Loading...
HomeMy WebLinkAbout310029_5 day POA_20181017 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-29 County: Duplin Facility Name: Steve Grady Nursery Certified Operator Name: Steve Grady Operator Number: 18050 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 3 Spillway(Y or N): N N N Level(inches): 9 6 6 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/22/2018 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Steve Grady Phone: 919 658-5757 Facility Owner/Manager(print) Date: 10/17/2018 Facility Owner/Manager(signature) II. TOTAL POUNDS OFRAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 212.6 lb PAN 2. Structure ID: 2 line m = 243.9 lb PAN 3. Structure ID: 3 line m = 436.3 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines I + 2 + 3 +4+ 5 + 6 = 892.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field # q. crop r. acres s. remaining IRR t.TOTAL PAN u. application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 1921 1D WHEAT 4.30 126.50 544.0 SEP-APR 1921 1 E WHEAT 4.55 126.50 575.6 SEP-APR 1921 1F WHEAT 5.58 126.50 705.9 SEP-APR 1921 1G WHEAT 5.27 126.50 666.7 SEP-APR 1921 1H WHEAT 4.34 126.50 549.0 SEP-APR 1921 11 WHEAT 3.10 126.50 392.2 SEP-APR 1921 1J WHEAT 4.34 126.50 549.0 SEP-APR 1921 1K WHEAT 4.03 126.50 509.8 SEP-APR 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4492.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 892.8 lb. PAN PoA(30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section 111) = 4492.0 lb. PAN y. Overall PAN balance (w -x) _ -3599 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level; add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields has begun and will continue as weather and field conditions permit PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard a. current liquid level according to marker 9.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 10.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 27563 ftz e. line c/12 x line d x 7.48 gallons/ft3 180400 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 23360 ft3 h. current herd # 3200 certified herd#1 3200 actual waste produced = current herd # x line g = 23360 ft3 certified herd# i. volume of wash water according to structural design 01W j. excess rainfall over evaporation according to design 17263 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 50643 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 0.92 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 212.6 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 12 2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 13.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) J 25658 ft2 e. line c/12 x line d x 7.48 gallons/ft3 215912 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 23360 ft3 h. current herd# F___3_20__01 certified herd#1 3200 actual waste produced = current herd# x line g = 23360 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 16110 ft3 k. (lines h + i +j)x 7.48 x 30 days/line f= 49206 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 0.92 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 - 243.9 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on-the next Structure tab shown below) PoA (30 Day) 2/21/00 e PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 3 2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.51 inches c. line b - line a (inches in red zone) = 13.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 43646 ft2 e. line c/12 x line d x 7.48 gallons/ft' 367281 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 46720 ft3 h. current herd # 6400 certified herd# 6400 actual waste produced = current herd# x line g = 46720 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 27067 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 91988 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 0.95 Ibs/1000 gal. m. ((lines e + k)/1000)x line 1 = 436.3 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day) 2/21/00