Loading...
HomeMy WebLinkAboutNC0025348_2018 PAR Review Ltr_20190327Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ® YES ❑ NO [:]YES ® NO Historical SNC ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Regional Office: Washington POTW: New Bern NPDES Permit No. NCO025348 Report Period:1/1/2018 to 12/31/2018 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below. 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form) 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ❑ NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment vole: tXCemons SnouIa De exDlalnea In the comment secuon Deiow: Reviewed By: r6WC, bVU6& Date: 3/27/2019 Regional Pretreatment Annual Report Review $06aOe56a8879$E0684B5A2A2643939E1ADD5FA189038F.docx 16