HomeMy WebLinkAbout310011_Compliance Inspection_20180404 ,7 Division of Water Resources
Facility Number O Division of Soil and Water Conservation
O Other Agency
Type of Visit: ompliance Inspection Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time: County: iJ1.11D 11n Region:
Farm Name: �LH'�, - , Owner Email:
Owner Name: ' �1 MKJ Phone:
Mailing Address:
Physical Address:
Facility Contact: j� Title: Phone:
q�
Onsite Representative: V��, 4 7"�-1 cj Integrator:
Certified Operator. Certification Number:
� 5�13
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Laver Dal[ Cow
Wean to Feeder 8 Non-Laver Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Lacers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets lBeefBroodCow
Turkeys
Other Turkey Pouets
Other Other
Discharees and Stream Impacts r,�,
I. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facili Number: - Date of Inspection:
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): 3 U
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.) 0
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan? 0.
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Appllicat__ion inside of Approved Area
12.Crop Type(s): rLl u S Q f) litl F�`t ( A
j
13. Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 14 No ❑ NA ❑ NE
15.Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17.Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records&Documents J�
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes IX1 No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes 1 No ❑ NA ❑ NE
the appropriate box.
❑WUP El Checklists ❑Design [:]Maps ❑ Lease Agreements ❑Other.
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 1VNo ❑ NA ❑ NE
23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes P No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
]Facility Number: Date of Inspection: qq��(
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a PDA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes QNo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [�No ❑ NA ❑ NE
and report mortality rates that were higher than normal? r
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ANo ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE
34.Does the facility require a follow-up visit by the same agency? ❑ Ye tNo ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
Slk
Utz
Reviewer/Inspector Name: y Y I'S I � E Phone: 1,, I�D I Q -7 a
Reviewer/Inspector Signature: Date: T
Page 3 of 3 21412015