HomeMy WebLinkAbout640040_Plan of Action_20190325 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 6q — - y 0 County: Lo.s h
Facility Name: , ) Faem ' I
Certified Operator Name: Lied- ,C, ��s Operator# 120�0
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): a oon
Spillway (Yes or No): No
Level (inches): 17 "
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
_Z Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility p
3. Earliest possible date to begin land application of waste: 2-
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Phone: 4SZ -S/G/
Facility wner/Manager (print)
9
�� ,, KCDept of rDaien+u ,n,; 0/
Faci Owner/Manager (signature)
PoA Cover Page 2/21100
Raleigh Pc,�innsl nrr:..,,
' PLAN OF ACTION (PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY(30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. 'Structure Name/Identifier (ID): Lagoon
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker 17 inches
b. designed 25 yr.124 hr. storm & structural freeboard 19 inches
c. line b - line a (inches in red zone) = 2 inches
d. top of dike surface area according to design 91875 ft2.
(area at below structural freeboard elevation)
e. line c x line d x 7.48 ala Ions = 114537 gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 159733 ft3
h. actual waste produced = current herd # x line g = 0 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 60958 ft3
k. (lines h + i +i) x 7.48 x 30 days = 75944 gallons
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 02/28/2019 2.36 Ib/1000 gal.
m. (lines e + k) x line 1 = 449.7 lb PAN
1000
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE
11. TOTAL POUNDS OF PAN-STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR: STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA(30 Day) 2121100 1
1. structure ID: Lagoon line m = 449.7 lb PAN
2. structure ID: line m = lb PAN
3. structure ID: line m = lb PAN
4. structure ID: line m = lb PAN
5. structure ID: line m = lb PAN
6. structure ID: line m = lb PAN
n. lines 1 + 2 + 3 +4 + 5 + 6 = 449.7 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD.
o. tract# p. field # q. crop r. acres s. remaining t.TOTAL PAN u.
IRR-2 PAN BALANCE application
balance FOR FIELD window
(Ib/acre) (lbs.)
column rx s
2903 HW-1 Bermuda-P 11.8 188 2218.4 Sept. 30
2903 HW-4 Bermuda-P 2.3 188 432.4 Sept. 30
2903 HW-5,6,7 Bermuda-P 12.9 188 2425.2 Sept. 30
2903 HY-1 Bermuda-P 1.93 188 362.8 Sept. 30
2903 HY-2 Bermuda-P 1.82 188 342.2 Sept. 30
2903 Hy-3 Bermuda-P 1.86 188 349.7 Sept. 30
2903 HY-4 Bermuda-P 1.60 188 300.8 Sept. 30
2903 HY-5 Bermuda-P 1.32 188 248.2 Sept. 30
2903 HY-6 Bermuda-P 1.32 188 248.2 Sept. 30
2903 HY-7 Bermuda-P 2.53 188 475.6 Sept. 30
2903 HY-8 Bermuda-P 1.88 188 353.4 Sept. 30
7640 1 Bermuda-P 6.20 188 1165.6 Sept. 30
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 8922.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA(30 Day) V21/00 2
' w. Total PAN to be land applied (line n from section 11) = 449.7 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 8922.5 lb. PAN
y. Overall PAN balance (w-x) = 8472.8 lb. PAN
Line y must show as a deficit If line y does not show.as ar deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
POA(30 Day) 2121100 3