HomeMy WebLinkAboutNC0032077_2018 PAR Review Ltr_20190327Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Narrative
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
PPS Form
® YES
❑
NO
® YES
❑
NO
SNCR
® YES
❑
NO
® YES
❑
NO
IDSF
® YES
❑
NO
® YES
❑
NO
Allocation Table
® YES
❑
NO
® YES
❑
NO
Compliance Schedules
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Public Notice
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Program Information
® YES
❑
NO
® YES
❑
NO
[:]YES ® NO
Historical SNC
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
❑ YES ® NO ❑ NA
Regional Office: Washington
POTW: Contentnea Metropolitan
Sewerage District
NPDES Permit No. NC0032077
Report Period:1/1/2018 to 12/31/2018
❑ Full ❑ Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
If No, check recommendation below.
1. Have at least 90% of SIU permits been issued within 180
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
days of expiration? See Allocation Table).
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
SNC, including those causing pass -through or interference? (See
Assessment
Narrative and SNCR Form)
4. Does public notice cover all SIUs in SNC?
❑ Yes ❑ No ❑ NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
Reviewed By: rebtiit, bVU6& Date: 3/27/2019
Regional Pretreatment Annual Report Review
$65c7bb518662$F6DA2F 1 OC 17548278F 16CBBD723912B0.docx 16