HomeMy WebLinkAbout310006_Compliance Inspection_20180308 Division of Water Resources /
Facility Number - I� 0 Division of Soil and Water Conservation ✓/
0 Other Agency
Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 1 0 Denied Access ,,1
Date of Visit: c Arrival Time: Departure Time: County: Region:
Farm Name: V —/ 1 l/, W"► Y✓ � J ' W Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: I fT Title: Phone:
Onsite Representative: &l/VI A K Yn'S Integrator:
Certified Operator: ��L AA, Ar\Apj Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I 11-ayer Dairy Co,
Wean to Feeder I INon-Layer Dairy Calf
Feeder to Finish I-It3kC IU DairyHeifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish I Layers I Beef Stocker
Gilts Non-Layers Beef Feeder
Boars I Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other Other
Discharees and Stream Impacts ��..,�{++
1. Is any discharge observed from any part of the operation? ❑ Yes kfNo ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facili Number: - Date of Inspection:
Waste Collection&Treatment �(
4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 StructureL3 Structure 4 Structure 5 Structure 6
Identifier: &iWA V
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): 31 21 L (u ������//////
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes 1�No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes 1%No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes XNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window /❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes )p No ❑ NA ❑ NE
❑
16.Did the facility fail to secure and/or operate per the irrigation design or wettable Yes tM No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records&Documents
19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes C�SNo ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall InspectiiNo
El Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ YesNo ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? [:] Yes ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facili Number: -31 Date of Inspection:
24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes $(No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes GNo ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes WO ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No JXNA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 121
0 ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes o ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately. 7�
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ONO ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes *o ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes o ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
A Vm~ 12&r�(- �6A JA44 CCVv,,f h'afl c�-
�,�,;-�-�., � l�otm - �udgu. 1�U� e9 �( �(► � � cave-p�Ta.�ee.
Reviewer/Inspector Name: LV AP Phone:
Reviewer/Inspector Signature: &= Date: 3
1da
Page 3 of 3 U 21412015