HomeMy WebLinkAboutWQ0040659_Application (FTSE)_20190327Central Files- APS SWID
2/20/2019
WQ0040659 Permit Tracking Slip
1-24unn er
Program Category Status Project Type
Non -discharge In review New Project
Permit Type Version Permit Classification
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions A Individual
Primary Reviewer
dean.hunkele
Coastal SWRulle
Permitted Flow
rZ
I a G i try
Facility Name
Tru & Tapestry Hotel Private Sewer
Location Address
5001 Market St
Wilmington . NC
Owner
28405 �
Permit Contact Affiliation
Major/Minor Region
Minor Wilmington
County
New Hanover
Facility Contact Affiliation
Owner Name Owner Type
Serai Enterprises Inc Non -Government
Owner Affiliation
Jayesh Patel
2006 Veasley St
Da'ites/Ee'en t's Greensboro NC 27401
Scheduled
Orig Issue App Received Draft Initiated Issuance
2/19/2019
el red Activities
Public Notice Issue Effective Expiration
Peulslesvt-ed IRV-ceive-c! Events
Additional information requested
mciies4ic�A
00 1,
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28401
Phone: (910) 763-5100 • FAX: (910) 763-5631
RECENVE"'MCDENR/DWR
February 19, 2019
FEB 19 20,19
NCDEQ
Division of Water Quality
127 Cardinal Drive Ext.
Wilmington, NC 28405
Attn: Dean Hunkele
Re: Tru &Tapestry Hotel
New Hanover County, NC
TE 17068
Dear Mr. Hunkele:
Water Quality Regional
Operation- SIction
Wi
Enclosed please find one (1) original and one (1) copy fast -track application, flow
tracking/acceptance forms, Secretary of State info, topo map, p , street , and a check to
cover the application fee for the above referenced project.
Tru & Tapestry Hotel is located at 5001 Market Street in Wilmington. We are
proposing to add a 6" sewer service line to serve a 207-room hotel expansion. This
service will tie into an existing 6" sewer service line located on the property which
currently serves the existing hotel. This will effectively create 88 if of 6" C-900 PVC
gravity sewer main (previously service line) which ties into the existing 10" sewer main
along Market Street. We are requesting flow of 24,840 gpd to provide sewer service to
the 207 hotel rooms based on 120 gpd per room.
Please review for approval and contact us with any questions, comments or if you
need additional information. Thank you.
Sincerely,
Tri nguesseerin P.C.
Phillip G. Tripp, P.E.
PGT: dcb
Enc.
State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 &SUPPORTING DOCUMENTATION
Application Number: �60 Q � (� C51 (co be completed by DwR)
All items must be completed or the application will be returned
I. APPLICANT INIL,-ORMATION:
1. Applicant's name: Serai Enterprises, Inc. (company, municipality, HOA, utility, etc.)
2. Applicant type: [:] Individual N Corporation ❑ General Partnership
❑ Federal El State/County ❑ Municipal
3. Signature authority's name: Ja_yesh Patel per 15A NCAC 02T .0106(b)
Title: Vice President
4. Applicant's mailing address: 2006 Veasley Street
City: Greensboro State: NC Zip: 27401-
5. Applicant's contact information:
Phone number: (240) 205-4950 Email Address: petepatelcnAgmail.com
El Privately -Owned Public Utility
❑ Other
II. PROJECT INFORMATION:
1. Project name: Tru & Tgpesqy Hotel Pei V4S7et,�
2. Application/Project status: Z Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: New Hanover
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.243889' Longitude:-77.883889'
5. Parcel ID (if applicable): R04915-001-010-000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Phillip G. Tripp, P.E. License Number: 17374
Firm: Tripp Engineering
Mailing address: 419 Chestnut Street
City: Wilmin on State: NC Zip: 28401-
Phone number: (910) 763-5100 Email Address: office@trippengineerin .com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: James A Loughlin WWTP (Northside) Permit Number: NCO023965
Owner Name: Cape Fear Public Utility Authorily
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 04-16 Page 1 of 5
VI.
GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ZN/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
E]Yes ❑No ZN/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
[:]Yes [:]No ZN/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned ❑Retail (stores, centers, malls) El Car Wash
❑ Residential Leased El Retail with food preparation service Z Hotel and/or Motels
❑ School /preschool /day care ❑Medical /dental /veterinary facilities ❑Swimming Pool /Clubhouse
❑ Food and drink facilities ❑Church ❑Swimming Pool/Filter Backwash
❑ Businesses /offices /factories ❑Nursing Home ❑Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(20))
Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 1.5A NCAC 02T .0114(fl? El Yes E No
➢ If _yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow 19b
No. of Units
Flow
Hotel room
120 gal/room
207
245840 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
24,840 GPD
a See 15A NCAC 02T .01.1.4(b), (d),(e) 1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01.14] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 24.840 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 . Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers:
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
6 88 C-900 PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: T
2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305�h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow Beater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (g) Z Yes ❑ No
15A NCAC 07T_0105(f)cnntnin.qminim»m .qenarntinnc that shall he nrnvided fnr sewer cvctemc-
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
"Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
-Any building foundation
5 feet
Any basement
10 feet
slope of embankment or cuts of 2 feet or more vertical height
10 feet
-Top
Drainage systems and interceptor drains
5 feet
swimming pools
10 feet
-Any
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes [:]No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? Z Yes ❑ No ❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or E]Yes 0 No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer. Permitting Branch.
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? [E Yes ❑ No
Per 1.5A NCAC 02T.0l05(c)(6),, directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 1.5A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
E]Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria latest version) as applicable?
❑ Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
I, LL I F— ,( attest that this application for
(Professional Engineer's name from Application Item III.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
attest that this application for
(Signature Authority's name & title from Application Item I.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-21.5.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to e ce d $10,000 as well as civil penalties up to $25,000 per violation.
Signature: Date: Lt
FORM: FTA 04-16 Page 5 of 5
State of North Carolina
'F Department of Environmental Quality
s
s Division of Water Resources
AM'S'l n of Water 11s-am es Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Seraj Enterprises, Inc.
Project Name for which flow is being requested: Tru & Tapestry Hotel
More than one FTSE may be required for a singleproject if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: James A. Loughlin (Northside) WWTP
b. WWTP Facility Permit #: NPDES NC 0023965
Allflowsare inMGD
c. WWTP facility's permitted flow 16.000
d. Estimated obligated flow not yet tributary to the WWTP 2.976
e. WWTP facility's actual avg. flow 10.661
f. Total flow for this specific request 0.024840
g. Total actual and obligated flows to the facility 13.661
h. Percent of permitted flow used 85.4%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow* *
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / p f),
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity* * *
89
N/A
14.583
5.833
4.493
1.583
6.075
-0.242
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow -
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cape Fear Public Utility Authority
Downstream Permit Number: Not Available
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Matthew Tribett, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
S4gWng�'Official Signature
Title of Signing Official
2
Dare
Page 2 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
26% total flow % and 1.583 MGD of the Available Capacity (E) in Pump Station
and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
Blue Clay Road Force Main is in design or under construction with
planned completion in complete ; and/or
d. The following applies:
The Blue Clay Road Force Main is able to provide additional capacity at PS 89 by
diverting existing. flow that is currently tributary to PS 89 directly to NSWWTP.
Construction of the force main is complete and was certified 4/5/18. The force main is
available for event management. Administrative procedures are required for full activation.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature
Date
r�
Page 3 of 6
FTSE 10-18
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online
• Add Entity to My Email Notification List • View Filings • Print an Amended a Annual Report form
• Print a Pre -Populated Annual Report form
Business Corporation
Legal Name
Seraj Enterprises, Inc.
Information
Sosld: 0428731
Status: Current -Active
Annual Report Status: Current
Citizenship: Domestic
Date Formed: 6/4/1997
Fiscal Month: December
Registered Agent: Patel, Nayan C
Addresses
Mailing
2006 Veasley St
Greensboro, NC 27407
Reg Mailing
2006 Veasley St
Greensboro, NC 27407
Officers
Secretary
Jayesh N. Patel
2006 Veasley Street
Greensboro NC 27407
Principal Office
2006 Veasley St
Greensboro, NC 27407
President
Nayan Patel
2006 Veasley Street
Greensboro NC 27407
Reg Office
2006 Veasley St
Greensboro, NC 27407
Vice President
Raman C Patel
3215 Morris Farm Dr
Jamestown NC 27282
Stock
! G 0
tu.`gle Maps
COFTIfOrt -'SLAULS:
L2.
Vla,tthew's, Rentta'ls
G enki Sushi
(r,
d R o o f I r- r, "" J 1,
Z&B Togs
QA
65
Dunkin' Do-nuAls;
r,p
� -I'
PIS, - �)
Hieron-yr -nu8 Seafood
Q-V 0
Restouran't Ovs,.,IP-r Bar
Rosalie�8
TratIc-ria
Ifin
if!,
V
Site
Splash -N-Dash
A T E x
p r-,,
V
s
D -3ys 'r-jr, by V,Jondha.F-ri
z
ra
II +'aii '1 I1 I:. on UrJvfUrsity Da' -Ad
Farm Insur-
eb[er i a Ip
A7
Childcare Network
Cadillac Cu8L=
QU---II Y. hin
Tattoo & P-Ile.rcing
Pei �r"G
Stric
WJITT',IirlgtDfl Silver
and Gold Refinery
vaince Auto Parts
ID
EarVs Wrecke'r Services
BMW a
R & R W]Ghine,
V
Gotcha
Covered
il njer Guris W
T E, I-- & La
1 -Motte
MRIer
Uphols-1.2-ry
College
z
Goo cde
V
Neil SmItfi Paint
Atlarit.ic Facitities
& Body Shop, !Inc
Map data @2019 Google 100 ft L.—
25
PINX
HANDICAP to:
RAMP* COMMERCIAL
HANDICAP PARKING
20
0000
:A 100
HOTEL PLUS LLC FM
ZONING: RB
\00-
USE: HOTEL
Its
ICYCLE RACK AIDICAP PARKIN
(1) FIRE HYDRAW ASSEMBLY
ONE
SIGN 0
tC
SIGIr
BICYCLE RACK R
X0.0.0ig OA 10 SPACES) % '4'
.-1 67 C-900 PVC FIRE ftp\ vc�
EX. SW Wy
PROPOSED c
WAT
TIE:; INTO EX
'ERVICE VESTIBULE
ISLAND 0 NOT
014
0 own
ZONING: RB
SMAC—K poop
.001, mow
USE: COMMERCIAL 25
ago 4w
OR wow,
06
tap
C vCEAIR Air :7 `:�4i�
lop
AP
IV
wwwwwo
rs ljd�' SID
A-L-H INC
CS
USE: CONVENIENCE * GROCERY
ZONING: RB it
USE: HOTEL
all
`