Loading...
HomeMy WebLinkAbout310006_Compliance Inspection_20180308 Division of Water Resources / Facility Number - I� 0 Division of Soil and Water Conservation ✓/ 0 Other Agency Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 1 0 Denied Access ,,1 Date of Visit: c Arrival Time: Departure Time: County: Region: Farm Name: V —/ 1 l/, W"► Y✓ � J ' W Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: I fT Title: Phone: Onsite Representative: &l/VI A K Yn'S Integrator: Certified Operator: ��L AA, Ar\Apj Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I 11-ayer Dairy Co, Wean to Feeder I INon-Layer Dairy Calf Feeder to Finish I-It3kC IU DairyHeifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish I Layers I Beef Stocker Gilts Non-Layers Beef Feeder Boars I Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharees and Stream Impacts ��..,�{++ 1. Is any discharge observed from any part of the operation? ❑ Yes kfNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - Date of Inspection: Waste Collection&Treatment �( 4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 StructureL3 Structure 4 Structure 5 Structure 6 Identifier: &iWA V Spillway?: Designed Freeboard(in): Observed Freeboard(in): 31 21 L (u ������////// 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes 1�No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 1%No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes XNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc. ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window /❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes )p No ❑ NA ❑ NE ❑ 16.Did the facility fail to secure and/or operate per the irrigation design or wettable Yes tM No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes C�SNo ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall InspectiiNo El Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ YesNo ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? [:] Yes ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: -31 Date of Inspection: 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes $(No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes GNo ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes WO ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No JXNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 121 0 ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 7� 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ONO ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes *o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). A Vm~ 12&r�(- �6A JA44 CCVv,,f h'afl c�- �,�,;-�-�., � l�otm - �udgu. 1�U� e9 �( �(► � � cave-p�Ta.�ee. Reviewer/Inspector Name: LV AP Phone: Reviewer/Inspector Signature: &= Date: 3 1da Page 3 of 3 U 21412015