboard(in): 2 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes DNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental t at,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ffNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes Ef No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes PrNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13.Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes MNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 9�0�0 NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 0 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes 0 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes F3No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ❑1qo­❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Date of Inspection: 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [—] Yes No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No DINA ❑ NE Otber issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ErNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes CrNo ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑'No o NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ffNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E.fN5o NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes o ❑ NA ❑ NE 111311(melfer*question JOY EVWIAiny YES' auNar atlons or any other comments. "necessa SI.- �C, � ,� & p (�w" ^) � � I rr ljc 5o 1, W 5- Reviewer/Inspector Name: G l t --,, --t Q , Phone: 1 I o -7 G7304 Reviewer/Inspector Signature: ` ( —�/I Date: 3 2 f Page 3 of 3 21412015