PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD -
STRUCTURE
I. TOTAL PAN TO BE -LAND APPLIED PER WASTE
1. Structure name/Identifier (ID): � Brent Watts lagoon 1
2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard
a. current liquid level according to marker
18.0 inches
b. designed.25 yr./24 hr. storm & structural freeboard
2C 0 inches
o. line b - line a ,(inches in red zone) =
2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
141050 ft2
e, line c/12 x line d x 7.48 gallons/ft3
1gallons
3_ Projected volume of waste liquid produced during draw down period
f.,temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
1 161410,9 ft3
h. current herd # 4896 certified herd # 4896 ;
actual waste produced = current herd # x line g =
161411 ft3
certified herd #
i. volume of wash water according to structural design
_�Oft3
j. excess rainfall over evaporation according to,design
- 82279 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f=
303800 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated APR 2018
3.03 Ibs/1000 gal.
T..((line"s e + k)/1000) x line I =
145S.3 Ibs_ PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below) ,
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL. FREEBOARD AND/OR 25 YR,124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure Brent Watts lagoon 1 line m 1453.3 lb PAN
2_ Structure ID: line m lb PAN
3• Structure line m = lb PAN
4. Structure line M = lb PAN
5. Structure line m -- lb PAN
6. Structure line m = lb PAN
. n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1453.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO
NOT LIST FIELDS TOWHICH 'PAN CANNOT BE APPLIED DURING
THIS 30
DAY PERIULI.
o. tract #
6550
p, field #
6
q, crop
6ermudagrass
r. acres
11.60
s. remaining'
IRR-2 PAN
balance Qb/acre)
50.25
L'TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x a
' 1742.9
u. application windows
Mar --Sep
...,...,.,.
rintca nr niwt
rrnn innlirntinn
beoinnina date
for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1742.9 Ib. PAN '
IV. FACILITY'S PoA OVERALL PAN BALANCE
W. Total PAN to be land applied (line n from section II) _ 1453.3 Ib. PAN
x. Crop's remaining PAN balance (line v from -section III) - 1742.9 Ib. PAN.
Y. Overall PAN balance (w - x) = • -290 Ib. PAN
POA (30 Day) 2/21 /00 '