HomeMy WebLinkAboutNC0020648_Annual Performance_20190327Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Narrative
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
PPS Form
® YES
❑
NO
® YES
❑
NO
SNCR
® YES
❑
NO
® YES
❑
NO
IDSF
® YES
❑
NO
® YES
❑
NO
Allocation Table
® YES
❑
NO
® YES
❑
NO
Compliance Schedules
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Public Notice
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Program Information
® YES
❑
NO
® YES
❑
NO
® YES ❑ NO
Historical SNC
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
❑ YES ❑ NO ® NA
Regional Office: Washington
POTW: City of Washington
NPDES Permit No. NC0020648
Report Period:1/1/2018 to 12/31/2018
® Full ❑ Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
days of expiration? See Allocation Table).
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
SNC, including those causing pass -through or interference? (See
Assessment
Narrative and SNCR Form)
4. Does public notice cover all SIUs in SNC?
❑ Yes ❑ No ❑ NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
vote: txcepuons snouia oe expiainea in me comment secuon Mow:
Noted correction on Pretreatment Program Info Database:
Pt Contacts need to be updated as follows:
Change Mr. Adam Waters with Ms. Hope Woolard, replace Ms. Hope Woolard with Mr.
Lonnie Woolard and update Mr. Lonnie Woolard's title to Treatment Plant Operations
Supervisor
Reviewed By: r6WC, bVU6& Date: 3/27/2019
Regional Pretreatment Annual Report Review
$11 fed9e 1 ec2e$33356EAEOFE242ACBCBD867D9C4EC 13D.docx 16