HomeMy WebLinkAboutWQCSD0455_Complaint Inspection_20190325DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
ROY COOPER
Cow -mar
K41C IAEL S. REGAN
Serrermy
LINDA CULPEPPER
Dip f toy
Randolph Cooper, Manager
Cedar Beach RWC Commercial, LLC.
109 River Landing Dr., Suite 100-B
Daniel Island, SC 29492
NORTH CAROL INA
Environmental Quality
March 25, 2019
SUBJECT: NOTICE OF DEFICIENCY
Tracking Number: NOD-2019-PC-0072
Permit No. WQCSD0455
Cedar Hill WWTP
Jackson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Cedar Hill WWTP on February
27, 2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions
and limitations specified in Collection System Permit No. WQCSD0455. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Complaint inspection was conducted by Division of Water Resources staff from the Asheville Regional
Office. The following deficiency was noted during the inspection:
Inspection Area Description of Deficiency
Performance Standards LS#2 was inoperable at the time of the inspection and had overflowed. Per 15NCAC
02T.0403 they system shall be effectively maintained and operated at all times to
prevent discharge to land or surface waters.
North CaroiinaDepsrtmentof -EnvironmentaiQuaiBy I OivisianofWsterResouroes
AshevO— Reg?onalOffsce 1 2090 U.S. 70Wgimay I Swaaoanos, North Csroim 23773
82325fi-45DO
DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. To prevent further action, carefully review these deficiencies and address the causes of
non-compliance to prevent the recurrence of similar situations.
If you should have any questions, please do not hesitate to contact Mikal Willmer with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4500.
Sincerely,
DocuSigned by:
7E617A38285848C...
G. Landon Davidson, P.G., Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
EC: WQS-ARO Server
LF
G:\WR\WQ\Jackson\Collection Systems\Cedar Hill\Inspections\Feb. 27, 2019\20190325_WQCSD0455_NOD2019PC0072
North CaroiinsDepartmentof -EnvironmentalQusiBy I -D111sionofWater Resouroes
Asheville Regional Mim 1 2090 U.S. 70Kighwsy I Swaaaanos, North Csrolina M773
��'� S2S�JG�500
DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
Compliance Inspection Report
Permit: WQCSD0455 Effective: 07/29/09 Expiration: Owner: Cedar Beach Investment Group LLC
SOC: Effective: Expiration: Facility: Cedar Hill WWTP
County: Jackson Cedar Hill
Region: Asheville
Cashiers NC 28717
Contact Person: Cody S Jones Title: Phone: 843-224-7260
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/27/2019 EntryTime: 10:OOAM Exit Time: 11:30AM
Primary Inspector: Mikal Willmer Phone: 828-296-4686
DS
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Complaint
Permit Inspection Type: Deemed permitted collection system management and operation
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Miscellaneous Questions Performance Standards
(See attachment summary)
Page 1 of 4
DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
Permit: WQCSD0455 Owner - Facility: Cedar Beach Investment Group LLC
Inspection Date: 02/27/2019 Inspection Type : Complaint Reason for Visit: Routine
Inspection Summary:
Inspector Mikal Willmer with the Asheville Regional Office conducted a complaint inspection of the collection system that
services the Cedar Hill Community on February 27, 2019. This inspection was conducted in response to our office being
notified on February 26, 2019 of the inoperability of one of the three lifts stations that service Cedar Hill. This notification
followed a recent power outage of the WWTP and lift stations due to lack of payment. Mike Beck, with RPB Systems,
visited lift stations #1 and #2 with me during the inspection.
As required by GS 15NCAC 02T.0403 the system shall be effectively maintained and operated at all times to prevent
discharge to land or surface waters.
During the compliance evaluation inspection conducted on December 17, 2018 at least one of the lift stations had only one
operable pump. The inspection report recommended the inoperable pump be replaced as soon as possible. Correspondence
with RPB Systems indicates request to replace the inoperable LS pump were not approved/addressed at the beginning of
December 2018. At the time of the complaint inspection, LS #1 had only one operable pump and LS #2 was no longer
operable and overflowing. Since the site visit, RPB Systems reports they have received approval to replace one pump within
LS #2. This work was reportedly completed the first weekend in March 2019; however, to date, duplex lift stations 1 & 2 are
only operating with one working pump. The lift stations have onsite backup generators; however, there is limited storage
capacity should the only operable pumps in each lift station quit working. This creates an increased risk for repeated
overflows.
These deficiencies should be addressed as soon as possible to bring the system back into compliance with 15NCAC.
02T.0403.
Page 2 of 4
DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
Permit: WQCSD0455 Owner - Facility: Cedar Beach Investment Group LLC
Inspection Date: 02/27/2019 Inspection Type : Complaint
Reason for Visit: Routine
Performance Standards
Yes No NA NE
Is Public Education Program for grease established and documented?
❑
❑ ❑
What educational tools are used?
Is Sewer Use Ordinance/Legal Authority available?
❑
❑ ❑
Does it appear that the Sewer Use Ordinance is enforced?
❑
❑ ❑
Is Grease Trap Ordinance available?
❑
❑ ❑
Is Septic Tank Ordinance available (as applicable, i.e. annexation)
❑
❑ ❑
List enforcement actions by permittee, if any, in the last 12 months
Has an acceptable Capital Improvement Plan (CIP) been implemented?
❑
❑ ❑
Does CIP address short term needs and long term \"master plan\" concepts?
❑
❑ ❑ ❑
Does CIP cover three to five year period?
❑
❑ ❑ ❑
Does CIP include Goal Statement?
❑
❑ ❑ ❑
Does CIP include description of project area?
❑
❑ ❑ ❑
Does CIP include description of existing facilities?
❑
❑ ❑ ❑
Does CIP include known deficiencies?
❑
❑ ❑ ❑
Does CIP include forecasted future needs?
❑
❑ ❑ ❑
Is CIP designated only for wastewater collection and treatment?
❑
❑ ❑ ❑
Approximate capital improvement budget for collection system?
Total annual revenue for wastewater collection and treatment?
CIP Comments
Is system free of known points of bypass?
❑
❑ ❑
If no, describe type of bypass and location
Is a 24-hour notification sign posted at ALL pump stations?
❑
❑ ❑
# Does the sign include:
Instructions for notification?
❑
❑ ❑ ❑
Pump station identifier?
❑
❑ ❑ ❑
24-hour contact numbers
❑
❑ ❑ ❑
If no, list deficient pump stations
# Do ALL pump stations have an "auto polling" feature/SCADA?
❑ ❑ ❑
Number of pump stations
3
Number of pump stations that have SCADA
0
Number of pump stations that have simple telemetry
3
Number of pump stations that have only audible and visual alarms
3
Number of pump stations that do not meet permit requirements
2
# Does the permittee have a root control program?
❑
❑ ❑
Page 3 of 4
DocuSign Envelope ID: 4A017A2A-6C45-4153-B8B9-790372908E64
Permit: WQCSD0455 Owner - Facility: Cedar Beach Investment Group LLC
Inspection Date: 02/27/2019 Inspection Type : Complaint Reason for Visit: Routine
# If yes, date implemented?
Describe:
No root control program. Contract operating firm helps maintain system lines.
Comment: In the previous inspection it was noted at least one of the duplex lift stations had only one
operable pump. Complaint visit was initiated due to lift station #2's operable pump going down
and no response received previously regarding repair requests.
Page 4 of 4
Docu5�".
6 S E C U R E D
Certificate Of Completion
Envelope Id: 4A017A2A6C454153B8B9790372908E64
Status: Completed
Subject: Please DocuSign: 20190325_WQCSD0455_NOD2019PC0072.docx, 20190325_WQCSD0455_NOD2019PC0072.inspec...
Source Envelope:
Document Pages: 6 Signatures: 1
Envelope Originator:
Certificate Pages: 2 Initials: 1
Mikal Willmer
AutoNav: Enabled
217 W. Jones Street
Envelopeld Stamping: Enabled
Raleigh, NC 27699
Time Zone: (UTC-05:00) Eastern Time (US & Canada)
Mikal.willmer@ncdenr.gov
IP Address: 149.168.204.10
Record Tracking
Status: Original Holder: Mikal Willmer
Mar 26, 2019 1 08:14 Mikal.willmer@ncdenr.gov
Signer Events Signature
Mikal Willmer DS�
mikal.willmermer@ncdenr.gov
Environmental Specialist
North Carolina Department of Environmental Quality
Security Level: Email, Account Authentication Signature Adoption: Drawn on Device
(None) Using IP Address: 149.168.204.10
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
G. Landon Davidson
landon.davidson@ncdenr.gov
Asheville Regional Office, Regional Supervisor
DEQ, Division of Water Resources, Water Quality
Regional Operatoins
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events
Editor Delivery Events
Agent Delivery Events
Intermediary Delivery Events
Certified Delivery Events
Carbon Copy Events
Notary Events
Envelope Summary Events
EDI-Signld by'
7E617A38285848C...
Signature Adoption: Uploaded Signature Image
Using IP Address: 149.168.204.10
Signature
Status
Status
Status
Status
Status
Signature
Status
Location: DocuSign
Timestamp
Sent: Mar 26, 2019 1 08:15
Viewed: Mar 26, 2019 1 08:15
Signed: Mar 26, 2019 1 08:15
Sent: Mar 26, 2019 1 08:15
Viewed: Mar 26, 2019 1 08:17
Signed: Mar 26, 2019 1 08:17
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamps
Envelope Sent Hashed/Encrypted Mar 26, 2019 1 08:15
Certified Delivered Security Checked Mar 26, 2019 1 08:17
Signing Complete Security Checked Mar 26, 2019 08:17
Completed Security Checked Mar 26, 2019 08:17
Payment Events Status Timestamps