Loading...
HomeMy WebLinkAbout310031_Compliance Inspection_20180619 � ivision of Water Resources Faciliy; Number - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Co lance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit C Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit:a//q (�o— Arrival Time: O D Departure Time: 33 '� County: Region: Farm Name: �' Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: / I ' v� Integrator: q Certified Operator: Certification Number: '1 7-7 3 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. eW to Finish La yer DairyCow ean to ecder oo }2i Non-La yer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Ca acity Pop. Non-Dairy Farrow to Finish ILayers I Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes <0 `❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE l� 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes [] No NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Ye s No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - -J 113ate of Inspection: Waste Collection&Treatment 4.fs storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes o ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): _2-k Z4� 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Ej No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes ETNo ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ETNo ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes [;Pro— ❑ NA ❑ NE maintenance or improvement? Waste Aootication 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? —/ 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes P<O ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ,EI-No ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes [:J`N�io ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes FfNo ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes 5o ❑ NA ❑ NE 18.Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. s ❑ No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections onthly and V Rainfall Inspections Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:] No ❑ NA CIE Page 2 of 21412015 Continued Facili Number: jDate of Inspection: cc 77i;tir 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes r1<0_00E] o NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ,0'9-o ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No �- ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E;� o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA [3 l E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes p "" ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). ,4,1 � � a �pG tnC orrPG�'i c-o c, Reviewer/Inspector Name: t Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 21412015