Loading...
HomeMy WebLinkAbout20190259 Ver 1_401 Application_20190218��l Transmittal Letter Date: February 11, 2019 Project Name: Broadway Townhomes ACE Project: 1775 To: NC Division of Water Quality,WBSCP Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1650 Attn: Andrew Moore cc: Via Mail Overnight Hand Delivered X Pick up @ ACE Office ____ Co ies -------------- Date_______ 5 02/11/19 ---------------------------------------- 5 02/11/19 ---------------------------------------- 3 02/11/19 ---------------------------------------- 2 ---------------------------------------- 02/11/19 1 02/11/19 REMARKS: 34 Big Bear Trail Asheville NC 28805 Phone: 828-545-5393 www.aceasheville.com Description --------------------------------------- ------------------------------------------- PNC Form --------------------------------------------------------------------------------------------- Set of Agent Authorization Forms --------------------------------------------------------------------------------------------- 11x17 Reduced Size Plan Sets --------------------------------------------------------------------------------------------- 24x36 Full Size Plan Sets --------------------------------------------------------------------------------------------- Check for $240.00 --------------------------------------------------------------------------------------------- By: Kathleen Penland ---------------------------------------------------------- r W A rF'q 111-J_�7� plqiii�< Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3, 27 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑X Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Rowhouse Development 2b. County: Buncombe 2c. Nearest municipality / town: Asheville 2d. Subdivision name: Rowhouse Development 2e. NCDOT only, T.I.P. or state project no: Fn/—a 3. Owner Information 3a. Name(s) on Recorded Deed: Boulevard Development Group, LLC; Broadway Bulls, LLC 3b. Deed Book and Page No. 4161/1930; 4575/0398 3c. Responsible Party (for LLC if applicable): Boulevard Development Group, LLC 3d. Street address: Broadway Street 3e. City, state, zip: Asheville, NC 28801 3f. Telephone no.: 828-242-5437 3g. Fax no.: 3h. Email address: kevinskerr@gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Mike Anderson, PE 5b. Business name (if applicable): Advantage Civil Engineering, PA 5c. Street address: 34 Big Bear Trail 5d. City, state, zip: Asheville, North Carolina 28805 5e. Telephone no.: 828-582-8970 5f. Fax no.: 5g. Email address: manderson@aceasheville.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 9649-32-0816; 9649-32-1627 1 b. Site coordinates (in decimal degrees): Latitude: 35.601603 Longitude: -82.556248 1c. Property size: 1.51 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Reed Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing lot is partially graveled and used for overflow parking in an urban setting. There is approximately 105 LF, of failing culvert outfalling into a deteriorated and eroding creek bed at the head of Reed Creek. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 482 3d. Explain the purpose of the proposed project: The project proposes to build 20 townhomes with parking, repair and replace the existing culvert and rehabilitate a portion of Reed Creek. Remove and replace 107 LF of failing concrete box culvert and extend an additional 122 LF all with 10' structural arch culvert. A large excavator and coffer dam with pump will be used during construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? 0 Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. On 03/26/08 DWQ received an incomplete application for this project, DWQ #08-0349. It is our understanding that the submittal was never completed. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert Reed Creek PER Corps 10 122 S2 P Replacement Reed Creek PER Corps 10 107 S3 P Stabilization Reed Creek PER Corps 10 350 S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 579 3i. Comments: Remove and replace 10 LF of failing 10' wide, hand -built box culvert with 10' structural arch culvert and extend an additional 122 LF. The remaining 350 LF of Reed Creek is to be rehabilitated. Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Tem ora T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Permanent impacts are being minimized by limiting the scope of culvert installation to replacing the existing failing culvert and limiting the culvert extension to 122 LF at which point the existing Reed Creek can be rehabilitated.. The proposed area of impact is limited to existing culvert and existing eroded creek bank areas that will be improved by this project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction will be done in a timely manner and follow all erosion control measures required to minimize and avoid impacts where possible. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form —Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes OX No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 54 2b. Does this project require a Stormwater Management Plan? 0 Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Local (City of Asheville) regulations require a stormwater management plan. Water Quality and Detention of the storm water runoff will be provided through an underground storage and treatment system. 2e. Who will be responsible for the review of the Stormwater Management Plan? Mike Anderson, PE 828-582-8970 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Asheville ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs USMP apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes Q No attached. 4. DWQ Stormwater Program Review ElCoastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs applyHSession ORW (check all that apply): Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes Q No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes © No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes © No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater from the protect will be collected in a public sewer extension to be owned and operated by the Metropolitan Sewerage District of Buncombe County. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑X No -T 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife Online Mapping 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC DENR Mapping 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes © No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC Historic Preservation Office website 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Risk Information System website. Mike Anderson, PE Applicant/Agent's Printed Name - pIicant/Ag$ Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Department of the Army Wilmington District, Corps of Engineers Attn: Amanda Jones 151 Patton Avenue #208 Asheville, NC 28801 -and- NC DWR, 401 and Buffer Permitting Unit Attn: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 I, the current landowner/managing partner of the property identified below, hereby authorize Andrew Bick of Headwaters Engineering, PC to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Andrew Bick is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, 1 authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: Boulevard Development Group LLC Property Owner Address: PO Box 2239, Asheville, NC 28802-2239 Phone Number: 828.242.5437 Email address: kevinskem@gmail.com Property Location: Broadwav St.AshnillC 28801 — pircel id's below Owner/Managing partner Signature: Owner/Managing printed name: Kevin S Kerr Managing Member Date: 1.17.19 Parcel ID #'s: 964932081600000 964932047900000 964932151300000 964932167400000 964932168100000 964932253300000 Department of the Army Wilmington District, Corps of Engineers Attn: Amanda Jones 151 Patton Avenue #208 Asheville, NC 28801 -and- NC DWR, 401 and Buffer Permitting Unit Attn: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 1, the current landowner/managing partner of the property identified below, hereby authorize Andrew Bick of Headwaters Engineering. PC to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Andrew Bick is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: Broadway Bulls LLC Property Owner Address: PO Box 3966, Hickory, NC 28603-3966 Phone Number. 828.210.4699 Email address: kevinskerratmail.com Property Location: Broadway St Asheville NC 28901 — Parcel#964932162700000 Owner/Managing partner Signature: 4-4 4 Owner/Managing printed name: Dale K Cline, Member Manager Date: 1.17. l9 Department of the Army Wilmington District, Corps of Engineers Attn: Amanda Jones 151 Patton Avenue #208 Asheville, NC 28801 -and- NC DWR, 401 and Buffer Permitting Unit Attn: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 1, the current landowner/managing partner of the property identified below, hereby authorize Andrew Bick of Headwaters Engineering, PC to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Andrew Bick is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: Matthew C. Baldwin, Yael J. Goldman Property Owner Address: 41 Elizabeth Place, Asheville NC 28801 Phone Number: J 7/5- 17 6 Email address: �� I til., vv� r �` C/ow� Property Location: Owner/Managing partner Sig Owner/Managing printed nar Date: Department of the Army Wilmington District, Corps of Engineers Attn: Amanda Jones 151 Patton Avenue #208 Asheville, NC 28801 -and- NC DWR, 401 and Buffer Permitting Unit Attn: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 1, the current landowner/managing partner of the property identified below, hereby authorize Andrew Bick of Headwaters Engineering, PC to act on my behalf as my agent duringthe processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Andrew Bick is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, 1 authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: 28 Elizabeth Street Land Trust Property Owner Address: PO Box 18261 Asheville NC 28814 Phone Number: V L?/ Email address: Property Location: 45 E Owner/Managing partner Signature Owner/Managing printed name: Date: Department of the Army Wilmington District, Corps of Engineers Attn: Amanda !ones 151 Patton Avenue #208 Asheville, NC 28801 -and- NC DWR, 401 and Buffer Permitting Unit Attn: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 I, the current landowner/managing partner of the property identified below, hereby authorize Andrew Bick of Headwaters Engineering, PC to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Andrew Bick is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property, owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: Michael and Lauren Tomavo Property Owner Address: PO Box 1556, Asheville, NC 28802 Phone Number: Email address: Property Location: Lot on Elizabeth Place, Asheville, NC 28801 Owner/Managing partner Signature: / Owner/Managing printed name: Date: S 7, DEVELOPMENT DATA EASING ADJACENT PROPERTY LINE (TYP) OWNER/REVELOPER: BOIILFVMO DEVEIDPMENT GflOUP, LIC NOTE: CONMACTIM SHALL PROVIDE THE CITY OF PO80%2239 E ASHEVILLE, NC 28902 (INVERTS aAmm ON11m LAD YN TO INSIDE MODS) BROADWAY SINS, LLC (NVERis BASED D LENGTH 10 INSIDE WOES) POOO%3966 HKXOpY, K28603 COI KEVIN ICOR A, (8211)2423437 CML ENGINEER: AOVANTAGEGWLENGINEERING,P.A ale M BIG 9FAR TRAIL a ASHEVILLE, NORM CAROLINA 28805 CONTACT: MINE LOVOY, P.E. WV. IN 22110Y.JB 1..011 WV. WT 20911.011 Ia2s)545-5393 SURVEYOR: SANDERS WRVEWNG&MAPPING WATER MAN, SEWER MAN, ANO SR)WIWATER 510 AVENA ROAD PI BUCK MOUNTNN, NC 28711 CONTACT: SANDERS RM 2107.59 W. N 2,00.20 3.5r3 IBnwP 2m N 2+M NOTES 1. SEE GRADING, ER090N CONTROL, AND STORM DRAINAGE DETAIL SHEETS FOR ALL GENERAL NOTES, CONTRACTOR RESPONSIBLE FOR INCLUSION OF DETAILS SHEETS WITH ALL PLANS. 2. NO PORTION OF THIS PROJECT UES WITHIN THE 100 -YR FEMA FLOODPLAIN. 3. SOL TYPE B. PPE TABLE (suGPE5 BARB ON W L84M TO INSEE PIPE NAME I 912E J LENGTH &OPE EASING ADJACENT PROPERTY LINE (TYP) APER NOTE: CONMACTIM SHALL PROVIDE THE CITY OF STRUCTURE E SURVEY INFORMATION NO UNDERGROUND UTILITIES ARE (INVERTS aAmm ON11m LAD YN TO INSIDE MODS) SSS ACRES (NVERis BASED D LENGTH 10 INSIDE WOES) LOCATED ALONG PROPOSED WATER k SEWER ROUTE CONTRACTOR TO VERIFY THIS BY CALLING NC ONE -CALL STRUCTURE STATION SRUCIUM DETASIS DEPTH DESCRIPTION STRUCTURE STATION SINX11M DE'TNLS DEPTH DESCRIPTION A, D+00 RV 2100.49 N A HW NV. IN 2093.41 / a ale Mi 2101108 WV. N 20911.31 Nv. N 20W.9e BN'3 WV OUT 20911.31 a MN 2f1M. A2 2+14 WV. IN 22110Y.JB 1..011 WV. WT 20911.011 LS1 AC OFFSITE: NV. WT:mxM t WATER MAN, SEWER MAN, ANO SR)WIWATER APPROVAL BY IRED IMPROVEMENT FOR ZONING BE COV DERED A REQUIRED PI ML 2100.110 G 1+M RM 2107.59 W. N 2,00.20 3.5r3 CB N 2+M INV. W 21 q.e5 1.16'3 CB INV. OUT -0 _ ' Al - l-- 10 r� NV. OUT HOMOO MINIMUNIMU M REQUIRED: Z AMOUNT PPOVIDFD:Z BKPG E: MINIMUM REWIRED: 3 T1.q RIM 0e a 14N IOM 210101. 3253 CB M 2+77 INV. WT 21..]11 4.253 C11MIN, ENNUARG3 1UNR4 35'-1}' S'. SF NV. OUT 2101.63 IMPERVNIUS CAICUTATIOIS: a19 / N A MW . Rte ■M 210.2401 MW. . WW 2097S]7.53 W. GONV. OPEN SPAS C=AA] )ft IN 2091.39 PROVIDED:9,9979 UNOSCMING REQUIREMENTS: i09 NV. OUT 2097.53 50113: Tm a2 aJ1 RON 2104.N NV. WT 208451 9-0r; WTIET SiRIlC111PE 02 D2 0+10 RN2101114 4.473 N Ce DIN 2101m Et 0+27 INS" ISM 0.,34 NN OUT T Z01 E00.N J B.14 1400 INV W '1094.]11 9.rT3 B.IC IN, Wt 209435 CI a00 IN w'N"N'16 10.773 M sPUT1ER EI I+R, WV WN M63T &ora a PPE TABLE (suGPE5 BARB ON W L84M TO INSEE PIPE NAME I 912E J LENGTH &OPE 4. RETAINING WALLS: EXISTING MINOR CONTOUR (TM) ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL EXISTING MAJOR CONTOUR (7TH) TO FINISH (RADE ELEVATION. CONTRACTOR TO ACCOUNT FOR FOOTER/COVER OVER FOOTER. REFER TO WALL DESIGN FOR FOOTER DESIGN. WALL DESIGN TO ALSO ACCOMMODATE STORM PROPOSED MAJOR. CONTOUR (TVP) PIPE PENETRATIONS PER PLANS. CONTOUIR (TVP) WALL DESIGN TO INCLUDE FOOLING DRAIN AND MINIMUM WIDTHPROPOSED MINOR OF - '. 1r O' 057 WASHED STONE BEHIND WALL FROM BOTTOM TO TOP OF WALL - I ALL RETAINING WALLS PROVIDING A CHANGE OF GRADE OF 30' OR MORE SHALL BE PROTECTED WITH A GUARDRAILTHE t; -31-a28 I MAH GUARDRAIL SHALL BE 42* MINIMUM IN HEIGHT, AND PREVENT THE R. ENTIAL H2O, Po - PASSAGE OF A 21" SPHERE UNLESS ADJACENT TO A WALING G: RMB B 154 PO 20 91119-2 TI SURFACE COORDINATE BARRIER SME AND COLOR WITH - - PROPOSED REED CREEX (TYP) zgllxc ARCHITECT AND AND ENGINEER. SEE SITE PLAN FOR APPROXIMATE - - LOCATION OF FENCING/BARRIERS. AN E)OST1NG PROJECT PROPERTY LINE (TYP) $ MATTHEW b�YAEL Ax MATMDO 2" Y PC 5 II CONTRACTOR TO SUBMIT TO OWNER AND ENGINEER FOR REVIEW A I I PB 154. PO 120 I BIS . PO IRO PROPOSED 30' STREAM IN 96 22-891M PRIOR TO ORDERING MATERIALS. CONTRACTOR TO COORDINATE ---- M ASE YOUNo ( PIN 96N9 -A 2 -BTO] I usE; ENrIAL WALL STYLE AND COLOR WITH ARCHITECT AND ENGINEER. EXISTING INTF11NA1, PROPERTY LI!E I BUFFER (TW) 4614. PG 1 I VSE: OMIT 2 c RMB B IM" PG 120 ZONING: PYB CONTRACTOR RESPONSIBLE FOR OBTAINING BUILDING PERMIT FOR EYM.0 DEVTLOPMENT GROUP, LLC E-ZT-91174 DBPM54 PG 1002 IE PROPOSED STACKED RE�MODRnAL ALL RETAINING WALLS PRIOR TO ORDERING MATERIALS OR 8 79 Po 5. tA} BOULDER HEADWALL 2 WA$ - OONSiRUCTION. CONTRACTOR RESPONSIBLE FOR CONSTRUCTING PIN -ANT 2µa78-I I RETAINING WALLS IN ACCORDANCE WITH ALL WNL MANUFACTURERS STANDARDS AND SPEOFlCATIONS. 3ag1IING RMB ALL RETAINING WALLS 4' OR TREATER TO BE REVIEW A TO GUY OF AN BUILDING SAFETY DIVISION FOR REVIEW W AND EASING ADJACENT PROPERTY LINE (TYP) -, APER NOTE: CONMACTIM SHALL PROVIDE THE CITY OF APPROVAL THE WALL ENGINEER UPON APPROVAL AND CERTIFIED SUBJECT TO E SURVEY INFORMATION NO UNDERGROUND UTILITIES ARE AS"EYH=E THE PERMIT NUMBER OF ANY So"'BORROW SSS ACRES ■ LOCATED ALONG PROPOSED WATER k SEWER ROUTE CONTRACTOR TO VERIFY THIS BY CALLING NC ONE -CALL OR WASTE SITE TO BE USED FOR THIS PROJECT PRIOR TO IMTIA71K LAND DISTURBING ACTIVITIES ! ! .[O/� `� ■ ■ `�■ CENTER PRIOR TO CONSTRUCTION. - CONTRACTOR TO RETURN ALL DISTURBED AREAS TO C1eGNAL NOTE: ALL PROPOSED GRADE CONTOURS REPRESENT K AEVARO oEVELOPMEI GROUP, LLC CONDITION (ENGINEER AND OWNERS APPROVAL REQUIRED LAND DISTURBANCE ACTIVITIES REWIRED TO NONE DISTURBED ARIA: BEFORE �NPIETION) CONSNIUCT ALL SITE INFRAS7RUCNRE INCLUDING, BUT NOT UMITED TO, ROAD, DRIVEWAY APRONS, LS1 AC OFFSITE: - CONTRACTOR TO K WITH ENGINEER AND CITY OF A94EMLLE TO DETE IMI EXACT LOCATION AND 517E OF EASTING WATER WATER MAN, SEWER MAN, ANO SR)WIWATER APPROVAL BY IRED IMPROVEMENT FOR ZONING BE COV DERED A REQUIRED PI MAINS PRIOR TO ORDERING MATERIAL& CONTRACTOR TO HAVE COLLECTION AND MANAGEMENT SYSTEMS MIN. 40 -RAX 60 SPACES PROVIDED: ALL OOSTNG UTILITIES LOCATED PRIOR TO ORDERING MATERIALS NONE: ALL HOLIES AND ASSOCIATED WILL WALKWAYS AND OTHER IMPERVIOUS AREAS REA$ NUBE CONSTRUCTED INDIVIDUAL INCREMENTALLY, UNDER SEPARATE PERMITS, AFTER ALL SITE INFRASTRUCTURE IS COMPLETED. 1 , Know wtws below. C811 beton you die. 9TARNE$ _ ' Al - l-- 10 r� 4. RETAINING WALLS: EXISTING MINOR CONTOUR (TM) ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL EXISTING MAJOR CONTOUR (7TH) TO FINISH (RADE ELEVATION. CONTRACTOR TO ACCOUNT FOR FOOTER/COVER OVER FOOTER. REFER TO WALL DESIGN FOR FOOTER DESIGN. WALL DESIGN TO ALSO ACCOMMODATE STORM PROPOSED MAJOR. CONTOUR (TVP) PIPE PENETRATIONS PER PLANS. CONTOUIR (TVP) WALL DESIGN TO INCLUDE FOOLING DRAIN AND MINIMUM WIDTHPROPOSED MINOR OF - '. 1r O' 057 WASHED STONE BEHIND WALL FROM BOTTOM TO TOP OF WALL - I ALL RETAINING WALLS PROVIDING A CHANGE OF GRADE OF 30' OR MORE SHALL BE PROTECTED WITH A GUARDRAILTHE t; -31-a28 I MAH GUARDRAIL SHALL BE 42* MINIMUM IN HEIGHT, AND PREVENT THE R. ENTIAL H2O, Po - PASSAGE OF A 21" SPHERE UNLESS ADJACENT TO A WALING G: RMB B 154 PO 20 91119-2 TI SURFACE COORDINATE BARRIER SME AND COLOR WITH - - PROPOSED REED CREEX (TYP) zgllxc ARCHITECT AND AND ENGINEER. SEE SITE PLAN FOR APPROXIMATE - - LOCATION OF FENCING/BARRIERS. AN E)OST1NG PROJECT PROPERTY LINE (TYP) $ MATTHEW b�YAEL Ax MATMDO 2" Y PC 5 II CONTRACTOR TO SUBMIT TO OWNER AND ENGINEER FOR REVIEW A I I PB 154. PO 120 I BIS . PO IRO PROPOSED 30' STREAM IN 96 22-891M PRIOR TO ORDERING MATERIALS. CONTRACTOR TO COORDINATE ---- M ASE YOUNo ( PIN 96N9 -A 2 -BTO] I usE; ENrIAL WALL STYLE AND COLOR WITH ARCHITECT AND ENGINEER. EXISTING INTF11NA1, PROPERTY LI!E I BUFFER (TW) 4614. PG 1 I VSE: OMIT 2 c RMB B IM" PG 120 ZONING: PYB CONTRACTOR RESPONSIBLE FOR OBTAINING BUILDING PERMIT FOR EYM.0 DEVTLOPMENT GROUP, LLC E-ZT-91174 DBPM54 PG 1002 IE PROPOSED STACKED RE�MODRnAL ALL RETAINING WALLS PRIOR TO ORDERING MATERIALS OR 8 79 Po 5. tA} BOULDER HEADWALL 2 WA$ - OONSiRUCTION. CONTRACTOR RESPONSIBLE FOR CONSTRUCTING PIN -ANT 2µa78-I I RETAINING WALLS IN ACCORDANCE WITH ALL WNL MANUFACTURERS STANDARDS AND SPEOFlCATIONS. 3ag1IING RMB ALL RETAINING WALLS 4' OR TREATER TO BE REVIEW A TO GUY OF AN BUILDING SAFETY DIVISION FOR REVIEW W AND EASING ADJACENT PROPERTY LINE (TYP) -, 964932-0616; 9 W & 32-1627 AGO":- APPROVAL THE WALL ENGINEER UPON APPROVAL AND CERTIFIED SUBJECT TO E / IT. -- - / SSS ACRES ■ LL ADDITIONAL RETAINING WALLS LANDSCAPING DEPENDING ON HEIGHT AND MATERIAL LANDSCAPING SETBACKS: ! ! .[O/� `� ■ ■ `�■ _ G_., �-�, • NONE AEVARO oEVELOPMEI GROUP, LLC NONE CORNER: NONE DISTURBED ARIA: 5. STREAM RESTORATION PORTON OF THE PROJECT IS SUBJECT 7O USACE NCDENR AND DEVELOPER AND SHALL NOT DB 4s5& PG woe 0j S.­2-1-1 LS1 AC OFFSITE: 0.61 AC PARIONG aLCUIATIONS: APPROVAL BY IRED IMPROVEMENT FOR ZONING BE COV DERED A REQUIRED PI MIN. 2 -MAX 3 SPACES/UNIT MIN. 40 -RAX 60 SPACES PROVIDED: 58 GARAGES: �B1U ■NNJe�■■ % 5-9' CULVERT _ e / /_ / 02 \� I ! _ ' Al - l-- 10 r� PROPOSED f0' -Y STRUCTURAL ARCH (TYPXSEE DETAIL) PRQPOSED 712' RIP RAP APRON LENGTH: 30.0 FT WIDTH: 4.0 FT WIDTH AT OU71ETI 10 FT 'D50: 0.5 FT (MN. APRON DEPTH: 1.0 FT (MIN) (SSE DETAIL). LAUREN W W­TA11- DB 51a PO 890 PS 154, Po 120 PIN 8649 -22 -MS$ A, LASE. REMOENnRI 2aNBRc: RMe 26 EUINS. DO D9 2251. P, l54. POSED CURET I7R0L. S1RIICNRE 732' - PROPOSED STMWWM STORM DETENTION SYSi WITH ISOLATION ROW 1& - 3500 9T(NMTECH. CHAMBERS T2' WASHED 057 STONE ABOVE CHAMBERS - 12' WASHED /J7 STONE BELOW CHAMBERS /-� USIEN,Sf. REDDENN.. 120 111139 NnN I Nb c2 C ; O DEVELOPMENT OROW, LLC p I ^ / ■ I■ f■ 6■ I■ r' /i �LA.OeI■ I■ ey, r-• �,- - 1a. �- 9R - - - - �L� CI. OB 4147, PG 1 F? Id $ W L ' .. ._ 18' HOPE. B2 �. W� Pe z, vc I � vI 1 D1 (LADS c) •...,�� � c3 PIN 8648-52-2'JOJ I _ L f N D2.O.S - �- ?-- I - sok- EI ZWWO: NCD _ ( i� _ FI \ CIn _ PROPOSED CONNECTION TO EXISTING CULVERT / -12'%12' POURED IN PLACE ,/` CONCRETE STRUCTURE / /( z I BASEMT FEE: -ABANDON EMOTING CULVERT / I ! A3ir \ / ss/- SS S --- S S� 55 I- ss APPRO)WAIE MV LEGAON TIOF EIas7NG T DDA BARTER T1( TOTo 8 I■ �i _1 Fri a PROJECT DATA II MR.. 964932-0616; 9 W & 32-1627 AGO":- BROADWAY STREET DEED BOOK/PAGE: 4161/1930,4575/0998 SITEACREAGE: SSS ACRES 2WXNG: -NCD SETBACKS: FRONT: _ G_., RDFS: NONE REAP: NONE CORNER: NONE DISTURBED ARIA: 2.10 AC WITHIN PRO ER: LS1 AC OFFSITE: 0.61 AC PARIONG aLCUIATIONS: VEHICUM REQUIREMENT: MIN. 2 -MAX 3 SPACES/UNIT REWIRED SPACES: MIN. 40 -RAX 60 SPACES PROVIDED: 58 GARAGES: 30 SURFAO: 2B HANDICAPPEDSPREES: HESET MINIMUNIMU M REQUIRED: Z AMOUNT PPOVIDFD:Z BKPG E: MINIMUM REWIRED: 3 AMOUR PROVIDFD:3 WIIDINGDATA: BUIIDING DESCRIPTION HEIGHT FOOTPRINT BUILDING I 6 UNITS 35'-4;' 5,005 SF BUILDING 2 8 UNITS 35'-4 j' ""051 ENNUARG3 1UNR4 35'-1}' S'. SF TOTAL 20 UNITS IMPERVNIUS CAICUTATIOIS: IMPERVIom PERVIOUS PRE-DEVEDDPMENT0.43 ACRES (29%) L■ACRES(71%) P= DEVELOPMENT: 0.81 ACRES 11 0.70 ACRES (I OPEN SPAS C=AA] )ft REWIRED: 9,816 SF (f}%1 PROVIDED:9,9979 UNOSCMING REQUIREMENTS: SEECHAIRONC2.S 50113: Tm . SOLGPOUP: B E / i BASEMENT FEE: F \ \ nOs FEE: - - PROPOSED SEINER LINE W/ 20' EASEMENT (SEE SHEET C7.0) BYVAY 3iiiE - - ------ ----72- -- - - - - - -- PROPOSED 8' HDPE DOWNSPOUT COuecnoIN PE HETWaRK (TYP) (40' ASPHALT PAVMnl>. / PI 55 - SS - SS SS -r- S $ y SS - SS -- SS PROPOSED DOWNSPOUT 55 t� - SS - -- / $ CONNECTION (TYPXSEE DETAIL) P \ - PROPOSED sraRM PPE (7YP) O� PROPOSED STORY STRUCTURE `1 ,.) m 41-2 P1 A �4d 'N' PRI moi, •'•FMOfNEE�,t.`t�"r` f T;II F_ W z 2g W 0u J z_ WQ 1.1..1 co 0 G O �W N V `JO � V 0 W W W PROPOSED II CONNECTED PROPOSED SSTTOaL DRAINAGE 9YSTUA (TYP) m EEsnINc cow GRADING & STORM DRAINAGE PRI %1 177 DRAWN BY: 1 0 FIRE N19RANT 7 PLANTL DAM 10-24-1 GRAPHIC SCALE COA PROJECT N04 XX-100pq MSD PROJECT NO.: 2018205 C4.0 (M7 1 fnch - a 9 30 tt 0 HESET DEVELOPMENT DATA OW%ENOEVEIOPER: BOULEVARD DEVELOPMENT GROIN, ILC PO BOK 2239 ASHEYILLE, NC 28302 BROADWAY BULLS, LLL M BOX 3966 HICKORY, W 28603 CONTACT: KEVIN ERR 13231242-5137 qVI ENGHIEER: ADVANTAGE CIVIL ENGINEERING, PA 34 BIG BEAR TRAIL ASHEVIUF, NORTH CAROUNA 21111IS CDNTKT: MIKE LOVOV, P.E. SURVEYOR: SMDERSWRVEYI &RAMPING 510 AVENA ROAD BLACK MOUNTAIN, W 28712 CONTACT: SANDERS (8281669.2777 NOTES 1. SEE GRADING. EROSION CONTROL AND STORM DRAINAGE DETAIL SHEETS FOR ALL GENERAL NOTES CONTRACTOR RESPONSBLE FOR INCLUSION OF DETAILS SHEETS WITH ALL PLANS. 2. NO PORION OF THIS PR0 ECT LIES WITHIN THE IDD -YR FEMA FLOODPLAIN. 3. SOIL TYPE B. 4. RETAINING WALLS ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL TO FINISH GRADE ELEVATION. CONTRACTOR TO ACCOUNT FOR FOOTER/COVER OVER FOOTER. REFER TO WALL DESIGN FOR FOOTER DESIGN. WALL DESIGN TO ALSO ACCOMMODATE STORM PIPE PENETRATIONS PER PLANS. WALL DESIGN TO INCLUDE FOOTING GRAIN AND MINIMUM WIDTH OF Ir OF #7 WASHED STONE BEHIND WALL FROM BOTTOM TO TOP OF WALL ALL RETAINING WALLS PROVIDING A CHANGE OF GRADE OF 30' I OR MORE SHALL BE PROTECTED WITH A GUARDRAIL THE GUARDRAIL SHALL BE 42' MINIMUM IN HEIGHT, AND PREVENT THE PASSAGE OF A 21' SPHERE UNLESS ADJACENT TO A WAUEING SURFACE COORDINATE BARRIER STYLE AND COLOR WITH ARCHITECT AND ENGINEER. SFE SITE PLAN FOR APPROXIMATE — — LOCATION OF FENCING/BARRIERS. EMIS11N0 PR CONTRACTOR TO SUBMIT RI OWNER AND ENGINEER FOR RENEW PRIOR T ORDERING MATERIALS. CONTRACTOR TO(NEER. COORDINATE WALL STYLE AND COLOR WITH ARCHITECT AND ENGINEER. CONTRACTOR RESPONSIBLE FOR OBTAINING BUILDING PERMIT FOR ALL RETAINING WALLS PRIOR TO ORDERING MATERIALS OR CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR CONSTRUCTING RETAINING WALLS IN ACCORDANCE WITH ALL WALL MANUFACTURERS STANDARDS AND SPECIFICATIONS. EXISTNO ADJACENT ALL RETAINING WALLS 4' OR GREATER TO BE SUBMITTED TO CITY OF ASHEVILLE BUILDING SAFETY DIVISION FOR REVIEW AND APPROVAL AND CERTIFIED BY THE WALL ENGINEER UPON COMPLETION. RETAINING WALLS SUBJECT TO ADDITIONAL LANDSCAPING DEPENDING ON HEIGHT AND MATERIAL S. STREAM RESTORATION PORTION OF THE PROJECT IS SUBJECT TO APPROVAL BY USACE, NCDENR AND DEVELOPER AND SHALL NOT BE CONSIDERED A REWIRED IMPROVEMENT FOR ZONING APPROVAL — — — r — / ^I _ M+ — — ss - ss — ssl ( ss SR � � � ss i ss r o APER NOTE CONTRACTOR SHALL PROVIDE THE CITY OF PIN: SURVEY INFORMATION NO UNDERGROUND U71UTIES ARE ASHEVILIE THE PERMIT NUMBER OF ANY SOIL BORROW NOW AVSTREET LOCATED ALONG PROPOSED WATER 8 SEWER ROUTE. CONTRACTOR TO VERIFY THIS BY CALLING NO ONE -CALL OR WASTE SITE TO BE USED FOR THIS PROJECT PRIOR TO INITIATING LAND DISTURBING ACTIATIES �QR CENTER PRIOR TO CONSTRUCTION.k� - CONTRACTOR TO RETURN ALL DISTURBED AREAS TO ORIGINAL NOTE ALL PROPOSED GRADE CONTOURS REPRESENT 4® CONDITION (ENGINEER AND OWNERS APPROVAL REWIRED LAND DISTURBANCE ACTIVITIES REWIRED TO SIDES: BEFORE CWPLETIOJ) CONSTRUCT ALL SITE INFRASTRUCTURE INCLUDING. NONE - CONTRACTOR TO WORT( WITH ENGINEER AND CITY OF ASHEVILLE TO DETERMINE EXACT LOCATION AND SIZE OF EXISTING WATER BUT NOT UNITED TO, ROAD, DRIVEWAY APRONS WATER MAIN. SEMER MAIN, AND STORMWATER DISTURBED AREA: MAINS PRIOR TO ORDERING MATERIALS. CONTRACTOR TO HAVE CGLLECTO4 MID MANAGEMENT SYSTEMS 1.51 AC ALL EXISTING UTILITIES LOCATED PRIOR TO ORDERING MATERIALS NOTE ALL HOSES AND ASSOCIATED DRIVEWAYS. CWALKWAYSONSTRUCTED AND OTHER DUAL LOTS AREAS WILL BE ON INDIVIDUAL LOTS INCREMENTALLY, UNDER UNDER SEPARATE PERNOTS,AFTER ALL SITE IS COMPLETED. INFRASTRUCTUCOMPLETED, i Know wws below. Call before you dna VEHIULARREWIREMENT: MIN. 2- MAX. 3 SPACFS/UNIT PROJECT DATA PIN: 9649324816;9649.32-1627 .ADDRESS: NOW AVSTREET DEED BOOK/RAGE: 4162/1930;4675/0398 IZE SACREAGE: 151 ACRES ZOMN6: NCD SETBACKS: MORT: 0-15' SIDES: NONE PEAR NONE CORNER: NONE DISTURBED AREA: 2.10 AC WITHIN PROTECT: 1.51 AC OFF-SITE: 0.61 AC PARKING CALCULATIONS: VEHIULARREWIREMENT: MIN. 2- MAX. 3 SPACFS/UNIT REQUIMI) PACES: MIN. 40-MAX.60 SPACESPROVIOEM 58 GARAGES: 30 SURFACE: 28' HANDICAPPED SPACES: MINIMUM REQUIRED: 2 AMOUNTPROVIDE0:2 NCYCIE: MINIMUM REQUIRED: 3 AMOUNT PROVIDED: 3 BUILDING DATA: BUILDING DESCNRION HEIGHT MMRINT BUILDINGS 6UNI1$ 3S' -4j' 5,005 SF WILDING2 BUNDS 35'-4j' 8,6705E WILOING3 6UNITS 35'-13' S'msF TOTAL 20 UNITS HmPERvxlus wcuunoxx IMPERVIOUS PERMOUS PRE�DEVELOPMENT: GA Acus (m) 11i ACRES (-n%) POSE -DEVELOPMENT: 081 MACS IS") 0.70 FILES N6%) OPEN SPACE CALCULATRX - MQUIRED:9,BS65E(15%) PROVIDED: 9,9975 IANDS ING REQUIREMENT: SEE [HMT O/N [2.1 50- T.E;UK - SOILGROUP: B 0. °o4k4z><�Oti TIS: uRI U L m 1 � Z W =N CL Og J z W _ WO W LW IY O� 2~ LJ'1 F W O " L ��.�L// Z <'�' 5 mD e STREAM RESTORATION PLAN DRAM BY: 1� DAM 10.2418 GRAPHIC SCALE CAAIRQIECTNO4 )DWOODOCK b .WI MSD MCBECT NO.: 20/8205 C4.3 (NncRff ) 1 inch- 90 tL ET 1 ..... . . ............. ............ ............. .......... mur BINE LANE EXISTING PAVEMENT [:ENERL NOTES 1. FRAME, GRATE AND HOOD ASSEMBLY WILL BE DOMESTIC STEEL PRODUCT 2. WHEN WARRANTED GRATES WILL BE TYPE E OR BICYCLE SAFE TYPE F AND TYPE G PER NC DOT STD. DETAIL 840.03 PAGE 2 OF 2. 3. CURB AND GUTTER WILL BE CONSTRUCTED WITH 4000 PSI CONCRETE 4. ANY SUBSTITUTION OF GRATE TYPES OR VARIANCE OF CONSTRUCTION PRACTICES MUST BE APPROVED BY THE STORMWATER SERVICES MANAGER OR APPOINTED DESIGNEE. City.fAP6.vi1W, NC xd... t. l er mrm ate• o..e t or.a d1w�JN.XawTMG.M 4u1N9W aprroa W4•rem ieWrmr.avnNwn Tm MIO.14JnWb.eN('.wN A Standard Bevels e9! aw- - 2 91uP.O L s `• a a A T4rornetp N .-.4 7 - FjW Vlev Section"- NeeMb Sec. A -A °0bA1"D� mwNwbH.WW alWpmr. - 9 TCWrryp) BbeYM t� T L, Ne.rmp 1FSYn A.�BOv4.PW NW\MpeeYP EOM.Pv. 1C �datl, Slope Collar Cross Section 2 iO MM . MAW NvsmHbun Jm..bxiem�m.Etl tr.nrainl bWM iW +Meta CwYM 14.1Avb cvrr.x.Y NPMn.b9w Mq.oM aoMr iWYN COWMCK STRUCTURAL PLATE BEVELS w.®,a w�m�a MH: & CUT OFF WALL 4 l -,BIKE LANE EXISTING PAVEMENT STACKED BOULDER ] NOT TO SCALE PIPE OUTLET TO WELL-DEFINED CHANNEL PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL A A A A - 1 T N ' PLANt. 12' I- ... .... .TT�Fpp .. d •BL%mT . BLMTF �FTIL GENERAL NOTES: SECTION AA SECTION AA 1is IS THE LENGTH OF THE RIP RAP APRON - - 2 d 1:5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 12' 3 IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF ""ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE SANK. WHICHEVER IS LESS 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RP RAP AND SOIL FOUNDATION. 5. 'COMPACTANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL e. RIP RAP MAY BE FlELDSTCIE IXR ROUGH WARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE: TOP OF RIP RAP SHALL BE LEVEL WITH TIE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM, ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL RIP RAP APRON FOR FLARED END SECTION NOT TO SCALE RECOMMENDED I�I MINIMUM TRENCH WIDTH i I I 6' MIN. COVER FOR C-48" III* PIPE DwWEIEP IN. (MM) TRENCH WIDTH IN. (M) - 8 100-200 ' yAIY.W 24 0.6) O 09� IrgE\J 35 (0.9). . 18 (480 43 (1.1) 24 (800) 56 (1.4) 30 (750) 60 (1.5) 36 (904 65 (1.7) 42 (1050 84 (2.1) 48 (1200) 91 (2.3) PRECAST CONCRET 97 (2.5) CATCH BASIN--Im iD3 (2.6) -■� PLAN OF 70P S_AB ■ ELEVATION \T!/ IeF�lj .agar DOWEL Pf:LTSF�•:J�T•Fly'17ii TI Not 9{"i3?•�4.I7-F.� ! !J•!)D�aliF N[aL=_ cE�R!.['u:lcl7t •n ® N ■F3iFdMF9SSim�i$1i®mmmm0mmmm��FaCE'mf�] ■Fi�Fd�11FSJ��E'Q•1�mefam0m0m0mm6FallY71r1rYFlr•.E?F] ■r.HFd•11PSJ��t•'d•"immm0m0m®Om[1FXTfl7['i1[]R:lr•]FR] ii�F1Q•TIF$7��i•'C'ammmOm®m®mm�i:3l�l�l .?�rIFQ�JF6JFdY�t'3'iF16�L^S•JtlflQ�rf>•FCL!•lilC'J!'16iiF1i•? I\iRFs7rd�.3lPlrf& F.'TiFdLFILPSHcdR�t'd3ifI6MFlSJOf16R1!!F'Q'JE1FdLE7FRDt�®��il <S1JFd+JFSJ�CUQiIt.'Q.iDQ.YFKL�fIC'JE11f1QiY11LTQRYtfaF'¢%7[)Ef47�iF_1E VmEb3i1�IJVIZA a!-1iFdJFSJ�4'II'+JtdiiFS]F170F6'JllLT6{Ylails[YF'7EdL7Q•'�E3.E1Q�I2E7r•EIY] F'.3iF'Q�JFd1�Fl6JtTEiFl651FSMocJSFMI�'IN6{YE71f16iYllL�T�i�IEz'.➢ 0. , ",.. -nal�� x n ' CATCH BASIN I R�If• 16TaicrcrriaraPacaTFFc'rFry[snc?Srn�L.i�ra[s>.>.E>cHTrssl /FT�cS'Jcd•JFGLowi.rF6f1iJF'JOl{[:7[R-1[N"I7iZ�.lfi-7Ex?Flr•1f•F'7 !f'aFCHFCJc6rQlF6rFQYllCliriF�l®[3' ©®ri i][ - �,\ iL4�FC'JFiC'rFJf'r!F)FlIrA l[ISJFF'7[1F ciff'7lfl[FZIrormu" Pat FiCJFiCLFCiQ7[!6r[fSr[ffIII•�ia•7 �E.-'7t•71�r"..�n�F7E5Y3) `O W7WriEAKWAEWA i7[SC'iGd'JF`Y•rQ..*<U QR10iSrl6lH1FW tS'aI�J[C'r['E'rf?7r 6Ji7r]S•'rrdYeTGM113Z9®Itt'§7®FdiFl�:7LIM 117 L0LiF.'Q'Ji7F`6�f1QOJfl6r•7r•][R7[I'ZlETC7iF-)•<S'i�FZTi7IdCF1 a.`•JIFCAF'GYFiffI!'•1 FE'ri6riCTi1�L'T• FEL`a7RlETi''�•1[F9m r>• iwStiFrnrcJria isrJeaRe iaRerFicTIFF:r•>t[•?ETrWIc��.•x�;rat•z^ur • D'ST3- - `�F•d- .hA : l _ :. 1 ..... . . ............. ............ ............. .......... mur BINE LANE EXISTING PAVEMENT [:ENERL NOTES 1. FRAME, GRATE AND HOOD ASSEMBLY WILL BE DOMESTIC STEEL PRODUCT 2. WHEN WARRANTED GRATES WILL BE TYPE E OR BICYCLE SAFE TYPE F AND TYPE G PER NC DOT STD. DETAIL 840.03 PAGE 2 OF 2. 3. CURB AND GUTTER WILL BE CONSTRUCTED WITH 4000 PSI CONCRETE 4. ANY SUBSTITUTION OF GRATE TYPES OR VARIANCE OF CONSTRUCTION PRACTICES MUST BE APPROVED BY THE STORMWATER SERVICES MANAGER OR APPOINTED DESIGNEE. City.fAP6.vi1W, NC xd... t. l er mrm ate• o..e t or.a d1w�JN.XawTMG.M 4u1N9W aprroa W4•rem ieWrmr.avnNwn Tm MIO.14JnWb.eN('.wN A Standard Bevels e9! aw- - 2 91uP.O L s `• a a A T4rornetp N .-.4 7 - FjW Vlev Section"- NeeMb Sec. A -A °0bA1"D� mwNwbH.WW alWpmr. - 9 TCWrryp) BbeYM t� T L, Ne.rmp 1FSYn A.�BOv4.PW NW\MpeeYP EOM.Pv. 1C �datl, Slope Collar Cross Section 2 iO MM . MAW NvsmHbun Jm..bxiem�m.Etl tr.nrainl bWM iW +Meta CwYM 14.1Avb cvrr.x.Y NPMn.b9w Mq.oM aoMr iWYN COWMCK STRUCTURAL PLATE BEVELS w.®,a w�m�a MH: & CUT OFF WALL 4 l -,BIKE LANE EXISTING PAVEMENT STACKED BOULDER ] NOT TO SCALE PIPE OUTLET TO WELL-DEFINED CHANNEL PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL A A A A - 1 T N ' PLANt. 12' I- ... .... .TT�Fpp .. d •BL%mT . BLMTF �FTIL GENERAL NOTES: SECTION AA SECTION AA 1is IS THE LENGTH OF THE RIP RAP APRON - - 2 d 1:5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 12' 3 IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF ""ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE SANK. WHICHEVER IS LESS 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RP RAP AND SOIL FOUNDATION. 5. 'COMPACTANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL e. RIP RAP MAY BE FlELDSTCIE IXR ROUGH WARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE: TOP OF RIP RAP SHALL BE LEVEL WITH TIE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM, ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL RIP RAP APRON FOR FLARED END SECTION NOT TO SCALE RECOMMENDED I�I MINIMUM TRENCH WIDTH i I I 6' MIN. COVER FOR C-48" III* PIPE DwWEIEP IN. (MM) TRENCH WIDTH IN. (M) - 8 100-200 ' 10 (250) 24 0.6) 12 (300) 28 (0.7 15 (375 35 (0.9). . 18 (480 43 (1.1) 24 (800) 56 (1.4) 30 (750) 60 (1.5) 36 (904 65 (1.7) 42 (1050 84 (2.1) 48 (1200) 91 (2.3) 54 (1350) 97 (2.5) 80 (1500 iD3 (2.6) 24 MIN. COVER FOR GREATER THAN 48* DIA:•• DPE PIPE III I -I 8' MAN TN 2" ABOVE TOP TRENCH W TO MIN. OF TPIPE - HAUNCHING/INIML BACKFILL: INSTALLEDPER 1. I MATERIAL PER ASTM 2321 MINIMUM BEDDING THICKNESS e-6' ALL HOPE PIPE TO BE NSTALLED PER MANUFACTURES- - - STANDARDS AND SPECFlCATONS. INCLUDING BUT NOT LIMnED'TO BACKFILL AROUND PIPE -REFERENCE ASTM D2321, -STANDARD -PRACRCE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER.. GRAVITY -FLOW APPLICATIONS.' - HDPE TRENCH INSTALLATION DETAIL NYLOPLASi INLINE GRAIN - CAST IN PLACE CCJCRETE ENCASEMENT FOR IWAFFlC APPLICATIONS (SEE NY_ LAST \ INSTALLATION. DETMLS): Z W Ln Q a- w 00 W LU W C ,W^ Ln V I Oa Z p ?> u - NYLOPLAST - �. LASS 1 OR II MATERIAL PER �� RISER ASTM D2321. LATEST EDITION. EXTENTION COMPACTED IN B' LIFTS TO A MIN. 95% OF MAX. SPD. FLOWABLE FILL FlOWABLE FILL . w 8' MN. 6 LE SUITABLE FOUNDATION ..FOUNDATIONFOUNDATION DOWNSPOUT CONNECTION NOT TO SCALE PeEMEC'T NO.: T75 GRADING & STORMWATER DAMN h". m DETAILS DAA 10."1' ' COA PROJECT NO.: XX -X10000( M50 PROUECr NO.: 2oi 9205 Know whbelow. Call before you a19. D4.0 SHEET