Loading...
HomeMy WebLinkAboutWQ0005763_Residual Annual Report 2018_20190305TUCKASEIOEE WATER & SEWER AUTHORITY SERVING JACKSON COUNTY 1246 West Main Street Sylva, NC 28779 Phone: (828) 586-5189 0 Fax: (828) 631-9089 Feb 25", 2019 NCDENR Division of Water Resources Water Quality Permit Section Non -Discharge Permitting Unit 1636 Mail Service Center Raleigh NC 27699-1636 Attn: Non -Discharge Compliance Unit, IV _DNC,V 0jDwR REG� Mf�R _• 5 2019 Non- piscn Uni9 Pemmjtdn9 MAR 0 5 2019 i1, l,NP?JCF�Si,�IGliNil Enclosed are three copies of the Annual Residuals Report for the Tuckaseigee Water and Sewer Authority Residuals Stabilization facility (permit #WQ0005763) for the period of January 1, 2018 - December 31, 2018 Should you have questions or comments or if I can provide you any additional information, please don't hesitate to contact me. Sincerely, Stan Bryson Wastewater Plant Operations Superintendent Tuckaseigee Water & Sewer Authority xc: Mr Dan Harbaugh Executive Director Tuckaseigee Water and Sewer Authority This institution is an equal opportunity provider and employer. 2018 Annual Residuals Stabilization Report for The Tuckaseigee Water and Sewer Authority MA U5 ZG19 &ECT/ON Distribution of Class A Residuals Permit # WQ000576Y'?s1N�U,�;, for the period of January 1, 2018-December 31, 2018 ....-i aYilr ...�;..�:]/MVM �� —_.a. • � r.b�`_H{}.rg�yj�+ RECEIVEM4r,DEQIDWR as required by 40 CFR, Part 503 Standards for the use or disposal of Sewage sludge z MAR - 5 2019 Non -Discharge Permitting Unit TABLE OF CONTENTS (1) PERTINENT INFORMATION (2) CERTIFICATION (3) 2018 Sludge Production Data APPENDIX (a) 2018 Distrubution and Marketing summary Parts Aand B (b) Annual Residuals Sampling Summary Form (c) Residuals Sampling Data (d) TCLP Analysis (e) Annual Pathogen and Vector Attraction Reduction Forms (f) 2018 Annual Sludge Production Data (g) Daily Dryer Record TWSA Plant #1 The Tuckaseigee Water and Sewer Authority Wastewater Treatment Plant #1 is rated as a 3.5 mgd facility. The facility also treats the sludge from two additional plants owned by the authority. Pertinent information includes: Facility name: Tuckaseigee Water & Sewer Authority Plant # 1 NPDES # NC0039578 WQ 00005763 Correspondence address: 1246 West Main St Sylva NC 28779 Physical address: 1871 North River Rd Sylva NC 28779 Facility perator: Stan Bryson Wastewater Plant Operations Superintendent sbrysontwsa@frontier.com ph. 828-586-9318 CERTIFICATION REQUIREMENTS PART I -POLLUTANT CONCENTRATIONS PARAMETER Avg Permitted Concentrations MAXIMUM monthly avg ceiling - Arsenic.....................2.0 mg/kg...... 3.1 mg/kg Cadmium....................0.8 mg/kg .................. 1.3 mg/kg Copper ..........I ........... 335 mg/kg .................. 429 mg/kg Lead ........................15.4 mg/kg ................. 18.7 mg/kg Mercury...................0.46 mg/kg .................. 1.1 mg/kg Molybdenum...............7.1 mg/kg .................. 8.3 mg/kg Nickel ......................15.0 mg/kg .................. 17.3 mg/kg Selenium....................5.0 mg/kg ................... 6.4 mg/kg Zinc .........................735 mg/kg .................. 993 mg/kg PART H - PATHOGEN REDUCTION (40 CFR 503.32) X Class A Class B 41 mg/kg 39 mg/kg 1500 mg/kg 300 mg/kg 17 mg/kg n/a 420 mg/kg 100 mg/kg 2800 mg/kg PART HI - VECTOR ATTRACTION (40 CFR 503.33) _ Option 1 _ Option 2 _ Option 3 _ Option 4 Option 5 _ Option 6 _ Option 7 X Option 8 75 mg/kg 85 mg/kg 4300 mg/kg 840 mg/kg 57 mg/kg 75 mg/kg 420 mg/kg 100 mg/kg 7500 mg/kg PART IV - CERTIFICATION " I certify under penalty of law, that the Class A pathogen requirements in 40 CFR, Part 503. 32 have been met and the vector attraction reduction requirement in 40 CFR, Part [503. 33(b)(61] has been met. I am aware that there are significant penalties for false certification including fine and imprisonment." Signed this 25th day of February , 2019. Stan Bryson, W tewater Superintendent i` 2018 SLUDGE PRODUCTION DATA TWSA PLANT # 1 (3.5 mgd plant capacity) NPDES # NCO039578 Sludge dewatered on belt press.................................................................2,946,747 gallons total tons...............................................254.28 tons total metric tons............................................230.6 dry metric tons The following residuals were included in the above totals. TWSA PLANT # 2 (0.5 mgd plant capacity) NPDES # NCO020214 Sludge Hauled to Plant # 1 digestor............................................................. 250,000 gallons totaltons.......................................................................... 20.5 tons total metric tons...............................................................18.6 dry metric tons TWSA PLANT # 3 (0.2 mgd plant capacity) NPDES # NCO063321 Sludge Hauled to Plant # 1 digestor........................................................ 75,000 gallons totaltons......................................................................... 8.87 dry tons total metric tons...............................................................8.05 dry metric tons During 2018 a total of 44.68 tons of residuals were disposed of in the: R&B Landfill 610 Frank Bennet Rd Homer GA, 30547 Operated by: Waste Management Services 1001 Fannin St Houston TX 77002 Additionally as of Jan 1, 2019 an estimated 70 tons of residuals were stored in the silo, located at the TWSA #1 facility, awaiting disposal. • Distribution and Marketing Summary Form DMSDF CLASS A ANNUAL DISTRIBUTION AND MARKETING/ SURFACE DISPOSAL CERTIFICATION AND SUMMARY FORM WQ PERMIT #: WQ0005763 FACILITY NAME: Tuckaseigee Water and Sewer Auth. PHONE: 828-586-9318 COUNTY: Jackson OPERATOR: Stan Bryson FACILITY TYPE (please check one): ❑ Surface Disposal (complete Part A (Source(s) and "Residual In" Volume only) and Part C) p Distribution and Marketing (complete Parts A, B, and C) Was the facility in operation during the past calendar year? Yes 0 No ❑ —► If No skip parts A, B, C and certify form below Part A*: Part B*: Month Sources(s) (include NPDES # if applicable) Volume (dry tons) Recipient Information Amendment/ Bulking Agent Residual In Product Out Name(s) Volume (dry tons) Intended use(s) January (TWSA Plant #1-NC0039578, All residuals 0 Charles Parham 24 Hayfield February TWSA Plant #2-NC0020214, produced by 27.56 Darrin Stewart 10 Pasture March and these three 39.97 H&H Farms 72.5 Corn, Hayfields April TWSA Plant 43-NC0063321) plants were 35.82 Stan Bryson 4 Hayfield May combined. 26.14 Tom Kelly 4 Pasture June Total 21 July product out 25.35 August was calculated 15.95 September by press 0 October and 27.16 November dryer runs. 18.15 December 17.18 Total from FORM DMSDF (sup) Totals: Annual (dry tons): 0 0 254.28 114.5 Amendment(s) used: I I Bulking Agent(s) used: * If more space is required, attach additional information sheets (FORM DMSDF (supp)): Total Number of Form DMSDF (Supp) Part C: Facility was compliant during the past calendar year with all conditions of the land application permit Yes (including but not limited to items 1-3 below) issued by the Division of Water Resources: ❑ No If No, Explain in Narritive 1. All monitoring was done in accordance with the permit and reported for the year as required and three (3) copies of certified laboratory results are attached. 2. All operation and maintenance requirements were compiled with or, in the case of a deviation, prior authorization was received from the Division of Water Resources. No contravention of Ground Water Quality Standards occurred at a monitoring well. "1 certify, under penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Z Si ature of Permittee *D **Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 2T .1102 (26) Signature of Preparer** (if different from Permittee) Date DENR FORM DMSDF (12/2006) 2018 Residuals Sampling Summary Form RSSF ANNUAL RESIDUAL SAMPLING SUMMARY FORM Please note that your permit may contain additional parameters to be analyzed. The parameters can be reported in FORM RSSF - B WQ Permit Number: WQ0005763 Facility Name: Tuckaseigee Water and Sewer Auth. Residual Source WQ # or NCO039578 NPDES #: WWTP Name: TWSA Plant #1 Residual Analvsis Data Laboratory: 1) Pace Analytical 2) 3) 4) 5) Parameter (mg/kg) Conc. Limit m a Sample or Composite Date 2/15 3/8 3/8 5/8 8/7 11/6 Percent Solids (%) NA 94.8 94.8 95.4 96.9 97.7 98.1 Arsenic 75 1.7 2.3 3.1 0.8 Cadmium 85 1.1 1.1 1.3 1.2 Copper 4,300 283 315 312 429 Chromium NA 17.6 19 17.9 21.8 Lead 840 13.8 13.7 15.3 18.7 Mercury 57 0.083 0.097 0.56 1.1 Molybdenum 75 8.3 6 8.1 5.8 Nickel 420 13.6 15.2 13.8 17.3 Selenium 100 4.1 6.4 3.9 5.7 Zinc 7,500 624 679 643 993 Total Phosphorus NA 13100 15700 9560 11400 TKN NA 49000 28700 32400 46700 Ammonia -Nitrogen NA 2260 1270 1570 2260 Nitrate and Nitrite NA < 2.0 < 2.0 < 2.0 < 2.0 a For surface disposal facilities the ceiling concentration limits listed in this form are not applicable. Reference the individual permit for metals limits. "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Prepare * D to *Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 2T .1102 (26) DENR FORM RSSF (12/2006) 2018 Residuals Sampling SAR Calculations- 2/15/2018 SAR = Sodium (Na) Milli Equivalent 0.5 X (Calcium (Ca) Milli Equivalent+ Magnesium(Mg) Milli Equivalent)` Na= 839 mg/kg/ Na Milli Equivalent(ME)= 839/23 equivalent wgt=36.5 ME Ca= 9530 mg/kg/Ca Milli Equivalent(ME)= /20 equivalent wgt= 476.5 ME Mg= 4550 mg/kg/Mg Milli Equivalent(ME)= 4550/12 equivalent wgt= 379.2 ME SAR= 36.5 Na Milli Equivalent 0.5 X (476.5 Ca Milli Equivalent + 379.2 Mg Milli Equivalent)o.s 36.5 Na Milli Equivalent (0.5 X 855.7) o.s 36.5 Na Milli Equivalent (427.9)o.s 36.5 Na Milli Equivalent 20.7 SAR= 1.8 SAR Calculations- 5/8/2018 SAR = Sodium (Na) Milli Equivalent 0.5 X (Calcium (Ca) Milli Equivalent+ Magnesium(Mg) Milli Equivalent)0.5 Na= 802 mg/kg/ Na Milli Equivalent(ME)= 802/23 equivalent wgt=34.9 ME Ca= 10200 mg/kg/Ca Milli Equivalent(ME)=10200/20 equivalent wgt= 510 ME Mg= 4070 mg/kg/Mg Milli Equivalent(ME)= 4070/12 equivalent wgt= 339.2 ME SAR= 34.9 Na Milli Equivalent 0.5 X (510 Ca Milli Equivalent + 339.2 Mg Milli Equivalent)0.5 = 34.9 Na Milli Equivalent (0.5X849.2)0.5 34.9 Na Milli Equivalent (425)0.5 34.9 Na Milli Equivalent 20.6 SAR= 1.7 SAR Calculations- 8/7/2018 SAR = Sodium (Na) Milli Equivalent 0.5 X (Calcium (Ca) Milli Equivalent+ Magnesium(Mg) Milli Equivalent)0.5 Na= 992 mg/kg/ Na Milli Equivalent(ME)= 992/23 equivalent wgt=43.1 ME Ca= 9110 mg/kg/Ca Milli Equivalent(ME)= 9110/20 equivalent wgt= 455.5 ME Mg= 4580 mg/kg/Mg Milli Equivalent(ME)= 4580/12 equivalent wgt= 381.7 ME SAR= 43.1 Na Milli Equivalent 0.5 X (455.5 Ca Milli Equivalent + 381.7 Mg Milli Equivalent)0.5 43.1 Na Milli Equivalent (0.5 X 837.2) 0-5 = 43.1 Na Milli Equivalent (418.6)0.5 SAR= 2.1 r._ 43.1 Na Milli Equivalent 20.5 SAR Calculations-11/6/2018 SAR = Sodium (Na) Milli Equivalent 0.5 X (Calcium (Ca) Milli Equivalent+ Magnesium(Mg) Milli Equivalent)o.s Na= 508 mg/kg/ Na Milli Equivalent(ME)= 508/23 equivalent wgt=22.1 ME Ca= 10400 mg/kg/Ca Milli Equivalent(ME)=10400/20 equivalent wgt= 520 ME Mg= 3690 mg/kg/Mg Milli Equivalent(ME)= 3690/12 equivalent wgt= 307.5 ME SAR= 22.1 Na Milli Equivalent 0.5 X (520 Ca Milli Equivalent + 307.5 Mg Milli Equivalent)o.s 22.1 Na Milli Equivalent (0.5 X 827.5) o.s 22.1 Na Milli Equivalent (413.8.)0.5 22.1 Na Milli Equivalent 20.3 SAR= 1.1 aCoAnalytical -www.pacelabs:com ANALYTICAL RESULTS Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Project: TWSA Dried Residual 2/15 Pace Project No.: 9237351.7 Sample: TWSA Dried Residual Lab ID: 92373517001 Collected: 02/15/18 09:00 Received: 02/15/18 10:15 Matrix: Solid Results reported on a "dry weight' basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010 MET ICP Aluminum Arsenic Cadmium Calcium Chromium Copper Lead Magnesium Molybdenum Nickel Potassium Selenium Sodium Zinc 7471 Mercury Mercury 254OG Total Percent Solids Total Solids Percent Moisture Percent Moisture 1010 Flashpoint,Closed Cup Flashpoint 9045 pH Soil pH at 25 Degrees C Plant Available Nitrogen Plant Available Nitrogen Total Nitrogen Calculation Nitrogen 350.1 Ammonia Nitrogen, Ammonia 351.2 Total Kjeldahl Nitrogen Nitrogen, Kjeldahl, Total 353.2 Nitrogen, N021NO3 Nitrogen, Nitrate ( Date: 02/27/2018 04:50 PM r Analytical Method: EPA 6010 Preparation Method: EPA 3050 23200 mg/kg 39.3 5 02/20/18 01:15 02/23/18 15:34 7429-90-5 1.7 mg/kg 0.79 1 02/20/18 01:15 02/23/18 01:46 7440-38-2 1.1 mg/kg 0.079 1 02/20/18 01:15 02/23/18 01:46 7440-43-9 9530 mg/kg 39.3 5 02/20/18 01:15 02/23/18 15:34 7440-70-2 17.6 mg/kg 0.39 1 02/20/18 01:15 02/23/18 01:46 7440-47-3 283 mg/kg 0.39 1 02/20/18 01:15 02/23/18 01:46 7440-50-8 13.8 mg/kg 0.39 1 02/20/18 01:15 02/23/18 01:46 7439-92-1 4550 mg/kg 7.9 1 02/20/18 01:15 02/23/18 01:46 7439-95-4 8.3 mg/kg 0.39 1 02/20/18 01:15 02/23/18 01:46 7439-98-7 13.6 mg/kg 0.39 1 02/20/18 01:15 02/23/18 01:46 7440-02-0 5600 mg/kg 393 1 02/20/18 01:15 02/23/18 01:46 7440-09-7 4.1 mg/kg 0.79 1 02/20/18 01:15 02/23/18 01:46 7782-49-2 839 mg/kg 393 1 02/20/18 01:15 02/23/18 01:46 7440-23-5 624 mg/kg 0.79 1 02/20/18 01:15 02/23/18 01:46 7440-66-6 Analytical Method: EPA7471 Preparation Method: EPA7471 0.083 mg/kg 0.0035 1 02/1711817:05 02/20/1816:26 7439-97-6 Analytical Method: SM 2540G 94.8 % 0.000010 1 02/16/1815:34 Analytical Method: ASTM D2974-87 5.2 % 0.10 1 02/19/1810:50 Analytical Method: EPA 1010 >200 deg F 70.0 1 02/16/18 09:30 Analytical Method: EPA9045 5.9 Sid. Units 0.10 1 02/16/18 13:40 Analytical Method: SM 2710B 15200 mg/kg 0.12 1 02/27/1816:48 N2 Analytical Method: TKN+NO3+NO2 Calculation 49000 mg/kg 40.0 1 02/27/1816:45 7727-37-9 Analytical Method: EPA 350.1 1993 Rev 2.0 2260 mg/kg 52.7 5 02/24/1815:17 7664-41-7 Analytical Method: EPA351.2 49000 mg/kg 1650 50 02/16/1817:49 7727-37-9 Analytical Method: EPA353.2 ND mg/kg 2.0 1 02/20/1815:06 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 4 of 22 QD Analytical www.pacelabs:cpm ANALYTICAL RESULTS Project: TWSA Dried Residual 2115 Pace Project No.: 92373517 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA Dried Residual Lab ID: 92373517001 Collected: 02/15/18 09:00 Received: 02/15/18 10:15 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 353.2 Nitrogen, NO2/NO3 Analytical Method: EPA353.2 Nitrogen, Nitrite ND mg/kg 1.0 1 02/20/1815:06 Nitrogen, NO2 plus NO3 ND mg/kg 2.0 1 02/20/18 15:06 365.1 Phosphorus, Total Analytical Method: EPA 365.1 Phosphorus 13100 mg/kg 364 200 02/21/18 01:06 7723-14-0 733C S Reactive Cyanide Analytical Method: EPA 9014 Preparation Method: SW-846 7.3.3.2 Cyanide, Reactive ND mg/kg 1.1 1 02/22/18 20:30 02/22/18 21:13 734S Reactive Sulfide Analytical Method: SM4500S2F-00 Preparation Method: SW-846 7.3.4.2 Sulfide, Reactive ND mg/kg 10.5 1 02/22/18 20:30 02/22/18 21:01 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 02/27/2018 04:50 PM without the written consent of Pace Analytical Services, LLC. Page 5 of 22 aceAnalXioal / www.pacelabs.com �1 I 1 ANALYTICAL RESULTS Project: TWSA dried residual 3/8 Pace Project No.: 92376216 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA dried residual Lab ID: 92376216001 Collected: 03/08/18 13:00. 'Received: 03/08/18 15:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual Percent Moisture Analytical Method:ASTM D2974-87 Percent Moisture 5.2 % 0.10 1 03/12/18 10:53 Sample: TWSA dried residual Lab ID: 92376216002 Collected: 03/08/18 14:00 - Received: 03/08/18 15:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qua[ Percent Moisture Analytical Method: ASTM D2974-87 Percent Moisture 4.6 % 0.10 1 03/12/18 10:53 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 03/19/2018 11:58 AM without the written consent of Pace Analytical Services, LLC. Page 4 of 12 RESEARCh & NAtYTiCAI LAWRATonk5, INC. For: Pace Analytical -Asheville 2225 Riverside Drove }Asheville, NC 28804 .Attn: Chris Derouen Report of Analysis 4/26/2018 Cilent Sample ID: TWSA Dried Residual Lab Sample 1D. 49640-01 Site: Pace Analytical -Asheville Collection Date: 4/23/2018 a12 46 Fecal Coliform Sill 9221 C E-2006 L P.O. Box 473 106 Short Street KernersAle, North Carolina 27284 ral_coa bass _noRL 4 t i ............. - <2 mpnlg TS LP 4/24/2018 NA = not onotyzed Tel: 336-996-2641 Fax: 336.996-0326 vAmrandalabs.com Page 1 Page 5 of 6 ki malXical tivrnupacela0.tmm _ Project: Dried Residual 5/8 Pace Project No.: 92383876 ANALYTICAL RESULTS Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 ( Sample: TWSA Dried Residual Lab ID: 92383876001 Collected: 05/08/1814:00 Received: 05/08/18 15:05 Matrix: Solid Results reported on a dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010 MET ICP Analytical Method:_ EPA 6010 Preparation Method: EPA 3050 Aluminum 24400 mglkg 86.0 10 05/19/1816:00 05121/1815:50 7429-90-5 Arsenic 2.3 mg/kg 0.86 1 05/19/18 16:00 05/20/18 20:30 7440-38-2 - Cadmium 1.1 mg/kg 0.086 1 05/19/1816:00 05/20/18 20:30 7440-43-9 - Calcium 10200 mg/kg 86.0 10 05/1911816:00 05/21/1815:50 7440-70-2 Chromium 19.0 mglkg 0.43 1 05/19/18 16:00 05/20/18 20:30 7440-47-3 Copper 315 mg/kg 0.43 1 05/19/18 16:00 05/20/18 20:30 7440-50-8 Lead 13.7 mg/kg 0.43 1 05/19/18 16:00 05/20/18 20:30 7439-92-1 Magnesium 4070 mg/kg 8.6 1 05/19/18 16:00 05/20/18 20:30 7439-95-4 Molybdenum 6.0 mg/kg 0.43 1 .05/19/18 16:00 05/20/18 20:30 7439-98-7 Nickel 15.2 mg/kg 0.43 1 05/19/1816:00 05/20/18 20:30 7440-02-0 Potassium 5450 mglkg 430 1 05119/1816:00 05/20/18 20:30 7440-09-7 Selenium 6.4 mg/kg 0.86 1 05/19/18 16:00 05/20/18 20:30 7782-49-2 Sodium 802 mg/kg 430 1 05/19/18 16:00 05/20/18 20:30 7440-23-5 Zinc 679 mg/kg 0.86 1 05/19/1816:00 05/20/18 20:30 7440-66-6 7471 Mercury Analytical Method: EPA 7471 Preparation Method: EPA 7471 Mercury 0.097 mg/kg 0.023 5 05/1611813:00 05/16/1815:19 7439-97-6 t �'-t540G Total Percent Solids Analytical Method: SM 254OG Total Solids 96.9 % 0.000010 1 05/09/18 16:59 Percent Moisture Analytical Method: ASTM D2974-87 Percent Moisture 3.1 % 0.10 1 05/1011811:04 1010 Flashpoint,Closed Cup Analytical Method: EPA 1010 Flashpoint >200.0 deg F 70.0 1 05/16/18 10:00 9045 pH Soil Analytical Method: EPA 9045 pH at 25 Degrees C 5.8 Std. Units 0.10 1 05/11/18 03:12 H1 Plant Available Nitrogen Analytical Method: SM 2710B Plant Available Nitrogen 8860 mg/kg 0.12 1 05/17/18 16:40 N2 Total Nitrogen Calculation Analytical Method: TKN+NO3+NO2 Calculation Nitrogen 28700 mg/kg 40.0 1 05/17/1816:47 7727-37-9 350.1 Ammonia Analytical Method: EPA 350.1 1993 Rev 2.0 Nitrogen, Ammonia 1270 mg/kg 20.2 2 05/15/1815:45 7664-41-7 351.2 Total Kjeldahl Nitrogen Analytical Method: EPA 351.2 Nitrogen, Kjeldahl, Total 28700 mg/kg 2240 50 05/16/18 02:58 7727-37-9 - 353.2 Nitrogen, NO2/NO3 Analytical Method: EPA 353.2 - . Nitrogen, Nitrate ND mglkg 2.0 1 05/16/18 21:36 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 05/21/2018 04:39 PM without the written consent of Pace Analytical Services, LLC. Page 4 of 24 �J 7 aceAnalytical sv�rxtpace)aDscom ANALYTICAL RESULTS Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Project: Dried Residual 5/8 Pace Project No.: 92383876 Sample: TWSA Dried Residual Lab ID• 92383876001 Collected: 05/08/18 14:00 Received: 05/08/1815:05 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 353.2 Nitrogen, N021NO3 Nitrogen, Nitrite Nitrogen, NO2 plus NO3 365.1 Phosphorus, Total Phosphorus 733C S Reactive Cyanide Cyanide, Reactive 734S Reactive Sulfide t Sulfide,'Reactive Date: 05/21/2018 04:39 PM Analytical Method: EPA 353.2 ND mg/kg 1.0 1 05/16/18 21:36 ND mg/kg 2.0 1 05/16/18 21:36 Analytical Method: EPA 365.1 15700 mg/kg 506 250 06/11/1810:25 7723-14-0 Analytical.Method: EPA 9014 Preparation Method: SW-846 7.3.3.2 ND mg/kg 1.0 1 05/14/18 21:17 05/15/18 00:04 Analytical Method: SM4500S2F-00 Preparation Method: SW-846 7.3.4.2 ND mg/kg 10.3 1 05/14/18 21:17 05/14/18 21:34 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 5 of 24 RES[ARCh&ANA1YTiCA1 LA ORATORiES INC& For: Pace Analytical -Asheville 2225 Riverside Drive Asheville, NC 28804 Attn: Chris Derouen Report of Analysis 5/15/2018 Client Sample ID: 'TWSA Dried Residual Lab Sample ID, 5036"1 Site: Pace Analytical -Asheville Collection Date: 51812018 '44:00TY.' Parameter Method Hogg gak Rep Limit Anals# Analysis Dateltime Fecal Coliform SM 9221 C E-2008 <2 mpn1qTS 2 LP 519/2018 t T, NA = not onoWed . ... ............. P.O. Box 473 106 Short Street KernersVille, North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 mvw.randalabs.corn Page I Page 23 of 24 KE�.EARCh.&ANAIyTiCA[ lb 6RATO RI Es,. N C4 'For: Pace An.alyVicalrAsheville, 2225:RivePside Drive Asheville, NO 28804 Attn: Chris DeFOu6n Report of Arialytis 7131/21018 C flent Sample , ID: TWSA Dried .116sidual Lab Sample ID: 53923-01 Site: Pace Analytical-A.sh.eville. Colibction,Dato: 712512018 j Parameter .Method Resul Units Rep' -Limit Anal ystAnalysis Date/Time FecaCcoiiform SM 9221 C E-2006 <2 mpNg TS 2 Bi 7l26/2018 NA = nol andlyzed -, aceAnalytical Y www.pacelabacom ~ ANALYTICAL RESULTS Project: Dried Residual 817 Pace Project No.: 92394777 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA DRIED RESIDUAL Lab ID: 92394777001 Collected: 08/07/18 14:00 Received: 08/07/18 14.43 Matrix: Solid Results reported on a dry weight" basis andare adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. 6010 MET ICP Analytical Method: EPA 601 OD Preparation Method: EPA 3050E Aluminum 21100 mg/kg 48.3 5 08/08/1810:13 08/11/18 20:22 7429-90-5 Arsenic 3.1 mg/kg 0.97 1 08/08/1810:13 08/10/18 01:36 7440-38-2 Cadmium 1.3 mg/kg 0.097 1 08108/1810:13 08/10/18 01:36 7440-43-9 Calcium 9110 mg/kg 9.7 1 08/08/18 10:13 08/10/18 01:36 7440-70-2 Chromium 17.9 mg/kg 0.48 1 08/08/18 10:13 08/10/18 01:36 7440-47-3 Copper 312 mg/kg 0.48 1 08/08/18 10:13 08/10/18 01:36 7440-50-8 Lead 15.3 mg/kg 0.48 1 08/08/18 10:13 08/10/18 01:36 7439-92-1 Magnesium 4680 mg/kg 9.7 1 08/08/1810:13 08/10/18 01:36 7439-95-4 Molybdenum 8.1 mg/kg 0.48 1 08/08/1810:13 08/10/18 01:36 7439-98-7 Nickel 13.8 mg/kg 0.48 1 08/08/1810:13 08/10/18 01:36 7440-02-0 Potassium 5560 mg/kg 483 1 08108/1810:13 08/10/18 01:36 7440-09-7 Selenium 3.9 mg/kg 0.97 1 08108/1810:13 08/10/18 01:36 7782-49-2 - Sodium 992 mg/kg 483 1 08/08/18 10:13 08/10/18 01:36 7440-23-5 Zinc 643 mg/kg 0.97 1 08/08/18 10:13 08/10/18 01:36 7440-66-6 7471 Mercury Analytical Method: EPA 7471 B Preparation Method: EPA 7471 B _Mercury 0.56 mg/kg 0.035 10 08/13/1814:01 08/13/1816:42 7439-97-6 r _54OG Total Percent Solids Analytical Method: SM 254OG-2011 Total Solids 97.7 % 0.000010 1 08/08/18 14:07 Percent Moisture Analytical Method: ASTM D2974-87 Percent Moisture 2.3 % 0.10 1 08/08/1814:01 9045 pH Soil Analytical Method: EPA 9045D pH at 25 Degrees C 6.3 Std. Units 0.10 1 08/13/1812:25 Plant Available Nitrogen Analytical Method: SM 271OB-2011 Plant Available Nitrogen 10000 mg/kg 0.12 1 n8/22HR 17•AR Total Nitrogen Calculation Nitrogen 350.1 Ammonia Nitrogen, Ammonia 351.2 Total Kjeldahl Nitrogen Nitrogen, Kjeldahl, Total 353.2 Nitrogen, N021NO3 Nitrogen, NO2 plus NO3 Nitrogen, Nitrate Nitrogen, Nitrite Date: 08/22/2018 05:47 PM Analytical Method: TKN+NO3+NO2 Calculation 32400 mg/k9 40.0 1 08/22/1817*41 7727-37-9 Analytical Method: EPA 350.1 Rev 2.0 1993 Mod. Preparation Method: EPA 350.1 Rev 2.0 1993 Mod. 1570 mg/kg 93.1 10 08/10/1812:59 08110/1817:37 7664-41-7 Analytical Method: EPA 351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.0 1993 32400 mg/kg 3300 100 08/21/18 01:46 08/22/18 03:59 7727-37-9 Analytical Method: EPA 353.2 Rev 2.0 1993 Preparation Method: EPA 353.2 Rev 2.01993 ND mg/kg 2.0 1 08/17/1810:49 0811711814:06 ND mg/kg 2.0 1 08/17/1810:49 08/1711814:06 14797-55-8 ND mg/kg 1.0 1 08/17/1810.49 08/17/1814:06 14797-65-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Qua[ H1 N2 Page 4 of 25 i laceAnalyfical www.pacelabscam L 4 i Project: Dried Residual 8/7 Pace Project No.: 92394777 ANALYTICAL RESULTS Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA DRIED RESIDUAL Lab ID: 92394777001 Collected: 08/07/18 14:00 Received: 08/07/18 14.43 Matrix: Solid Results reported on a dry weight" basis and are adjusted forpercent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 365.1 Phosphorus, Total Analytical Method: EPA 365.1 Rev 2.01993 Preparation Method: EPA 365.1 Rev 2.0 1993 Phosphorus 9560 mg/kg 474 250 08/17/18 03:16 08/20/18 21:14 7723-14-0 M6, R1 Sample: TWSA DRIED RESIDUAL Lab ID: 92394777002 Collected: 08/07/1814:00 Received: 08/07/1814:43 Matrix: Solid Results reported on a dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Percent Moisture Analytical Method: ASTM D2974-87 Percent Moisture 2.3 % 0.10 1 08/08/18 14:07 1010 Flashpoint,Closed Cup Analytical Method: EPA 1010A Flashpoint >200.0 deg F 70.0 1 08/14/18 16:57 9045 pH Soil Analytical Method: EPA 9045D pH at 25 Degrees C 6.4 Std. Units 0.10 1 08/12/18 15:23 '33C S Reactive Cyanide Analytical Method: EPA 9014 Preparation Method: SW-846 7.3.3.2 - "Cyanide, Reactive ND mg/kg 1.0 1 08/09/18 23:37 08/10/18 00:38 734S Reactive Sulfide Analytical Method: SM4500S217-00 Preparation Method: SW-846 7.3.4.2 Sulfide, Reactive ND mg/kg 10.2 1 08/09/18 23:37 08/09/18 23:39 r REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 08/22/2018 05:47 PM without the written consent of Pace Analytical Services, LLC. Qual H1 Page 5 of 25 r� l �- LAORAT®RIES, INC. For: Pace Analytical -Asheville 2225 Riverside Drive Asheville, NC 28804 Attn: Chris Derouen Client Sample ID: TWSA Dried Residual Site: Pace Analytical -Asheville Report of Analysis 8/13/2018 t��uu��►f�� AIACy,.'4y w ; a o CCCSSA77 + C9 NC1134 Z C • NC 037701 Lab Sample ID: 54391-01 Collection Date: 8/7/2018 T4:00 I Parameter meter Method Result Units Ron Limit Analyst Analysis Date/Time 1 Frond r`M;f— QAa nna4 n c nnnc •� ugrnry . v a uu vw...v w rvc NA = not analyzed r, —P.O. Box 473 106 Short Street Kernersville. North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 ww mandalabs.com Page 1 Page 24 of 25 - "RESEARCH &ANAIYT*ICAI .m. LA-b-o"Tokits, report: of For: Pace Ana101oad-Ashev'1116 ea 2225. Mve rslda'Drlvo� % AhOVOIO;i NO .26604 NCVi4 NIC6;.701 Attriviw' dksberduen Clulaht'Uh.010 ID: TWSA Dried Reildlu6l fecei U : b temple 10;- 55029.-01 altai Pace .AnalytIcid-Asheville C0116ctlpn Date: 9M.U2018 43.100, -Eprarneter. method Rk& Mak 'deb ithlt Anslvst Analvalp-12ptalme Fecal-colubr, rr, SM:9221,:C.SWOS ;42 mphigTIS 2 Bi 9/1212018 1320t' NA not onalyzed tQ .FA SOX473-108.Shmit Street, r..bmd.mvflf#. North.Carollha -:27284 T41:336-996-2841 Fax: 3WG96-0326 wwwmandalabs.cora Pago I 10 o -lasic-Ad Page 5 of 6 0 r c -~ RESEARCh & ANALYTICA[ �f €} LABORATORIES INC. For: Pace Analytical -Asheville 2225 Riverside Drive Asheville, NC 28804 Attn: Chris Derouen Report of Analysis 10/10/2018 I..; NC1134 �N NCU37701 i o i���t+'•®!REctc�.V V.o �% Client Sample ID: TWSA Dried Residual Lab Sample ID: 56963.01 Site: Pace Analytical -Asheville Collection Date: 10/1/2018 Parameter Method Result Units Rep Limit Anal st Analysis Date/Time Fecal Coliform SM 9221 C E-2006 <2 mpn/g TS 2 BJ 10/2/2018 Jp45:= NA = not analyzed P.O. Box 473 106 Short Street Kernersville, North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 www.randalabs.com Page 1 ral coa basic v1d Page 5 of 6 aceAnalytical www.pacelabscom f I ti Project: TWSA DRIED RESIDUAL Pace Project No.: 92406196 ANALYTICAL RESULTS Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA DRIED RESIDUAL Lab ID: 92406196001 Collected: 11106/1814:00 Received: 11106/18.15:21 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. 6010 MET ICP Analytical. Method: EPA 6010D Preparation Method: EPA 3050E Aluminum 32700 mg/kg 76.1 10 11/14/1810:49 11/18/18 00:48 7429-90-5 Arsenic ND mg/kg 0.76 1 11/14/1810:49 11/15/18 23:39 7440-38-2 Cadmium 1.2 mg/kg 0.076 1 11/14/18 10:49 11/15/18 23:39 7440-43-9 Calcium 10400 mg/kg 76.1 10 11/14/1810:49 11/18/18 00:48 7440-70-2 Chromium 21.8 mg/kg 0.38 1 11/14/1810:49 11/15/18 29:39 7440-47-3 Copper 429 mg/kg 0.38 1 11/14/1810:49 11/15/18 23:39 7440-50-8 Lead 18.7 mg/kg 0.38 1 11/14/1810:49 11/15/18 23:39 7439-92-1 Magnesium 3690 mg/kg 7.6 1 11/1411810:49 11/15/18 23:39 7439-95-4 Molybdenum 5.8 mg/kg 0.38 1 11/14/1810.49 11/15/18 23:39 7439-98-7 Nickel 17.3 mg/kg 0.38 1 11/14/1810:49 11/15/18 23:39 7440-02-0 Potassium 3390 mg/kg 380 1 11/14/1810:49 11/15/18 23:39 7440-09-7 Selenium 5.7 mg/kg 0.76 1 11/14/1810:49 11/15/18 23:39 7782-49-2 Sodium 508 mg/kg 380 1 11/14/1810:49 11/15/18 23:39 7440-23-5 Zinc 993 mg/kg 7.6 10 11/14/1810:49 11/18/18 00:48 7440-66-6 7471 Mercury - Analytical Method: EPA 7471 B Preparation Method: EPA 7471 B Mercury 1.1 mg/kg 0.056 10 11/13/18 21:07 11/14/1812:05 7439-97-6 `- .OG Total Percent Solids Analytical Method: SM 2540G-2011 Total Solids 98.1 % 0.000010 1 11/14/1816:30 Percent Moisture Percent Moisture 1010 Flashpoint,Closed Cup Flashpoint 9045 pH Soil pH at 25 Degrees C Plant Available Nitrogen Plant Available Nitrogen Total Nitrogen Calculation Nitrogen 350.1 Ammonia Nitrogen, Ammonia 351.2 Total Kjeldahl Nitrogen Nitrogen, Kjeldahl, Total 353.2 Nitrogen, NO2/NO3 ^"+rogen, NO2 plus NO3 l Date: 11/29/2018 04:48 PM Analytical Method: ASTM D2974-87 1.9 % 0.10 1 11/14/1816:15 Analytical Method: EPA 1010A >200 deg F 70.0 1 11107/1814:55 Analytical Method: EPA 9045D 5.8 Std. Units 0.10 1 11/07/18 06:48 Analytical Method: SM 2710B-2011 14500 mg/kg 0.12 1 11/29/1812:17 Analytical Method: TKN+NO3+NO2 Calculation 46700 mg/kg 40.0 1 11/29/1812:20 7727-37-9 Analytical Method: EPA 350.1 Rev 2.01993 Mod. Preparation Method: EPA 350.1 Rev 2.01993 Mod. 2260 mg/kg 48.1 5 11/1411817,40 11/15/1817:09 7664-41-7 Analytical Method: EPA 351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.01993 46700 mg/kg .1960 50 11/26/18 14:30 11/28/18 03:58 7727-37-9 Analytical Method: EPA 353.2 Rev 2.01993 Preparation Method: EPA 353.2 Rev 2.01993 ND mg/kg 2.0 1 11/19/1810:38 11/20/18 09:39 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Without the written consent of Pace Analytical Services, LLC. Qual M6 M6 M1 M1 M1 M6 H1 H3 N2 M1,R1 M6, R1 M1,R1 Page 4 of 24 1- aceAnalytical / www.pacelabs.com Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 i Project: TWSA DRIED RESIDUAL Pace Project No.: 92406196 ANALYTICAL RESULTS Sample: TWSA DRIED RESIDUAL Lab ID: 92406196001 Collected: 11/06/18 14:00 Received: 11/06/18 15:21 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 353.2 Nitrogen, NO2/NO3 Analytical Method: EPA 353.2 Rev 2.0 1993 Preparation Method: EPA 353.2 Rev 2.0 1993 Nitrogen, Nitrate ND mglkg 2.0 1 11/19/1810:38 11/20/18 09:39 14797-55-8 Nitrogen, Nitrite ND mg/kg 1.0 1 11/19/1810:38 11/20/1809:39 14797-65-0 M1,R1 • 365.1 Phosphorus, Total Analytical Method: EPA 365.1 Rev 2.01993 Preparation Method: EPA 365.1 Rev 2.01993 Phosphorus 11400 mg/kg 392 200 11/15/18 03:56 11/15/18 08:55 7723-14-0 M6, R1 733C S Reactive Cyanide Analytical Method: EPA 9014 Preparation Method: SW-846 7.3.3.2 Cyanide, Reactive ND mg/kg 1.0 1 11/16/18 01:01 11/16/18 02:46 734S Reactive Sulfide Analytical Method: SM4500S2F-00 Preparation Method: SW-846 7.3.4.2 Sulfide, Reactive ND mg/kg 10.2 1 11/16/18 01:01 11/16/18 01:08 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 11 /29/2018 04:48 PM without the written consent of Pace Analytical Services, LLC. Page 5 of 24 lay} RESEARCh & ANA1YTICA1 ,K'i, % LAbORATORIES� INC. For: Pace Analytical -Asheville 2225 Riverside Drive Asheville, NC 28804 Attn: Chris Derouen Report of Analysis 11 /8/2018 ,'kJ1111111,14, • p2ki': NC 934 NC937701 9 .- Client Sample ID: TWSA Dried Residual Lab Sample ID: 58716-01 Site: Pace Analytical -Asheville Collection Date: 11/6/2018 14:00 Parameter Method Result Units Rep Limit Analyst Analysis DatelTime Fecal Coliform SM 9221 C E-2006 <2 mpn/g TS 2 BJ 11/7/2018 1350 NA = not analyzed P.O. Box 473 1116 Short Street Kernersvllle, North Carolina 27284 Tel: 336-996.2841 Fax: 336-996.0326 www.randalabs.com Page 1 (al con basicOd Page 23 of 24 2018 TCLP Analysis f aceAmlyical --pece/abs;com 1 ' September 20, 2018 Mr. Stan Bryson Tuckaseigee Water & Sewer Co. 1246 West Main Street Sylva, NC 28779 t RE: Project: TCLP Scan 9/11 Pace Project No.: 92399078 0 CT _ 4 2018 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Dear Mr. Bryson: Enclosed are the analytical results for sample(s) received by the laboratory on September 11, 2018. The results relate only to the samples included in this report. Results reported herein conform to the most current, applicable TNI/NELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. If you have any questions concerning this report, please feel free to contact me. Sincerely, Chris Derouen christopher.derouen@pacelabs.com (828)254-7176 Project Manager Enclosures REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, I.I.C. Page 1 of 18 aceAnalyfical wwwpacelabs.com �l CERTIFICATIONS Project: TCLP Scan 9/11 Pace Project No.: 92399078 Atlanta Certification IDs 110 Technology Parkway Peachtree Comers, GA 30092 North Carolina Certification #: 381 Florida DOH Certification #: E87315 South Carolina Certification #: 98011001 Georgia DW Inorganics Certification #: 812 Texas Certification #: T104704397-08-TX Georgia DW Microbiology Certification #: 812 Virginia Certification #: 460204 Charlotte Certification IDs 9800 Kincey Ave. Ste 100, Huntersville, NC 28078 Louisiana/NELAP Certification # LA170028 North Carolina Drinking Water Certification #: 37706 North Carolina Field Services Certification #: 5342 North Carolina Wastewater Certification #: 12 Asheville Certification IDs 2225 Riverside Drive, Asheville, NC 28804 Florida/NELAP Certification #: E87648 Massachusetts Certification #: M-NC030 North Carolina Drinking Water Certification #: 37712 South Carolina Certification #: 99006001 Flodda/NELAP Certification #: E87627 Kentucky UST Certification #: 84 Virginia/VELAP Certification #: 460221 North Carolina Wastewater Certification #: 40 South Carolina Certification #: 99030001 VirginiafVELAP Certification #: 460222 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 2 of 18 ,aceAnalytical www.paeelapaxw Project: TCLP Scan 9/11 SAMPLE ANALYTE COUNT Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Pace Project No.: 92399078 Analytes Lab ID Sample ID, Method Analysts Reported Laboratory 92399078001 TWSADRIED RESIDUAL EPA 8081B NU1 9 PASI-C EPA8151A ACM 3 PASI-GA EPA 601OD DS 7 PASI-A EPA7470A SER 1 PASI-A EPA 8270D PKS 18 PASI-C EPA 8260B GAW 14 PASI-C REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 3 of 18 acoAnalytical www.pacelabs.com 1 ANALYTICAL RESULTS Project: TCLP Scan 9/11 Pace Project No.: 92399078 Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 Sample: TWSA DRIED RESIDUAL Lab ID: 92399078001 Collected: 09/11/18 13:00 Received: 09/11/18 14:30 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qua[ 8081 TCLP Pesticides RVE gamma-BHC (Lindane) Chlordane (Technical) Endrin Heptachlor Heptachlor epoxide Methoxychlor Toxaphene Surrogates Decachlorobiphenyl (S) Tetrachloro-m-xylene (S) 8151A Cl Acid Herbicides TCLP 2,4-D 2,4,5-TP (Silvex) Surrogates -- 2,4-DCAA (S) 6010 MET ICP, TCLP Arsenic Barium Cadmium Chromium Lead Selenium Silver 7470 Mercury, TCLP Mercury 8270 MSSV TCLP Sep Funnel 1,4-Dichlorobenzene 2,4-Dinitrotoluene Hexachloro-1,3-butadiene Hexachlorobenzene Hexachloroethane 2-Methylphenol(o-Cresol) 3&4-Methylphenol(m&p Cresol) Nitrobenzene Pentachlorophenol Pyridine 2,4,5-Trichlorophenol Analytical Method: EPA 8081 B Preparation Method: EPA 3510C Leachate Method/Date: EPA 1311; 09/12/18 17:30 Initial pH: 6.75; Final pH: 5 ND ug/L 0.50 1 09/18/1815:26 09/19/1813:27 58-89-9 ND ug/L 3.0 1 09/18/1815:26 09/19/1813:27 57-74-9 ND ug/L 0.50 1 09/18/181'5:26 09/19/1813:27 72-20-8 ND ug/L 0.50 1 09/1811815:26 09/19/1813:27 76-44-8 ND ug/L 0.50 1 09/18/1815:26 09/19/1813:27 1024-57-3 ND ug/L 1000 1 09/18/1815:26 09/19/1813:27 72-43-5 ND ug/L 3.0 1 09/1811815:26 09/19/1813:27 8001-35-2 67 % 10-138 1 09/18/1815:26 09/19/1813:27 2051-24-3 73 % 10-110 1 09/1811815:26 09/19/1813:27 877-09-8 Analytical Method: EPA8151A Preparation Method: EPA8151A Leachate Method/Date: EPA 1311; 09/17/18 14:00 Initial pH: 6.58; Final pH: 4.99 ND mg/L 0.0050 1 09/19/1810:30 09/19/1818:13 94-75-7 ND mg/L 0.010 1 09119/1810:30 09/19/1818:13 93-72-1 122 %. 10-155 1 09/19/1810:30 09/19/1818:13 19719-28-9 Analytical Method: EPA6010D Preparation Method: EPA3010A Leachate Method/Date: EPA 1311; 09112/1819:44 Initial pH: 5.96; Final pH: 5 ND mg/L 0.050 1 09/1311815:18 09/17/1818:58 7440-38-2 ND mg/L 0.25 1 09/13/18 15:18 09/14/18 20:15 7440-39-3 ND mg/L 0.0050 1 09/13/18 15:18 09/14/18 20:15 744043-9 ND mg/L 0.050 1 09/13/18 15:18 09/14/18 20:15 7440-47-3 ND mg/L 0.025 1 09/13/18 15:18 09/14/18 20:15 7439-92-1 ND mg/L 0.10 1 09/13/18 15:18 09/14/18 20:15 7782-49-2 ND mg/L 0.025 1 09/13/18 15:18 09/14/18 20:15 7440-22-4 Analytical Method: EPA7470A Preparation Method: EPA7470A Leachate Method/Date: EPA 1311; 09/12/18 19:44 Initial pH: 5.96; Final pH: 5 0.00059 mg/L 0.00020 1 09/13/18 21:20 09/17/18 13:06 7439-97-6 Analytical Method: EPA8270D Preparation Method: EPA 3510C Leachate Method/Date: EPA 1311; 09/12/18 17:30 Initial pH: 6.75; Final pH: 5 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 106-46-7 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 121-14-2 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 87-68-3 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 118-74-1 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 67-72-1 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 95-48-7 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 15831-10-4 ND ug/L 500 1 09/13/18 11-56 09/14/18 01:16 98-95-3 ND ug/L 1000 1 09/13/18 11:56 09/14/18 01:16 87-86-5 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 110-86-1 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 95-95-4 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 09/20/2018 01:57 PM without the, written consent of Pace Analytical Services, LLC. Page 4 of 18 n u ' j aceAnalyiical rnwipecelab&COM 1 Project: TCLP Scan 9/11- Pace Project No.: 92399078 Sample: TWSA DRIED RESIDUAL Parameters 8270 MSSV TCLP Sep Funnel 2,4,6-Trichlorophenol Surrogates Nitrobenzene-d5 (S) 2-Fluorobiphenyl (S) Terphenyl-d14 (S) Phenol-d6 (S) 2-Fluorophenol (S) 2,4,6-Tribromophenol (S) 8260 MSV TCLP Benzene 2-Butanone (MEK) Carbon tetrachloride Chlorobenzene Chloroform 1,4-Dichlorobenzene i- 1,2-Dichloroethane 1,1-Dichloroethene Tetrachloroethene Trichloroethene Vinyl chloride Surrogates 1,2-Dichloroethane-d4 (S) Toluene-d8(S) 4-Bromofluorobenzene (S) Date: 09/20/2018 01:57 PM Pace Analytical Services, LLC 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 ANALYTICAL RESULTS Lab ID: 92399078001 Collected: 09/11/18 13:00 Received: 09/11/18 14:30 Matrix: Water Results Units Report Limit DF Prepared Analyzed CAS No. Analytical Method: EPA8270D Preparation Method: EPA 3510C Leachate Method/Date: EPA 1311; 09/12/18 17:30 Initial pH: 6.75; Final pH: 5 ND ug/L 500 1 09/13/18 11:56 09/14/18 01:16 88-06-2 28 % 12-102 1 09/13/18 11:56 09/14/18 01:16 4165-60-0 25 % 13-107 1 09/13/18 11:56 09/14/18 01:16 321-60-8 63 % 21-132 1 09/13/18 11:56 09/14/18 01:16 1718-51-0 12 % 10-110 1 09/13/18 11:56 09/14/18 01:16 13127-88-3 16 % 10-110 1 09/13/18 11:56 09/14/18 01:16 367-12-4 77 % 27-108 1 09/13/18 11:56 09/14/18 01:16 118-79-6 Analytical Method: EPA8260B Leachate Method/Date: EPA 1311; 09/12/18 14:30 ND ug/L 100 20 09/13/18 20:48 71-43-2 321 ug/L 200 20 09/13/18 20:48 78-93-3 ND ug/L 100 20 09/13/18 20:48 56-23-5 ND ug/C 100 20 09/13/18 20:48 108-90-7 ND ug/L 100 20 09/13/18 20:48 67-66-3 ND ug/L 100 20 09/13/18 20:48 106-46-7 ND ug/L 100 20 09/13/18 20:48 107-06-2 ND ug/L 100 20 09/13/18 20:48 75-35-4 ND ug/L 100 20 09/13/18 20:48 127-18-4 ,ND ug/L 100 20 09/13/18 20:48 79-01-6 ND ug/L 100 20 09/13/18 20:48 75-01-4 110 % 70-130 20 09/13/18 20:48 17060-07-0 113 % 67-135 20 09/13/18 20:48 2037-26-5 111 % 70-130 20 09/13/18 20:48 460-00-4 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Qual Page 5 of 18 r. Pace Analytical Services, LLC ® 2225 Riverside Dr. aceAnalyfical wwwpaoelapa.cam Asheville, NC 28804 (828)254-7176 QUALIFIERS Project: TCLP Scan 9111 Pace Project No.: 92399078 DEFINITIONS DF - Dilution Factor, if reported, represents the factor applied to the reported data due to dilution of the sample aliquot. ND - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL -Adjusted Method Detection Limit. PQL - Practical Quantitation Limit. RL - Reporting Limit - The lowest concentration value that meets project requirements for quantitative data with known precision and bias for a specific analyte in a specific matrix. S - Surrogate 1,2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270. The result for each analyte is a combined concentration. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates .the compound was analyzed for, but not detected. Acid preservation may not be appropriate for 2 Chloroethylvinyl ether. A separate vial preserved to a pH of 4-5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylonitrile by EPA Method 8260. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI -The NELAC Institute. LABORATORIES PASI-A Pace Analytical Services -Asheville PASI-C Pace Analytical Services -Charlotte PASI-GA Pace Analytical Services -Atlanta, GA Date: 09/20/2018 01:57 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 14 of 18 • 2018 Annual Pathogen and Vector Attraction Reduction Form PVRF 503 ANNUAL, PATHOGEN AND VECTOR ATTRACTION REDUCTION FORM (503 Rules) Facility Name: Tuckaseigee Water and Sewer Auth. WQ Permit Number: WQ0005763 WWTP Name: TWSA Plant #1 NPDES Number: NCO039578 Monitoring Period: From 1/1/2018 To 12/31/2018 Pathogen Reduction (40 CFR 503.32) - Please indicate level achieved and alternative performed: Class A: Alternative 1 ❑ Alternative 2 ❑ Alternative 3 ❑ Alternative 4 ❑ Alternative 5 0 Alterative 6 ❑ If applicable to alternative performed (Class A only) indicate "Process to Further Reduce Pathogens": Compost ❑ Heat Drying El Heat Treatment ❑ Thermophilic ❑ Beta Ray4Gamma a Ray Y z Pasteur? atron ❑ ClassB: Alternative 1 ❑ Alternative 2 ❑ If applicable to alternative performed (Class B only) indicate "Process to Significantly Reduce Pathogens": Lime Stabilization ❑ Air Drying❑ Com osting ❑ Aerobic Digestion ❑ Anaerobic Digestion ❑ If applicable to alternative performed (Class A or Class B) complete the following monitoring data: Parameter Allowable Level in Sludge Pathogen Density Number ot e- de Cee Frequency of Analysis Sample 'Type na ytica Tech - inane u Geo. Mean axim Units Fecal Coliform 2 x 10 to the 6th power per gram of total solids NUN CFU 1000 mpn per gram of total solid (dry weight) < 2 < 2 mpn/g 0 quaterly grab SM 9221 Salmonella bacteria (in lieu of fecal colifb2y 3 MPN per 4 grams total solid (dry weight) Vector Attraction Reduction (40 CFR 503.33) - Please indicate option performed: Alt.1 (VS reduction) ❑ Alt. 2 (40-day bench) ❑ Alt. 3 (30-day bench) ❑ I Alt. 4 (Spec. 02 uptake) ❑ Alt. 5 (14-Day Aerobic) ❑ Alt. 6 (Alk. Stabilization ❑ Alt 7 (Drying - Stable) ❑ 1Alt. 8 (Drying - Unstable)❑ Alt. 9 (Injection) ❑ Alt. 10 (Incorporation) ❑ No vector attraction reduction alternatives were performed ❑ CERTIFICATION STATEMENT (please check the appropriate statement) 0 "I certify, under penalty of law, that the pathogen requirements in 40 CFR 503.32 and the vector attraction reduction requirement in 40 CFR 503.33 have been met." ❑ " I certify, under penalty of law, that the pathogen requirements in 40 CFR 503.32 and the vector attraction reduction requirement in 40 CFR 503.33 have not been met." (Please note if you check this statement attach an explanation why you have not met one or both of the requirements.) "This determination has been made under my direction and supervision in accordance with the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen and vector attraction reduction requirements have been met. I am aware that there are significant penalties for false certification including fine and imprisonment." �e-.-TGI n �) y c�0►� L�9 w T /0 ��j , Preparer Name and Title (type or print) Signature of Preparer* Dat Land Applier Name and Title (if applicable)(type or print) Signature of Land Applier (if applicable) Date *Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 2T .1102 (26) DENR FORM PVRF 503 (12/2006) 2018 Annual Sludge Production Data Part A Residual Sources and Volume Sludge Volume Produced Month Source (dry tons January TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 0.00 1.49 0.00 1.49 February TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 26.14 1.42 0.00 27.56 March TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 37.71 2.26 0.00 39.97 April TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 30.95 1.75 3.12 35.82 May TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 24.31 1.83 0.00 26.14 June TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 16.17 1.80 3.03 21.00 2018 Appendix A Part A Residual Sources and Volume Sludge Volume Produced Month Source (dry tons July TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 22.55 2.80 0.00 26.35 August TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 14.54 1.41 0.00 15.95 September TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 0.00 1.54 2.72 4.26 October TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 26.17 0.99 0.00 27.16 November TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 15.75 2.40 0.00 18.15 December TWSA Plant # 1 (NC0039578) TWSA Plant # 2 (NC0020214) TWSA Plant # 3 (NC0063321) Monthly Total 16.42 0.76 0.00 17.18 Est. Total "sludge" produced by all sources for 2018= 260.03 dry tons Calculated Total "sludge" dewatered by belt press in 2018= 254.3 dry tons Daily Dryer Record TWSA DRYER OPERATIONS I • `" DAILY RECORD DATE [ 'a START STOP TOTAL �• RUN TIME, HRS 1 DRYER BATCH FILL CYCLE START @ '6 -DRY CYCLE STARTED @ :+38 DISCHARGE CYCLE STARTED @ TGAADGRATI IRCC 0C'CHAMBER =WIN OUT DRYER -OUTPUT % SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH T n GRAMS OOLA4 '2-0-, gL4 9 1STWGT. QA IC16 2ND WGT.._a 3RD WGT. B AW X 100 ND 1 I 9 2DRYER BATCH FILL CYCLE START @j 3 DRY CYCLE STARTED @ t` S DISCHARGE CYCLE STARTED @ " :OF rrnnnrnA• 1.---.0- ® imm , + • ■ . ®® 1 . UT • • • • • • , m nto mifs a 1 'Mm DRYER OUTPUT % SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 2 3,aZ 41 1�rWGT. P_a V91 2ND WGT. . r u� 3RD WGT. p LLKLI 1 g5s-co Li I3 _ X 100 � % TOTAL SOLIDS ` CALCULATIONS: o� (DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE +'DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH . •...rr. v•.1-. VI "I. 9IVI•/J DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @.3-��' DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ i TFMPFRATI IRFS of k, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER' OUT ROTOR IN ROTOR OUT O.I. 3 :•53 , 0- 36 40 4o. i 3$2- L-Aoi ►q3 2,00 53Z go Lf w 408 Lizo 2-5q-" �3 q-57 j6o I 4L(Y.3(o .5 z3L 19(o 3 (0 `o I Liqq kt3 37 ' t S 5 LW75 4(,t:p I 44-C) 1 bra 315 DRYER OUTPUT_ SOLIDS RESET # RESET # CALCULATION DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS j 0 1 Li S 2-5.53 0S 1 T WGT. - 2ND WGT. 3RD WGT. I- vA RR q ff��r Q % TOTAL SOLIDS , 5 DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 17 WGT. ' 2ND WGT. 3Ro WGT. X 100 '= % TOTALSOLIDS DISH WGT GRAMS WET SAMPLE+DISH GRAMS DRIED SAMPLE'+DISH GRAMS GRAMS 1' WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) -,x 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS �,Yo i DAILY RECORD DATE '- I START STOP TOTAL r RUN TIME, HRS (v / 1st DRYER BATCH FILL CYCLE START @ ��3d� DRY CYCLE STARTED DISCHARGE CYCLE STARTED @ TEMPERATURES °F' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TINIER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT .0.1. -o A fe.o • IP-a 9.3( 6740 �. u DRYER OUTPUT SOLIDS DISH WGT GRAMS •WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS '1.0O-75 2-ytIZ-45 1ST WGT. 7 2ND WG ob �O 3RD WGT. % TOTAL SOLIDS 2ND DRYER BATCH p FILL CYCLE START @ / Q•1f� DRY CYCLE STARTED @ - DISCHARGE CYCLE STARTED @ TEMPERATURES °F DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. bD 46 11 q5 3 -7 X44- 7� DRYER OUTPUT' %SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS ZL4 ? 14 . -7 1 1r WGT. Si' Ci 2ND WGT. \� 3RD WGT. X100 %TOTALSOLID SOLIDS CALCULATIONS: . CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH w Pry I VVJH unirm Vrmm IUIVJ DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ a `f DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ • e : _3 7 TEMPERATURES DF , DISCHARGE DISCHARGE DRY CHANGER CHAMBER ROTOR ROTOR - TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. L2 c� ' R '3-i � K>� 14 ; 12- Z o .3 2-7 0 �f Z ?,o 4 Z. z6 a 6 Z 1.13(o 3Zt S0 W5 43 45 .. ; 37 'I D ID-7 Li Lt t-(�( 3q DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOIN DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS �o-oIc 2-e��y��. 1'WGT. a'.. 2ND WGT. S .3 C _ 3RD WGT. X-100 02�- /4 (p� '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1" WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTALSOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. S: 2ND WGT. 3RD WGT. ALARM`S OR COMMENTS l'-^Ad,PA.<-er i. k -�c X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. l x 100 WET SAMPLE + DISH -DISH SGT. '= % TOTAL SOLIDS wl+ _ use , ra r�� o t -- - �EZ-se f 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE 'y- -) q " 1 START STOP TOTAL --RUN TIME, HRS ; a 1st DRYER BATCH FILL CYCLE START @ Lo : 33 DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TEMPERATURES OF' will IF 44 a FIVE amp] Wei 6 fil TO CHAMBER Viam ® / :% rmmf . 7 �wzm � rg An om ffffl�I �wl P m W 4m DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH DRYER OUTPUT SOLIDS � X 100 % TOTAL SOLIDS 2ND DRYER BATCH I` U FILL CYCLE START @ I : q(D DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TMKADCDATt mcc Ur. DISCHARGE DISCHARGE DRY CHAMBER v CHAMBER ROTOR ROTOR ST PRODUCT TIMER OUT IN OUT TIME EXHAUST IN O.I. wl �o a o � o s z a7c b, :t5 16� y E' 7 .1 A DRYER OUTPUT SOLIDS y. 12/12/17JH DISH WGT GRAMS DRYER OUTPUT SOLIDS y. 12/12/17JH DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1ST WGT. S/ 2ND WGT. 3RD WGT. X100 ' = % TOTAL SOLIDS 9 CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS i vv jn vn i r-n vrLIAM I ww.J DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ ;S j DRY CYCLE STARTED @ , 2 6 DISCHARGE CYCLE STARTED @ ' 14 TFMPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER . IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. ?;oLt 3-a:5 3-7 c�5 2zo 1 t5Z7 2 d Lf 3 Z LkzD Lk3 Z- z--(19 b. 32 l b D LR5 t-(3(0 LP4 5 �Z 5 5 q 3 -71 160 LfL[5-q 55 qLfs e3(0,8 DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIO( DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1sTWGT. a3 . 3 D 2ND WGT. I 3RD WGT. X.100 a3 �� '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT: S: 3RD WGT. X 100 '= %TOTAL SOLIDS (DRIED SAMPLE+ -DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - c 12/12/17JH • I VVJA UKTtK UYtKA11UNb �1 -0 DAILY RECORD �Q DATE �- -- 1 " 1 START STOP TOTAL Y ....RUN TIME,. HRS Vok ,' 1st DRYER BATCH FILL CYCLE START @ •3 DRY CYCLE STARTED @ -DISCHARGE CYCLE STARTED @ v� TMAPFRATI IRFC oF• CHAMBER to] rt0p Mit i i i ,�0 Kohl DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH • GRAMS yw 0r�l`l(03• L�—�., ki QH 1STWGT. 107 2ND WGT. 3RD WGT. ND � �. l � � � ' _ % TOTAL SOLIDS � r I Af 0 2 DRYER BATCH FILL CYCLE START @-16:44 DRY CYCLE STARTED @ k M DISCHARGE CYCLE STARTED @ �9 TFKADFRATI IRFc DF ® • ` • , 1 • �® CHAMBER OUT • • • • • • • _ lcmlwom �mWh �� DRYER OUTPUT SOLIDS I 12/12/17JH DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH r GRAMS ,�► 1ST WGT. ,j t b\ D 2ND WGT. 3RD.WGT. 03" ` ;ty IX100 % TOTAL SOLIDS. �70 CALCULATIONS: (DRIED SAMPLE + DISH -DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = %TOTAL SOLIDS DAILY RECORD 3RD DRYER BATCH 'r FILL CYCLE START @ o�� ` — DRY CYCLE STARTED @ . 2-q DISCHARGE CYCLE STARTED @ TQ 1 TPRADIMATI MIN °D TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3: 2-4 zoZ 3 11 l 1 C30i l 2v •A •,�y a-i • 3,5--7 so qL4 5 Lf Sto L4L4S 30-7 • wtZ 04 1 6 S D 45r L[3'5 44 .3't �-•� R ot s 3-7-2- D 1 Lf L[5 43.5 46`s 3( e5 (o .3 ..3 4 t 93 4q d 4 vac jL.J DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS c ,o,g2,2 25,4502- 1'WGT. 2ND WGT. oC lPo2�-� 3RD WGT. X.100 %TOTAL SOLIDS 9 �. •� DISH WGTI-WETSAMPLE+DISH GRAMS GRAMS DRIED SAMPLE'+ DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT.. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE +DISH GRAMS GRAMS 1� WGT. S' 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH I VVJH Vni rn VYCRHI IVIVJ DAILY RECORD ' v DATE oZ ^ I C) _� START STOP TOTAL - RUN TIME, HRS 15i DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ 7 =17 DISCHARGE CYCLE STARTED @ `' rrnenrnnri terc Or' ®al , 1 • , wal ' • ®® CHAMBER OUT , • , • • • • DRYER OUTPUT SOLIDS DISH WGT WET -SAMPLE + DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS 41, i, 0(37 f WGT. 2ND WGT. 3RD WGT. x 100 r GiOl '_%TOTAL SOLIDS Ti'-7 2NO DRYER BATCH FILL CYCLE START @ U: S DRY CYCLE STARTED @7 DISCHARGE CYCLE STARTED @ TCBADCRATI'IR•GC OC mm W14mr-Allt-72m = u 10] pill" = =I I VMS OF x m WA IBM lwm T*Fmmff�CQI N DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS ` 1.ui Ll 'Z.I-lq4 1 1sTWGT. /7./a71j 2ND WGT. 3RD WGT. • i � � © 6 � � ,, . l � � 1L� ��� X 100 ' _ % TOTAL SOLIDS I d� CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ %TOTAL SOLIDS 12/12/17JH DAILY RECORD - 3 RD DRYER BATCH FILL CYCLE START @ '3'�' DRY CYCLE STARTED @ 3,3Z_ DISCHARGE CYCLE STARTED @ � 1 mre- Or DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1.— qb Ll 326 1417-3 205 IS: 00 S �. /�/ / 37z sv Y�IS 35 7 Liti DRYER OUTPUT SOLIDS RESET # DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1ST WGT. 2ND WGT.- 3 RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS i 5.�t 7D5 1' WGT. 2ND WGT. 3RD WGT. RESET # al►� CALCULATION X 100 % TOTALSOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS b 1ST WGT. S: 2ND WGT. 3RD WGT. ALARMS OR COMMENTS - 12/12/17JH ` t f X 1001_ / TOTAL SOLI S (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH :SGT. '= % TOTAL SOLIDS TWSA DRYER OPERATIONS G DAILY RECORD + �' DATE _ a O i 0 START STOP TOTAL �`-- RUNTIME,HRS 1' DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ `I •` %� DISCHARGE CYCLE STARTED @ TFMPPRATI PIN, 0G' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN' CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7:10 •9:a3 *2 vl 1,191. 17.0a le E:b V.Do 164 &llb oo 4447 & 3� 5-1 3 tr � o . fe 1 D:3 a yglo v5 -DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS _! 1.00so i2.•3b'31 1�r WGT. 1, 2ND WGT. 3RD WGT. • 161-76 f 3 x 100 «•� l TOTALSOLIDS� ND DRYER BATCH FILL CYCLE START @ d �� DRY CYCLE STARTED @- DISCHARGE CYCLE STARTED @ 02 ' A{b TEMPERATURES °F ® • 1 • • , • �® OUT +illiplipomm • • • • • • • pomp � � i � �� r DRYER OUTPUT SOLIDS 12/12/17JH i � y DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1, o l 15 1�r WGT. 2ND WGT. 3RD WGT. .T]f2 x100 qY f vc�(� ' = % TOTAL SOLIDS CALCULATIONS: (( iR (DRIED SAMPLE+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ %TOTAL SOLIDS I YVJ11 VI\1L % Wv L.11111V IYJ DAILY RECORD 3RD DRYER BATCH •� FILL CYCLE. -START @ .IST> DRY CYCLE STARTED @ '�5 DISCHARGE CYCLE STARTED @ TCAADCDATI IDCC DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :?5 "Jo . ") 2 r 390 66 -a33 15 -�L .oLl . 3-r1 50 14`45 4. 2 99 5 as-G . n qL6.u5 -) 100 14,• 5 ' 7 t , Ebb 2 3$°I 5 0 M 5 LA35 Llqs 36� 5H tiv Y 7- DRYER OUTPUT %SOLIDS RESET # RESET # CALCULATION DISH WGT GRAMS WET SAMPLE + DISH GRAMS" DRIED SAMPLE + DISH GRAMS GRAMS Iy . S2.1 b c 1sTWGT. /3r 2ND WGT. 3. 0 3RD WGT. V Lt 1� x 100 '=%TOTALSOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1 r WGT. 2ND WGT. 3RD W.GT. X 100 % TOTALSOLIDS DISH WGT -GRAMS . WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1'T WGT. S: 2ND WGT. 3RD WGT. ALARMS OR COMMENTS - r X 100 % TOTAL SOLIDS — (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE Iq`xo i t �a START STOP �3` OTAL - RUN TIME, HRS (Q :'o� /j'3 °•�� / 4 ' 1st DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ 2' b8' DISCHARGE CYCLE STARTED @ 133 Tl:hADG0ATI IRGC DC• m0rwrm-v��, OUT • 1 fflffbm�� owl • �i-- �,=7= S / 0 1 m Es". DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1'T WGT. J qp,0 c' '0� 17 WGT. !i:D r kRD WGT. X 100 ND % TOTAL SOLIDS _. � _ 2 DRYER BATCH FILL CYCLE START @ D `3 DRY CYCLE STARTED @ j .' (8 DISCHARGE CYCLE STARTED @ V, 73!9' TFMPFRaTi IR-FS DF OUT Ipm R-AVE Mir, I , �� • _ ra- in m IWI Am WE% •� � y I /J M DRYER OUTPUT % SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS L.OS97 1' WGT. 15,5097 qq 2ND WGT. 5,5o-7J. 3RD WGT. X 100 %TOTAL SOLIDS_ C34-3i CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH -DISH SGT. _ % TOTAL SOLIDS 12/12/17JH V• DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ Z-S DISCHARGE CYCLE STARTED @ '��•�V . I- °r DISCHARGE DISCHARGE 1 DRY CHAMBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN Ll OUT O.I. 1 ':Z5 2v� 3j1 d p 3012. o%/ 2391 av5 33 `IL16 43,6 p y Fiji LI-5 7 1135 IRV 36 3 3ff DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS //GRAMS 1T WGT. l,J�• Q (Uo2 4 2" WGT. 7 • "(f c� 3RD WGT. �o5te i (t7b X 100 %TOTAL SOLIDS /q L'-7D DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '_ % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS -GRAMS GRAMS 1sT WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE+ DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17J H TWSA DRYER OPERATIONS DAILY RECORD (� DATE �� j START STOP TOTAL RUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ : a9' DRY CYCLE STARTED @_$ DISCHARGE CYCLE STARTED TFMPFRATI IRFC or-* TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. o .3e:o d & 13 en oo 1 4 M33 4- ' C t l a b5 DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS I,0095 2r7t 25ZZ 1nWGT. �1a5 A5i I I 1 2ND-WGT- 3RD WGT. X 100 22!/ ND a�'to��o`17 - '=%TOTAL SOLIDS 5,5 2 DRYER BATCH FILL CYCLE START @ .3 DRY CYCLE STARTED @ :� -`� DISCHARGE CYCLE STARTED @ 3'•33 TFMPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY - TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. p• 1.3 b iq 8 ?3 0 ''o3 11) 1 -1-93 o 430 Af 1 0 ' GT7 16b 4,Y,57 1 g Lf 3 0 A00 I qL(Ll 1 4142- (4 =. 121 TL.i DRYER OUTPUT SOLIDS •.b. 12/12/17JH DISH WGT- GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS �c0 2t-(•39(q� 1STWGT. 93.9be 2ND WGT. t L L y 3RD WGT. CALCULATIONS �-a'si I (o r q-211 V3 (DRIED SAMPLE + DISH - DISH WGT.) WET SAMPLE + DISH - DISH SGT., X 100 q % TOTAL SOLIDS . [ x 100 _ % TOTAL SOLIDS i irg Krj DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ �3 DRY CYCLE STARTED @ L( DISCHARGE CYCLE STARTED a A- 1RrC-Or ' DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME- EXHAUST PRODUCT TIMER IN Lf.a -z OUT T IN 4 U OUT 0.1. �i.� l ;� w col - 23 z� 3 5 Z 6� 5158 1`t5 34 06 L(S 3 3� ;� y i S 8cp 15,0 -; 3 1 '3 �r5 IA�-{�l c�L5 L �3°1tit s�.s DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIO( u DISPVWGT GRAMS WET SAMPLE + DISH. GRAMS . DRIED SAMPLE.+ DISH GRAMS GRAMS [(TLjie3 25,c1Z(o% 17WGT.o.QC/- 9993 2ND WGT. 3RD WGT. ,93, 95 X 10D p Q� '= % TOTAL SOLIDS -1 " DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS P WGT. 2No WGT. 3R° WGT. x 100 TOTAL SOLIDS — DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. S: 2ND WGT. 3RD• WGT. ALARMS OR COMMENTS - X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS 12/12/17JH DAILY RECORD 31t DATE Le "� 1 START STOP TOTAL RUN TIME, HRS va 15L DRYER BATCH JJ FILL CYCLE START @ l0 33 DRY CYCLE STARTED @ 7 ' 6 & DISCHARGE CYCLE STARTED @ : c3 TCRADMATI IDCC °C' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER 'IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. •06 v a' qa3I E' 6 'a - 430 A4,1Ea ;� 3 190 • 445 3 $ it 160 - S' 3 14a41 'j J4 up/ DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS OR 9 9 9 2_5 1-7 `1 % % 1s-r WGT. .76715--l" 2ND WGT. -�2 3RD WGT. �J,/ b f l�oiUJ X100 ' = % TOTAL .SOLIDS \ 2ND DRYER BATCH FILL CYCLE START @.� :�} i DRY CYCLE STARTED @ I .`� DISCHARGE CYCLE STARTED @ a =3G, TCRADCDATI IOTM Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 1 314- 409 kote A49 f • zV S"D a-zr jar_- 1(9 a JV 3 7 41 h 7 1 . Lo 19 150 DRYER OUTPUT SOLIDS DISH WGT' GRAMS WETSAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS �,dt�5 22,5�55 1TWGT. 2ND WGT. ,��l�i �() 3RD WGT. Sol X 100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TA DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ tS'sZ( DISCHARGE CYCLE STARTED @ k' 3Cp • TCf A1]LDA" IDCC DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. IN 3 &?-,q [ 3 zz LA 3LE �kzZ � z� G� 5: t Z.o 6 :W-j4 3 �3� 5 1 ' 6 elg C9'0 '{ LI 3`I ( cl2.) Le qo q (-t 5 3 %7 DRYER OUTPUT %SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE'+ DISH GRAMS GRAMS GRAMS GRAMS D-C't9"7 3 2 1'WGT. 2ND WGT. A _7 2- 3RD WGT. a 152— 3g o� X. 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 109 %TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. S: 2ND WGT. 31D WGT. X 100 %TOTAL SOLIDS _ (DRIED SAMPLE + DISH — DISH WGT. 1 x 100 WET SAMPLE + DISH — DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS — 12/12/17JH C; ) TWSA DRYER OPERATIONS DAILY RECORD DATE J ` 7 v START STOP TOTAL RUN TIME, HRS F 1' DRYER -BATCH FILL CYCLE START @ �' � DRY CYCLE STARTED @ 7 • %d DISCHARGE CYCLE STARTED @ 114 -7,.S`` TCKADCRATI IRGC DC- TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER, OUT ROTOR IN ROTOR OUT 0.1. 7:kb ik 0 2 3 67 2),70 3 7ad o 3"60 0-o a. � se 'vg� /.l .9519 eigo a 1 v a Y4- 3 d FD :yo "1 �19 , 8b /s b -V#,O I Z37 DRYER OUTPUT %SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS o rv3 2.. k ( I•Sq 1TWGT. /S. 2ND WGT. ' 0.Od(o� 3RD WGT.�j x soo C�-/• Its*%71 5 ' _ %TOTAL SOLIDS 2NO DRYER BATCH FILL CYCLE START @ b S3 -� DRY CYCLE STARTED @ j : I ID DISCHARGE CYCLE STARTED @ TCA/IDIM ATI IR•FC OC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 461 A2 PLO : no _ :3D S ao A06 DRYER OUTPUT SOLIDS 12/12/17JH DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 3 3Cl % 1T WGT. .1L/.94P/S 2ND WGT. `�-l. q 37S 3RD WGT. SCJ ,)-1.93 %S ~- =• x soo) �.3.335'r - I•oa��' ��>333 . %=%TOTAL SOLIDS q''' 7 --)— CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT. l x 100 WET SAMPLE + DISH - DISH SGT. _ %TOTAL SOLIDS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ o2.'?/0 DRY CYCLE STARTED @ % �� DISCHARGE CYCLE STARTED CO ;3 0, DISCHARGE DISCHARGE .1 DRY %WJI% CHAMBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN q. OUT - 3'7/0 IN C 3q 1 OUT z-Z 5' 0.1. " l ff ,0S �.r 2,oLk i 3 ZZ O 2-6 18 l, 65 1 1 `ts c3tf0 t' D zf� �-t t fq!5 v —1 U21 .q5 19 7 5 3 d 44- � , `Z Z5z DRYER OUTPUT SOLIDS 5-119 RESET# t-5+ RESET# ' • DISHWGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS Z % At 31 1' WGT. 2ND WGT. ap ja-g& 3RD WGT. CALCULATIOD X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS -, 1 Q1)A3 1' WGT. /17 1a3T 2ND WGT. 1'9 q 3RD WGT. 19, /a 73 Zv 1� Ivoge3 . Dotg X 100 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS ?log 1TWGT. a-l. 1714- S: 2ND WGT. 3RD WGT. x 100 %TOTAL SOLIDS (DRIED SAMPLE + DISH'- DISH WGT.) x 100 WET SAMPLE+ DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH DAILY RECORD DATE START STOP TOTAL " rtUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ b 1p DRY CYCLE STARTED @ 7+3I DISCHARGE CYCLE STARTED @ 1.'D_:374o TGKADGDATI in GC Or_' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANGER IN CHAMBER OUT ROTOR IN ROTOR OUT OJ. aol 315 b 3S-b U5 39-E - '-I- 7 W J414 9" AAA -• 1 ,60o 6 •o t� 7 �,A �. DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS p�-'-"- L 2-L4 Z l 1'WGT. vgl 4 . 6o 2ND WGT. „c/g--7e? 3Ro WGT. F X 100 TOTAL SOLIDS 2ND DRYER BATCH FILL CYCLE START @ % DIP DRY CYCLE STARTED @ J Z 1 DISCHARGE CYCLE STARTED @_ TCIIADGDATI I cc Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN'- CHAMBER OUT ROTOR IN ROTOR OUT 0.1. o t) 3 a`8,. a 42 rr'�� itiT 3 9 aD .% v D j "'� 14.-� r �J �% e II t Ll l ' �• ''f� 7 3-D1 q 3 1 (� R 1 DRYER OUTPUT % SOLIDS l 12/12/17JH DISH WGT • GRAMS WET SAMPLE + DISH GRAMS GRA M�S DRIED SAMPLE + DISH i t u3(V ZLtt (zcl 2 l -GRAMS 1TWGT. 2ND WGT. 3RD WGT. ;2—Qr Ll9&q a%�39 `T X100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS DAILY RECORD 3RD.DRYER BATCH. FILL CYCLE START @ l4 DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED • TrwAMVnArl Inre- Or DISCHARGE DISCHARGE DRY CHANBER CHAMBER - ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT O.I. ' �{ Z b 1 3 7�ZS3 36 Lc Zo '—�3L124. Lq l Lq Va L 5 '. . 2,00 D 5 t-4 3``L L. 3 I S i7 S L-4 3 LC�- 3 S 7 :0 i q o ( q. 4 c) L( � DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1 , O l 3-0 22 S , -7 (33a' 1' WGT. 2ND WGT. 3RD WGT. ,a3.05I ,�g31ds1 X100 a4 Gt '=%TOTAL SOLIDS Rh/• �m DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 17 WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3Ro WGT. S: r ALARMS OR COMMENTS - 12/12/17JH X 100 . % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. 1 X 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD DATE -' START STOP TOTAL RUN TIME, HRS to 1st DRYER BATCH tt11 FILL CYCLE START @ GO •'I j{" DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TIMADGQATI IRGC DC' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER• IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. ab ' 3 - A 3 . e-19 4 ' 6 V � Z) 0 ab P?3 3 .�b0 2 M;5 9 �& : 0 �1�F r DRYER OUTPUT SOLIDS DISH WGT GRAMS' WET SAMPLE + DISH GRAMS ! DRIED SAMPLE + DISH GRAMS �,. O l 1? 2 2 Z, Ce U L( 7 ' - 1T WGT. o� 1! ���/� iiI 2ND WGT. vQ g 3RD WGT. Uc • �� (p a- X 100 t{ • 5 �� ' = %TOTAL SOLIDS ND 2 DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TCnADCDATI mac DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 9 • a d 406 06 ,S.:z tvi r- b ZIA0, � G %6L5 :aT 1V 2443, U 1 44-5 s? aig =S` 3g3 !� u :'�� 1 4 b1S 14 4 e, DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH ' DRIED SAMPLE + DISH GRAMS GRAMS GRAMS ` �CC��•• Ll I 3 • �s v `1� 1' WGT. 2CD 2ND WGT. y 3RD WGT. A Q8 9-If , G ��� � `�� X 100 % TOTAL SOLIDS CALCULATIONS:- (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH -DISH SGT. _ % TOTAL SOLIDS 12112/17JH DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ o2:J57 DRY CYCLE STARTED @ I DISCHARGE CYCLE STARTED @ . TIMADMATI IRGC oC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER . IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1., .3 ; 3 3 1 z 3 I S U -q o! 3 F 3 400 1:5-"Z4 q',23 f `d-1 33 0 W45 L(3 q 5 2-01 "aLJl 5 13 j O 354 o a L4 1-E L-f 3 445 d-cj v63 Igo � `.(3 446 ZZZ 3 • L47- L - qL41 1-£L-((P ' . 2-35 61-J DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION r DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS O 03 2 2 A t to (p Z 4 1T WGT. a. a33 40, 2ND WGT. 3RD WGT. ():3 o S� X 100 50.a- '=%TOTAL SOLIDS �' O DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 %TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE+DISH GRAMS GRAMS 1�T WGT. S: 2ND WGT. 3RD WGT. ALARMS OR COMMENTS - X 100 %TOTAL SOLIDS (DRIED SAMPLE + DISH -DISH WGT.) , x 100 NET SAMPLE + DISH - DISH SGT. % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS ��-Yfl DAILY RECORD 6, DATE 2 ` A( .' START STOP TOTAL RUN TIME, HRS 1st DRYER. BATCH FILL CYCLE START @ fv : 3�' DRY CYCLE STARTED @� DISCHARGE CYCLE STARTED \ TEMPERATURES 0F' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. lg 3 d 3 H5 - � I�t D d o 8 2-. �- & 6a.elm • f9 U 4a Os- 14rd J4 li of — DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS y 1T WGT. 73 45-1 2ND WGT. 'o��. ��� 3RD WGT. rq yq 1 �I�S�6S(.Q X 100 � .. - I q - � la►1 � SOLIDS 2ND DRYER BATCH [ l FILL CYCLE START @ b g DRY CYCLE STARTED @ r =a DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN- CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 2.3 31 D - 91 391P 'fly , V b3199 37-5 e® 144 14, 37 -29 e kl /94 g ' . 0 9,1 411fq a a4t_lr �•lq DRYER OUTPUT SOLIDS 12/12/17JH DISH WGT GRAMS / SAMPLE+ DISH GRAMS 1sT WGT. 2ND WGT. 3RD WGT. DRIED SAMPLE + DISH GRAMS I -%72 w ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH -DISH SGT. - _ % TOTAL SOLIDS 3RD DRYER BATCH FILL CYCLE START @, DAILY RECORD DRY CYCLE STARTED @ DISCHARGE. CYCLE STARTED @ 'rreA11CDATl muc, Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATI O I` DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 V '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 17 WGT. 2ND WGT. 3RD WGT. X 100 % TOTALSOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS •DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. S: 2ND WGT. 3Ro WGT. X 100 %TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD � 2 i t[OtQ DATE 3 A START STOP TOTAL RUN TIME, HRS 6; 2 / 0� / 1st DRYER BATCH FILL CYCLE START @ ,q& DRY CYCLE STARTED @�: l7 DISCHARGE CYCLE STARTED @ TEMPERA-fURES °F' • DRYER OUTPUT % SOLIDS TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :1:7 19 p 31),.; b 394 IT1214 IM4' cl. 1 0— jiD,r .5 (V '? &1 3q X,, NS 4V7 d zz3 . . Lgrif _lp� k l 5 0 qk 5 3(1 �.�. 3 •S� DISH WGT GRAMS WET SAMPLE + DISH GRAMS. DRIED SAMPLE + DISH GRAMS i7 WGT. 2ND WGT. o"L.5, 5 go . 3RD WGT. X 100 % TOTAL SOLIDS 2ND DRYER BATCH FILL CYCLE START @ �(Z:Sa DRY CYCLE STARTED @� 7 DISCHARGE CYCLE STARTED @ =1 4 TFMPFRATI IRFS Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :A 46V q69ot ova.61 �f : c 13 �. 66 . 3 0 /Rl o�, god � L:_. 5 ��o �' Y&S a as cd' va 6 *41 44� DRYER OUTPUT % SOLIDS 12/12/17JH DISHWGT• WETSAMPLE+DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS t,trb13 23,91`76(o / i'WGT. 2ND WGT. 3. 3RD WGT. 09L 53q X100 ` ,aa ✓(,�� 53 ' = %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH —DISH WGT.) x 100 WET SAMPLE + DISH — DISH SGT. _ %TOTAL SOLIDS T-9 IVVJA UKYtK UYtKAIlUNJ DAILY RECORD 3RD DRYER BATCH 2 • FILL CYCLE START @ ; $ DRY CYCLE STARTED @ J 1�'I� DISCHARGE CYCLE STARTED @ TCIIADLD ASI IDCC oC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR ' OUT O.I. 3'.41 101 Z © Z 1 2- LA 2-4 1 to I • i' 3'7 f w 9 3(0 y L4-3 C4 Lr(4 z31--) 5:2'? LIED 3 S j 00 4' �3 C( a Y9 J6 7. i 6Z - 2,OG I •y 4 3 96- • L( qO 43G , ZS 1 DRYER OUTPUT % SOLIDS RESET # RESET # CALCULATIOr DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS MS 1 100`7,5 24p, ZZ-7 (p 1�TWGT. _ 2ND WGT. - 3RD WGT. opt-51031 53 x too G, % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�T WGT. 2ND WGT. S: 3RD WGT. X 100 %TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. l x 10Q WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - C 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD �6 �l DATE ' START STOP TOTAL RUN TIME, HRS q,ou 1st DRYER BATCH FILL CYCLE START @ •y� DRY CYCLE STARTED @ Q - D DISCHARGE CYCLE STARTED TFMPPRATI IRGC or_* TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. Q 2g _ ale 6 a -3'0 a 31 3 b 4a.l a a :ab �7 -'44� qA1 4,��,o 9.37 e DRYER OUTPUT %SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS. GRAMS GRAMS 0.9g33 � 2S,(o3�3 .1srWGT. a�� ��/� $� I d217 • 2 ND WGT. a IOU, p / 5 ' c 3RD WGT. -�t3.91 3 -0/ . 9 -7-7 �L 575'a- x soo ' _ %TOTAL SOLIDS 2ND DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ = / TGMDGRATI IR•Cc 0C TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER_ OUT ROTOR IN ROTOR OUT 0.1. ' .D .i 3 i 3 R y r' 397 �3 : a 331 so .3 6 Lf / -7 4,36 450 -3 a* R5 34 R 6 L4145 L-3 I-f S Zz�cw a �' 3,2 /5 L� 5 LQ S I LAq S 2,1 t i s 4 z-o 9,00 1 LL+� LA" )..I z3d �LJ DRYER OUTPUT SOLIDS 0 DISH WGT • WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 5� l ,OUL-t 5 Z r.7 3 l 9 1 r WGT. a �7 2ND WGT. r 3RD WGT. A3,7&0 . Ala/& 7 ' '=%TOTALSOLIDS CALCULATIONS: l (DRIED SAMPLE + DISH - DISH WGT.1 x 100 WET SAMPLE + DISH - DISH SGT. _ %TOTAL SOLIDS 12/12/17JH DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ n ATE I- Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOI DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�T WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS MPLE +DISH GRAMS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SA GRAMS 1�T WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH Cl: • TWSA DRYER OPERATIONS DAILY RECORD DATE 3 START STOP TOTAL RUN TIME, HRS 6 L5�- 1s' DRYER BATCH FILL CYCLE START @ 7 DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ 14. 17 /0 TFRAPPP ATI IRFC °r-. TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR - OUT 0.1. D 3 ( D Ce. - 97 3 - �- t 3a a E :615 q S �d F p DRYER OUTPUT %SOLIDS • • DISH WGT GRAMS WETSAMPLE+ DISH GRAMS DRIED SAMPLE+ DISH GRAMS f wpT. 3 •!/aa 2ND WGT. // 3RD WGT. a . U ; ya2-937 x 100 13, I ,f TOTALSOLIDS 2ND DRYER BATCH FILL CYCLE START @A67 DRY CYCLE STARTED @ . 3� DISCHARGE CYCLE STARTED @ a TrRADIMATI MCC OC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR • IN ROTOR OUT O.I. a D a b -4a i! IV213 .5�5 eo • 2. .116 yf36 46, a ao c DRYER OUTPUT SOLIDS •2. 0 DISH WGT - WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS I ocw P.1 . 7 1T WGT. 2ND WGT. 3RD WGT. X100 Q % TOTAL SOLIDS % �b CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH N I VVJH unym urcm- uima DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ rrw Anrn ATI inP[' Or- ® T� OUT DRYER OUTPUT l % SOLIDS RESET # DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�T WGT. 2ND WGT. 3RD WGT. X 100 '= %TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. 3ao WGT. RESET # CALCULATION x 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS . 1'T WGT. 2ND WGT. 3RD WGT. S: x 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY -RECORD DATE 3 START STOP TOTAL \ RUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ �' 7 CA /a' 7 DRY CYCLE STARTED @ -bg DISCHARGE CYCLE STARTED @ TPRADGRATI I09:4Z 9W TIME DISCHARGE EXHAUST DISCHARGE ODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 5V 14 a 2:7 5 -o J4 J a ep 2) /do 'q 5 of 160 3 t 3 1 1 ?l 11 9-3 165 I 'qq (o DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS- DRIED SAMPLE +DISH GRAMS wGT. 2ND WGT. q, a // v 3RD WGT. - . �Btiap51 Rsas 1 °17 x100 ' = % TOTAL SOLIDS 2ND DRYER BATCH 3 / ` FILL CYCLE START @ ! D�'7 !' DRY CYCLE STARTED @ ; DISCHARGE CYCLE STARTED @.�5 TIMADFRATI IR•FC UD TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. g a o o T. 8 32 F IF'6 - , 6$ 3jilie so hKAA 413 4 eil DRYER OUTPUT SOLIDS •1. 0 DISH WGT - GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1 .13I 9- 33 1T3 . r 2 N D WGT. 3RD WGT. 1a.aa % TOTAL SOLIDS• a CALCULATIONS: (DRIED SAMPLE +DISH — DISH WGT. 1 x 100 WET SAMPLE + DISH — DISH SGT. _ %TOTAL SOLIDS 12/12/17JH DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ 0- TIME DISCHARGE EXHAUST DISCHARGE PRODUCT 1 civircnmi DRY TIMER vnw CHAMBER IN r CHAMBER OUT ROTOR IN ROTOR OUT O.I. DRYER OUTPUT % SOLIDS RESET # RESET # CALCULATIOI` DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT-. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS' GRAMS 1�T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 17 WGT. 2ND WGT. 3RD WGT. S: ALARMS OR COMMENTS - r v X 100 %TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS 12/12/17JH 4 TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME,-HRS j 15L DRYER BATCH FILL CYCLE START @ :3.I DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ l d %✓?`t� =` TIMARGRATI IRCC OC' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. A Acl ce rl� C qq5 o �1Ice 9- e� "o -q3e, xs ;:Zzjc C? ID '3. 1A a r5 J�45 �-f 1 414*5 a DRYER OUTPUT % SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS ,,999ci 2- 1-7WGT. 2V, 03 2ND WGT. 3RD WGT. X 100 "a,�— ' _ %TOTAL SOLIDS � a 2ND DRYER BATCH 6 . FILL CYCLE START @ Igo DRY CYCLE STARTED @ a DISCHARGE CYCLE STARTED @ :, 1 TIMADCDATI MCC Or: TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER v IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 11 1 3 66 1271 •• b q 5 DJ4 J4 x q 3 1:11. JGd C ' a aoa c DRYER OUTPUT % SOLIDS 12/12/17JH DISH WGT • WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS �tu171 1IWGT: 2ND WGT- 3 RD WGT. q 3b I X100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS IVVJH UKTCR urrnmI IVIVJ DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ Z DISCHARGE CYCLE STARTED @ Tanre- or DISCHARGE DISCHARGE I LIVIr"%il DRY l v It CHANBER . a CHAMBER ROTOR ROTOR TIME EXHAUST 10 PRODUCT 3 Z TIMER C) IN 39 9 OUT 3 Sty IN 39 9 OUT 15 0.1. -&A 19,214 t I ?>L4 I l nLIS 5:oq c350 !Do I 4LE 5 445 Zz � ',54 1 F-7 gwl 50 L- 65 q4 5 ;3 I141 jq5 I LXIG, DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOI` DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS OZ O °( 2. 1 --1 LA 19. 1�WGT. a 2ND WGT. a3:6�S- 1 /� 3RD WGT. Q x 100 %TOTAL SOLIDS a ---2 a [ ! DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE +DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X-100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. S: 2ND, WGT. ` 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. 1 X 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - c- 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE 3 START STOP TOTAL RUN TIME, HRS I" DRYER BATCH FILL CYCLE START @ - 3 V DRY CYCLE STARTED @ = DISCHARGE CYCLE STARTED @ TCRADCRATI IRCC OC' mulatelpilligm OUT wl am IN s r ��� �►„ gm DRYER OUTPUT %SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS �� r✓% ��• j1J� j 1T WGT. 16, 2ND WGT. % . g a 3v 3RD WGT. 7�782 X100 J �r TOTAL SOLIDS 2ND DRYER BATCH J �¢ FILL CYCLE START @ DRY CYCLE STARTED @ • d1O DISCHARGE CYCLE STARTED @ o- : A1d TPUDCRATI IR•Cr, °C TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANGER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. c:aZ ro . 0 3 •: q9 1,0D 44S VILA /50. q*s a . a: 4o 12 6 q a, 3 a.©d 6 a - DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS 91. CALCULATIONS: (DRIED SAMPLE+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH DAILY RECORD aRD DRYER BATCH FILL CYCLE START @ oZ��`% DRY CYCLE STARTED @ 3 'Z� DISCHARGE CYCLE STARTED @ Tr: AT1 MCC DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY � TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT. 0.1. Lfo r s 3W 6'0. Z2 Y t ((o U LJ �sa5 $ /b (4 � 37 4 2.,r 8 �� 5 %55 18Lf 'llD L445 u3 1 44 S 1 zzC <-TQ ',qa 1 ' . & ,,5 4 cf < L14D Lf t-( ZSY 7 FT DRYER OUTPUT SOLIDS RESET # DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS g / ! f/ P 3/ 1gWGT. (/GRAIMS 2ND WGT- 3 RD WGT. �r l�3ya X100 f.5r 3r3 '=%TOTALSOLIDS DISH•WGT GRAMS WET SAMPLE+ DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. RESET # CALCULATION X 100 % TOTAL SOLIDS MPLE +DISH GRAMS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SA GRAMS 1 r WGT. S: 2ND WGT. 3RD WGT. ALARMS OR COMMENTS - r� 12/12/17JH X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD c, 5 10 DATE 4Z _ d. ` A7 START STOP TOTAL RUN TIME, HRS to / '`Q "A Ok/ 1st DRYER BATCH j FILL CYCLE START @ DRY CYCLE STARTED- @ ��` DISCHARGE CYCLE STARTED @ <rt` TFAAPFRATI IRM OG• TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR 1N ROTOR OUT 0.1. IR-9 13 1 1 1I0 0 C7 o✓ D �" /vf0 � a D ci 1'M os j+ W DRYER OUTPUT SOLIDS r. DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +D.ISH GRAMS (, u`Z3P Z2, 5 3 Q 4 1� WGT. 2Nn WGT. a RD . 3WGT X 100 q % TOTAL SOLIDS , 7� 2NO DRYER BATCH FILL CYCLE START @ %�:5, DRY CYCLE STARTED @ ! = �� DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0:1. t; � l 6 2 3 _ o� v� .jqI'la. 33� o 4a to Ia 1� 5'o (o -7 LI(o 2 2- Q 0, 06 4 G / DRYER OUTPUT SOLIDS 12/12/17JH DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS rp� / / 1l WGT. "2_;Z / � 2ND WGT. �.-S� (O 3RD WGT. X 100 %TOTAL SOLIDS' 6)� CALCULATIONS: IDRIED SAMPLE + DISH - DISH WGT.) x 100 WET -SAMPLE + DISH - DISH SGT. = %TOTAL SOLIDS �v DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ ' DRY CYCLE STARTED @ 3 t/ 3q DISCHARGE CYCLE STARTED @ -A- l mrr Or, DISCHARGE DISCHARGE 1 LIYIF DRY "11r I CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST Iqq PRODUCT t3 TIMER 4 IN OUT 3(o IN 3wo OUT t S 0.1. 2L1 19.3 L 2A r0 5 r I i -7 . 1 oO qLt 3 Lt L Z3q �o 2 3� c7 (4q(p Z33 11.4 ► �t� 4 6, LF\-( ZJA t 3-c.J DRYER OUTPUT SOLIDS RESET # RESET # DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS Z3e L(LF7 1�rWGT. 12-gq7 2ND WGT..$ t0 3 3RD WGT. a I Y9 553 D X 100 a a --7 3 a (e -'= % TOTAL SOLIDS is DISH WGT WET SAMPLE + DISSH DRIED SAMPLE +- DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. CALCULATION X 100 '= % TOTALSOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS _ ,(DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE - 7 START STOP TOTAL RUN TIME, HRS 1' DRYER BATCH FILL CYCLE START.@ tp.'vZ DRY CYCLE STARTED @ I DISCHARGE CYCLE STARTED @ Da rrnnnrn A" mrc• Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER v IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. lD D g� _ a 0 1 L71 a9Q 7-. ' V /S'o 43 1 4g a� �. 6. y DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS Loqo& 16-707 Rr WGT.. 2ND WGT- 3RD.WGT. a /I , 23/� 1 o s' x 100 ND � 7a-7I ' _ % TOTAL•SOLIDS -2 DRYER BATCH . -FILL-CYCLE START @ A) - S a DRY CYCLE STARTED @ v a� DISCHARGE CYCLE STARTED @_ 0•=417 TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7 3 &1 o- s tQ 191 3-/a .�O 41& C3 a-' `? 9-00 474 DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS ,GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 ( 3, 35 ag ' _ % TOTAL SOLIDS _�Jz !349 y CALCULATIONS: DRIED SAMPLE + DISH - DISH.WGT.) x 100 WET SAMPLE + DISH -DISH SGT. _ % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ =� DRY CYCLE STARTED @ �- 3 3 DISCHARGE CYCLE STARTED TrneorDATI IDCC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3 t 33 (go 319 (o 399 `377 39 r Ise LI:)_3 leA 333 D -7 1115 �So d D LI kS �13 7 �ILI S 2'z Z 3ff y b g I-r-1 qqo I yqo `f3i ass u DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATI O P DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 3(77a T WGT. 2ND WGT. l5, 56 5� 3RD WGT. , ! 7 / q X 100 -�i %51 3055 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS • DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. 1 X 100 '= % TOTAL SOLIDS _ MPLE +DISH -GRAMS - DISH WGT GRAMS WET SAMPLE+ DISH GRAMS DRIED SA GRAMS 1'T WGT. • S.;3RD 2ND WGT. WGT. X 100 % TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - , 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE t START STOP TOTAL RUN TIME, HRS / %:.3.3 / P DRYER BATCH , FILL CYCLE START @ DRY CYCLE STARTED @_~I I DISCHARGE CYCLE STARTED 'TrnAnrnAT11nrro'. DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT. IN OUT 0.1. t 3 o f�6_1 •. 3 g� 1 J13 6 yr 0 0 `Z IZa 8 = 63 i 9 0 kA 3 04f,�a� e - 3f! 9- 2THe A05 4 6 " :3, DRYER OUTPUT SOLIDS DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS 1, rv.�aa6 1TWGT. L9ir :DV - 2ND WGT. 9 69/ lS.Dl7 . 3RD WGT. • X 100 p 9 , /q-q-q '_%TOTAL SOLIDS' / b 2ND DRYER BATCH FILL CYCLE START @ D1` DRY CYCLE STARTED @ s a3 DISCHARGE CYCLE STARTED @ =�3 • TCf1ADCD ATIIn.rr �r • DISCHARGE DISCHARGE DRY LI\!"ll VI\LJ CHANBER 1- CHAMBER ROTOR ROTOR TIME EXHAUST -PRODUCT TIMER•• IN OUT IN. • OUT 0.1. y 1 Id,: i3 3 _ D a oL D 3 lb- 0 .� ''� �g DRYER OUTPUT SOLIDS 12/12/17JH DISH WGT - GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1�WGT. lq- /5 o-v -DIU \ 2ND WGT. 3RD WGT. 12. IS Da- x 100 q % TOTAL SOLIDS (,. -7 6 CALCULATIONS: (DRIED SAMPLE+ DISH - DISH WGT 1 x 100 WET SAMPLE +.DISH - DISH SGT. _ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ - (✓ DRY CYCLE STARTED @3-2g DISCHARGE CYCLE STARTED.@ 2 o; - TCf AnffDATI MCC"OE TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3.2a Icm -30� 3a4 271L '3q3 /sa Lh (g 3 _ O 4:1.1 NbcA �/22 Id 3 —N 0 8 3/ 7 1 0 U I V ql 3) c c '3 3 S� 195 3b's 1 o kc{9 115 c � ZZ S 3 c El l .5 I i1142 l 23 DRYER OUTPUT % SOLIDS RESET # RESET # CALCU LATI OIL DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS �.03,iq .11.57ff% 1�rWGT. 2ND WGT. D'DD: p 3RD WGT. g 9 x soo dry/ '= %TOTAL SOLIDS q1 ' /T DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1�WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLI DS — (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS ! T /5 46 DAILY RECORD DATE if%"1 -- START STOP TOTAL RUN TIME, HRS F 1' DRYER BATCH FILL CYCLE START @ �Jg DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ I b• = % TI'AAA1-•A A TI 111P• 01" DISCHARGE DISCHARGE DRY • CHANBER V , CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER .IN OUT IN OUT 0.1. c�. p 0 �3 GP d. lid, - $ v a.le DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS I-Imis 15. oclsq 17 WGT.. 1 a .� t1J 2ND WGT. Z , 3RD WGT. ND ' L�� � ,' '=%TOTALSOLIDS;-y� 2 . DRYER BATCH FILL CYCLE START @ /a=7 DRY CYCLE STARTED @ '_� - as DISCHARGE CYCLE STARTED @ `rra Anrn ATf IIt— 01 DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR • ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. 3t © ':off 1 b ' 3 adoZ414 �5 a V 5 ��. a g a o DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH q GRAMS Tall .S' ILLAso 1TWGT. / �. /��� 2ND WGT. ell 3RD WGT. _I �� 1�GS' m 2�7aa-oaf x100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS • DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ a ' a DRY CYCLE STARTED @ �?J. -7 DISCHARGE CYCLE STARTED @ .,A�lmrrOr TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :2 0 3IS 6 37 • Z911, I62- 7A :I 1�17c 3�,3 d l5 'Wa.B" t67 v 5� 7 160 `� 3 yard 32_ :4Z Z `12s IV-7 V25 2'`�Z DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH -GRAMS GRAMS GRAMS GRAMS �j 1�WGT. D �$ 2ND WGT. 3RD WGT. ,_.,� 7 � 5q•�3 i � 3�e� � �� � x 100 '_ %TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS. DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLI OS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS Q U 3a- DAILY RECORD DATE ' •_. START STOP TOTAL RUN TIME, HRS Jc / !�•, /d / 1n DRYER BATCH ' FILL CYCLE START @_ DRY CYCLE STARTED @ $_ •Jr DISCHARGE CYCLE STARTED rrnnnrn e'1'1 mrr °r- I -DISCHARGE DISCHARGE DRY - CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN- OUT 0.1. ` d 83 2* 3? E a 4 s-sQ '�7:7 / b !p a E -% I n �-dS . b * DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS (.0535 2-4i N53 / 1srWGT.. aa'�a-0a-- 2ND WGT. O 3RD WGT. x 100 % TOTAL SOLIDS . �/b �o 2ND DRYER BATCH ' FILL CYCLE START•@_/a. -2 7 DRY CYCLE STARTED @ / . to a" DISCHARGE CYCLE STARTED @ DISCHARGE DISCHARGE DRY Y11 LI\ . VI\LJ CHANBER 1 CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. -5a 3 a l d a _�37` 41.4 -ij/ � �- 3 CI(f� Zzz_ 1-7. i 2215 � A y4t L 14(o ) DRYER OUTPUT SOLIDS 1� 12/12/17JH DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS fwGT ' 2V 07.6 2ND WGT. o� Q� 3RD WGT. A.5. Dag � fir, 0.�3 x 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @= -rrK enrD A" IDCC C'L TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER •CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. Q d 50 DRYER OUTPUT %SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1''T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WE SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 17 WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS. GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 01 4 DATE START STOP TOTAL RUN TIME, HRS , 1st DRYER BATCH D FILL CYCLE START @. 3 DRY CYCLE STARTED @ 7-,-V DISCHARGE CYCLE STARTED TEMPERATURES °F DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST . PRODUCT TIMER IN OUT IN OUT 0.1. 7' 17 . D s a DRYER OUTPUT SOLIDS DISH WGT GRAMS WETSAMPLE+ DISH GRAMS DRIED SAMPLE+ DISH v GRAMS l.005l Z202-01' 1sTWGT... 2ND WGT. 3RD WGT. X 100 �. 2 NDDRYER BATCH % TOTAL SOLIDS l FILL CYCLE START DRY CYCLE STARTED @ d , �, DISCHARGE CYCLE STARTED @_ 4: y TEMPERATURES ° t, DISCHARGE - DISCHARGE DRY CHANBER F CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. as �' 317 115S c o e DRYER OUTPUT SOLIDS 12/12/17JH DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS 24. l Z3 Z 1srWGT- ND WGT. 3RD WGT. X 100 a5,, %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ ' ZS DISCHARGE CYCLE STARTED @ w Aft— ATl InrC 0, DISCHARGE DISCHARGE DRY � CHAMBER - • CHAMBER ROTOR ROTOR TIME 3,zg EXHAUST t9Z. PRODUCT 3 ( TIMER D IN 3 •",; OUT 1370 IN 396 OUT 15G 0.1. 15 I 1 Z� !90 L4 Li L43--2 (`� • 5,c� 353 160 LILIG 43 ZZ`l 0- 5 - 55 - ! S 3 . !J L43 `7 q- Z-13L a DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS. GRAMS GRAMS i, o Z I-1•.I-1 Q -7 z�WGT. 2ND WGT. a3 . o y 0 3RD WGT. 90001'� a9375al X100 3 1 C/P I I '_ %TOTAL SOLIDS T� DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1�WGT. 2N0 WGT. 3" WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1" WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17J H TWSA DRYER OPERATIONS �• ���j3 b - , DAILY RECORD DATE / "/ � START STOP TOTAL RUN TIME, HRS & I" DRYER BATCH FILL CYCLE START @ •3� DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ - TCMDCDATI IDCC °C TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. Sal i� a 3 3r� l�(2 D 6-0 1 �5a & Da 4 a1,5 a., ao s � 5go, n DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS 1, L;L.(O-7 2-1 t 62 �.6 1�T WGT.. /, J 2ND WGT. 9.a 7h 3RD WGT. X100 '=%TOTALSOLIDS� 2ND DRYER BATCH nn I f FILL CYCLE START @ V DRY CYCLE STARTED @ l I �� DISCHARGE CYCLE STARTED @ _ 14D •r-rnenrn A-rl mre- Or DISCHARGE DISCHARGE DRY - CHANBER v , CHAMBER ROTOR • ROTOR TIME EXHAUST PRODUCT TIMER -IN OUT IN OUT 0.1. 1-ao 1 zt a 7 \. 1 D 3 �.� '�V a s :dlb 414[,:�F D All? '7 46 IgS ��33 E'er a-40 1 15 Govy DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1 1 v (o 5 l 2-2 1 3 4 Ce b 1T WGT. 2. 2ND WGT. 3RD WGT. (LIa c�tl(o X100 %TOTAL SOLIDS � CALCULATIONS: (DRIED SAMPLE + DISH -.DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS -_ 12/12/17JH I WJA UKYtK UVtKAI IUND DAILY RECORD 3RD DRYER BATCH //-- FILL CYCLE START @ DRY CYCLE STARTED @ 3 �25 DISCHARGE CYCLE STARTED @ �D ., Arl mre- Or DISCHARGE DISCHARGE DRY CHAMBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. ,3',z5 lq3 312 �?t 3 38(o l �W 15 c(I 339 60 4 "7 I ID`"LIA 6: 05 4 2 v 49 D D '-t 3-7 4q 2Z-L 51,55 '2 D Z Lf Y7 Lfq-7 Z3 & (o'4D Z 46`1. 45 t4(45 c4l_3 9 V •5 ' ZE-,8 DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS • GRAMS GRAMS I,PZ45 ` 2'J c t zb5B 1T WGT. a -3 �•�J 2ND WGT. a 3 3RD WGT. ��1 y 9:Q X 100 d 3 ` 1 g 13 '_ %TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS • DRIED SAMPLE + DISH GRAMS GRAMS 1�1 WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS _ DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. • S: 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH -DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/1.2/17JH i TWSA DRYER OPERATIONS �j J DAILY RECORD DATE �{ — ,\ START STOP TOTAL CRUN TIME, HRS / / 1st DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @_ ��7_ DISCHARGE CYCLE STARTED @ /a 1 TFKADIM ATI IRIN DF, lm� OUT we "Im OVUM 0 WIN, DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS a C) 2-1 Z 2 L(c d 9 (4 C( n/� �j 1sTWGT.. ,V , 554 2ND WGT. 3RD WGT. _ `ND 23' 67 5' l ' _ % TOTALSOLIDS.� 2 DRYER BATCH FILL CYCLE START DRY CYCLE STARTED @ �.Jr DISCHARGE CYCLE STARTED @� TCIIADCDATI IDCC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3' s eltj a A 4a 3 - as - as le 493 3 0 �-{q 7_3Z 1-4 1 Z_ AbD LI L{ O ILf (1(o Z-3 DRYER OUTPUT SOLIDS y. 12/12/17JH DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1r WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE+ DISH - DISH WGTJ ' x 100 WET SAMPLE + DISH -DISH SGT. = % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD t 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ ' Trh Anrr)ATI IDCi DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT %SOLIDS RESET # RESET # CALCULATIOI DISH WGT GRAMS WET SAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS GRAMS 1T WGT.. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. ' 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1 r WGT. IS:. 2ND WGT. 3RD WGT. X 100 % TOTAL• SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH t TWSA DRYER OPERATIONS DAILY RECORD DATE START ! STOP TOTAL r RUN TIME, HRS 1' DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ : D.J DISCHARGE CYCLE STARTED.@ • c3% O • DISCHARGE DISCHARGE TEMCHANBERES DRY CHAMBER TIME EXHAUST PRODUCT TIMER IN OUT 4515 Lr37 o DRYER OUTPUT DISH WGT WET SAMPLE + DISH SOLIDS GRAMS GRAMS U 1 Z 3 �e Za % 1ST WGT.. 2ND WGT. 3RD WGT. ROTOR ROTOR - IN OUT 0.1. a ID i-I13 ILL x.� .LP4 DRIED SAMPLE + DISH GRAMS 53 5 4, v.vaq,(, I _ o..�• X100 �•2ND % TOTAL SOLIDS � O DRYER BATCH ff FILL CYCLE START @ i' D DRY CYCLE STARTED @ - DISCHARGE CYCLE STARTED @- 3 -•3yr w S ° TIME DISCHARGE DISCHARGE EXHAUST PRODUCT DRYTEMCHANBER TIMER IN CHAMBER ROTOR • ROTOR OUT IN OUT 0.1. I- Ela- t 4 Apt 7 0.) l ...., a v-Vv I DRYER OUTPUT SOLIDS DISH=WGTETE+DISHFDRIED SAMPLE.+ DISH GRAS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH �7 FILL CYCLE START @ 5 DRY CYCLE STARTED @ 4 ,.Z0 DISCHARGE CYCLE STARTED @ S r�rn e-rl In1=r. br DISCHARGE DISCHARGE 1 LIVIu'.—. DRY v CHAMBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT t 5To 0.1. •, 192 303 ao4 Z8 5 u D 0 LkLk5 Ll3`1 Lm Z- 3 (0"6o 123 331 /S0 4 Lt3 445 25t5 6 1-7 *- 35 -1 X-L-1 c4 L L.1 qSU Li Lf 0 L-<<t 3 z 3 DRYER OUTPUT SOLIDS RESET # RESET #. CALCU LATI O I` DISH WGT GRAMS WET SAMPLE+ DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�. WGT.. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. S. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - p l 5 l r0.'P R't n l� �c P f . Su 1't-P !1 n A va 2 r-1 0.,-Nd 118 1 , 12/12/17JH • TWSA DRYER OPERATIONS [ " DAILY RECORD DATE" a 45� �. START STOP TOTAL RUN TIME, HRS ,•' ; 22,E / 7: 20 1s' DRYER BATCH FILL CYCLE START @ �-3� DRY CYCLE STARTED @ : D DISCHARGE CYCLE STARTED @ TMAPFRATI MPZ Qr-. ® , , • , 1 • �® CHAMBER OUT • • • • • • �m LMMFARM _lllll�� / I DRYER OUTPUT %SOLIDS Cis ;!e— Sg,•�/e DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH • GRAMS 'GRAMS GRAMS 1' WGT.. • s �- / 2ND WGT. 5 3RD WGT. - L �3 • YctVL/ -L-su(p X 100 n %TOTAL SOLIDS 2ND DRYER BATCH l FILL CYCLE START @/ DRY CYCLE STARTED @ I DISCHARGE CYCLE STARTED @ a :36 TCNADCDATI IDCC OC ® , l LAI 51411 m ' FillMCI ttoj 111 IN ®� CKA-MBERwl; •UT • • • • • • • DRYER OUTPUT % SOLIDS DISH WGT WET SAMPLE+DISH DRIED SAMPLE+DISH GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 ' = %TOTAL SOLIDS 1 CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH DAILY RECORD 3RD DRYER'BATCH FILL CYCLE START DRY CYCLE STARTED @ 3' 2-S DISCHARGE CYCLE STARTED @ -rr-?. Anr-n ATI.InCC Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3` 4rdr6 36g 3 (S 37 315 IS3 Lub L1 D a L 5S 5; a5 ' If) 352- qS7 :Hp DRYER OUTPUT SOLIDS RESET # .i >') RESET# CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. 13.381 (o x 100 /q-.9/70 '_ % TOTALSOLIDS 91 DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS AD3(�53 11TWGT. . S: 2ND WGT. 3RD WGT.. —;R1,3"*791+9odX100 Q '_ %TOTAL SOLIDS a.3 (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH C - TWSA DRYER OPERATIONS DAILY RECORD DATE 46-3,0'' START STOP OTAL RUN TIME, HRS :3 C7 / ". / 1st DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ •ZU DISCHARGE CYCLE STARTED @ TEMPERATURES °F' • TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER . OUT ROTOR IN ROTOR OUT DRYER OUTPUT % SOLIDS . DISH WGT WET SAMPLE+DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS t �]4-71) 2.5 1 R. 1ST WGT.. 34 7% 2ND WGT. °�,i -7 3RD WGT. �3;33c1� x100 nn %TOTALSOLIDS7� —�� -2ND DRYER.BATCH i - FILL CYCLE START @- / DRY CYCLE STARTED @ . 21 DISCHARGE CYCLE STARTED @ TCIIBDCDA,m once Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT' DRY TIMER CHANBER v IN CHAMBER .OUT ' ROTOR • IN ROTOR OUT 0.1. as © JV190), a o 41a elo D7 moo -q3 4fl! 2. c�4je, , A/ A1 a DRYER OUTPUT %SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE.+ DISH GRAMS 1T WGT. 2ND WGT. 3RD WGT. v CALCULATIONS: 12/12/17JH X 100 ' = % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TWSA UKYLK UFLKAI IUIVJ DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ ° 32- DISCHARGE CYCLE STARTED @ �1 nrn A- t Mr-r•Or DISCHARGE DISCHARGE t DRY urn a CHANBER CHAMBER ROTOR ROTOR TIME 31, 3 z EXHAUST l R 0 PRODUCT 3 t. cl TIMER ly IN kA o'� OUT 3C-9CD IN 0 OUT 0.1. s ` 22 IS-7 335 LAk48 Lt v (85 � ` L Z 9 �3 5 f 0D q L-E 446 z33 ', o 2 ! D -3 01 Lkq5 LA L-I.Lt5 237 .t DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATI O f DISH WGT WET SAMPLE +DISH DRIED SAMPLE+ DISH GRAMS GRAMS- GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= %TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3ID WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE+ DISH GRAMS GRAMS 1' WGT. • S: 2ND WGT. RD 3WGT.. X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - .12/12/17J H (7 TWSA DRYER OPERATIONS DAILY RECORD ot-6(w- DATE .5 I START STOP TOTAL CRUN TIME, HRS 2.. / 3 / 4 . 1' DRYER BATCH FILL CYCLE START @ to,35 DRY CYCLE STARTED @ D DISCHARGE CYCLE STARTED @� TEMPERATURES °F' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. : 1 D 3)b a 1? �Uo7> s I ' Ala E :Ub 1$ a a -49*7 a - oe' 4-u 67 �z ; DRYER OUTPUT % SOLIDS DISH WGT GRAMS WET SAMPLE+ DISH GRAMS DRIED SAMPLE +DISH GRAMS %E7 4.c7o O s cl 3 1u WGT.. � 2ND WGT. 5 63 3RD WGT. X100 ` ND �0 3 `=%T.OTAL•SOLIDS_q �... •2 DRYER BATCH FILL CYCLE START @ d = DRY CYCLE STARTED @ � DISCHARGE CYCLE STARTED @ 0 :3 • TCfAhC17 ATI If1r[` Dr OUT mAEWRFM NONE r�' mwom m"Op, in 1 � mom, O • i _ �lll� r - .��� DRYER OUTPUT % SOLIDS i 12/12/17JH DISH WGT ' WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1'T WGT. 2ND WGT. 3RD WGT. X 100 ` = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS I WSA DRYER UPERA I IUN-j DAILY RECORD. 3RD DRYER BATCH a FILL CYCLE START @ a'�� DRY CYCLE STARTED @-AL)2,LL DISCHARGE CYCLE STARTED @ �• 3 TChADCDATI IRGC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3' 2 c. t -30$ o 3 1Z 3 7 Z- 3 2. •I(os at- 0 3 ZO o 2-,L--) Lf L{ b �_Tw 5'.5 Lk z s 0 4451 L4bi LN 5 s-� !a 11 31 - . $ —1 q c D. LA(o I LA k4to 1-4 4 z :�, 0-� DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATIOIN DISH-WGT GRAMS WET SAMPLE + DISH' GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1�T WGT. 2ND WGT. 3RD WGT. -X 100" '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE +DISH GRAMS DRIED SAMPLE+ DISH GRAMS .GRAMS 1�T WGT. . • S: 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS . (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - (7 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD ` DATE START STOP TOTAL RUN TIME, HRS ; a: r� L,1 1st DRYER BATCH FILL- CYCLE START @- DRY CYCLE STARTED,? 7 : v5 DISCHARGE CYCLE STARTED @ I b-- 3 7 • TIME DISCHARGE EXHAUST DISCHARGE PRODUCT iuvmrr-nmaunr-a DRY TIMER CHANBER IN r CHAMBER OUT ROTOR IN ROTOR OUT 0.1. a6 �0 o 15 l DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS 1sT WGT.. // 2NDWGT- 3RD WGT. x 100 ND TOTAL SOLIDS 9A9 `7 2 DRYER BATCH / FILL CYCLE START @ &f DRY CYCLE STARTED @ 6 ' d291pISCHARGE CYCLE STARTED n TIME 1; DISCHARGE EXHAUST DISCHARGE PRODUCT d 1 CIVIrEnm DRY TIMER i unCJ CHANBER IN r. CHAMBER OUT ROTOR- IN 3cr . ROTOR OUT 0.1. :5 Al Qleel ,s E Z4-1 DRYER OUTPUT SOLIDS i 12/12/17JH DISH WGT WET SAMPLE+DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS 1�r WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT 1 x'100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS TA/ TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH • FILL CYCLE START @ o : Sd2 DRY CYCLE STARTED DISCHARGE CYCLE STARTED @ rrn enrn eTl MCC Or - DISCHARGE DISCHARGE DRY �•CHANBER - CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. .3'',2 31 d c(3 35 3 -oi3 :iJ ', l 8 3Z2 �5-6 L-(2(4 Y L 3 2- L `7 2, L-YO 5A�7 tZ�? 35 /D 45 .3 45 Z43 <<5-1 ca 0) (Aq5 q45 ZLL0 Z5-Li 2, 402). 1 Q.4 (t Ll y 3 t-( 2-q 3 DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1�T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS . 1' WGT. 2ND WGT. 3RD WGT. X 100 '_ % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1"'WGT. S: 2ND WGT. 3RD WGT. X 100• % TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH • TWSA DRYER OPERATIONS DAILY RECORD DATE-% o % START STOP TOTAL RUN TIME, HRS :2, 14 1' DRYER BATCH FILL CYCLE START DRY CYCLE STARTED DISCHARGE CYCLE STARTED (a) �d TIMADMATI IRGC OC• TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 1 o VIM q b'01 - e 0 -�l C 4q DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE+ DISH GRAMS DRIED SAMPLE + DISH GRAMS 1,03(oo 2-5►51G4 1'WGT..��:� 2ND WGT. 02 3RD WGT. X 100 q %TOTALSOLIDS r771C) 2ND DRYER BATCH FILL CYCLE START @ / DRY CYCLE STARTED @ 1 DISCHARGE CYCLE STARTED @ • TCnADCbATI mcc Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR • IN ROTOR OUT 0.1. �� g6 C !.!' • '8 33 -:3 a .493 . . `D 5 DD DRYER OUTPUT % SOLIDS h• • 12/12/17JH DISHWGT. GRAMS WETSAMPLE+ DISH GRAMS DRIED SAMPLE+ DISH GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 ' = %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS i vvim un i izn urcnm I ivivi DAILY RECORD 3RD DRYER BATCH / FILL CYCLE START @ DRY CYCLE STARTED @ , 30 DISCHARGE CYCLE STARTED @ TGKADCRATI IRGC or_ TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3y33 t -7 31s 19 i cl `-k ' 7.0 1 2 (o 3•z2 0 ! U 3c.A 5',1 D 122— c3(o0 /00 446 L4n q4f . 23`S cUl-� w. DD 1-78 's 1 16-0 5 L4 (4q S 2,325 3t-� u 4 1 �t 1 l �-4 - Ll J DRYER OUTPUT % SOLIDS RESET # RESET # CALCULATIOb DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1�T WGT. ' 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS . 1' WGT. ' 2ND WGT. 3RD WGT. X 100 '= %TOTALSOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. S: 3RD WGT. X 100. % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - a Dli I L, 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 5—z2—I fe DATE �.. START STOP TOTAL RUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ -Pit DRY CYCLE STARTED @ (� DISCHARGE CYCLE STARTED @ TCKA DCD ATI MCC CC or- 0 �(_'44" TIME DISCHARGE EXHAUST DISCHARGE PRODUCT, DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. V 6 .. -1 36-7 3s� " t c18' . Thy ci-ak 3z a A%0 - - 5a qt, 5 3q 1 155 t"d 1.56 175 31cd 1.60 445 c S a23 I� ' LAI is-ILib a0 DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH I 071> Z q . 2e , 5 ct 3 -3 /'GRAMS 17 WGT.. S (D 2ND WGT. 3RD .WGT. x 100 \ "• a� . ��p0� ' _ %TOTAL SOLIDS � R� . � v �D 2ND DRYER BATCH FILL CYCLE START @\1.5\ DRY CYCLE STARTED @ �-��b DISCHARGE CYCLE STARTED @ 3' TPUDCDATI MCC °C TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR- 1N ROTOR OUT 0.1. 0 3 tgs 3z 5D 4 v' 353 lob L11 L Yir t5d IiLf5 14L(5 Z35 4 1 015 414 (0, LtL-ko I Lf z 1-1 DRYER OUTPUT SOLIDS 12/12/17JH DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE.+DISH GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED -SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ rw An- ATl inr[- Dr TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. D `D too 5c, DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1'T WGT. • 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WETSAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. ' S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS ;ro / ', / 1n DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ 1;0 TLflAhCh ATI Ihr[` Qr. TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER . CHANBER IN 1 CHAMBER OUT ROTOR IN ROTOR OUT 0.1. W6 d 3ci I 35 uN ��7 z 3 5 job -ors 7 3-m 5 o D�Z, 3t4 2z 205 T3ot LI-67 DRYER OUTPUT SOLIDS DISH WGT GRAMS WETSAMPLE + DISH GRAMS DRIED SAMPLE+ DISH GRAMS 3 2-3 t g O C� 1STWGT..c9,3, a ST EGT.GT. X100 g ND �o�c o / / '=%TOTAL,SOLIDS 2 DRYER BATCH FILL CYCLE START @ ��O DRY CYCLE STARTED @ ' Z 1 5 5 DISCHARGE CYCLE STARTED @ TI'1nArn wTI tne-n 0 DISCHARGE DISCHARGE DRY CHANBER 1- CHAMBER ROTOR- ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. Z ;1 5 � 0 15 C� Ob �Z (act aw 3, i 4s t z 3 2 So Ll y3 Lt 3 -7 9 2 k o a 44 143S ` iLt 2,46 Z�: Z 5 6 '3 4 ( (4 Z3`Z DRYER OUTPUT SOLIDS 12%12/17JH DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS 1 r WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ Tr�enrnAT11DCC! Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOr DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1l�l WGT. - •2ND WGT. 3RD WGT. X 100 '= % TOTALSOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�WGT. 2ND WGT. 3RD WGT. X 100 % TOTALSOLIDS MPLE +DISH GRAMS DISH WGT . WETSAMPLE+ DISH DRIED SA GRAMS GRAMS GRAMS 1�T WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - Oro r s! L O (u t i ` l�i✓�'�'l 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS ("DRYER BATCH FILL CYCLE START @2'57 DRY CYCLE STARTED DISCHARGE CYCLE STARTED @ /. S DISCHARGE TIME EXHAUST 3Z - Q -- DISCHARGE PRODUCT DRY TIMER gnv CHAMBER OUTIN STD ROTOR ROTOR OUT 3g2 1y9 t*XL c� I bb (ALA t, 3-1 q qiA.,ZSs •s7 i`SH 3Tb L Sa ab �t46 •H36 stub :3y SH- 3�LALA 435 Z`i, S�1 DRYER OUTPUT DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SOLIDS GRAMS GRAMS GRAMS 11019 Z 2-3 CID 1TWGT.. 2ND WGT. �3►33�/� 3RD WGT. c; X 100 _ ND 'aa .� 3 ' _ %TOTAL SOLIDS 2 DRYER BATCH FILL CYCLE START @ I2.w2 'DRY CYCLE STARTED DISCHARGE CYCLE STARTED @ Z. DISCHARGE DISCHARGE DRY tIV�CHANBER S CHAMBER TIME EXHAUST bi PRODUCT TIMER IN OUT z WLA 3tz o u • $2 ' 3 1�3 3z3 yZzLA . u) Z S 355 loo y1- ROTOR- IN ROTOR OUT 0.1 kK� o'�.3tS DRYER OUTPUT DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SOLIDS GRAMS GRAMS GRAMS I'WGT. h 2ND WGT. 3RD WGT. X 100 %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH -DISH WGT) x 100 12/12/17J H WET SAMPLE + DISH-- DISH SGT. _ % TOTAL SOLIDS ,, TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ of TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER uvirunrvnw CHANBER IN -CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOP DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. ' ` X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS I'WGT. 2ND WGT- 3RD WGT. X 100 '= % TOTAL SOLIDS _ DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 17 WGT. S: 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS _ (DRIED SAMPLE + DISH - DISH WGT.) _ x 100 WET SAMPLE+ DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS 1 � po DAILY RECORD I DATE START. STOP TOTAL RUN TIME, HRS (� ; / - ► / 1' DRYER BATCH FILL CYCLE START @_ (o- 0j DRY CYCLE STARTED @ !,),& DISCHARGE CYCLE STARTED @ D •. DISCHARGE DISCHARGE TIME EXHAUST PRODUCT I DRY TIMER- virr-nmju SCJ CHANBER IN r CHAMBER OUT ROTOR IN ROTOR OUT O.I. -Aiv as ooki ' S44 6 C;23S L)KYtK OUTPUT SOLIDS s •- DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS I f OL05 7 2-L4.5 og Q I' WGT...0Z /3 3 ND 2-WGT. a .�Yg.5� Ar/�f 3RD WGT. ` - �3i 0�g�" d 7iS 1�✓�,�� .9100 _ 3 4 6 a 3 % TOTAL SOLIDS 7 �v 2ND DRYER BATCH FILL CYCLE START @ t3 ! DRY CYCLE STARTED @- f DISCHARGE CYCLE STARTED @ TEMPERATURES OF: DISCHARGE DISCHARGE DRY [!CR—ANBER CHAMBER TIME EXHAUST PRODUCT TIMER IN OUT .2; a. DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE +DISH GRAMS GRAMS 1' WGT. 2"D WGT. 3RD WGT. DRIED SAMPLE + DISH GRAMS rff X 100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT 1 x 100 12/12/17JH WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS . TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH J� FILL CYCLE START @_ 1 • v DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ •7� -rrnenronTl loCc 0[ TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. .a 7 Z u � z 4q5 43 45 2- vsi q I 1 LALA0 55 DRYER OUTPUT % SOLIDS RESET # ,Sl �1��.,•::.r .��Yi r• DISH WGT WET.SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100. '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS . 1�T WGT. 2ND WGT. t 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1�r WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS _ ,(DRIED SAMPLE+ DISH - DISH WGT.) X 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS 0 12/12/17J H i WSA UKYEK UPERATIONS 0 ( v DAILY RECORD �i DATE_ START STOP TOTAL RUN TIME, HRS Le 1st DRYER BATCH FILL CYCLE START DRY CYCLE STARTED @ O DISCHARGE CYCLE STARTED @ 3 TMADEDATI IDEC oC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 'b 02 1)P 15 . C 50 v,q ► E W Z 74 ' a IDD a.l o 9 E 1t 041435r a. DRYER OUTPUT SOLIDS DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS, 11OZ53 2<e11ct9Lk 1�rWGT.. ag 2ND WGT. 3 3'D WGT. Jam• 1 ��� 162 6 135 V X 100 ' = % TOTAL•SOLIDS/ 2ND DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ 'e DISCHARGE CYCLE STARTED @ a =37 TEMDEDAT[ IDEc DC `•mm:Klmr-AXIMmmu"Rejoill"`•� •e •• • •• mmm I wig�c ® _ ® • 1 DRYER OUTPUT %SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE.+ DISH GRAMS GRAMS GRAMS 1�WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS ` 12/12/17JH DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ 3 . 2 2 DISCHARGE CYCLE STARTED @ 42 . 3-7 TCh ADCDATI ID CC OC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 13 ;22 Z a�� © �32 3 1 s 12. 116o 310 o l 4o L 3 ((6(a 3t,S 5;oZ t'�S 3L( j f? L4 -Y7 2,32- JW 5; 5 2 1-� - Z D 5 Ll (>� Z•zw 1 .t 8 3 t-f DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATI O ( DISH WGT WET•SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS GRAMS 1r WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 17 WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS ,(DRIED SAMPLE+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE S- 3 I —Or START STOP TOTAL RUN TIME, HRS / ►. �Ej / 1st DRYER BATCH FILL CYCLE START @ c3 DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ < D : 45 S TCAMCDA,TI IDCC Or' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. >0 la, .17 Is 6 4 3 L� . oa '20-0 o 423 41 t ' a.? q:' p 1, a�33 DRYER OUTPUT Y. SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS %Z 2(p l O 2 3 1ST WGT.. 2ND WGT. 3RD WGT.. x 100 % TOTAL SOLIDS 2ND DRYER BATCH FILL CYCLE START DRY CYCLE STARTED @- DISCHARGE CYCLE STARTED @_ a.•� Trh Anrn A-rI In Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER v . IN CHAMBER OUT ROTOR • IN ROTOR OUT O.I. �. b - d 6. 3 & s i do �•'S5 '7 5 l* -�2: If S DRYER OUTPUT % SOLIDS 12/12/17JH DISHWGT GRAMS WETSAMPLE+DISH GRAMS DRIED SAMPLE +DISH GRAMS ITWGT. 2ND WGT. 3RD WGT. X 100 ' = %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ •ASS DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ i S TCMDCDATI IDGC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3f: 3 0 .8 C3l C) Lf0 2 v8 5 Lfo . Z [ (Q I S� . 1,'. 7-6 ( t 2.5 4A2 YaG 43S l si 5,1D t -7v a55 406 .L( L4_?�,T3 1-4 Z (o T ','0 a 1 `t i 39 ,50 'LfLf L4 -6-1 4ceq 2 5 _S (o. � 45 1 ct b L41 a L145 .44 214 v SQ DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE +DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2No WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS • GRAMS GRAMS 151 WGT. 2"D WGT. 3RD WGT. X 100 '= % TOTALSOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1 'WGT. • 2ND WGT. S: 3RD WGT. X 100 '= % TOTAL SOLIDS — (DRIED SAMPLE+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD Q-)Ea3�" l DATE U a �� ` START STOP TOTAL RUN TIME, HRS E10,14 / �'lj'I / 1st DRYER BATCH I y� FILL CYCLE START @ ! D•3a DRY CYCLE STARTED @- I(:b7 DISCHARGE CYCLE STARTED @ a t3 Z Tr11ADrD ATI IDrc Or. TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER y IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :D 3 la C� q "s � a 4 6 15f a: :3 ova �o 4!y 8 4 a Lp 14*3r a5 DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS i . 0 1 Z 2 2'I1 3� Z3 n 1STWGT.. d i 33 2ND WGT. GL 3RD WGT. x 100 ND a(2 -3` o ' _ %TOTAL.SOLIDS 3 2 DRYER BATCH 22 ' FILL CYCLE START @ o� �'ToZ DRY CYCLE STARTED' J i I % DISCHARGE CYCLE STARTED @ 3-7 TCnnDrDATI lerc Or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER y IN CHAMBER OUT ROTOR- IN ROTOR OUT 0.1. 3'1I 1 -79 O d5 3 3 S 1(� � ol i —7-7134 1 sED . ( 1-4 LA o? 1 '4 Co 5 o b �-l3 4 Z� ', (� 396 � �-(3 �A 3 4 3 � Z T 3 42-1 1 Q66 S Li 1 ` L(S Z S j DRYER OUTPUT SOLIDS 12/12/17J H DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) WET SAMPLE + DISH - DISH SGT. X 100 % TOTAL SOLIDS x 100 _ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ r 'rl Inrr or TIME DISCHARGE EXHAUST .DISCHARGE PRODUCT 1 LIY11 DRY TIMER LI.I"l l CHAMBER IN CHAMBER OUT ROTOR IN' ROTOR OUT 0.1. DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIO1 DISH WGT WET SAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS- GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1sT WGT. 2ND WGT." 3RD WGT. X '100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT.- S:- X 100 % TOTAL SOLIDS (DRIED SAMPLE+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH • TWSA DRYER OPERATIONS DAILY RECORD f �idlb p, S DATE START STOP TOTAL RUN TIME, HRS (Q : / 15t DRYER BATCH j� FILL CYCLE START @ I� DRY CYCLE STARTED @ 2-Me DISCHARGE CYCLE STARTED @ U�'�c� TChADCDATI IRCC or-, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :oq D. 0 (97it c-ig — t. ilk 1od A ' q'3 s .3 7 J? �j Ll 5 �j -'; 6 �ym'-5: �l ;2 3 t 0-. 1 _�gv oS DRYER OUTPUT SOLIDS DISH WGT WETSAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS k.., 24,2445 17WGT.. 2s R� 2ND WGT. 3RD WGT. !S 1753/ X100 a3i ga`U %TOTAL.SOLIDS 2ND DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ 1 �r DISCHARGE CYCLE STARTED @ TEMPERATURES °F OUT DRYER OUTPUT SOLIDS r L DISH WGT WET SAMPLE + DISH DRIED SAMPLE.+DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH 7 FILL CYCLE START @ o� ' �� DRY CYCLE STARTED @ J IZ� DISCHARGE CYCLE STARTED @ �� TCnAOCDATI IDGC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7,q Z�[ 5 O 3R D t Z '> z4 H 181 3Z 32 4 Z 432 t �� 43 z3;� ;s 1-7s - 3s/ o . L,as Lc L( C3 ��9 I .406 -+<-�> 7 DRYER OUTPUT SOLIDS RESET # RESET # CALCU LATI OIN DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND W.GT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. . 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - L, 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE L2 0- START STOP TOTAL RUN TIME, HRS ' 15t DRYER BATCH FILL CYCLE START @ (o•N DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TPKADIMATI IRGC Or-* luff(I / J WON' NNW ME"ll DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS �.UUg3 ZCp 1 049 % I' WGT.. 3 " 2ND WGT. 3RD WGT. X 100 !�5 EfI L. 3 '=% TOTAL ,SOLIDS r 2ND DRYER BATCH FILL CYCLE START @ !D: 55' DRY CYCLE STARTED @ I t : ag DISCHARGE CYCLE STARTED @ TG'ADCDATI.IDCC oC a PRODUCT OUT ■ KE I FARM I UFO= NWoUS 0 W.M. W'il Kom� _ movir� , i N Am re. %n •slem DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 ' = %TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ 9 'cJ g DRY CYCLE STARTED @� 3J DISCHARGE CYCLE STARTED a-n-rl mrc Or DISCHARGE DISCHARGE DRY CHAMBER CHAMBER ROTOR ROTOR TIME 3 EXHAUST PRODUCT 3l TIMER D IN lj OUT col IN Li1S OUT t13 0.1. �- &f 1 2 5•0 6 Zl -1 - 5-, t 3 1-1 34 q q- 5 Z3�3 Z: (� a 3 i -1 -L 3 Z� /�D 4 5 5 44 Z 3 405. 1 g-�' 4U5 LA'14© L+4 S q ;:�w DRYER OUTPUT SOLIDS RESET # DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2"D WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS RESET # DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. • 2ND WGT. CALCULATIONS: 13RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS -�G (�-(� p��h•- {n��5�e-�' hi v-24•e� 12/12/17JH • TWSA DRYER OPERATIONS �o DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS ; d- 15' DRYER BATCH nn FILL CYCLE START @ �.d� DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @� TFIIADFRATI MIN DP• TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1.. 1f i127) 45 12a.g- e #q el -I 7 • 7 43olav '44,5 qys ;Z,4,3 c DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH - DRIED SAMPLE + DISH GRAMS GRAMS GRAMS v. 0 S(A 2-G , cJ(o g 5 1"r WGT.. ;L8•6 SSW"" 2ND WGT. 95,6 -7 y$/ 3RD WGT. 0-6 j r t'e X 100 nrr �� ' = % TOTAL.SOLIDS �� 2ND DRYER BATCH d�rJ+53C) l . FILL CYCLE START @ 1 D �DRY CYCLE STARTED @ .a� 7 DISCHARGE CYCLE STARTED @_a:4'Z TFAAPFRATI IRFC DI= TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR- IN ROTOR OUT 0.1. '1 `7 $ D 640 a-° i 3 SD. 4.3 z7W3 /%3 l J47 1b D 3� 98 �3 .414 0 c;2 DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ .�: �i�_ DRY CYCLE STARTED @ 32 DISCHARGE CYCLE STARTED @ - L{ Tr1Anrn ATI Mcc or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. ZZ i -7 9 2 -o 32- ZZ 43> 2-. l `1 E 135 b 200 3 Lf 37 1 L4 DRYER OUTPUT SOLIDS RESET # RESET # CALCULATIOIN DISH.WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH - DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 1.00 a % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS- S11-0'tt I 8)?)wfR rkYL `rjc�CY,S • 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE i START STOP TOTAL RUN TIME, HRS '.a� / �„ '� / a• 1st DRYER BATCH ! , FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ a TEMPERATURES 0F• TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. •0 1 = 3 -3 a as 1�5 Lf3 .Sr Lfs"c2 P. E' I'DrIg 17 4 1 4j a o 'f DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS cOZLk 3 Z -7,Lf -7 Z' 1�T WGT.. 61 a, 2ND WGT. a�, �2- 3RD WGT. X 100 % TOTAL•SOLIDS 1 o1-� ND 1P• z" 2 DRYER BATCH r� FILL CYCLE START @ U •,35DRY CYCLE STARTED @ ` 1-3 DISCHARGE CYCLE STARTED @ 9- -33 . TFIVIPPPATI IRFC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. - 6 a�5 1DD . -7 5 150 DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE +DISH DRIED SAMPLE.+DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. •X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @;), 'AJ3 DRY CYCLE STARTED @ 3 DISCHARGE CYCLE STARTED @ 3 3 •YreenrDAT11DCC Or TIME- DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3', t 1-7 q0 L -Fo l (og uw- `-fi0`8 Zg `i 8 cl 01-� `,5 •?Z 3 Lf co lbo L44LI 1-131 LA144ZZY �',33 Zz . o q`( Zq " DRYER OUTPUT' SOLIDS RESET # RESET # CALCU LATI O I\ DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1�r WGT. 2ND WGT. 3RD WGT. `'X 100 % TOTAL SOLIDS DISH WGT WE SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 17 WGT, 2ND WGT. S: 3RD WGT. X 100 '_ % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. / '_ % TOTAL SOLIDS ALARMS OR COMMENTS - V t 8l ow r ra VU o2 to xo a l eepn-T 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ :a7 DRY CYCLE STARTED DISCHARGE CYCLE STARTED ..•• CHAMBER OUT a "JP old 46 �• DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS tloJ� Z(e. Bg �Z 1'WGT..A 2ND WGT. ,& 5- 3RD WGT. AD x 100 �O TOTAL.SOLIDS (�c7 2ND DRYER BATCH nn a 5, FILL CYCLE START @ V DRY CYCLE STARTED @ 1 1 DISCHARGE CYCLE STARTED @ DISCHARGE DISCHARGE 1 LIYIV DRY LI AM Luj 11 L.7 CHANBER 1- CHAMBER ROTOR- ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. Al i 5 p 9 3.913 D c. -ta:D1 3 al : 5 i /Da iH J .p 4q 9- DRYER OUTPUT SOLIDS 12/12/17JH DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS TWSA DRYER OPERATIONS • DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ ,3' DISCHARGE CYCLE STARTED @ Trn Anrn ATI IDCC-or DISCHARGE DISCHARGE DRY �YCHANBER �v CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. I(o 3og Q LA DI 312 4D-1 \�Q�Q --T- I i.EIt 0(Q 1 6 _ ©'LA46 , 431 Lfq6 <ctC) •U� ' 5 [ -7 I 5 Ll (0 L4 cl 614 5 v 15 ( L E Zz Lf Z Lk L- LA 1 L4L3 Z � DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WE SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= %TOTAL SOLIDS ALARMS OR COMMENTS - C .1 12/12/17JH TWSA DRYER OPERATIONS q�3 DAILY RECORD DATE `7 - q ! START STOP TOTAL ✓ RUN TIME, HRS F " 5 1st DRYER BATCH / FILL CYCLE START @ ! d DRY CYCLE STARTED @ 1 l : )`� DISCHARGE CYCLE STARTED @ •'�Iv�- TEMPERATURES DF' CHAMBER nHT FIRM M DRYER OUTPUT SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS UC7M 17,37av 1'WGT.. X 9-307 2ND WGT. 3RD WGT. 1_0 x 1oo q q�'ry'/ `� 2 % TOTAL_SOLIDS , 3 Ia 2ND DRYER BATCH FILL CYCLE START @_ DRY CYCLE STARTED DISCHARGE CYCLE STARTED @ C 5 TFMPFRATI IRFC Or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR- IN ROTOR OUT O.I. 6 39 2- �(b Vic) 5 a - k I i cl 0.. S zmi- . S = S' O 1S 3�13 6 Ll �(3 z"lz Il 6 `Y M Z i9 M lir Zru DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS 1TWGT. 2ND WGT. 3RD WGT. CALCULATIONS: X 100 ' = % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. _ % TOTAL SOLIDS TWSA DRYER OPERATIONS . DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ �l- Tr1l Anrn ATl ID CC or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. DRYER OUTPUT % SOLIDS RESET # RESET # CALCU LATI O I\ DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3R°• WGT. C. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ %TOTAL SOLIDS ALARMS OR COMMENTS -,� er 12/12/17JH TWSA DRYER OPERATIONS g 'J' DAILY RECORD DATE START STOP TOTAL 1 RUN TIME, HRS ., 1st DRYER BATCH FILL CYCLE START @ 10:414 DRY CYCLE STARTED @ / {�DISCHARGE CYCLE STARTED @ TFHADFROTI IRFC or-, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. aig /-/o 2-o3 km 390. 40a-- i bal 4 3q3' I/fla �44 gD-VT a a� �y 4 a DRYER OUTPUT SOLIDS S's 1-3 DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1.0l s 11 -? L1 SZ/ 1T W GT.. 2ND WGT. 3D/s 3RD WGT. 019 �l 30l00 ` �y/33 X100 6, 90676 17�� % TOTAL SOLIDS 9s `qf 2ND DRYER BATCH J FILL CYCLE START @! �/53 DRY CYCLE STARTED @ J DISCHARGE CYCLE STARTED @ Tr:KADGR ATI IRCC OC OUT ffilcm V, mol 6 -If DRYER OUTPUT SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = % TOTAL SOLIDS V /� 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ -2 - j> DRY CYCLE STARTED @ 33_ DISCHARGE CYCLE STARTED @ -rrhA ICD ATI ID CC DC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :3a 17$ , o lob ok 117 4;17- - .3cSOLI 5id36 S7.06 3(/ S: i 2- I (, Z5 `lay V, 3 6 :0'2- 1- 6 6lm 'Af L/ I36 6:q -7 K Ll I KK ( 1/10 2y9 �+ DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND* WGT. 3Ro WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. . S: X 100 '= % TOTALSOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE 7 L I 1 START STOP TOTAL RUN TIME, HRS IS 1st DRYER BATCH FILL CYCLE START @ Lp •35DRY CYCLE STARTED @ - 1 DISCHARGE CYCLE STARTED @ / D• 34 TCKADCRATI IRGC OC- mlvlmfjwrmaclxjmgm���� CHAMBER COMM wmm I I' I DRYER OUTPUT % SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS C772,5 1T WGT.. S • • 2"D WGT. ra- 3RD WGT. 9S 3!5 X100 % TOTAL •SOLIDS K,3-5 2ND DRYER BATCH q FILL CYCLE START @11�-� DRY CYCLE STARTED @ • % b DISCHARGE CYCLE STARTED @ TF�ADFRATI IRGC �C IN DRYER OUTPUT % SOLIDS ,,. DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 ' = % TOTAL SOLIDS CALCULATIONS: (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. = %TOTAL SOLIDS 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ ZS DISCHARGE CYCLE STARTED @ '' �� .1 TIME DISCHARGE EXHAUST DISCHARGE PRODUCT 1 LIVII DRY TIMER LI\r\1 CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :1.5 177 0 '-11� '_sQ 4. l" 7 33 rO YK b 6 2oq S 1 3g�, Y 4 5 art (3"� ��I q.,5 q3rl DRYER OUTPUT SOLIDS RESET # RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1T WGT. 2ND WGT. 3RD WGT. X 100 '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17J H TWSA DRYER OPERATIONS _ DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS a 5 1" DRYER BATCH / FILL CYCLE START @ �'� DRY CYCLE STARTED @`Z DISCHARGE CYCLE STARTED @ TEMPERATURES °F s a� � . � 13 e a / 5 0 �qs �03 � q 2ND DRYER BATCH FILL CYCLE START @ D; DRY CYCLE STARTED @ f . s DISCHARGE CYCLE STARTED @ TEMPERATURES DF DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT 0.1. 305 6 �3 'Yd 411 . ks E-p U 5 1 347 �5 7 7/18/18JH 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 'RD DRYER BATCH ,'FILL CYCLE START @ o� DRY CYCLE STARTED @ �3� DISCHARGE CYCLE STARTED @ TEMPERATl1RFS or TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR 'IN' ROTOR OUT 0.1. 3.1aD i '? _� '3 1� d CV 1 (411. q�-Z n 3 fLj Lt '-. Zo 1-7 (e (D-7 3,314 c3c5lf D J00 3 `-f,3(. (4Y7 (IN S LfLfa • 7Q 3 (C) 0 qoD % 5 0 �c3i c4(4c-1 zZ7 (Q L6 8 LI yZS AS- Hcta, �-tq) (fyz ZLfZ COMPOSITE SAMPLE RESET # CALCULATIONS: ALARMS OR COMMENTS - 7/18/18JH DISH W. GT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 0 0053 Z(eiZZ55 1srWGT. ��•�'7�3 2ND WGT. 3RD WGT. 9 73 a a r' x 100 % TOTAL SOLID DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH 5` GRAMS GRAMS GRAMS GRAMS 1s'r WGT. 2ND WGT. 3RD WGT. X 100 '_ % TOTAL SOLIDS (DRIED SAMPLE'+ DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS TWSA DRYER OPERATIONS DAILY RECORD DATE / START STOP l TOTAL RUN TIME, HRS 0 / 1 15c DRYER BATCH / FILL CYCLE START @ g ' 3 0 DRY CYCLE STARTED @ (�� DISCHARGE CYCLE STARTED @ ` 0.26r TFMPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANGER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7. �v l7d- .3 aS 0 4/6 46' . #-/b 4:5r� I e 0 1-21 3,30 5 0 A�q-5' 43 �r � ,� 14 �' C 9 =3 0 it, 5 g ,J- 15 a -f*5 u 3 .Lls- 2ND DRYER BATCH AA FILL CYCLE START @ U' 3�J DRY CYCLE STARTED @ -f DISCHARGE CYCLE STARTED @. 3 Q TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. W ] b m = 30 /� 03. 4/t::5 El0 a=b� -7Ot 33 5 413Co -qAIs 2oa a:�a 1tQ'-7 37Z/ ) 0 9 1437 s- a : zb J�o 9 3, 50 HJ45 �s J 44 qs a� 7/18/18JH -TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ v2 `fD DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ 3 TFMPFRATI IRFC or - TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN 3', tS i -7- 3z 5 6 L4gi q,3co) C44 l �aS 1. p,3c� d ��( q32��c �55 l (� 3 l90 Y4 3`l J114 i--7 l 38g 160 HqL( 1-E35 y4�( (6-31D i —7S c.3 5 ) ,5 liL(z Lt 4?- �-44 2 COMPOSITE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS i,02-77L{ 2`7,g-7 t 5 1-TWGT. a—/, a783 2ND WGT. -�7. D- 9 o "5- RESET # ROTOR OUT 0.1. 1&Z q SJ ZL3Z Zl Z ow ZA 15 Dw 3RD WGT. C X 100 �7• �5/� �.Da7c� ��,gac�( '=%TOTALS0LDS %7,g1/y�v DISH WGT WE SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. CALCULATIONS: 3RD WGT. X 100 % TOTAL SOLIDS DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18J H TWSA DRYER OPERATIONS DAILY RECORD DATE -7 START STOP TOTAL RUN TIME, HRS -,A o / "Q ; 0 / 15L DRYER BATCH I l FILL CYCLE START @ DRY CYCLE STARTED @ 7-'6 DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANGER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7 5� 1 `7.3 3,31 S'o 415 1437 193 E 1,5 o 4 `73 1441 a os 4145 4413 cyj 2NO DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ l I .1d DISCHARGE CYCLE STARTED @ oZ �J Zi TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. N Q .31 � 0 .43 413. 4a3 149 a:o !tS-) 33to T6 S --'136 • S ac)5 C fa -gib /6 (e ;3,ya -`0o 43y qq 3 e l =4,o /*3 38R 4#s 3b ia'7 4il8 go-o q4� 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH 22 FILL CYCLE START @ 02 DRY CYCLE STARTED @� DISCHARGE CYCLE STARTED @ TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3 ', I S- �.� -� 91(0 d 418 L fo 1. -((S t (09 - u Ll"05 eD� 333 5D Llgq Ld y) 44I -,;:'b`I Lf•,55 Noy 335 )oa 44Lf 9n (4L{ 2.33 i8 q YZ�7 J95 445 yq5 -2-4q �__rw COMPOSITE SAMPLE RESET # DISH WGT WET SAMPLE + DISH DRIED SAMPLE +•DISH GRAMS GRAMS GRAMS GRAMS "01(0'i 2-T �13�p3 I' WGT. D' 2ND WGT. g 3RD WGT. CALCULATIONS: ALARMS OR COMMENTS - 7/18/18JH x100 % TOTAL SOLIDS c)J'o DISH WGT WE SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE + DISH -DISH SGT. '_ % TOTAL SOLIDS C RUN TIME, HRS TWSA DRYER OPERATIONS DAILY RECORD DATE -7" 31 _ Or START STOP TOTAL C9 : A.3 / -1: 52- 15L DRYER BATCH ? J FILL CYCLE START @ _Q ( DRY CYCLE STARTED @ -7 ' 13DISCHARGE CYCLE STARTED @ TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. A 16Fr 30a D - o c J85 4ot so En 19, d 3 � q Jai So y # *-7 - 43s 44 %7 Ll'� (p /q3 qq�* o o� � 5 4�� a� 2NO DRYER BATCH FILL CYCLE START @ , �.ff�' DRY CYCLE STARTED @ aZ DISCHARGE CYCLE STARTED TFMPFRATURFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1-. 40 IM eD 2� 3 3 / JtAI-Ir 433 1-145 �4;5 )f 45 0233. �b q3 �-oa. J4 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @- TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PR CT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. h i 1�D s COMPOSITE $ Sv DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE 16,1' 1 GRAMS GRAMS GRAMS GRAMS I, O(y7 .2rZ7y iST WGT. 2ND WGT. bt el/ 3RD WGT. s# �a l� 7 — /• D SF9.7 x ioo % TOTALS LI RESET # 411114 DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 0.3 7 % 8' 2ND WGT. (.3 s� % CALCULATIONS: 3RD WGT. /�. 3� �% —" l• 05D3 x ioo % TOTAL SO LI S (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18JH �l'657v RUN TIME, HRS TWSA DRYER OPERATIONS DAILY RECORD DATE W 1 I START STOP TOTAL ` l ;L13 / 13•a, 1st DRYER BATCH i FILL CYCLE START @ t DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TFMPFRATIIRFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 1 `t 411 4111 J,3,r 00 $•o ! 7 333 .41-13 l q-, /9 q c ,g:,54 67 3 H.'q4 43 -Q97 (2 9M- IWe' 014 . a )44� A4;3to JVYb, I al . et) 13 Lf a- d5 'q 'gq A�� I c,25 c 2ND DRYER'BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TFMPFRATIIRFi DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 33 � l� 143(o 446 Rd l 1-6 2� l t. q 3✓ 1 -10 a s `�° 3 Vq,S a 3 - ' 5 - 1 te3 -4/,Y 6,, c2 1 '5' 24gq a 09, qw qq�v- 4�x,� PZ ' CIO 7e 12112/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ C2: 59 DRY CYCLE STARTED @ �•DISCHARGE CYCLE STARTED @ i LI3 TEMPERATURES °F DISCHARGE DISCHARGE DRY R CHAMBER. ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IfV.'';' OUT IN OUT 0.1. -2� t74 13qc6 V72 16-7 �u "ll 27 50 •01 36 10 S'.o 1 Vi32 ! a445 L[. q W5 2 ; 5g 6 3? r 1 S 4�15 �35 `�`l s arZUlf n ; V3 t-25 �Bs o/ �13� ` % a�rz -,r# COMPOSITE SAMPLE RESET # CALCULATION DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1T WGT. 2ND WGT. j 3RD WGT. 9(2 X100 /q, �� '_ %TOTAL SOLIDS, -Z,!:; 6lc) DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 13RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD ' DATE START STOP TOTAL RUN TIME, HRS : 3J!� / 1st DRYER BATCH FILL CYCLE START @ �'� DRY CYCLE STARTED @ 7 .a3 DISCHARGE CYCLE STARTED @ TFMPFRATURFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7;a3 36 06 36o� 3 I 3 a a 60 .414 I-ij il YIV& Q g.-, o3 lo3 353 1Dz) N.5 3s L(LqL.s a 4 C ,53 V`7 3 gf? 150 *44 43L5 2ND DRYER*BATCH T FILL CYCLE START @ �� DRY CYCLE STARTED @ ! - 3� DISCHARGE CYCLE STARTED @ � • 51) TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. J y Jo'- D 426 �D5 -4 2& I(WR- c aJ�:b �; �"D -14,15 143i� I-lq5 eij �36 2 1 oh s 4/3(o 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ . 3M2 DISCHARGE CYCLE STARTED @ TV) TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. T%11 [ og tits Llof V13 f7 -S4 y.2b ! S 33o 5C) 4�-_7� yq 6= 0 b ` '� �s� �u 5 l✓'SI ��7 k3� �3S `��i 3� �( �t COMPOSITE SAMPLE DISH WGT WET- SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS i%, 1'WGT. /75�6§t;e 2ND WGT. 17 3RD WGT. X100��', '= % TOTAL SOr�") `S RESET # CALCULATION DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. ) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL. SOLIDS ALARMS OR COMMENTS - l 12/12/17JH TWSA DRYER OPERATIONS �- DAILY RECORD DATE 0 r O START STOP TOTAL L RUN TIME, HRS 1st DRYER BATCH FILL CYCLE START @ (0- 3a DRY CYCLE STARTED @ '7 = %1 DISCHARGE CYCLE STARTED @^%D: a � TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. `2:OA bl 41 tf (�8- 4(4 cn 173 �3 AJ 4" iN 4o V4,4� 9 7e19 6f c / 3 / (/`� / ' P J� f/ J� rT'C rJr r t7C C-:41 qr-3J-� I V :3 9 "7 190 3 "-13 4? 4q.3 a q qz�9 any q qT R 2.5 �p eA 2ND DRYER•BATCH j 1 FILL CYCLE START @ ! D'3� DRY CYCLE STARTED @ ! - * DISCHARGE CYCLE STARTED @ 02 • c3 TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. 7q 3 �� *�6 �s�� ao 5 1 ?a 33R ��37 t*Ii�- 1`Z� 3q- /5 o �'�� aat �b -Ii41 C9 ob �{�Fj� �i` �� � � �7 0 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ - DRY CYCLE STARTED @ liff DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. �<<� [7? 3i� y21 Li�� r76 ,y o qq.5 36 Lr 3 a 372 ! D b qq5 y35 Nq 7� j5o q4. COMPOSITE SAMPLE RESET # CALCULATION DISH WGT GRAMS WET -SAMPLE + DISH GRAMS DRIED SAMPLE + DISH • GRAMS GRAMS l l r b (277 (( l r LI `62 r� 1' WGT. / / • �d g3 2ND WGT. 3aD WGT. i • 7,IIA3 ld67-7 X100 819 7iK� C. / v '= % TOTAL SOL DS 75-3�� / &77 DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 2� WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS ` (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE 0 o START STOP \ TOTAL -- RUNTIME, HRS 15C DRYER BATCH 2 D FILL CYCLE START @ '33 DRY CYCLE STARTED @ :D3 DISCHARGE CYCLE STARTED @� } TFMPFRATl1RFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER ' CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. `7'�•531-73 33 SO '414S L4 r � ?.q3 6v 3108' joo .414S ate' c 166 q a ,5 ,Yq q,? 14 L�s . m f214 2ND DRYER'BATCH % FILL CYCLE START @ DRY CYCLE STARTED @ / b -'5'%2-DISCHARGE CYCLE STARTED @ TFMPFRATI IRFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. Ibf�'2� t-7 3l5 ® JW3 t 4�,3 173 ED t,,7 *p, 3-3 Lf 14 J4,5 1113 ( 4 ,V5 0-9-0 o- ef J:a�, LID3 151) J--l-I 43 2 q3 s- - u-If 7 �le� r 17-b 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ `d3 DRY CYCLE STARTED @�• 3 f? DISCHARGE CYCLE STARTED @ TFMPFRATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT. DRY TIMER CHANGER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. T? 11,5 3 t 1 o )4a3 c 1 LIT- lto © �f Z� �-1 I �-{�(� Z I i c,? `7 351 5 0 H q(f Lf L4-cf 2 I-icf Lf-a)cf L4L Z ZkZ c L-E 3i 150 L(L(5 4Li-I LH 2-2�� � (o H 5 o I Co 7 L( H -T L4 51 L+L4 (Q. 1 COMPOSITE SAMPLE RESET # CALCULATIOf 12/12/17JH DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS t ,0 342 z(o, ?-009 isTwGT. 2N0 WGT....:.•L. 3RD WGT. X 1010 S �1 - kr r '= % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1� WGT. 2ND WGT. 3RD WGT. S: X 100 . 1 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH -.DISH WGT.). x 100 ` WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS 7I�,�Ei,3 •��,A�'l'� wt>� !` i3 kr iq ef, �QeS-4- F-v START TWSA DRYER OPERATIONS DAILY RECORD DATE lb- I STOP TOTAL RUN TIME, HRS ; S / ✓�: �y / Id• _ 15C DRYER BATCH FILL CYCLE START @ 1: DRY CYCLE STARTED 7 DISCHARGE CYCLE STARTED @ �� O TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 5 7 3a ;L 24 )24 9 7 1414 17 4 37 b l 01: 1-D I V? 31a 0- 0 a 4115 4311 44 a,q D'37 Po 24 j�5D qq5 qqb J445 3 C 1 4� 5 f4�'50 1,?d- ,5,0 )44 q -45D 2ND DRYER•BATCH - FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ =/ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. If: l b5 �9q ;I 1 � 5 GIB c `7� 5 4145 3' 44. g >fl 3 1 bb - q4_5 4.3;? .3 ep 1- 0 73 150 1445 )-f63 q 3:iq 1 -1 5 Lt3 5 d-d-b 445 L-i 42 q 5 ��J 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DRYER BATCH FILL CYCLE START @ . Z. DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TEMPERATURES °F f `' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. ROTOR IN- ROTOR OUT '0.1. %e513�v uOUT / . H ; a`1 k-M 3Zis . Lt36 kqy (bo L[4 b6 Y`/3 23v 2r7 4,qg � y 4 `l`tZ qV i I 21/sr COMPOSITE SAMPLE RESET # CALCULATION DISH WGT GRAMS WET -SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS bl3! b. 3663 1ST WGT:' /j5 C/o 7 9 2NDWGT. /6-• 913 9 3RD WGT. /�• 9/3 i = /. D13 dd g X 100 %TOTAL SOLIDS �. 3 668 - 1. v i3/ /5-a53 DISH WGT WETSAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100'- WET SAMPLE + DISH - DISH SGT. %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17J H TWSA DRYER OPERATIONS DAILY RECORD DATE V oc START STOP TOTAL RUN TIME, HRS I to ---6 / W'9 j I 1st DRYER BATCH FILL CYCLE START @ ; ,4{4( DRY CYCLE STARTED @ 7- DISCHARGE CYCLE STARTED @ 1D=37 TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. 7 1t `� � a g- D 4 o J9 A /t.54 °7 III 3a,5 �5D D. L445 43(a S l9`7 160 lq*s !tea 9 q 'q 3 1 a o9 G 5-4 q7 2ND DRYER'BATCH nn / FILL CYCLE START @ • V % DRY CYCLE STARTED @ !) ' °� DISCHARGE CYCLE STARTED @- a ; TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. -3 tLf Liar /0 49! 169 e aW qq la, L © 1 33 A 10-0 q 3`z �91-/5 J36 3 7LQ q4,5 I a-. 0, 1169 43V goo I 4,q5 I Ll�a la5:5 c /3 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD c'DRYER BATCH FILL CYCLE START @off - 5A DRY CYCLE STARTED @ '3',26 DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. • b M 3lK 0 �1�3 Ala �21 , 1-7. 5N 16 17 3Z(o 1,50 Vq3 2.04 0 1 Vq3 V-Z6 :fit N43 �it-fzaI;l— COMPOSITE SAMPLE RESET# CALCULATION DISH WGT WET*SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS . 1, oa�5 i t . N k)-5 1ST WGT. 2No WGT. 3RD WGT. /.vZ, X100 a 6- — /. v 3 % '= % TOTAL SOLIDS--1--�� `12 DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 15'r WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17J H TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS CP �5 / 7 CIS l ,_ 1st DRYER BATCH FILL CYCLE START @ 6-.3 DRY CYCLE STARTED @ 1: b� DISCHARGE CYCLE STARTED @C TFMPFRATI IRFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. �T-ob 4o 3ova o 7- 5� l 7 3-33 50 4 e. 8? 3 -5a 6 0 4iY5 I3S a E? cl % 1? -7 4(31 6 : i 7 2ND DRYER'BATCH '' LL •�f FILL CYCLE START @ D: `�� DRY CYCLE STARTED @ l DISCHARGE CYCLE STARTED @ o� •J (� TFMPFRATl1RFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. la:�to 3a 5a lAf 4349 c;206 c Af a s c 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH n FILL CYCLE START @ d_ •� DRY CYCLE STARTED @ 31121 DISCHARGE CYCLE STARTED @ TEMPERATURES °F I TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. 3018 D 4.2o 4 o 7 Lt ap - ) -7B c� "I ] z 50 y2_6 Liv q �127 20 7 -SW v ��0 3sb / Q D %s ' 3 Yv:�; ��7 34- .5 06 0 4ys y s 1y3 s 'I q,yr �`i Z N'�y qq/ aSs 1H- COMPOSITE SAMPLE RESET # CALCULATION DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS . GRAMS GRAMS 1.0g33 tqgq 07 1ST WGT. 9 2ND WGT.�- 3RD WGT. X 100 /3,7?7y '= % TOTAL SOLIDS 1-7,�� DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= %p TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP RUN TIME, HRS TOTAL 15L DRYER BATCH • FILL CYCLE START'@ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ l� TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. :5' V'73 3OT 6 4X3 ------------- 411 9=qg /7a-, 30.) -q q5 q34 .1445 E jo l 0,3-d ! 14�- le ly L► lo a� g l ga 1 f� a 41EiTi:c la: . El �D- q5c 4-��5� qs0 4 5- 1 129�- I d, :d, d. o .d 2ND DRYER'BATCH ` FILL CYCLE START @_1 d 3 L DRY CYCLE STARTED @ PO G DISCHARGE CYCLE STARTED @ o��P TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. L4 6 .�� �3 pf '51 Wa& q a r Alai o �' a-�{� ! b 3jl oo q3 )43i -3:34 169 Lto 3 l5 0 1[4 4:a& !A LiLf6 I aoa I gLfl L-tLfZ LfLn 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TFMPFRATURES 'F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. COMPOSITE SAMPLE RESET # CALCU LATIOI` DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS t�GRAMS 1' WGT. 2ND WGT. Jr 3R°WGT. 9 X 100 %TOTAL SOLIDS � �o DISH WGT GRAMS WET SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS 1ST WGT. S: 2ND WGT. 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGTJ x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS . DAILY RECORD _ DATE � O �S START STOOP TOTAL RUN TIME, HRS% 15` DRYER BATCH FILL CYCLE START @� .3 DRY CYCLE STARTED @ �- /,7� DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 73 2814E It 395 141 b ofi Al -q,41 l4� 17 %50 '4q(,, 'q'I b aag J45 to 2ND DRYER'BATCH41r f FILL CYCLE START @ l �• DRY CYCLE STARTED @ I DISCHARGE CYCLE STARTED @� LC TFMPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. �a 7 6V a: o to 1 `I 3 3 a3 D & 14/3 'qo 1, aa� ch 4 35� 4L� 14V JV a2 � M�a I'I i 33 2 0 4L W 43� qt4 zz-t -3� 43 �q' Q ob 414E 1 "y-2 q q? I a&q jo 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD bRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TFnnPFRAT[ IRFS OF •s, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER. IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. COMPOSITE SAMPLE RESET # CALCULATIOI` DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1,�Q17j�, ZZ �.3-7 1TWGT. 2ND WGT. % 3 99- 3RD WGT. X 100 % TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGTJ x 100* WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH .. TWSA DRYER OPERATIONS DAILY RECORD DATE /19 START STOP TOTAL RUN TIME, HRS 15i DRYER BATCH �1 FILL CYCLE START @ S - D DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ MA TFAAPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 4 140(o 161 CZ J436�� ce So le a:- M 50 3&d qlr J-/7 414g lb 2ND DRYER*BATCH FILL CYCLE START @ DRY CYCLE STARTED @► . c� c DISCHARGE CYCLE STARTED @ 3t TFAAPFRATI IRFq OF DISCHARGE DISCHARGE DRY CHANBER CHAMBER ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT. 0.1. /74 qa 5 ( 3 Sa f-f 443 C 14 . l 43D ja o 445 4,jq a Iq\ `t 6 44q 0-1 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT OJ.. COMPOSITE SAMPLE RESET # CALCU LATI O N DISH WGT GRAMS WET -SAMPLE + DISH GRAMS DRIED SAMPLE + DISH GRAMS GRAMS L13 1ST WGT. 7. S Si 3 r��.��%9 2ND WGT. /. 3 r,5'R 3RD WGT. 5,5/3 — /, v / s�3 . •t. X 100 — / TOTAL SOLIDS DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1s,r WGT. 2NO WGT. 13RD WGT. S X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH = DISH SGT.. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH RUN TIME, HRS TWSA DRYER OPERATIONS DAILY RECORD DATE "6'"' I START STOP TOTAL fve3 -7:ys i 3. 1st DRYER BATCH ' FILL CYCLE START @ (P- `�t � DRY CYCLE STARTED @ . �� o��% DISCHARGE CYCLE STARTED @-/o;i� TEMPERATURES °F ri TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 4? 0 5 0 1 (o Y6 6 `ff fo 165 e "7 `7 b 3 a 0 445 4,35 41(S G' T,57 b14 733a 160 -1-445 qJ5 449 iZ e j;q7 r 3Pf 1,5-0 1-44 qji�p q4 te 911 �bt l?8' 4,5a 1 / �� �{�,� qL[3 4L�s I 2NO DRYER BATCH FILL CYCLE START @Its: j DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ a TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 0,16 d'. b (p 1 1-76 30, 5o. 4 --14 `f3 % .60 n. -5 4 ' & ` ! D ° 3" 3 q- a2,76 1:If-to llol 40 /%0 Y 5 j43�, 462/1 .5 - a2k- l $ t -�4 50 qq�p LA15 4"146 0?-5 r e ..z)lL r �I'v3 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD CDRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ : D DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHAMBER 'IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. 3 -3dg v at141p, -,427 �t'Kb 6 yN� u33 0-3 V. ISO 4t5 l ,so q43- 9Z y lit Gal t7 I 1,1-k-7 1 q 5 4ky �L13 �5b j14 COMPOSITE SAMPLE C RESET # CALCULATION DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS o t 9'7 .0 q. ,6 1ST WGT. /S 2ND WGT. 7 k;;WGT. C.- C1, . � ��6 • / '_ % TOTAL SOrD�SDl`•"'L DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1s,r WGT. ZNo WGT. 3RD WGT. S: X 100 %TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE D START STOP TOTAL RUN TIME, HRS / M Z5 / 15Y DRYER BATCH FILL CYCLE START @ CP y� DRY CYCLE STARTED @ /+'`a DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 366 b 14 D 4 0T J a4 1/,v 9� 3S- `0b q-5 q3# 4.46- as Z� e 0 a 1 4bf 1,5 c) 4q � )438' 41 q6 ;2 a o. c Ll J-5 /9 ,9, 2ND DRYER'BATCH 35 FILL CYCLE START @ D- DRY CYCLE STARTED @ �� DISCHARGE CYCLE STARTED @ d. 3 D TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. Oat 467 4d, r 67 CD D6 /a .50 ;1 a, qA �o 4 cry '0 plo na li4li 4tq-1as7 c 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD rbRYER BATCH J FILL CYCLE START @ DRY CYCLE STARTED @ �'(3 DISCHARGE CYCLE STARTED @ TFMPPRATIIRFS OF ; DISCHARGE DISCHARGE DRY CHAMBER CHAMBER. ROTOR ROTOR TIME EXHAUST PRODUCT TIMER IN OUT IN OUT O.I. 3'.�3 i73 3l o zZ n I .0 3z SD `tt5 Ul 417 /c� y: 5-:; 17 D `IO HEN Ll ��l V O f 65 37Y 4'6 L136 q5 ata �l-1 b I l � LI Ll 4 o Nyu q35 aY3 art COMPOSITE SAMPLE RESET # CALCU LATIO I` 185 DISH WGT WET. MP + DISH DRIED SAMPLE + DISH GRAMS GRAMS . GRAMS GRAMS ` rJ �rJZ l7? `k5 1ST WGT. g 931W 2ND* WGT. Sur/ 3RD WGT, '= % TOTAL SoCIDS/g.3 J DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1' WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH -"DISH WGT:) x 100 WET SAMPLE + DISH - DISH SGT. '_ %TOTAL SOLIDS ALARMS OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP TOTAL RUNTIME, HRS C2 " A 1st DRYER BATCH FILL CYCLE START @ �c �� ` DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ D� Q TEMPERATURES DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0. 39a E q Los '30s- qq6 3,5 193 e j43`1 /J"o q4 .3q- e aso'D 1 a8(i leh ip,-- 11-i l 2ND DRYER'BATCH FILL CYCLE START @ DRY CYCLE STARTED @ o �-s DISCHARGE CYCLE STARTED @ TFMPFRATI)RFS DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. �o .3 5 Po Z 191 y0 HA[5 1-13 7 )-A c2— � 0,*.!:;5-; a533 .s15 AW- l ql'�- qf� a - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ a •aa DRY CYCLE STARTED @ -5� DISCHARGE CYCLE STARTED @ bJl TEMPERATURES °F TIME DISCHARGE- EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER. OUT ROTOR IN ROTOR OUT 0.1. 9,54P 1-7 b 36 ;o q a t q r. 1� .3: 4 b 1-1 3 5-b 3cr- q 3016 a62 s� 4-5b 167 33_C l %'5 yys 5:z6 rhg S-7 ) 5D ga `l3G yyS a1�/ 'I !7Z G No M 442 14LILI `qo ay COMPOSITE SAMPLE RESET # CALCULATION DISH WGT WET -SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS U3�Iq� D 1ST WGT. '��CFJ 2Nn WGT. 3RD WGT. X 100 '_ % TOTAL SOLIDS C� DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1sr WGT. 2ND WGT. 3RD WGT. S: X 100 TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS -OR COMMENTS - 12/12/17JH TWSA DRYER OPERATIONS DAILY RECORD c� DATE /I— -5 ` 1 0 START STOP TOTAL RUN TIME, HRS �p : Alf 15C DRYER BATCH f FILL CYCLE START @ ( 1 DRY CYCLE STARTED @ = G 6 DISCHARGE CYCLE STARTED @ • TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER' CHANBER .IN. CHAMBER OUT ROTOR. IN ROTOR OUT O.I. 7I � X3 D 4 Qlk 0 #3 $1 b) 6 b 3 a (v . 50 Y S :S 1.( a, `0 0 i & E' 231 <0 mi 2ND DRYER BATCH n FILL CYCLE START @ U • 3� DRY CYCLE STARTED @ dJ� DISCHARGE CYCLE STARTED @ J TFMPFRATI IRFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. (� �� 1 �� 3� O 1•fl �f ��� `(� 16:5 3 .moo • y-/*g; 435 )Vq g . �3�� 1�0`�.� 4 : ✓ l (P �"" ebb y� =�A-1� c 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH /- FILL CYCLE START @ ,a� DRY CYCLE STARTED @3.'6A DISCHARGE CYCLE STARTED @ f7•r7 TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE. PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. r l b6 '333 '50 W q37 ll3y 1213 -14 Lit 1-12 12 -3D 16 D 445 2Z7 I-ra 166 160 4q5 y35 qv-3 ( ;s!y -14-I q-57 ) 9-5 `'IZ,ti `/Z7 zY7 COMPOSITE SAMPLE RESET # CALCULATION DISH WGT WET SAMPLE+.DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS q 1, b�3E 15, Llgol 1STWGT. �/3. /66 g 2No WGT. 3RD WGT. X100 AS, 4b / '= % TOTAL SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST.WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT. 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18JH TWSA DRYER OPERATIONS 1, DAILY RECORD DATE START STOP TOTAL RUN TIME,-HRS 15` DRYER BATCH FILL CYCLE START @ f� 3 q DRY CYCLE STARTED @ � U �P DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT O.I. 7;a (o &7 c2,qR 37,5 403 56 c T510 leg 3 X7 50 -944, 44- 14 S = q -6 3 -3 &, f r o qqs 4,36 a-ag, e 9.34? Lai. 39 q 160 143,5 y(a Alt a ) g b 450 q--05 Lt4 7 443 14- 2 5 (• E 2ND DRYER BATCH ! y r FILL CYCLE START @ j : 3 a DRY CYCLE STARTED @ ! ' �J DISCHARGE CYCLE STARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. b5 "i 1 p 1) OW It = 3V7 3 W7 JS D 1 )4445,1 1-i `7 1 44 1ao a I q,-(.51 4,tf 3 I , Sa - 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @y�i aJ DRY CYCLE STARTED @ �' %v DISCHARGE CYCLE STARTED @b/ • 3 TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. 3�Io ` -.00 n ` 6 y115 LI35 iy5 Ice-/ 314 Li;5o 167 355 /C�0 ' `!Y W35 I/V3 aZ-7 5•.�0 16�6 393 150 Ms qql Llyy 2/5 �;v 6-23 / R Q37 % `f 3S Zl(Z COMPOSITE SAMPLE RESET # CALCU LATIO N DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS pp O leg al g0o% 1sr WGT. 3 Sr' G I+ , 2" . WGT. 14. 7 3RD WGT. C:. x 100 / % TOTAL SOLIDS DISH WGT WET SAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2"D WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18J H 97 V� 9c • TWSA DRYER OPERATIONS DAILY RECORD DATE ! 6 "' ` t 6 START STOP TOTAL RUNTIME, HRS 15t DRYER BATCH FILL CYCLE START @ (c�� `f V DRY CYCLE STARTED @ r DISCHARGE CYCLE STARTED @ b TEMPERATURES DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 31 3�3 a 47 7 C gi63 100 #46 q3/ & 9:43 l0 3q [ 1 0 f-ig(p 136 446as c ! 4q 4uq qqS 4-q.9, 14q5 Q q3 2ND DRYER BATCH FILL CYCLE START @ D• DRY CYCLE STARTED @ �DISCHARGE CYCLE STARTED @ C2 133 TEMPERATURES DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. j1=a3 )(0 :3d� 0 4b9 313 1469 A59 C 33 Irk 15D q417 q36 qq W �7 3�� 1 'li 43.EZ4& 's 33 /S C:�p I q3 31 4 qj-fg, 4t-(3 .2,y(a C� 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH nn FILL CYCLE START @_4 DRY CYCLE STARTED @ (Tj DISCHARGE CYCLE STARTED @'•�� TEMPERATURES °F t, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT O.I. 3 ;l ?-.), I `l 2 3og 6 H0-� z1 , Lf 01 I(o-S � �: og 326 Yq 5 L(36 5g l b Z jo 4qS L/3q. yqq zz� Z'y -so /5 0 L1K 6 4-56 Yyy 2/0 � r;'33 Icy y4a 0,3 I-lyo yL[z 939 ayl -sa COMPOSITE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS I�.03bo 55p 1ST WGT. f 2ND WGT. 3RD WGT. y�! 5 lae X100 % TOTAL SOLIDS RESET# DISH WGT WET SAMPLE +DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS °I I7 1sT WGT. 2ND WGT. CALCULATIONS: 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH -DISH WGT.) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18JH �C • TWSA DRYER OPERATIONS DAILY RECORD DATE START STOP j Q TOTAL RUN TIME, HRS ll� '� / • S 1s` DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @_ DISCHARGE CYCLE STARTED @ D•` rrnnncDATI IDCC DC •i, C' TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER " CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT O.I. �sD�t 0 49 3 31l d 3g0 �3-7Q 3qo )35 E n] q'4-7 E' 2ND DRYER BATCH FILL CYCLE START @ DRY CYCLE STARTED @ �l a DISCHARGE CYCLE STARTED @ �•rwnnrn ATI IDCC 0, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANGER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. p 3`7 15' D -f 3 43,11 a6 to CD '33 15 ! - L4q a a.O�29 E 7/18/18JH TWSA' DRYER OPERATIONS DAILY RECORD C'RD DRYER BATCH , ILL CYCLE START @ DRY CYCLE STARTED 3' 2 r� ��. @ ! DISCHARGE CYCLE STARTED @ b •3� TEMPERATURES OF ,. TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 2LI 167 -.2-11 39+ 3�� `3�3 141 '327 •SD gggl `!3V 9q21'72— s. y 3 3SZ l b b qb �13� '► I 616 5.GLJ 3 160. I-Als 'A& L P,o6 3 6,4 L13L c13cj LlLl I -2 S 7 TT] COMPOSITE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS i.5y j�.IJ $f 1ST WGT. 2ND WGT. C. f 3RD WGT. %l(k '_%TOTAL SOLIDS RESET# DISH WGT WE SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. CALCULATIONS: -q Wr,T X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. '= % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18J H • TWSA DRYER. OPERATIONS DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS to 1st DRYER BATCH FILL CYCLE START @ ! -% DRY CYCLE STARTED @ %:�a DISCHARGE CYCLE STARTED @ ; TFAA P FR ATI I RFS'0F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT O.I. o 3 4?lf 1,37 E 21rx* 49 661 aa )4I� sq o q.a ,5 ioo #�t�.a7 2 uR C13 414 2ND DRYER BATCH FILL CYCLE START @ 1 v : DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER CHAMBER OUT�j� ROTOR ROTOR ODUT O.I. ]�'IN(� �G 614 33`.'. /� /IIN/� 'l v 1- L b3 ,5(o 4 37 445 ) 6 CO 6D 3� I.rO �f�3� aoSs E � It 431 9-9a 414 a 'i4L7 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD ,ao DRYER BATCH FILL CYCLE START @ d ' DRY CYCLE STARTED ' �-� DISCHARGE CYCLE STARTED f� @ ARTED @ TEMPERATURES °F t, TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. 3,-0 10 0 3'--A-7 2 9. CrE I52, J46 4.15 10 3 ( D q36 �ZS c13t 166 314 5: 05 It 4 s 34L 1 bb 1146 y36 {yc zlel `Sr-# 55 -M6 7 �JL1S 43L1 +1 z 2a7 Sl b., ( to 5 - `1 5 (-13y qql �36 23z may. COMPOSITE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. �. • 3RD WGT. X 100 %TOTAL SOLIDS RESET # DISH WGT WET SAMPLE+ DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. - 2ND WGT. CALCULATIONS: 3RD WGT. X 100 % TOTAL SOLIDS (DRIED SAMPLE'+ DISH - DISH WGT) x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD �J DATE / — 3 _ b .t. START STOP r-� TOTAL RUN TIME, HRS (� / •• I / < 1st DRYER BATCH / , r FILL CYCLE START @ DRY CYCLE STARTED @ DISCHARGE CYCLE STARTED @ / �= TCIIADCRATI IRGC OC TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN, CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 7.P,b 166 311 D 38 b 314 3?b 37 C . ?: fb5 33 6t> -11dX 4v wA as 44 q37. D:Xw J59 -jqa:41- Ziq& �39 q'Y6 9-3 py 2ND DRYER BATCH t FILL CYCLE START @ O.DRY CYCLE STARTED @ 1-I3 DISCHARGE CYCLE STARTED @ �• TCKADGRATI IRFC DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. (a I� �`1 �03 3 C a-63 LOCI 32, 5Z 44 V g2S* Wqc a 16� � `� �� 44 3`Z � 1� �zs 46,3 / 5 0 116- J-13z1- 4Y,5- a1iQ c 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD . 3RD DRYER BATCH FILL CYCLE START @ ' °1� DRY CYCLE STARTED @s.: DISCHARGE CYCLE STARTED @ b•7 TFMPFRATI IRFS of TIME DISCHARGE DISCHARGE EXHAUST PRODUCT DRY TIMER CHAMBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3`.93 Ll : u 3- S:33 tb 3�1 5 b.44L Ll � CN/ o I-7 �(3: .� `lY3 IyYZ Y3 a3t� 'N COMPOSITE SAMPLE RESET # DISH WGT I WET SAMPLE + DISH DRIED SAMPLE + DISH GRA GRAMS GRAMS GRAMS /MS �. �oZ&S !I ��'�/ 15TWGT. ZRD WGT. 3RD WGT. X100 f'o•�, / �.0 %TOTALSOLIDS- DRIED SAMPLE + DISH DISH WGT WET SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS 1STWGT. ZRD WGT. a-9. %9l� CALCULATIONS: 3RD WGT. Algo I osv/ x 100 9a,* 66, ALARMS OR COMMENTS - 7/18/18J H (3 - /i lj �7 C(i� '_ % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS 4 TWSA DRYER OPERATIONS Q DAILY RECORD DATE / J- START STOP + TOTAL RUN TIME, HRS Ist DRYER BATCH 7 7� FILL CYCLE START DRY CYCLE STARTED @ : V DISCHARGE CYCLE STARTED @ 1 TFMPFRATURFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT -'� 10 `l o� b a 10 t�i G!J 7�5�1 3>D 50 j4A *A ) E '3:4� '314d /00 9:lcl to D 38q. ll�r qql!� JV 3,5 4f 1�:A 1-6D 43D )447 1 4'4 3 `7 31 eo 190 2ND DRYER BATCH J I FILL CYCLE START @ _ DRY CYCLE STARTED @ D`F DISCHARGE CYCLE STARTED @ ,2 1, TEMPERATURES OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 19D .16-3 63 315. 403 1,5,1 ' l0,0 50 qqA qdq 6 3lo6 l00 144 7 a ate E 2;od If `114to q3q 0 fag EO ` 33 --41W *47 4j-� 3 1 J447 Ab 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ : �� DRY CYCLE STARTED @ '�- DISCHARGE CYCLE STARTED @ TEMPERATURFS OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. .� 162 i5$ 3Z`l'510` 36b D 0 t CIS `35 L13? L(y3 7� �N 605 15 6 LI3q %.� `{`jb LJN a33 ZFlV COMPOSITE DISH WGT WET SAMPLE +DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS .o b 1(-•7633 I' WGT. 2ND WGT. 3RD WGT. r - C gr0 /.!� ��� X100 y f j4&3,1 - /,v(�(o % '_%TOTAL SOLIDS d RESET# DISH WGT WE SAMPLE+ DISH DRIED SAMPLE+ DISH GRAMS GRAMS GRAMS GRAMS 1h WGT. 2ND WGT. CALCULATIONS: 3RD"WGT. ALARMS OR COMMENTS - 7/18/18JH X 100 % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT 1 x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS TWSA DRYER OPERATIONS �. DAILY RECORD DATE -- START STOP TOTAL .t, RUN TIME, HRS y e% ' I" DRYER BATCH FILL CYCLE START @ - DRY CYCLE STARTED @_ DISCHARGE CYCLE STARTED @��: a a TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN, CHAMBER OUT ROTOR IN ROTOR OUT O.I. ,3b� �� 3 93'. D 1 % 60 31 �a q to q e � -' 5 i l 3 5' -7 44o *q g`,5r (r 1 39 7 I5 a J414& 141 as c :a 1 ,q Lt5� 7 149 7 r� 1,10 2ND DRYER BATCH FILL CYCLE START @ !y -�d� DRY CYCLE STARTED @ = U DISCHARGE CYCLE STARTED @ TCKADCOATI IRCC °G TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. �) I.57 i 5 5 3 1 *7 J-lq5 J � f � 4.4 4f(e- aas lg� 144 .a L 7/18/18JH TWSA DRYER OPERATIONS U DAILY RECORD �Ro DRYER BATCH l FILL CYCLE START @ oC DRY CYCLE STARTED �-J 7 DISCHARGE CYCLE STARTED �'' ( Z @ ARTED @ TEMPERATURES °F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER I CHAMBER OUT ROTOR IN ROTOR OUT 0.1. c tb`� 3zo —56 N-15 qIS3 i 1 � L��3i Z Llyl-1 ZI-7 5•. Z� l5� 3�{6 �D y46 y3 y�15 ;bcti L►1-1v LlLIZ LI36 2-'ss COMPOSITE SAMPLE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS .0 2.�b 1E. Z82 1GRAMS 1' WGT. f� 2ND WGT- 3 RD WGT. l Z 010 . X100 % TOTAL SOLIDS RESET # DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT. CALCULATIONS: 3RD WGT. X 100 '= % TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT.) x loo WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS 7/18/18JH • 7/18/18JH TWSA DRYER OPERATIONS DAILY RECORD DATE STARTSTOP TOTAL RUN TIME, HRS 15L DRYER BATCH p� FILL CYCLE START @ &• q Iy DRY CYCLE STARTED @�'_ DISCHARGE CYCLE STARTED @ TPRADFRATI IRFC OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN. CHAMBER OUT ROTOR IN ROTOR OUT 0.1. �jk 1 6 g --3 cU of 33 dg lefid �7 :5(oI )AM . 4J-)5 a v 4 qs' 4 114 a ag /q 2ND DRYER BATCH II�� FILL CYCLE START @ DRY CYCLE STARTED _@ DISCHARGE CYCLE STARTED @ TFMPFRATLIRFS 'F TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. tag 66, b 3g� a. S� C l6' a, b 5d * /-/LO-1 q Ay )Y- I7A co /•7�3 J6 5 3 sq ILH:;, 43 T 4V C6 �g� TWSA DRYER OPERATIONS DAILY RECORD 3RD DRYER BATCH FILL CYCLE START @ p(• DRY CYCLE STARTED @ 3 � Z3 DISCHARGE CYCLE STARTED @ TEMPERATURES DF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. Z_q 0 0 3 88 3 tO9 3V8 zTl­j H',13 ' to-1 34 -5'0 LfLt3 1-f3(p 5,o3 t(o Z c(c �) 3C� 44 3 ZzLt .Tr„ S 5', 53 i (3 �f �.I �d c(4 3 3 q 443 Zz 3 J"z.S Co ; L13 1-7 l y 3 5 19,5 L-1L13 U y I Lf 3 Z3 �? COMPOSITE DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH SAMPLE GRAMS GRAMS GRAMS GRAMS 1e05H 2-3: 9?(o5 1'WGT. 3. 11o/ .2ND WGT..3, FeD WGT. % TOTAL SOLIDS RESET# DISH WGT WET SAMPLE+DISH DRIED SAMPLE +DISH GRAMS GRAMS GRAMS GRAMS 1ST WGT. 2ND WGT.. CALCULATIONS: 3RD WGT, X 100 '= Y. TOTAL SOLIDS (DRIED SAMPLE + DISH - DISH WGT) x 100 WET SAMPLE + DISH -DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18J H TWSA DRYER OPERATIONS ' DAILY RECORD DATE START STOP 1 TOTAL RUN TIME, HRS • 3 1sc DRYER BATCH FILL CYCLE START @ �/�, DRY CYCLE STARTED @ ~/ DISCHARGE CYCLE STARTED @R- TEMPERATURES °F -_.. lb.: TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT O.I. b S 9,a o Lf3 A, q:b4� �. .. 16D� 43� ats c q q a63 145 439 I 1 `K` I Jf-yam I elf- I �a 2ND DRYER BATCH FILL CYCLE START @ ! 6 DRY CYCLE STARTED @ ! 1 6 DISCHARGE CYCLE STARTED @ TFMPFRATI IRFC OF TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 0 )a: 6 �� 8 9 I5a �A` b� aED �:31 1Vd 44D 345 a� r 7/18/18JH W L TWSA DRYER OPERATIONS DAILY RECORD Ro DRYER BATCH C 'L j,� ILL CYCLE START @ `I `� % Z ' DRY CYCLE STARTED @3I DISCHARGE CYCLE STARTED @ TEMPERATURES of TIME DISCHARGE EXHAUST DISCHARGE PRODUCT DRY TIMER CHANBER IN CHAMBER OUT ROTOR IN ROTOR OUT 0.1. 3" Z 1 6 '�v Z b ill N7 LOY 155 -150 1.11 M -533 150 441 1:�5 Vy5 . to . (66 3 K j 00435 43c 44H aiy fi'.(a1 t6N Liar Ov t(Ks LI30t Vqq 2-Ij ITY V-510 rn 435 i qy 1 (441 4Nz- qp, I -A-1, C_ COMPOSITE SAMPLE RESET # CALCU LATIO i\ DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS GRAMS GRAMS 0550 (5. (,5�0 1ST WGT- 2 ND WGT. 3RD WGT. I3 �93sS t qSf (xloo 7 i�, 4G5 '=%TOTAL SOLIDS � : D DISH WGT WET SAMPLE + DISH DRIED SAMPLE + DISH GRAMS GRAMS* GRAMS GRAMS 1ST WGT. 2ND WGT. 3RD WGT. S: X 100 % TOTAL SOLIDS (DRIED SAMPLE'+ DISH - DISH WGT.)' x 100 WET SAMPLE + DISH - DISH SGT. '_ % TOTAL SOLIDS ALARMS OR COMMENTS - 7/18/18JH