Loading...
HomeMy WebLinkAboutWQ0040659_Application (FTSE)_20190327Central Files- APS SWID 2/20/2019 WQ0040659 Permit Tracking Slip 1-24unn er Program Category Status Project Type Non -discharge In review New Project Permit Type Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions A Individual Primary Reviewer dean.hunkele Coastal SWRulle Permitted Flow rZ I a G i try Facility Name Tru & Tapestry Hotel Private Sewer Location Address 5001 Market St Wilmington . NC Owner 28405 � Permit Contact Affiliation Major/Minor Region Minor Wilmington County New Hanover Facility Contact Affiliation Owner Name Owner Type Serai Enterprises Inc Non -Government Owner Affiliation Jayesh Patel 2006 Veasley St Da'ites/Ee'en t's Greensboro NC 27401 Scheduled Orig Issue App Received Draft Initiated Issuance 2/19/2019 el red Activities Public Notice Issue Effective Expiration Peulslesvt-ed IRV-ceive-c! Events Additional information requested mciies4ic�A 00 1, TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 RECENVE"'MCDENR/DWR February 19, 2019 FEB 19 20,19 NCDEQ Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Attn: Dean Hunkele Re: Tru &Tapestry Hotel New Hanover County, NC TE 17068 Dear Mr. Hunkele: Water Quality Regional Operation- SIction Wi Enclosed please find one (1) original and one (1) copy fast -track application, flow tracking/acceptance forms, Secretary of State info, topo map, p , street , and a check to cover the application fee for the above referenced project. Tru & Tapestry Hotel is located at 5001 Market Street in Wilmington. We are proposing to add a 6" sewer service line to serve a 207-room hotel expansion. This service will tie into an existing 6" sewer service line located on the property which currently serves the existing hotel. This will effectively create 88 if of 6" C-900 PVC gravity sewer main (previously service line) which ties into the existing 10" sewer main along Market Street. We are requesting flow of 24,840 gpd to provide sewer service to the 207 hotel rooms based on 120 gpd per room. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tri nguesseerin P.C. Phillip G. Tripp, P.E. PGT: dcb Enc. State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 &SUPPORTING DOCUMENTATION Application Number: �60 Q � (� C51 (co be completed by DwR) All items must be completed or the application will be returned I. APPLICANT INIL,-ORMATION: 1. Applicant's name: Serai Enterprises, Inc. (company, municipality, HOA, utility, etc.) 2. Applicant type: [:] Individual N Corporation ❑ General Partnership ❑ Federal El State/County ❑ Municipal 3. Signature authority's name: Ja_yesh Patel per 15A NCAC 02T .0106(b) Title: Vice President 4. Applicant's mailing address: 2006 Veasley Street City: Greensboro State: NC Zip: 27401- 5. Applicant's contact information: Phone number: (240) 205-4950 Email Address: petepatelcnAgmail.com El Privately -Owned Public Utility ❑ Other II. PROJECT INFORMATION: 1. Project name: Tru & Tgpesqy Hotel Pei V4S7et,� 2. Application/Project status: Z Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: New Hanover 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.243889' Longitude:-77.883889' 5. Parcel ID (if applicable): R04915-001-010-000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Phillip G. Tripp, P.E. License Number: 17374 Firm: Tripp Engineering Mailing address: 419 Chestnut Street City: Wilmin on State: NC Zip: 28401- Phone number: (910) 763-5100 Email Address: office@trippengineerin .com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: James A Loughlin WWTP (Northside) Permit Number: NCO023965 Owner Name: Cape Fear Public Utility Authorily V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ZN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? E]Yes ❑No ZN/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? [:]Yes [:]No ZN/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑Retail (stores, centers, malls) El Car Wash ❑ Residential Leased El Retail with food preparation service Z Hotel and/or Motels ❑ School /preschool /day care ❑Medical /dental /veterinary facilities ❑Swimming Pool /Clubhouse ❑ Food and drink facilities ❑Church ❑Swimming Pool/Filter Backwash ❑ Businesses /offices /factories ❑Nursing Home ❑Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 1.5A NCAC 02T .0114(fl? El Yes E No ➢ If _yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow 19b No. of Units Flow Hotel room 120 gal/room 207 245840 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 24,840 GPD a See 15A NCAC 02T .01.1.4(b), (d),(e) 1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01.14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 24.840 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 . Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 6 88 C-900 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: T 2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305�h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow Beater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (g) Z Yes ❑ No 15A NCAC 07T_0105(f)cnntnin.qminim»m .qenarntinnc that shall he nrnvided fnr sewer cvctemc- Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet -Any building foundation 5 feet Any basement 10 feet slope of embankment or cuts of 2 feet or more vertical height 10 feet -Top Drainage systems and interceptor drains 5 feet swimming pools 10 feet -Any Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes [:]No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? Z Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or E]Yes 0 No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer. Permitting Branch. 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? [E Yes ❑ No Per 1.5A NCAC 02T.0l05(c)(6),, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 1.5A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. E]Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria latest version) as applicable? ❑ Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, LL I F— ,( attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-21.5.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to e ce d $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: Lt FORM: FTA 04-16 Page 5 of 5 State of North Carolina 'F Department of Environmental Quality s s Division of Water Resources AM'S'l n of Water 11s-am es Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Seraj Enterprises, Inc. Project Name for which flow is being requested: Tru & Tapestry Hotel More than one FTSE may be required for a singleproject if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: James A. Loughlin (Northside) WWTP b. WWTP Facility Permit #: NPDES NC 0023965 Allflowsare inMGD c. WWTP facility's permitted flow 16.000 d. Estimated obligated flow not yet tributary to the WWTP 2.976 e. WWTP facility's actual avg. flow 10.661 f. Total flow for this specific request 0.024840 g. Total actual and obligated flows to the facility 13.661 h. Percent of permitted flow used 85.4% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow* * Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity* * * 89 N/A 14.583 5.833 4.493 1.583 6.075 -0.242 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow - that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority Downstream Permit Number: Not Available Page 1 of 6 FTSE 10-18 III. Certification Statement: I Matthew Tribett, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. S4gWng�'Official Signature Title of Signing Official 2 Dare Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 26% total flow % and 1.583 MGD of the Available Capacity (E) in Pump Station and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Blue Clay Road Force Main is in design or under construction with planned completion in complete ; and/or d. The following applies: The Blue Clay Road Force Main is able to provide additional capacity at PS 89 by diverting existing. flow that is currently tributary to PS 89 directly to NSWWTP. Construction of the force main is complete and was certified 4/5/18. The force main is available for event management. Administrative procedures are required for full activation. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date r� Page 3 of 6 FTSE 10-18 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print an Amended a Annual Report form • Print a Pre -Populated Annual Report form Business Corporation Legal Name Seraj Enterprises, Inc. Information Sosld: 0428731 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 6/4/1997 Fiscal Month: December Registered Agent: Patel, Nayan C Addresses Mailing 2006 Veasley St Greensboro, NC 27407 Reg Mailing 2006 Veasley St Greensboro, NC 27407 Officers Secretary Jayesh N. Patel 2006 Veasley Street Greensboro NC 27407 Principal Office 2006 Veasley St Greensboro, NC 27407 President Nayan Patel 2006 Veasley Street Greensboro NC 27407 Reg Office 2006 Veasley St Greensboro, NC 27407 Vice President Raman C Patel 3215 Morris Farm Dr Jamestown NC 27282 Stock ! G 0 tu.`gle Maps COFTIfOrt -'SLAULS: L2. Vla,tthew's, Rentta'ls G enki Sushi (r, d R o o f I r- r, "" J 1, Z&B Togs QA 65 Dunkin' Do-nuAls; r,p � -I' PIS, - �) Hieron-yr -nu8 Seafood Q-V 0 Restouran't Ovs,.,IP-r Bar Rosalie�8 TratIc-ria Ifin if!, V Site Splash -N-Dash A T E x p r-,, V s D -3ys 'r-jr, by V,Jondha.F-ri z ra II +'aii '1 I1 I:. on UrJvfUrsity Da' -Ad Farm Insur- eb[er i a Ip A7 Childcare Network Cadillac Cu8L= QU---II Y. hin Tattoo & P-Ile.rcing Pei �r"G Stric WJITT',IirlgtDfl Silver and Gold Refinery vaince Auto Parts ID EarVs Wrecke'r Services BMW a R & R W]Ghine, V Gotcha Covered il njer Guris W T E, I-- & La 1 -Motte MRIer Uphols-1.2-ry College z Goo cde V Neil SmItfi Paint Atlarit.ic Facitities & Body Shop, !Inc Map data @2019 Google 100 ft L.— 25 PINX HANDICAP to: RAMP* COMMERCIAL HANDICAP PARKING 20 0000 :A 100 HOTEL PLUS LLC FM ZONING: RB \00- USE: HOTEL Its ICYCLE RACK AIDICAP PARKIN (1) FIRE HYDRAW ASSEMBLY ONE SIGN 0 tC SIGIr BICYCLE RACK R X0.0.0ig OA 10 SPACES) % '4' .-1 67 C-900 PVC FIRE ftp\ vc� EX. SW Wy PROPOSED c WAT TIE:; INTO EX 'ERVICE VESTIBULE ISLAND 0 NOT 014 0 own ZONING: RB SMAC—K poop .001, mow USE: COMMERCIAL 25 ago 4w OR wow, 06 tap C vCEAIR Air :7 `:�4i� lop AP IV wwwwwo rs ljd�' SID A-L-H INC CS USE: CONVENIENCE * GROCERY ZONING: RB it USE: HOTEL all `