Loading...
HomeMy WebLinkAbout240100_30 day Plan of Action_20180612PLAN OF ACTIO (Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number:toble 2 y — (m 0 County: Columbus Facility Name: �Butlle� certified operator Name: Operator Number: 19252 1. Current liquid level( in inches as measured from the current liquid level in the lagoon to the lowest point on the top f the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bo m of the spillway for lagoons with spillways. 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Spillway(Y or N): Level(inches): 2. Check all applicablej items Liquid level `!!s within the designed structural freeboard elevations of one or more structures. Five and 3dday Plans of Action are attached. Hydraulic and agronomic balances are within acc4table ranges. X Liquid level lis within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is tot be pumped and hauled to off site locations. Volume and PAN content of waste to be pumptd and hauled is reflected in section III tables. Included within this plan is a list of the pro sed sites with related facility numbers, number of acres and receiving crop information Contact and secure approval from the DWO prior to transfer of waste to a site not covere� in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a cmpto belete sch*ifedule with corresponding animal units and dates fro depopulation ' animals removed to another permitted facility, provide facility number, lagoon freeboard 1 vets and herd population for the receiving facility 3. Earliest possible dIte to begin land application of waste: 6/19/18 Weather permitting. 1 hereby certify that 11 have reviewed the information listed above and Included within the attached Plan of Actn, and to the best of my knowledge and ability, the information is accurate and correc Phone: 910-918-3714 ��'�F////a��,�cil'�ity Ov�ner/Mona er (print) Billy C. Butler Date: 6/12/2018 FlAilitv Owner/Manager (signature) Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in to Sam Edward on 6/12/18. if. TOTAL POUNDS Cif PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVAT16NS IN ALill WASTE STRUCTURES FOR FACILITY 1. Structure ID: �07-24) line m = 794.7 lb PAN 2. Structure ID: line -m = lb PAN 3. Structure ID: f line m = lb,PAN 4. Structure ID- line m lb PAN 5. Structure ID, i line m = lb PAN 6- Structure IN line m = lb PAN 'Ines DOW Ill. TOTAL PAN BALA 10E REMAINING FOlk AVAILABLE CROPS DURING 30 DAY DRAW q. crop �2 PAN banhance (Iblacre) �coluinn FIELD r x s u7pplicationwina3w Bermuda Grazed 11111YXIII, Ma V. I Mal IV. FACILITY'S PoA w. Total F x. Crop's y. Overall AIM avall4gifu lug VERALL PAN BAU N to be Ian' d applie -maining PAN balai 'AN balance (w - x) i (line n from section 11) = * (line v from section 111) J I. TOTAL PAN TO BE �ND APPLIED PER WASTE STRUCTURE 1. Structure Na t elldentifiei• (ID): I Double B (17-24) 2. Current liquid volume in 25 yr.124 hi. storm storage & structural freeboard a current liquid level according to marker 17.0 inches b designed 25 yr./24 h. storm & structural freeboard 19.0 inches line b - line a (inches in red zone) = 2.0 inches s top of dike surface aflea according to design c. (area at below structural freeboard elevation) 157136n2 i line ell x line d x 7.48 gallons/ft' 195896 gallons 3. Projected v lume of waste liquid produced during draw down period temporary`, storage period according to structural design i80 days t volume of waste produced according to structural design 193851.3 ft3 current herd # 1 58801 certified herd # 5880 actual waste produced = current herd # x line g = 193851 ft' i certified herd # volume of wash water according to structural design fts excess rainfall over evaporation according to design 94791.7 ft3 (lines h + i + j) x 7.4, x 30 dayslline f= 359842 gallons 4. Total PAN W be land applied during draw down period I. current Waste analysis dated 5/23/2018 1.43 . ((lines e + k)11000) x line 1= 795 lbs. PAN REPEAT SECTION I �OR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) i t , 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (_farrow to finish) x 1417 0 sows (farrow to feeder) x 522 3-880 head (finishing only) X 135 0 sows (farrow to wean) x 433 head (wean to feeder) x 30 Describe other 0 0 793800 0 0 Total Average Live Weight = 793800 I volume of waste produced: 1793800 lbs ALW/135 x 1.37 gal/day I a450008 gal or 193851 cu. ft 180 days excess rainfall = 7.0 —inches Volume = 7.0 inches DA/12 inches per foot ,volume = 91662.7 cu ft 180 days