Loading...
HomeMy WebLinkAbout240108_30 Day POA_2018080255M Braidon Road Hope Mills NC 28348 Fax Faxi _ Phom - r *0 From r Gallberry Consulting Services N4 Y,-- I o F? Ta4.ee� .e 0 IZ I zz PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD - STRUCTURE I. TOTAL PAN TO BE -LAND APPLIED PER WASTE 1. Structure name/Identifier (ID): � Brent Watts lagoon 1 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed.25 yr./24 hr. storm & structural freeboard 2C 0 inches o. line b - line a ,(inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 141050 ft2 e, line c/12 x line d x 7.48 gallons/ft3 1gallons 3_ Projected volume of waste liquid produced during draw down period f.,temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 161410,9 ft3 h. current herd # 4896 certified herd # 4896 ; actual waste produced = current herd # x line g = 161411 ft3 certified herd # i. volume of wash water according to structural design _�Oft3 j. excess rainfall over evaporation according to,design - 82279 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 303800 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated APR 2018 3.03 Ibs/1000 gal. T..((line"s e + k)/1000) x line I = 145S.3 Ibs_ PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) , PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL. FREEBOARD AND/OR 25 YR,124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure Brent Watts lagoon 1 line m 1453.3 lb PAN 2_ Structure ID: line m lb PAN 3• Structure line m = lb PAN 4. Structure line M = lb PAN 5. Structure line m -- lb PAN 6. Structure line m = lb PAN . n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1453.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TOWHICH 'PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIULI. o. tract # 6550 p, field # 6 q, crop 6ermudagrass r. acres 11.60 s. remaining' IRR-2 PAN balance Qb/acre) 50.25 L'TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x a ' 1742.9 u. application windows Mar --Sep ...,...,.,. rintca nr niwt rrnn innlirntinn beoinnina date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1742.9 Ib. PAN ' IV. FACILITY'S PoA OVERALL PAN BALANCE W. Total PAN to be land applied (line n from section II) _ 1453.3 Ib. PAN x. Crop's remaining PAN balance (line v from -section III) - 1742.9 Ib. PAN. Y. Overall PAN balance (w - x) = • -290 Ib. PAN POA (30 Day) 2/21 /00 '