HomeMy WebLinkAbout10-0163-WS-0070_Complete - Historical File_20190326 APPENDIX-;
6.250° DIA. CASING. x 0.185"WALL THICKNESS
(13 LB. FT.)
CAP WHEN TESTED
Z.
3: MIN..
4"MIN v: u :9 SLOPE'., 6"
0
,
:. [—NO
GROUTASINCG TO :ROC z - PERVIOUS
�i .IMPERVIOUS j
12':,'INTO ROCK
. STRATUM ,S
TO _WATER BEARING
STRATA
117.
6 WELL SHAFT
DETAILS OF .. OPEN END _WELL
; z
f d j
,
I
-
//-- BOARD OF WATER AND AIR RESOURCES
APPLICATION FOR PhTdVIIT TO'.CONSTRUCT A WELL
�— 19.As',
Garl,i.lna ..,ard of Water ajid Air Resoarr'es
ccordance with the provisions of Article 7, Chapter 87, General Statutes of North
ar:;l:ina, and regulationo pursuant thereto, application is hereby made by
Rid ecrest Conference Center for a permit to construct a well
name of well ovaier
as described below, and in the accompanying data submitted as a part of this application,. .:`
(`a) ,.dame of property owner Ridgecr s .. Cnnference LntPr
(b) Location of property Boys Camp area Rid ecrest Buncombe
Road, Community, Subdivision, Lot No. Town County
!c) Purpose of well addition to system ( 3 )
td) Will proposed well replace an existing well No
(e) . Total' capacity of existing system: 288 G . P . M . gallons. per day '
Well. No. Yield Well No. Yield'
1 60 G P M 4 4n (. - P. M-
60
3 12 6 41
(f) Proposed' Drell: ( 3 ) 7 67
Construction type open-end (open-end,, screened, gravel-packed, 'etc.)
Estimated depth 350 Estimated, yield 75.
Estimated date .of construction: Begin June . 1985 Complete 198 5 '
(g) Drilling contractor: —t o bp gel Pr tp
. (h)'� 'Location of Well: Provide a detailed map showing the location of the proposed .well ;
arid' any wells in the existing system to at least two (2) nearby reference point's such,
as 11 roads, intersections, and streams. - Identify roads with State Highway road ide'nti
fication numbers. Show all existing water supply wells within a radius of 1 ,OOd feet
of the proposed well.
Well Construction Diagram: Provide a diagram showing proposed construction .`
specifications. (See Form GW-22A) Ri dgecrest Conference Center
P . O. Box 218
' . Ridgecrest ,N . C ." 28770
`1lia Applicant hereby agrees the proposed Mailing Address of Well Owner ' Required
well will be constructed in accordance with
approved specifications and conditions of
the Well Construction Permit. �yyy
Mailing Address of Agent"
S' gnature of Well. Owner or .Agent
. Title
PERMIT NO. issued 19
r'O, M GW-22:.:
Page Z
Permit issued this the 12th day of April, 1955.
NORTH CAROLINA E MIROPIENTAL WAGMENT C0101ISSION
ORIGINAL SIGNED BY. 'ROY M. DAMS
Roy M. Davis, Regional Supervisor
Division of Environmental Management
By Authority of the Environmental Management
Commission
PERMIT NO. 10-0163-WS-0070
NORTH CAROLINA
ENVIRONbMNTAL MANAGEMENT COMMISSION
DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT
ASHEVILLE, NORTH CAROLINA
PERMIT R THE Ca RU Q o AWELL-OR WELL SYSTEM'
In accordance with the provisions of Article 7, Chapter 87, North Carolina
General Statutes, and other applicable Laws, Rules and Regulations.
PERMISSION IS HEREBY GRANTED 70
RIDGECREST CONFERENCE CENTER
FOR THE CONSTRUCTION OF A WELL located in the Blue Ridge-Inner Piedmont Sgdrogeologic
System near SR,2705 in-Buncombe County, in accordance with the application dated
April 4, 1985, and in conformity with specifications and supporting data, all of
which are filed with the Department of Natural Resources and Community Development
and are considered a part of this Permit.
This Permit is for well construction only, and does not waive any provisions
or requirements of the Water Use Act of 1967, or any other applicable laws or
regulations.
Construction of a well under- this Permit shall be in compliance iIth the
'North Carolina Well Construction Regulations and Standards, and any other laws
and regulations pertaining to well construction.
This Permit will be' effective from the date of its issuance until October 4,
1985, and shall be subject to other specified conditions, limitations, or exceptions
as follows:
1. Prior notice of the pumping test-date must be given to'Donald R. Link,
P. 0. Box 370, Asheville, N. C., 253-3341 at least 48 hours prior to
the start of the test.
2. Well site approval must be obtained from the Division of Health
Services of the North Carolina Department of Human Resources in
Black Mountain, N. C.
LIP
DIVISION OF
ENVIRONI SM
MANAGEMENT
April 12, 1985
Mr. Kenneth McAnear
Ridgecrest.Conference Center
P. 0. Box 218
Ridgecrest, North Carolina 28770
Subject: Wall Construction Permit
No. 10-0163-1dS-0070
Ridgecrest Conference Center
Buncombe County, North Carolina
Dear Fir. McAnear:
In accordance with your application received April 5, 19850 we are forwarding
herewith Well Construction Permit No. 10-0163-WS-0070 dated April 12, 1985, issued
to Rxdgecrest. Conference Center for the construction of a 324,000 gallon per day
water supply well.
This Permit will be effective from the date of its issuance and shall be
subject to the conditions and limitations as specified therein.
Sincerely,
ORIGINAL SIGNED BY ROY M. 'DAVIS
Roy M. Davis
Regional Supervisor
RMD/ar
Enclosure
cc: Perry No
N. C. Department of Human Resources
Willard Hintz
�\/ /f
11 � ,f ('
_-,
i � '
/' � �
��
��, ; �,
, -
�,,�_:.�
7`V►rO
CHESTNUT KNOB ••'� ,f ! .lr�u � (DfTE S
]],�1 y •BedFLT1s 4` / W�7H
F O E 5 T 4
ti� ],Li]R M71i9 711 T, 77 > CRAGGY PINNACLE
11 Lt1 f 2115 '
L]i f
r71$A -- ,,s•.ss-- MTunlo. , e Jw DOMEchop•1 1]V'}b rA3 swVOYAn'. 4 vrL •s4 V LITTLE CRAGGY St'Pub
71vs 3 S •7,Y1_ ARKWAV CRAGGY ' KNOB Y Jwl s
T 7-J f l'11i COIMTIHOUSE FLATS
5 .3 3 '1 e' Cr 151753z� ,. KNOS /GREYBEARD
2IQ6 Ip• 1N L7niw) ' -yJ 31,2
►4martGalo7 VoBsy Ch- ////
1L41 1 „La139 Ch. " JChf4S f e 1 t.
�y IrA, H( E "ell
\ LITTLE DAM 'f,E:r:S� Nt'\yJS S._\.7 aJ \
MTN. 1.0 / '_5 AO
ROARING J h'¢..•':••r ., _ ____ - ]
PAS S R GAP
KNOB d e T1• �._ 11
ROCKY '' „ \r. MUN•4FA"
1 KNOB
v 69e>
EST 4�7•
lT S 7.79 �( :.]1 Jd FA'J
A4s _ BAp�PTT Bae irce
Ch
d.5 G� _ r,:\ZS' 7J30 (- ]Jba ' lr•' t .�. 5wAN
OTEEN VET'S __ 5\VANNANOA .. ?, ham- yj i-5 L. A f°�TO L
ADM. FAC o I wNR+C -(^_
POP. 2,1e9
313, Ridgxresf
) ,- rn 1s maw ' 31 �:— � �f" _�rk_wr•„rr J
694 _ It, aa� F: 1r I 1 -
is
MTN u Sao nanoa 1r _ J ` `�
JI-
1S VILLE FA5 �\ F FLAN + AKE 35 35
U -__ __ _
ror .iR'r� 7 o Ofe+n v �' s \ 1 ``
r �•I� �. - JESSfS'IIGN TOP K^i x '+
M114
E
HAT OP 5 Q W'iNey .�,
IT 8 i�i il•10'T BIG FLATS MOUNY� NDV FiRI Y'?'i ]Jea q K:,
2re9 10wf2
a , TN g _ Y y (D
75 y a r- 1 b Fn
7rr7 � � �. Ch :raa
7a e i 1 I / �'�'{ `
lR i7;1
BI RESERVOM
_ j��. ac,^h.,]' <v aCana,-1 ,R9 ,
e'` a $131 ` � +�
f`BIITMORE I 7.17a r�, +_ SUtld31 NS'�2"T,7t
1 ]0>d
KX. 1,004 WerraVal.
n:., cl, UAR7LN
FA5
t' 1 � ] •r?*>.,t tl3e P+S 1 i %(~ A .,, o
vI
1 I 0 m C� 'D� l 7 Y r'br n�,. .• C:,...r• !h . I +� -
ay 1 n v �,(N V �7 ,h`an � � � ( f v �,n �>•r r�y �
[� .R 0- FAS -a Itl:!
mae L' _ P •33 ]a � .R I�.r'�+.• >n G p-R>)
MERRILL Gro e J ]v J•,
Tr MTN 1 V ] ]• CLl �- Ti l` _ MOJTREAI \ R`
a.7
IN B
F S $131` 1•+' r ,� o~ Hite JRYNUT
AS, .L a h pk 1'.e •`JC 4rPP r1J J-•�C- v ~ \
280 .• e']v3� ). Ch
3 di
y 7 y�
CONLOR
b
s. Je'`,, �f RIDGE >e
F Arden, - x
Oak ���
Park o-`' /
.� Vic iNITY :
-�- — y MTN WEL SITES
T a L y 'i� 1 1
of
];�; RIDGECREST CONFERENCE
I ti c O GENTERY
i
4t(
\\ t16� m ( ' BUNCOMBE CO.,N.C.
a
=Z
APPENDIX
�y
CAP WHEN TESTED
611 STD. 1NE LB. / FT.) ..gNG - Z
3 MIN. SLOPE 6'
TOPSOIL
GROUT SING TO ROCK - ------ �--
_ _ PERVIOUS
-� IMPERVIOUS
- --- '_ •, / fj STRATUM
12" INTO ROCK
TO WATER BEARING
STRATA 6" WELL SHAFT
DETAILS OF
OPEN EN® WELL •
ti
T'S
Upon Completion ®f the wall, the contractors shall furnish
the raquirameF4ts of the H. C. Depa-rt en't ®f Natural 6Rnd
Economic RGSOUat ce5.
The plate; slh all< co Lain the following infox-mmtiona
tea er -We"ll and Pump Company
RegAatT.attion Number 000
Raleigh W. C.
Date Completed .�19 --
Screen
t®
Gravel Intertval o to
Static Water Laye t Date
Yield - s����u�s on,
Specific Capacity� - - vpm/ft.dd
1. rIIv c l -UP
s contractor IQzva the site in good conelition. All.
Paa Pmf,,,,s and debris shall be disposed of to the satisfaction
faction
Of the Engineer and Owmer.
12. 2UAYTIT, IES AND PAYMENT
The estimnted quamti-ties givens oil the !eorz of Pr,,zposals (Special
PTOvi3 ions) shall be used to evaluate proposal r'ece-3.vsd
will be made can the basi3 of the unit pvice fa.r each itaz.
These tmi$ pTicss mhni l include �ayRent for f:Al i nciC-11antal work
cone-eted with the itemn
TS -9
7. WELL DEVELOPMENT
After drilling, casing and Zrauti.7ng operations have been com-
pleted, the con-tractor shall prcparly develop they wall. The
development small includa the removal of all for-ration cutting;
and mue-., all drilling flinids, and any formation materials from
the *a-&ter bearing zones wiii ch Puny enter the well cjhaen purged
within the 11mits ®f the repowted yield.
6. WELL TEST FOR YIELD ARD DROIDONRI
The contractor shall test the wall for cap city by they pumping
method, using the top of they casing for a re feresice Point.
The peep small conforn to the requirariean'te set fc,'o h under
Pare-graph 29 (Equip Bern$)
This test shall be performed for a 24 incur in continuous
oiler atio n and results submitted t® the Engineer in proPer
form as required by the H. C. Department of Human Resources
and the H. C. Dap&rtmentc of Natural and Economic Resources.
S. WELL SLAB
After drilling operations and well. tests have been completed,
the contractor shall constwuvt the well slab in ancordance
with the details included on the drami.rng in the Appendix.
The slab shall be 81 L, $t with special attention to drainage aG
indicated thereon. it shall be constructed o 3010 psi concrete
with 4 1/2 per cunt air enty aiwae nt
TS
Drilling f IUIdS viev. be Obtained. from StrOWW ad-jacent -"L-O
-the Site.
All ovw-.b=-den zones and wateiz-bearing zonevs c6ntriisijing xlon-
pot able water ohall be cased and cemented off.
The wall shall be caeed 12 _-Inches iplta kciperv'r-ous strata, but.
not less than 20 feet tram the ground surface,, The top of the
casing shall be left at least 2Z inches above the surface..
Xf Uater is encount-G-Oad during drilling operations, operations
Shall -be Stowed until tile gnantity of was can be datermift's-6
and o3-,�Ea.pled.
A'Coynplete log OE th"p; eq—z-jIliang open?ation bu, ,.cept by the
coatnac-L.Or and submitted to the Engine-ex. in 4--yped Norm. Drill
SaMr:.ISS SIU13.2, bia submitted tzo the ',IYIortJ-x ca.-calinya Depart-
ment of Matural and Zconomic Resources as required.
CLSING
Casing used in the vuell construction shall he new 6-inch
(nom-IMI) standard s wiless casing meei-Aaig TUSTH-A.9819-70 specift.-
cations :F.r--)r W.,ater "Nall Casing, heving a weight. of la.977
pounds per. The casing may i4a-ve either threaden-61 or weldeA
connections,.
5. ALIGNME NT
The well shall be aonstxuctee-1 -vartically, and botlh v"'ZIII and
I M% -Y.
Casing shall be tzrue to - -ii-* to a. shaft in v.'A d.ch a.
aonventional submersible turbline. pump can be installsd -without
deviations in aligiun nt %ehich w�ould cause uns;atisf sac qmip installa 1,1011.
h LZ
Tests for Plwdbness and alig.nment shall be iwAde_ by t- e. Conl" actor
4
befo.-e acceptance by �-.Ihe Bngineey:.
6. GROUTING
`Rhe anirular space, bai:weerj -;.-h,e c,-.1sing and fo.,cma.tio-.n _-halll be,
completely filled with caoxnent gront. ThiF aygiular space shall
be a-%'- least 2. 'L/2 inchcis greatt"B"r than the cents de di.-ameter �f
th couplings.
Grout Shall consist- Of 'a neat Ce"Mant mixutre OZ, not !_r)Dre than
5 1/2 gallons of wztaar par bag of' -postland convent.
The grout shall be pumped -Into pluace tkW- #-')U9h elctened
to U-te bottom of the space,, , The grout pipe may :O-e r:!nI.Sed as
the Sprout is -rapplied I'vt it emu;st --remain sub-tiiercjed du,ring the
application.
TS - l
TECHNICAL SPECAPMVEXO S
1. GEMERK AL
The Contractor shall construct a well at a point designated
as "Wall Site No. 1119 and, at the option of the Owner at
addi.tiognal points designated as ���Pe4� Site No. 211 and rr 3".
The exact point Zvi ll he stipulated by the Engineer prior to
Isobi.lrzation. Sites av a shouni oil the drawing entitled "Well
Site Locations" enclosed in the envelopa of the near" cover.
Dvilli.ng operat"lons will continue to no Hoge than plus 25%
of the quantity listed in the Pvoposal without authorization
of the Owner and/or the Engineer.
2. EQUIPS°ENT
The .Contractor shall provide one (1) complete air-rotary
l.dr ling unit and all other equipment and experi en wed personnel
necessary to conduct efficient drilling operations. The drill
unit shall be in good condition and of such capacity as to
drill a hose to the app°coxi.mate depth as listed on the bid
schedule, without difficulty. The contractor 4:211a71 provide
all materials, tools, drilling equipment, access<ar,p os 9 water,3
cement, fuel, power, lighting and all Esther mate izls and
services necessary :for the satisfactory completion of any and
all work required under these specifications
`rhe Contractor shall also furnish and install nece -s ry test
Pumping equip�,=t capable of pumping tnater from Lh s well and
discharging it at l.erst two feet (2 1 ) above the tc,�, of theb. well
casing. nlis test pumping equipment shall have a 3a a i sfactory
throttling device, so that the discharge may he Teduced from
a ma-2.imum of Lifty (50) gall.ona par min Ate to a i-Animix-n of ten
(10) gallons per minute.. Electricity is not available at the
hell sines; therefore, the pmping equipment shall include
a power unit of ample power, and accessories , required to
operate the pn°F.-ip at the afor asaid rate of di schar:Igc fro a con-
tinuous and uninterrupted period of not less than troen ty—foam
(24) hours. Compressed air sha11 not be used fav rouyitpi.ng
during drawdotm tests.
3. DRILLING PROCEDURE
The well shall b� constructed in conforiza nce with the regula-
tions of the H. C. Department of Hummn Resoera aa, s a,�A the 14. C�
Department of Natural and Econ mic Resources, as
fore an open-egad. well, all as slhow-n on the details shown on the
drawing included in the Appendi z entitled "Details of Open End
Well".
WELL NO. 3
Estimated Unit
quanja.ty Unit Price Amount
1. Price for drilling and W � �...
casing overburden to ssuit-
able roek including well
slab, complete, as shown
and specified, so felt
2. Price for drilling to
Water bearing strata (open-
4
and specified, 200 feet
3. Price for developing well,
completes as sho�m and y g+
sp6�a�fled, LU.cS e
4. Price for testing yield
and draw—deem, complete, as
shown and specified, L.G
TOTAL. - WELL NO. 3
TOTAL - ALL 8 WELLS
Respectfully submitted;
(Title)
attest: Registration Number
By.
.
Title: Corporate Seal.
--------------------------------------------------------------------
ACCEPTED (Date)
Ridgecrest Hapti st Con e:oenice Center
the Baptt-i6t Sunday Schoo.a 3oard
Nashville, Tennessee
Witness
(by) �-
Title
SP 4
WELL NO. 3. Estimated Lrait
Q Uz R% Unit Price Amount
I. Price for drilling and
casing overburden to suit-
able rock including wall
slab:, complete 1, as Shatm
and specified, 30 feat
2. Price for drilling to
water bearing st.Tata (open-
dmd wall) complete.2, as shown
and specified, 200 feet
8. Price fox, develo�ing well.,
complete, as s1hoznq and
specified,
114,a Price for ta8ting yield
and draw-down, coorpleteA
as shown and st.-eciftedj, L.S.
TOTAL, - IVELL NO. I
IMUR NO. -2
1. Price for dri'21ing and.
casing overburden to suit-
able rock including well
slab,, complete.,, as ahotm
and apscifiad5 30 feet
2. Price for drillb)g to
water bearing ptrata (open-
end well) complete, as shown
&nd specified5 200 feet
3. Frice for developing 7,;ell'
con-plote, a.s- sho-un end
specified, L.S.-
4's Price for testing yield
and draw-dorm, complate,
as showni mid specified, L. S.
TOTAL - WELL NO. 2
SP - 3
7. SAFETY
The COntrEctOL- Will bc-t 801elY 100-sponsible for all safety re-
quirzm-3Ynts as set forth under the Occupational Safety and
Health Act COSHA) .
2. MINE OF COMPMMON
Each bidder shall Gtate in his PVOPoodl the tine raquired for
co,mpletion of th-a work. This will be a nertinant factor in
evilluation bids.
9. FOM OF PROPOSAL
Each bidder shall cub2mit his pro�
in duplicat,.,a , on his
Xetterheadq in the following fol-m. (using the listed quanti-
(LETTERHEAD)
TO: Paul TuT-sinr
Special Projects supervit-or
Property ?Ianagement
F. 0. Box 210
Ridgecioeat� Novth Caznolina
PROPOSAL FOR WELL CONSTRUCTION
-ViCE C.E.MUM
BU."IM01MIE COUNI-Vt IM70RUI UIROLINA
Puvsuant to your invitation to submit a proposal fo.-o the con-
s trvuction of t,hrae (3) wells at Ridgearmst Baptist 0onference
Center, Ridgecrc�st, North Carolina, and all rc-
.71 -
quiraments rc-ardin-, sane, including the Ovyrierl,, o.,?--hZ.-ion to
construct (at this ti,-me) either one, two, or thpee wells,
this fir-m suhmml-tI,. the ffollowing Dvices:
i
gp v2
G. INSURANCE
The Corn':Wasctorr shall not commence work evader this contract
until he has obtained all insurance required, and such insur-
ance has been approved in writing by the Owner, nor shall the
Contractor a.11ou any sub-contractor to commence work on his
sub-contract until all s:bnillar insurance required of the sub-
contractor has been so obtained and approved.
(4a) Worlcmenla Compensation
The contractor shall, table out and maintain during the life of
this contract Wgrlana n s s Compensation Insurance for all eruployees
employed at the site of the project under axis contract.
(b) Public Liability and Property Damage
The Contractor shall take out and maintain during the life of
- this contract such Public Liability and Property Damage. lnvur-
sage as shall prrottct him and any sub-contractor performing
e�ovk covered by this contract,, f:,,om claims for damage for
p rsonal in iuvy, including accidental death, as well as froyn
claims for property damages which may arise from operations
under this contract, whether such operation by himself or
by any sub-contiactor, or by anyone directly or indirectly
employed by either of theca and the amounts of such insur"a ee
shall be as follows:
Public Liability _nsurrance in an am-ount not lass than $100400
for injuries, including accidental death, to any ozn, Werson
and subject to the same limit for ea6h persona, in ars - amour't
not Ness than M0,000 on account of one accident; and Property
Damage Insurancein an amount not less than $5 0,0 00 f�.10®9 0 U 0.
(c) Gtiner Insurance
The Contractor shall . furnish such addiLtional i nsu ranca as may
bo required by GeneralStatutes of North Carolina, inclueling
- actor vehicle insurance in amounts not less than statuto:3Y limits
(d) Cancellation
Each Certificate of Insurance shall bear the provision tbat
the policy cannot; be cancelled,, redVecd in anount o:z co•.:oar nge
e�.imi>n,ated in less than five (5) days after mailing written
notice to th.a insured and/or the ®riser of such alteration or
cA ncellatioyn, sent by registered mail.
- (a) Proof of Carriage:
The Contractor shall fuvnish the Owner with sec ,factory proof
of carriage of the insurance required before writtcn approval
-, of such ixnsurraxncc is granted by the Owner.
i
SPECXAL PROVISIONS
1. SCOPE OF TOORK
The scope of the work under this contract shall include the
furnishing of all laboYh, materials, equipm-ent, and gther
incidentals necessary to constru&3t 'three (3) wells on the
property of Ridgecrest Baptist Confarence Center, R-idgecrest,
Buncombe County,, 11"Jorth Ca-wolina.
The uork shall include drilling, casing, surging, and testing
Operation Zor each wiall, all in accordance, with -the rl; guja-
tions of thim- NOXIVI carolk-al'a Deaartnavt of, HIIA-aan Ilw-aource'z; and-
the Departzippt of Naturvl and l3conom'ic Resotwoes, om cj as shozvm,
on, the dra;w-ings included in the Appendix and as deocribed
2. LOCK71ON OF PROJECT
The site& a:re located p)� the prownty of Aidgecrest, Dap tizt
confe.ronce centow, Aidgecrestv North carplim, as sho"M on
the a!icinity Map included in the Appendin of t1lese documen' ta.
3. PERMITS
All. Permits required by the North Carol3ina Departmantz o:f
Hunan Resources and Hatuval site EcopicAl.c. Recati-r-ces fo'r wall
construction n O
ill be secured by tht we��. The Coqtracto?.,
trill be raspon3ible for all other permits and 11ceRT386 as
L
may be required, including wall tests.
4. tXAHIWATIOH Q.? CONDITIONS
The submisa�:.pn of a bid will asswe that the ContrG4ctor bas
fully examined -the site and knous exieting conditions and
hao made every provisinn for oparation under exiot.tIrIg conditio-,-,p,,,
and has included all nracessary itemst;
5. DEFXWXTIONS
(a) Contrapt Document@ consist of the Invitation, trD Biddera,
Proposal, Special Provisions, Tachnica.l SpeciA--ications,
DrawSlngs and all addenda, bonds, insurance, and other
documents Rn raquired.
(b) The IlOwner" is that Ridgecrest Baptist Confore-_.-iA2e Center
of the Baptist Sunday School Board, Hashville, Tennessee.
(c) The "Engineer" is the fixm of Vlathef;an, Hintz --ind Associa-
tion, lytc. 2 or their author.ized
The "Contrac:toT'I shall menn the IIPa�oty ()f the ;:?irst PELV-t-"
of the con-tvact.
19VITATION TO BIDDERS
The Ridgecrest Baptist Conference Center will raceive
proposals on or before for the
iurnishing of all ana-e—OU-MPM-Glit to
construct three (8) wells foT potable water supply.
Well co-ntr,-x(.-.:torts a-ra, has ebb notified that they miust hmv�
prop,ar Certificate of Registration under North CaTiolina
lxvrs governing the construction trade.
Proposes is must be submfitted on the bidder's letterhead,
in duplicate, and must be in the �orma included in -the
Special. Provisions of these doctureiits.
Payment will be made in full only upon the complat-ion Of
each well and acceptcutee of thelwroxrl: recjui ed therafore.
Insurance coveraga, is comply uith voquirements oat forth
in the Special Provisions.
The Owner reserves the right to reject a-TINY oil all prapasals,
or to accept a proposal for one, two, or three walls, and
to waive infor-ftalities.
Signed:
/&JL d_t�l
Special Pro-lectf Supervisor
Property Managenont
P. 6. )3oN 218
Ridgecrest5 Nort�- Carol-Laa
I
VIe l Construction
Bunca.,albe County C.
PALL TLTRENER
SPECIAL PROJECTS SUPERMOR
Consulting Engineers
Route 29 Bo , 206
Flee e-0, M. C. 28732
CAR
�O —7
Pdo. 3133
PROFESSIONAL
Ire—
ATH�