Loading...
HomeMy WebLinkAbout20190312 Ver 1_401 Application_20190311a`'oF wArE�Q� Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): NX 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express NX Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes NX No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes NX No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2. Project Information 2a. Name of project: 6139 Gainsborough Drive 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: Brookhaven 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: David, Sarah Triplett; Ashley, Bradford Cox; Guy, Margareth Galardi; Martha Waters 3b. Deed Book and Page No. DBO10278 PG02561; DBO17151 PG00483; DBO16026 PG00594; DB3976PG203 3c. Responsible Party (for LLC if applicable): 3d. Street address: 6139 Gainsborough Dr; 6121 Battleford Dr; 6105 Battleford Dr; 6404 Margate Ct 3e. City, state, zip: Raleigh, NC 27612; Raleigh, NC 27612; Raleigh, 27612; Raleigh, 27612 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: City of Fbleigh 4b. Name: Wayne Miles, PE 4c. Business name (if applicable): City of Raleigh Public Works Department 4d. Street address: 222 West Hargett Street, PO Box 590 4e. City, state, zip: Raleigh, NC 27602 4f. Telephone no.: 919-996-3940 4g. Fax no.: 919-996-4011 4h. Email address: wayne.miles@raleighnc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Becky L. Ward 5b. Business name (if applicable): Ward Consulting Engineers, P.C. 5c. Street address: 4805 Green Road, Suite 100 5d. City, state, zip: Raleigh, NC 27616 5e. Telephone no.: 919-870-0526 5f. Fax no.: 919-870-5359 5g. Email address: bward@wce-corp.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0797212984, 0797215870, 0797212389, 0797211788 1 b. Site coordinates (in decimal degrees): Latitude: 35.8707 Longitude: -78.6879 1 c. Property size: 5.29 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Hare Snipe Creek 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Please see documentation attachment 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,440 3d. Explain the purpose of the proposed project: Please see documentation attachment 3e. Describe the overall project in detail, including the type of equipment to be used: Please see documentation attachment 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases in the past? ❑ Yes ❑ No ❑X Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: N/A 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Stabilization LIT to Hare Snipe Creek PER Corps 25 218 S2 - Choose one S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 218 3i. Comments: Please see documentation attached Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 P TOB relocation planted UT to Hare Snipe Creek No 700 0 B2 P TOB relocation riprapped UT to Hare Snipe Creek No 210 0 B3 T Construction Access UT to Hare Snipe Creek No 8,152 1,416 B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 9,062 1,416 6i. Comments: Please see attached documentation Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Please see documentation attachment 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Please see documentation attachment 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). N/A 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. No new impervious area is being added ❑ Yes ❑X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes 0 No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Raleigh ❑X Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑X Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑X Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Please see documentation attachment 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The project is located in an urban stream. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC Historical Preservation Office website (www.hpo.dcr.state.nc.us) was searched and no sites were listed for this property. In addition, no architectural structures or archaeological artifacts were noted during preliminary surveys at the site. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? (Floodmaps.nc.gov) Wayne Miles, PE 3/7/2019 Applicant/Agent's Printed Name Date Applican gent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 10 of 10 Documentation for Pre -Construction Notification (PCN) Form 6139 Gainsborough Drive, City of Raleigh, NC B. Project Information and Prior Project History 3a. Project Description The project site is located in a primarily residential area at 6319 Gainsborough Drive within the Brookhaven Subdivision Phase III in Raleigh, North Carolina. An unnamed tributary (UT) to Hare Snipe Creek forms the western property line. The driveway at 6319 is currently being undermined by an active lateral migration of a meander bend in the channel. Approximately 220 feet of stream bed and bank have been identified for repair and improvement through the City of Raleigh Drainage Assistance Program. The project is located just south of the triple box culverts at Gainsborough Drive. The project includes the properties located at 6139 Gainsborough Drive, 6121 Battleford, Drive, 6105 Battleford Drive, and 6404 Margate Court. The property at 6105 Battleford Drive had approximately 130 linear stream bank repairs permitted in July/August 2007. No permits are known to have been issued for the other properties within this project limits. The West bank of the stream at 6319 Gainsborough is partially riprapped beginning at the roadway culverts, extending south approximately 200 feet. The bank migration begins at the current end of the riprap bank and continues for an approximate distance of 750 feet downstream. It is likely that some portion of the eroded bank was lined with riprap prior to the bank erosion as a significant amount of riprap has migrated into the center of the channel at station 3+00 causing the stream flow to be directed towards the eastern bank. The eastern bank below the riprap has eroded approximately 10 feet laterally for a distance of 45 feet. This bank erosion is located on the property at 6105 Battleford Drive. An existing lawn has been maintained to the top of the western bank at 6319 Gainsborough providing only a shallow root system to aid in stabilizing the bank soil. The eroded bank height ranges from 7 to 8 feet along the western face. The eastern floodplain is wooded and the bank heights range from 2.5 to 4 feet providing for better access to the adjacent broad floodplain. The watershed contributing stormwater to the project site on UT to Hare Snipe Creek has an area of approximately 0.89 square miles and is not FEMA regulated. The regional curve data for a watershed of this size is listed in the Table A. Table A: Piedmont Regional Curve Data Bankfull Urban Curves Rural Curves Area (Sq Ft) 53 20 Width (Ft) 25 13 Depth (Ft) 2.2 1.3 Discharge (Cfs) 300 180 Supplemental Information 6139 Gainsborough Drive PCN Application March 2019 The project reach classified as a C4 stream that is slightly entrenched. The eastern bank is lower and has better connection to the floodplain than the steep western bank located on the outside of the meander bend. The following morphological data included in Table B, was obtained from surveyed cross sections at riffle locations. The morphological cross sections and longitudinal profile data is included in the Appendix. Table B: Site Morphological Data Cross Section Slope (ft/ft) Wbkf (ft) Abkf (sqft) dbkf (ft) dmax bkf (ft) Qbkf (cfs) W/D ER 4A/4B 0.009 14.62/ 25.44/ 1.74/ 3/38/ 152.5 8.4/9.0 14/17 Total 11.76 15.29 1.3 2.36 17.1 T: 26.38 T:40.73 T:1.54 5 0.016 25.1 29.124 1.16 3.02 161 21.6 6 8 0.016 15.33 31.64 2.06 2.8 206 7.43 14 10 0.009 17.59 39.76 2.26 3.27 196 7.78 13 The site morphological data is within the data range for the urban curves. The site will be accessed from adjacent to the existing driveway and equipment will be limited to the area shown as the limits of disturbance. 3b. List the total estimates acreage of all existing wetlands on the property No wetlands are located within the limits of disturbance for this project. 3c. List the total estimated linear feet of all existing streams( intermittent and perennial on the property The total stream length of streams is 1,440 broken out by properties shown below. The stream lengths were measured from Wake County Imaps tool. 6139 Gainsborough Drive — 200 Lf 6105 Battleford Drive — 1,140 Lf 6121 Battleford Drive -100 Lf 3d. Explain the purpose of the project The objective for the proposed design is to restore the vertical bed and bank stability to the stream within the project area. The stabilization will stop the active lateral bank erosion and sediment import into the stream. 3e. Describe the overall project in detail, includingthe he type of equipment to be used. The eroded western bank at 6319 Gainsborough is planned to be reshaped, a bankfull bench provided on the eastern floodplain, and a short segment of the eastern bank at 6105 Battleford stabilized. The reshaped western bank will be filled and stabilized with a rock toe. A ten (10) foot wide bankfull bench will be provided on the eastern floodplain to lessen the pressure on the 2 Supplemental Information 6139 Gainsborough Drive PCN Application March 2019 outside of the meander bend during large storm events. The migrated riprap in the center of the channel at station 3+00 will be removed and a constructed riffle installed. The eastern bank erosion caused by the riprap deposition in the center of the channel will be repaired with soil fill and a rock/boulder toe. The reconstructed channel throughout the repaired reach has been designed to contain the bankfull (1.5 to 2 -year) storm event. The stream bank improvements will include work of reconstruction to varying slopes shown on the plan with a minimum 1.5H: IV slope at 6319 Gainsborough due to the limited area adjacent to the existing driveway. The top of the reconstructed bank is proposed to be located a distance of 5 feet from the existing driveway edge. A rock/boulder toe has been designed at critical outside bend areas, locations where fill is proposed to be introduced to re-establish the channel toe, and in areas where the proposed benching will affect the existing vegetation. The rock toe on the West channel bank will be constructed to a maximum elevation of 331.0 feet which places the installed rock just outside of the existing sanitary sewer easement. The proposed bankfull channel and benching has been based on a bankfull slope of 0.009 ft/ft with bankfull elevations determined in the morphological analysis. The channel design has been based on a cross sectional area of approximately 37.5 square feet in the riffle sections with pool areas approximately 25% larger. The pool area is anticipate to adjust over time with sediment deposition and point bar formation. The proposed channel will remain in the approximate location of the current channel with toe adjustments at scoured locations reconstructed at approximated original toe locations. The stream bank corridor within the repair area will be re -vegetated along both sides of the stream along with the bankf ill bench. The re -introduction of vegetation to the graded channel banks will aid in providing long term bank stability. The vegetation will be a combination of native herbaceous and woody plant species. The stabilized banks and re -vegetated corridor will additionally provide stormwater quality benefits. The equipment to be used in the project is earth moving equipment and various other support apparatuses. The stream normal flow will be pumped around the project site. Stabilization will occur daily within the work area. Heavy equipment may include hydraulic excavator, compactors, bulldozers, skidsteer loaders, and dump trucks to load and unload materials. The construction equipment will enter the site from Gainsborough Drive on either side of the stream and all construction will be performed within a defined limit of disturbance. C. Proposed Impacts Inventory 3i. C'nmmentq- S 1: Stream stabilization will be provided on the bank through reconstruction to a typical channel cross section, rock toe reinforcement in reconstructed areas, and installation of permanent woody vegetation. The profile will be stabilized through the removal of debris that is currently diverting water towards the bank and destabilizing the stream bank. Further profile stabilization will include the installation of a constructed riffle to transition the stream out of the meander bend pool. A bankf ill bench will be developed on the east bank to reduce shear stresses on the outside of the meander bend bank during large storm events for long term stability. 3 Supplemental Information 6139 Gainsborough Drive PCN Application March 2019 hi rnmments- B 1: The top of the stream bank will be relocated due to the bank stabilization work to be conducted on both sides of the bank. The changes in the buffer involve a 700 sf area. This area will be revegetated in accordance with the planting plan. 132: The top of the stream bank will be relocated due to the bank stabilization work to be conducted on the bank and riprap will be place to bankfull. The changes to the buffer involve a 210 sf area. This area will be stabilized with Class II Riprap. 133: This area will be impacted due to construction access and development of a bankfull bench on the south side of the stream. The buffers to the north will be re-established to match the existing lawn. The buffers on the south side of the stream will be re-established with native grasses and woody vegetation as shown on the stabilization plan. D. Impact Justification and Mitigation la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This project is necessary due to the active bank erosion that is undermining an existing concrete driveway at 6319 Gainsborough Drive. The project will stabilize the stream channel and to eliminate active erosion of the stream channel bank. The repaired channel will enhance aquatic habitat and will reconnect the stream through the construction of a constructed riffle transition at the location of the existing head cut. The minimization of the project includes working with the exiting stream pattern with limited pattern changes and enhancement of a floodplain bench to lessen the stress on the stream banks at the outer bend during large storm events. The limits of disturbance has been minimized to only the area needed to construct the repairs. Buffer impacts will minimize impacts by accessing the site through a narrow corridor and protection of as much existing vegetation as possible. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Pumping of normal stream flow be maintained and pumped around the site during construction activities. Bank stabilization, covering the slope with riparian seed and coir matting, will occur daily upon completion of bank grading. Permanent woody vegetation will be installed on all stream banks above rock toes. F. Supplementary Information 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The site is an existing urban residential area that has been previously impacted by development. Open areas are currently being mowed and maintained. Habitat is not present for Wake County listed vertebrate and invertebrate endangered species with the exception of Northern Long Eared Bats. It is not anticipated that this tree removal would be an impact to critical habitat for the Northern Long Eared Bat in Wake County. Therefore it is not anticipated that there will be any adverse impacts associated with T/E species. 4 Supplemental Information 6139 Gainsborough Drive PCN Application March 2019 Appendix A Photo Log Location Map USGS Quad Map Wake County Soils Map Impact Map Photo Log iJz 1� rr L Source: Wake County Imaps 6319 GAINSBOROUGH DRIVE PROJECT LOCATION MAP CITY OF RALEIGH, NORTH CAROLINA DATE: MARCH 6, 2019 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100919 870-0526 �' Raleigh, NC 27616 FAX 919 870-5359 6319 GAINSBOROUGH DRIVE e2AW I SOILS MAP CITY OF RALEIGH, NORTH CAROLINA DATE: MARCH 6, 2019 SOURCE: USDA SCS (NOW NRCS) SOIL SURVEY WARD CONSULTING ENGINEERS, PC WAKE COUNTY, NORTH CAROLINA ISSUED NOVEMBER, 1970 SCALE: NTS _ 4805 Green Road, Suite 100 (919) 870-0526 Raleigh, NC 27616 FAX (919) 870-5359 WARD CONSULTING p / N ENGINEERS, I --------------------------- - w- ~�M" f.• TEMPORA Y Rd. SWte If 018 / TEMPORARY 63 I ZONE 2 63 0,078 001 EXISTING � ZONE 1 .f (moo) e87 naso XISTING 20' ITARY t: '' BUFFER PERMANENT 61 72 SF. 270 SF. �.�a.,.)-�.om SEWER MENT �•�" LIMITS � � — — — — >— — ZONE 1 10 / /--- 100° ° --- — _ 194 SF. o v_ ,.' TEMPORARY -------------------D- -- ° ° a o U) ' , o tD 0 - 340 CD 63 ZONE 1 i, � � ° o � � N r- _ 900 SF. ,94 an an an ° an ° o A A� Lu m + ° — — co oro 0 . 61 PERMANENT ••y/ , o MAINTAIN 5 MINIMUM �� N � .0 n 0 i �. ZONE 1 e o> FROM EDGE OF DRIVEWAY a N Z° 0 = ' 200 SFy I �� 'z -TO RECONSTRUCTED Z Y m° ♦ o TOP OF BANK _ °� —3¢�—Q0 an ♦ ��� ♦ mm(n 3 W R S � Z - s — -- `� �/ 332 � \ u (6 ---\Nil I F- 20AR \ \ O / J.S�QQJ� /moi 20AR�/ BTREE� o 8�\ 1 ` 1gTREE '_ —Z ✓ / _ 1 \ \ I } 1 I 8"HW 18"H HW 12TREE 2-1+2 \ n 3 1 24"HW /' 33 609"HW b 1-325 / \ \ t7 .3 I 1 12"PI� 00 12"H 7"HW \40 rpt---- -- 000 SOW PERMANENT A ZONE 1 N w I o TR ALLEN \/ 0 '/ 141 SF p �� j '.01 HSPwo i"HW L13D LM -- LOD.•• .r _ . 00 .01 10 POST PROJECT, / rot:. ' — ••�'�• / BUFFER LIMITS / PERMANENT -'1 / B1 ZONE 1 z o 165 SF. O N .•' � 00, 18 N D ice•` �. _ . L9 ------A- _. FV 31— 10 ,`•� 333 �' — / _ - _= T - ----1------------ 14" ----------14 W� \y -,,3333,,3�� 24"HW v 24 TiW LEGEND 62 PERMANENT t® TEMPORARY ZONE 1 y ` 63 ZONE 1 — MoD Lai)— LIMITS OF DISTURBANCE 210 SF. 5,280 SF. — — — — — - EXISTING BUFFER LIMITS tOD� ODI LOD LQ. POST PROJECT BUFFER LIMITS ` B 1 BUFFER IMPACTS S 1 STREAM I M PACTS TEMPORARY / PERMITTING DOE: 3-8-2019 ZONE 2 20 10 0 20 40 BUFFMD"PACT MAP 1,146 SF. a„ E. 1'-20' PLAN VIEW — SCALE 1"=20' awa I Z J W /� IL Q � U � Q Z m 3fH iii Z Q W g J rn ,--I LL M p U PERMITTING DOE: 3-8-2019 ZONE 2 20 10 0 20 40 BUFFMD"PACT MAP 1,146 SF. a„ E. 1'-20' PLAN VIEW — SCALE 1"=20' awa I Appendix 6 Existing Conditions Morphological Data Surveyed Cross Sections Longitudinal Profile Project: Gainsborough Location: Cross Section 4 (Upstream of Culvert Section) Station: Benchmark description: Riffle Date: 1/8/2019 WGS (aid Cpprdimma Phn Sh- Photo Reference Location: NOM Ease Permanent Benchmark Elevation: Permanent Benchmark Location: e ms ru ead Illeln crop Section liken ftom IM to rip. looking devmstream. GM celle ere adpub antl should be et alkn•. ,_ cells are hr data input 9 you neetl atld Tonal sheets for more crps seRions, just create a copy of tFe sheet by right clicking on -tab at - bottom of this sM1eet. These number. are taken from the raw dNa table. There Ia no need to change thpe cella Bankfull TOB TW LeR Right 338.00 333.00 328.00 Station Elevation — Station I Elevation Station I Elevation — — — 116.841 331.2871 125.961 332.353 re elatMtof oRsalhescelle e n be left bWnk Ryou doe wieh to make changes t soft p meters Ee ow. The TW 95.00 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 Left Ri hl Left Ri M Station Elevation Station Elevation Station ElevaBon Slation Elevation Station Elevation 0 U 0 -0.006 0 0.547 0 0 0 0 Th—re para—that are used fpr mmpho es, calculrtlwre, after any a kenm sts bebw. TMre Is no need to Changs the. TW Bankfull TOB Left M Ri LeftRi ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 120.78 329.518 114.381 332.91 125.961 332.91 116.841 331.2871 125.961 332.353 MKOTH These number. are taken from the raw dNa table. There Ia no need to change thpe cella Bankfull TOB TW LeR Right 338.00 333.00 328.00 Station Elevation — Station I Elevation Station I Elevation — — — 116.841 331.2871 125.961 332.353 re elatMtof oRsalhescelle e n be left bWnk Ryou doe wieh to make changes t soft p meters Ee ow. The TW 95.00 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 These number. are taken from the raw dNa table. There Ia no need to change thpe cella Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 120.76 329.518 114.38 332.9031 125.961 332.3531 116.841 331.2871 125.961 332.353 re elatMtof oRsalhescelle e n be left bWnk Ryou doe wieh to make changes t soft p meters Ee ow. The TW BankfullTOB Left Ri hl Left Ri M Station Elevation Station Elevation Station ElevaBon Slation Elevation Station Elevation 0 U 0 -0.006 0 0.547 0 0 0 0 Th—re para—that are used fpr mmpho es, calculrtlwre, after any a kenm sts bebw. TMre Is no need to Changs the. TW Bankfull TOB Left M Ri LeftRi ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 120.78 329.518 114.381 332.91 125.961 332.91 116.841 331.2871 125.961 332.353 LPIN antl RPIN 0 Sta Elev P NO 0 0 0 0 Stream Morphology Wbkf= 14.623 AbM = 25.444 dbkf = 1.740 W/D= 8.404 dmbkf= 3.382 Wfpa= 205.000 g eaeF ER= 14.019 bankfanreievation,dad-. LBH= 1.769 a Project: Gainsborough Location: Cross Section 4 (Upstream of Culvert Section) Station: Benchmark description: Riffle Date: 1/8/2019 WGS (aid Cpprdimma Phn Sh- Photo Reference Location: NOM Ease Permanent Benchmark Elevation: Permanent Benchmark Location: e ms ru mad Ricin crop Section liken ftom IM to rip. looking devmstream. GM celle ere outpub antl should be et akn•. ,_ cells are hr data input 9 you neetl atld Tonal sheets for more crps seRions, just create a copy of tFe sheet by right clicking on -tab at - bottom of this sM1eet. These number. are taken from the raw dNa table. There Ia no need to change thpe cella Station Bankfull TOB 338.00 333.00 1 LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 328.00 136.61 331.9931 145.231 333.1361 136.611 331.9931 143.111 332.229 re elatMtof oRsalhescelle e n be left bWnk Ryou tloara wieh to make 125.00 130.00 135.00 140.00 145.00 150.00 155.00 160.00 165.00 170.00 These number. are taken from the raw dNa table. There Ia no need to change thpe cella Station Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 140.26 330.616 136.61 331.9931 145.231 333.1361 136.611 331.9931 143.111 332.229 re elatMtof oRsalhescelle e n be left bWnk Ryou tloara wieh to make changes t soft p meters Ee ow. The TW Bankfull TOB Lel Ri hl LeftRi M Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 0 0 0 0.907 0 -0.236 0 0 0 0 ThIll re para -that are used fpr mmphobgy calculrtlwre, after any a kenm sts bebw. TMre Is no need to than. thap TW Bankfull TOB Left Ri ht LeftRi ht Station Elevation I Station I Elevation Station Elevation I Station I Elevation Station Elevation 140.28 330.818 138.81 332.9 145.23 332.91 I 136.611 331.9931 143.11 332.229 BanJ3&3' Station 132.921 144.678 2xBa Station 130.37a r ror data neededIfred 152.78 nkfull Elevation R 332.9 ih it 11.7577 a WH,ight 15.2875.ad ".." er ft13.8869 raulic Radius R 1.10086 ei ht ft 1.377 Average PIN Elevation (ft) LPIN and RPIN 0 Sta Elev P NO 0 0 0 0 Stream Morphology Wbkf= 11.758 AbM = 15.287 dbkf = 1.300 W/D= 9.043 drI 2.357 Wfpa= 205.000 ft each ER= 17.435 bankfenreievation��ada d-. LBH= 1.377 LBWdrnax D50 = Qbkf ld DASlope Sinwsi Project: Gainsborough Location: Cross Section 5 Station: 1+25.5 Benchmark description: Pool Date: 1 /8/2019 USGS trid Cpprdimma Pan Sneer Photo Reference Location: NOM Ease Pef. W. Permanent Benchmark Elevation: Permanent Benchmark Location: —..r.,... ins ru ead Illeln Drop Section liken hem IM to rip. looking downstream. GM celh are outpub antl should be kft abn•. YNbw cells are for data input antl manipulation you neetl atld conal sheets for more cross seRions, just create a copy of the sheet by right clicking on [M1e tab at the bottom of thio sM1eet. MW ®' 1111 11 Bankfull TOB 333.00 328.00 Left Right I11I®IIs�' Station Elevation Station Elevation Station I Elevation Station Elevation 127.13 328.772 126.9 330.246 136.02 331 100.00 110.00 120.00 130.00 140.00 150.00 160.00 re elafMtof oRsa lhes.11. e n be left bWnk Ryou tloa wish to make changes t soft p meters Ee ow. The TW Bankfull TOB Left Right Left 1Ri M Station Elevation vat Station Eleion Station Elevation Station Elevation Station Elevation 0 0 0 1.55 0 0.8 0 0 ol 0 re paramgere thN are used fpr morph nesy cNculatl., after any adluNmanb bebw. -ne Is no need to Changs these TW Be.kfull TOB Left Ri hl Left Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 127.13 328.772 128.9 331.796 136.021 331.81 126.9 330.248 136.02 331 MKOM���� EMM MKM���� MKM 338.00 hom the raw tlNa table. There Is no need to change these cella Bankfull TOB 333.00 328.00 Left Right L-Rlg. Station Elevation Station Elevation Station Elevation Station I Elevation Station Elevation 127.13 328.772 126.9 330.246 136.02 331 100.00 110.00 120.00 130.00 140.00 150.00 160.00 TM1eae numbers are taken hom the raw tlNa table. There Is no need to change these cella Bankfull TOB TW Left Right L-Rlg. Station Elevation Station Elevation Station Elevation Station I Elevation Station Elevation 127.13 328.772 126.9 330.246 136.02 331 126.9 330.246 136.02 331 re elafMtof oRsa lhes.11. e n be left bWnk Ryou tloa wish to make changes t soft p meters Ee ow. The TW Bankfull TOB Left Right Left 1Ri M Station Elevation vat Station Eleion Station Elevation Station Elevation Station Elevation 0 0 0 1.55 0 0.8 0 0 ol 0 re paramgere thN are used fpr morph nesy cNculatl., after any adluNmanb bebw. -ne Is no need to Changs these TW Be.kfull TOB Left Ri hl Left Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 127.13 328.772 128.9 331.796 136.021 331.81 126.9 330.248 136.02 331 �Im FETE--- RPIN 0 Sta Elev P NO 0 0 0 0 Stream Morphology WbM= 25.104 AbM= 29.124 dbkf = 1.160 W/D= 21.639 dmbkf 3.026 Wfpa= 140.000 ftaeon ER= 5.577 banxrnnreievati n��ada d-. LBH= 1.474 LBWdnrex 87 D50 = ObM = DA= SIOPe = Sinlwsi — Project: Gainsborough Location: Cross Section Station: 1+48.1 Benchmark description: Run Date: 1 /8/2019 USGg trill Cpprdimma Plan Sh- Photo Reference Location: NOM Ease Permanent Benchmark Elevation: Permanent Benchmark Location: —..r.,... ins ru sed Illeln Grose Section liken ftem IM to rip. —lot downstream. GM cel6 are ortpub antl should ba kft abn•. YNbw cells are for data input antl manipulation9 you neetl atld conal sheets for more cross seRions, just create a copy of the sheet by right clicking on [M1e tab at the bottom of thm sM1eet. MW ®' 1111 11 Bankfull TOB — I11I®IIs�' Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 330.00 131.69 331.493 144.32 331.525 0 I0 145.39 331.575 reelafMtof oRsatW Th`:l'.e n aleft bWnk Ryou tloa wi. to make — TW — TOB 325.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 170.00 Loll Ri hl LeftRi M Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 0 0 0 0.087ol 0.055 0 0 0 0 Th—re paramrtere thrt are used fa mprphologY calculNlwre, after any adlutmanb bebw. -ne Is no need to thongs these TW Bankfull TOB Left RiM LeR Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 137.9 328.576 131.89 331.58 144.32 331.58 0 0 145.39 331.575 TM1ese numbers are taken 340.00 335.00 cella Bankfull TOB — — — Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 330.00 131.69 331.493 144.32 331.525 0 I0 145.39 331.575 reelafMtof oRsatW Th`:l'.e n aleft bWnk Ryou tloa wi. to make — TW — TOB 325.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 170.00 TM1ese numbers are taken hom the raw tlNa table. There Is no need to change thane cella Bankfull TOB TW LeR Right LeR RIgM Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 137.9 328.576 131.69 331.493 144.32 331.525 0 I0 145.39 331.575 reelafMtof oRsatW Th`:l'.e n aleft bWnk Ryou tloa wi. to make changest sofIh p meters Ee ow. The TW Be.kfull TOB Loll Ri hl LeftRi M Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 0 0 0 0.087ol 0.055 0 0 0 0 Th—re paramrtere thrt are used fa mprphologY calculNlwre, after any adlutmanb bebw. -ne Is no need to thongs these TW Bankfull TOB Left RiM LeR Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 137.9 328.576 131.89 331.58 144.32 331.58 0 0 145.39 331.575 FETE--- RPIN 0 Sta Elev P NO 0 0 0 0 Stream Morphology Wbid13.854 AbM = 25.991 dbkf = 1.876 W/D= 7.384 dmbkf= 3.004 Wfpa= 225.000 g eaeM1 ER= 16.241 bankfnnreievation,dad-. LBH= -328.576 LBWdnax -109.379 D50 = Obkf = DA= Slope = Sinlwsi - Project: Gainsborough Location: Cross Section 7 Station: 1+76.5 Benchmark description: Pool Date: 1 /8/2019 USGS trid Cpprdimma Pan Sneer Photo Reference Location: NOM Ease Pef. W. Permanent Benchmark Elevation: Permanent Benchmark Location: —..r.,... ins ru ead Illeln Drop Section liken ftem IM to rip. looking downstream. GM celh are outpub antl should be kft abn•. YNbw cells are for data input antl manipulation you neetl atld conal sheets for more cross seRions, just create a copy of the sheet by right clicking on [M1e tab at the bottom of thio sM1eet. MW ®' 1111 11 Bankfull TOB TW I11I®IIs�' Station Elevation Station Elevation Station Elevation --- — 123.62 331.867 136.77 330.567 123.82 331.867 138.52 332.754 re ala fMtof oRsa Thescalle e n i left bWnk Ryou tloa wish to meka changes t soft p meters Ee ow. The 330.00 'owl -- — Left Right LaR Ri M 325.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 Station Elevation Station Elevabon Station Elevation Station Elevation B U U 0 0 0 0 ol ol 0 re.ra—thst are used fpr morphdny cNculatl., after any adluNmanb bebw. -ne Is no need to than. these TW Bankfull TOB Left I Ri ht LeR Ri ht Station Elevation Station Elevation Station Elevation Station Elevation StationI Elevation 126.771 327.1451 1 23.821 331.8671 136.77 330.56711 332.754 MKFZMM ��® MKMoff ���� • aa������ TM1ese numbers are taken 340.00 cella Bankfull TOB TW LeRRight 335.00 Station Elevation Station Elevation Station Elevation --- — 123.62 331.867 136.77 330.567 123.82 331.867 138.52 332.754 re ala fMtof oRsa Thescalle e n i left bWnk Ryou tloa wish to meka changes t soft p meters Ee ow. The 330.00 Bankfull 1 -- — Left Right LaR Ri M 325.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 TM1ese numbers are taken hom the raw tlNa table. There Is no need to change these cella Bankfull TOB TW LeRRight L-Rlg. Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 126.77 327.145 123.62 331.867 136.77 330.567 123.82 331.867 138.52 332.754 re ala fMtof oRsa Thescalle e n i left bWnk Ryou tloa wish to meka changes t soft p meters Ee ow. The TW Bankfull 1 TOB Left Right LaR Ri M Station Elevation Station Elevation Station Elevabon Station Elevation Station Elevation B U U 0 0 0 0 ol ol 0 re.ra—thst are used fpr morphdny cNculatl., after any adluNmanb bebw. -ne Is no need to than. these TW Bankfull TOB Left I Ri ht LeR Ri ht Station Elevation Station Elevation Station Elevation Station Elevation StationI Elevation 126.771 327.1451 1 23.821 331.8671 136.77 330.56711 332.754 FETE--- RPIN 0 Sta Elev P NO 0 0 0 0 Stream Morphology Wbld 13.517 AbM = 38.345 dbkf = 2.837 W/D= 4.765 dmbkf= 4.072 Wfpa= 225.000 g eaeh ER= 16.646 bankfnnreievati n,dad-. LBH= 4.722 LBWdnax 1.180 D50 = Obkf = DA= Slope = Sinlwsi — Project: Gainsborough Location: Cross Section 8 Station: 2+02.5 Benchmark description: Riffle Date: 1/8/2019 WGS (aid Cpprdlmma Plan Sneer Photo Reference Location: NOM Ease Permanent Benchmark Elevation: Permanent Benchmark Location: e ms ru mad Illeln Drop Section liken hem IM to rip. looking downstream. GM celle ere outpub antl should be loft akn•. ,_ cells are hr data input 9 you neetl atld Tonal sheets for more cross seRions, just create a copy of the sheet by right clicking on [M1e tab at the bottom of this sM1eet. TM1eae numbers are taken 340.00 335.00 330.00 cella — --- -- TW Left Right LeR Right Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 325.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 170.00 TM1eae numbers are taken hom the raw tlNa table. There Is no need to change thane cella Bankfull i TOB TW Left Right LeR Right Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 139.34 328.163 132.28 332.1751 148.071 330.9611 132.281 332.1751 150.061 333.481 re elafMtof oRsatW lhescelle e n be left bWnk Ryou dorotewish to make changes t soft p meters Ee ow. The TW Bankfull TOB 333.763 Left light Left Ri M Station Elevation Station Elevation Station ElevaOon Station Elevation Station Elevation 0 0 0 -,.21 ol I ol ol ol 0 re para—thst are used fpr—0clegy eak—1—, after any a kedmanls bebw. -ne Is no need to Changs thsae TW Bankfull TOB ft Left Ri M LeR Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 139.34 328.183 132.28 330.9651 148.07 330.961 ,32.28 332.175 150.061 333.481 kfull Stream MorphologyElevation 330.963 Wbkf= 15.334 330.963 I AbM = 31.643 nkfull dbkf= 2.064 Elevation W/D= 7.430 333.763 ror, a a nee e r dmbkf = 2.800 333.763 Wfps = 225.000 g each tion R 330.963 Avera a"1-1 ER= 14.674 bankfenreievat..r,sad-. LBH= 4.012 Bankfull 15.3336 LBWdnax Bankfull 1.6433 D50= Bankfull ter ft .2778 ObBankfulls ft 1.83144 DALowan4.012 Slope= Average PIN Elevation (ft) Sin lwsi – LPIN and RPIN P NO 0 Sta Elev 0 0 0 0 Project: Gainsborough Location: Cross Section 9 (Downstream Reference Geometry) Station: Benchmark description: Date: 1/8/2019 USGg odd Cppr n— Plan Sheet Photo Reference Location: NOM East Permanent Benchmark Elevation: Permanent Benchmark Location: e ms ru —d men, Gro- Section liken ftom IM to rip. —II devmstr-m. GM celle ere ortpub antl should be raft aldn•. ,_ cells are hr data input 9 you neetl atld tonal sheets for more cr-s seRions, just create a copy of the sheet by right clicking on [M1e tab at the bottom of this sM1eet. TM1ese nuMtere are taken 335.00 330.00 cella Lt onElevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 112.81 325.32 102.91 326.989 ol 01 325.00 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 re elatMtof oRsatW lhescelle e n be left bWnk Ryou doe wiatt to meka changes t soft p meters Ee ow. The TW Bankfull TOB Avera a Bankfull Elevation it328.409 Left light Left Ri M Station Elevation Station Elevation Station ElevaOon Station Elevation Station Elevation 0 0 tt 1.42 0 0 0 0 0 0 re psra—th t are deed far —ph., calculrtlare, after any adlutmenb bebw. llere la no need to chappa tMee TW Bankfull TOB Low Bank Rei im tt Left Ri ht Left Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 112.81 325.32 102.91 328.409 ol 01 104.46 328.179 117.92 328.095 Sta Elev 0 0 0 0 MM TM1ese nuMtere are taken 335.00 330.00 cella Lt onElevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 112.81 325.32 102.91 326.989 ol 01 325.00 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 TM1ese nuMtere are taken from the raw drta table. There Is no need to change th-e cella Lt onElevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 112.81 325.32 102.91 326.989 ol 01 104.461 326.1791 117.921 326.095 re elatMtof oRsatW lhescelle e n be left bWnk Ryou doe wiatt to meka changes t soft p meters Ee ow. The TW Bankfull TOB Avera a Bankfull Elevation it328.409 Left light Left Ri M Station Elevation Station Elevation Station ElevaOon Station Elevation Station Elevation 0 0 tt 1.42 0 0 0 0 0 0 re psra—th t are deed far —ph., calculrtlare, after any adlutmenb bebw. llere la no need to chappa tMee TW Bankfull TOB Low Bank Rei im tt Left Ri ht Left Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 112.81 325.32 102.91 328.409 ol 01 104.46 328.179 117.92 328.095 Bankfull Lt onElevation Stream Morphology 100.72 328.409 WbU- 21.488 122.208 328.409 AbM = 48.060 1xBankfull dbkf= 2.237 Station Elevation W/D= 9.608 #NUM! 331.652 s a t 331.652 ror, a a nee e r a d rc ed dmbkf = 3.166 Wfps = 225.000each Avera a Bankfull Elevation it328.409 ER= 10.471 bankfdnreievation��add d-. LBH= 0.775 Bankfull Width it 21.4881 LBWdrnax Bankfull Area 48.0599 D50= Bankfull Waited Perimeter ft 22.8942 Qbkf= Bankfull draulic Radius R 2.09922 DA= Low Bank Rei im tt 0.775 Slope= Average PIN Elevation (ft) Sinwsi - LPIN and RPIN P NO 0 Sta Elev 0 0 0 0 Project: Gainsborough Location: Cross Section 10 (Downstream Reference Geometry) Station: Benchmark description: Riffle Date: 1/8/2019 USGS (aid Cppreimka Par Sh-I Photo Reference Location: NOM Ease Permanent Benchmark Elevation: Permanent Benchmark Location: e ms ru -d Mien, Gro- Section liken ftom IM to rip. -e devmstr-m. Gray celle ere ortpub antl should be kft akn•. ,_ cells are hr data input 9 you neetl atld Tonal sheets for more cr-s seRions, just create a copy of the sheet by right clicking on [M1e tab d the bottom of this sM1eet. TM1ese number. are taken 335.00 cella Station Elevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 330.00 114.93 328.4021 130.921 327.9141 114.931 328.4021 130.921 327.914 re elatMtof oRsetW lhescelle e n be left bWnk Ryou doe -to make changes t soft p meters Ee ow. The TW Bankfull TOB Average Bankfull Elevation R 328.401 Left Ri hl LeftRi M Station Elevation Station Elevation Station Eleva0on Station Elevation Station Elevation 0 0 0 0.486 0 325.00 320.00 re paramrtere thrt are deed fpr mmphobgy calculrtlare, after any adllrtmenb belles. TMre Is no mad to changstM- TW Bankfull TO -- --- Ri ht Station Elevation Station Elevation Station Elevation 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 140.00 145.00 150.00 125.76 325.336 114.93 328.888 130.92 327.914 114.93 328.402 130.92 327.914 Sta Elev 0 0 0 0 ����� • aa���®��� NEEM TM1ese number. are taken 335.00 cella Station Elevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 330.00 114.93 328.4021 130.921 327.9141 114.931 328.4021 130.921 327.914 re elatMtof oRsetW lhescelle e n be left bWnk Ryou doe -to make changes t soft p meters Ee ow. The TW Bankfull TOB Average Bankfull Elevation R 328.401 Left Ri hl LeftRi M Station Elevation Station Elevation Station Eleva0on Station Elevation Station Elevation 0 0 0 0.486 0 325.00 320.00 re paramrtere thrt are deed fpr mmphobgy calculrtlare, after any adllrtmenb belles. TMre Is no mad to changstM- TW Bankfull TO -- --- Ri ht Station Elevation Station Elevation Station Elevation 100.00 105.00 110.00 115.00 120.00 125.00 130.00 135.00 140.00 145.00 150.00 TM1ese number. are taken from the raw drta table. There Is no need to change th-e cella Station Elevation Bankfull TOB TW LeR Right LeR Right Station Elevation Station I Elevation Station I Elevation I Station I Elevation Station I Elevation 125.76 325.336 114.93 328.4021 130.921 327.9141 114.931 328.4021 130.921 327.914 re elatMtof oRsetW lhescelle e n be left bWnk Ryou doe -to make changes t soft p meters Ee ow. The TW Bankfull TOB Average Bankfull Elevation R 328.401 Left Ri hl LeftRi M Station Elevation Station Elevation Station Eleva0on Station Elevation Station Elevation 0 0 0 0.486 0 01 ol ol 0 re paramrtere thrt are deed fpr mmphobgy calculrtlare, after any adllrtmenb belles. TMre Is no mad to changstM- TW Bankfull TO Low Bank Haight k Left RightLeft Ri ht Station Elevation Station Elevation Station Elevation Station Elevation Station Elevation 125.76 325.336 114.93 328.888 130.92 327.914 114.93 328.402 130.92 327.914 Bankfull Station Elevation Stream Morphology 114.932 328.401 Wbid 17.589 132.521 328.401 AbM = 39.768 2x Bankfull dbkf= 2.261 Station Elevation W/D= 7.780 100.00 331.878 a a t 100.00 331.878 ror, a a a a rc ed nee e r dmbkf = 3.271 Wfpa = 225.000 n -M Average Bankfull Elevation R 328.401 ER= 12.792 bankrdnreievation'�add d-. LBH= 2.578 Bankfull Width k 17.5892 LBH/d-. Bankfull Area 9.7685 D50= Bankfull Wetted Perimeter k .3951 Obkf= Bankfull drauli.7. Rdius tt 1.9499 DA=11 11 Low Bank Haight k 2.578S lope= Average PIN Elevation (ft) Sinitosi - LPIN and RPIN P NO 0 Sta Elev 0 0 0 0 Construction Plans Cumberland Cove Hidden PondO` Gurnlrert vCreP��a 4r9 Rd �. V I v; Pl'`'Z�. \.b ARIUM Lake Lynn 0 Cron Rd 7822 VIM Rd n c LYNNDALE TOWNHOMES LAKE LYNN LYNN TOWNES Laurel Oaks Apartments G�rrysb„_ � LONDONDERRY TOWNHOMES 60 WESTWOOD BROOKDALE ROAD o` m `' TAMAR ffreys Grove MagnetL Elementary Schaal 19 so JEFFRIES GROVE skyb,.00k aao 6 0 4 Caruvright 6319 Gainsborough Drive VICINITY MAP Scale: NTS NOTES: 1. ALL STORM, SEWER, WATER AND SEDIMENT/ EROSION CONTROLS TO BE BUILT TO CITY OF RALIEGH STANDARDS. 2. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED 48 HOURS PRIOR TO MOBILIZATION ON SITE. NORTH CAROLINA ONE CALL CENTER DIAL 811. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES DURING CONSTRUCTION. 4. ALL AREAS OUTSIDE OF THE TEMPORARY CONSTRUCTION LIMITS TO REMAIN UNDISTURBED. 5. DAMAGED EDGES OF ASPHALT OR CONCRETE SHALL BE SAW CUT PRIOR TO PATCHWORK. 6. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF RALEIGH AND/OR NCDOT STANDARDS, DETAILS AND SPECIFICATIONS. 7. ANY DISTURBANCE WITHIN THE RIGHT OF WAY WILL BE REQUIRED TO BE REPLACED TO CITY OF RALEIGH AND/OR NCDOT STANDARDS AND INSPECTED. �i DEVELOPMENT Project Data Sheet 1 SERVICES DEPARTMENT Development Services Customer Service Center I 1 Exchange Plaza, Suite 400 1 Raleigh, NC 276011919-996-2495 Litchford Satellite Office 18320 —130 Litchford Road I Raleigh, NC 276011919-996-4200 GENERAL INFORMATION Development Name: 6319 Gainsborough Drive I Proposed Use: Stream Repairs Property Address(es): 6319 Gainsborough Drive; 6121 Battleford Drive; 6105 Battleford Drive; 6404 Margate Court Wake County Property Identification Number(s) (PIN) for each parcel to which these guidelines will apply: PIN #0797212984 PIN #0797215870 1 PIN #0797212389 1 PIN #0797211788 What is the project type? oApartment ❑Bank ❑Elderly Facility ❑Hospital ❑Hotel/Motel ❑Industrial Building ❑Mixed Residential oNon-Residential Condo ❑Office ❑Religious Institution ❑Residential Condo ❑Retail ❑School ❑Shopping Center ❑Single Family Residential ❑Telecommunication Tower oTownhouse dOther Scope of Work: The project work will involve stream channel and bank grading to restore proper function to the stream and prevent continued erosion. A portion of existing driveway will be replaced. FOR APARTMENTS, CONDOS, AND TOWNHOMES ONLY 1. Total number of townhouse lots: N/A Number attached: N/A Number detached: N/A 2. Total number of apartment or condominium units: N/A 3. Total number of Congregate Care or Life Care Dwelling units: N/A 4. Overall total number of dwelling units (from 1-3 above): N/A 5. Number of bedroom units: 1 BR N/A 2BR N/A 3BR N/A 4BR or more N/A 6. Overall unit(s) per acre densities per zoning district(s): N/A DEVELOPMENT TYPE AND SITE DATA TABLE (applicable to all developments) Zoning Information Building Information Zoning District(s): R-4 Proposed use of building(s): Existing Residential If more than one district, provide acreage of each: Proposed Sq. Ft. of building(s) gross: N/A N/A Overlay District(s): N/A Existing Sq. Ft. of building(s) gross: N/A Total site acreage: 4.61 Total Sq. Ft. gross (existing and proposed): N/A Off street parking: Required N/A Provided N/A Proposed height of building(s): N/A COA (Certificate of Appropriateness) case # N/A FAR (floor area ratio) %: N/A BOA (Board of Adjustment) case # A -N/A Building lot coverage %: N/A CUD (Conditional Use District) case # Z - N/A Inside City Limits? ❑■ Yes ❑ No STORMWATER INFORMATION , Existing impervious surface: N/A acres/square feet Proposed impervious surface: N/A acres/square feet Neuse River buffer: ❑■ Yes ❑No Wetlands: ❑Yes ❑■ No Flood Hazard Area: ❑ Yes ❑■ No If yes, Alluvial Soils: N/A Flood Study: N/A FEMA Map Panel #: 3720079700J Total disturbed area: 0.39 acres/square feet PAGE 1 OF 1 WWW.RALEIGHNC.GOV REVISION 03.22.16 Plans Prepared By: CAD File Path: Becky Lb Ward, P.E. "%0%J111118" , A '� ' °L Ward Consulting Engineers, P.C. - FIRM LICENSE N0: C-2619 13344 c3 4805 Green Rd, Suite 100919 870-0526 �+�•s� �`°:' �� Raleigh, NC 27616-2848 FAX �919� 870-5359 r�rrnhhlt°1N Contact—Becky L. Ward P.E., bward@wce—corp.com CITY OF RALEIGH PROJECT MANAGER DALE HYATT, P.E. (919)996-3940 P.O. BOX 590 RALEIGH, NC 27602 Dale.hyatt@raleighnc.gov ENGINEERING SERVICES DEPARTMENT RUFFIN L. HALL CITY MANAGER Sheet Index 1. Title Sheet 2. Existing Conditions and Demolition Plan 3. Erosion Control Plan 4. Proposed Plan and Cross Sections 5. Stabilization Plan 6. Details UZ MiT, Iq vLakl Ri wAaimml, iL I MAYOR PROJECT SURVEY DATA FOR 6319 GAINSBOROUGH DRIVE PROVIDED BY: STEWART ENGINEERING, INC. 5410 OLD POOLE ROAD RALEIGH, NC 27610 SUPPLEMENTAL DATA COLLECTED BY: WARD CONSULTING ENGINEERS, P.C. Construction Plans 6319 Gainsborough Drive PUBLIC IMPROVEMENT QUANTITY TABLE Phase Number (s) PHASE 1 PHASE 2 PHASE 3 Number of Lot (s) 0 Lot Number (s) by Phase 0 Number of Units 0 Livable Buildings 0 Open Space NO Number of Open Space Lots 0 Public Water (LF) 0 Public Sewer (LF) 0 Public Street (LF) 0 Public Sidewalk (LF) 0 Street Signs (LF) 0 Water Service Stubs 0 Sewer Service Stubs 0 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF RALEIGH AND/OR NCDOT STANDARDS AND SPECIFICATIONS. ATTENTION CONTRACTORS The Construction Contractor responsible for the extension of water, sewer and/or reuse, as approved in these plans, is responsible for contacting the ENGINEERING SERVICES at (919) 996-2409, and the PUBLIC UTILITIES DEPARTMENT at (919) 996-4540 at least twenty four hours prior to beginning any of their construction. FAILURE to notify both City Departments in advance of beginning Construction, will result in the issuance of monetary fines, and require reinstallation of any water or sewer facilities not inspected as a result of this notification failure. FAILURE to call for Inspection, Install a Downstream Plug, have Permitted Plans on Job site, or any other Violation of City of Raleigh Standards will result in a Fine and Possible Exclusion from future work in the City of Raleigh. an 0 0 U o, M SHEET N0. 0 v 1 WARD CONSULTING �7�ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com I (10 LF TO REMOVED) '� __ o ° tnl�lnvu rluu�rTOC=337.8 - - c� �•����-""" ' ' EXIST( 120' SA ---- - > -- FF=349.13 -v n = IN(N)=329.31 / Z .RETAIN ° IN=333.75 c� _ / I SEWER EAS NT �.' o ° - - � N OUIN(W)=328.21' /)�QRB 1 / EXISTING SSMH ° --�� � OUT=333.65 � / (B.M. 197 G. 213) .' RIM=336.48' CA I/ IN=326.68' -340 GIBER T E A p \y > o o TBM-1 I REMOVE D REPLAC s / TBM-2 / � �`\EXIS`fIf�IG b{�VEWAY ` / s cu �� O T s ( —; _— _ � ----_ -- � � �.�----�� '339 3,3, �♦ � s / 24 \� X60 _- �/i'1�3,�� 33�� ��---_ RE0. TAIN EXIST \�\\ 'C FH / `Z -33 �� -- . EXISTING 8» ♦ t �/ 33�„ DIP ��;33 I � � 9� ® 334 I '' •�\P S - �, 2kegii///i/; ec����� �`20�_ \ AIN %r NV=-- 0.54 S�� �� I YV EXIST NG CI 20AR -_ 328 -�- ..� —`��., EXISTING PED TOC=337.84 EXISTING j� �X\`�- �W 2_oA -ate- ='��� _ _ �_ ,�'____�;�,\ X L���_� RIPRAP `'� OUT=3 V /` � TOP OF ANK G / - o\ - _ Lug c P\N �' �2 - f%• r� �� -/ 30 ,33��i`. o-_-___ t--------_-_---- �=t�— STING -'15" R i o?t� ,-' �!" 2� _ / �," - 32� - - _3 _z-� R Al - - - - - - » - - - - / t.�XISTING 15 R --- }--------- I 8 REE RETAIN w IX ► r F� ^ 32� \ �� \ �s \ , _3 _ " . 810 \ 11 I RETAIN v /Z21 r2TREJ-- D_ ". t 1+ o II EXISTING O " 334 - ¢� ------ ---- CULVERTS I rte\ �' /�' I 8'HW 18"HW HW ` ----- I ,yRO\" , ����N 18 H �\ 'x 1 41Lfi.. .... ' 1+2 _ 1 - I----- ' / _ O RETAI II l`�`� 3�� /--5 / 4"HW i DEAD 60 ' XISTING SSMH II - i _ O I I�� +80 ib _326v__ +� RIM=330.45 o0i i .%' __ 3+60 _ 3 ,,-- 20/' co D\ C, ? Hw'� - _ 3 I o-- ' j,"OD --�------�'� 5' 12"PINE 12 "HW �Qi, �� x`33 �-i / v ° INV=322.75 .�'� I ,-32 ��� / - '�j� x 3 .�� y8"H �_. _E 7"11W I k20 /�'� I Iii d� _ - _ �_ _ /'��\\' k'+�i 3t� ��� ° '.' �'� - I ` \ ° % i _ BRIAN WEAVIL & ^ ��� /�.'� 44"HW C� 33\ IP -_ - _ - _= T --- / 2 MARGARET HUDOME WEAVIL EXISTING i'� •' —332 `�. " �� 33 �' 8"Hyy`�, \ I T `/ I 6201 BATTLEFORD DR. rTOE i ' N �� Hw •1 I o ---- PIN: 0797226020 10"DBL , � � / �� -y� � � � � —� k HW �O 9 FALLE `/ �1 �� �.5 �\ N _ r - --------------- I I k IO Zfn / .. g"TRP ` \y`�� //N�� 24"HW C7 14"HW N \ F ±- 3 - �I 1 ~ 1 % I 0EXISTING 1 ?� I HW •� + �\ I 33 \ / II RETAIN 1 1 `� .-'' c�� �` ----- - " X \\\� -L-- I I STING_18"RCk I 15"Hw TOP OF BANK — LOD .• �� ti ---- _ I--- -�� LU -� �`\\�, -1_ - ^�__-____r_= SIDEWALR`IO BE REMOVED - LOD LOD ' �z ��R �� w Q . Z3� t AND REPLACED EXISTING RIPRAP �� ��_ Z 0%% 2 , Q 00 ---- �� 00i ACCUMLATED IN CHANNEL `.� /'� c ��.� ' i I yx° �.' ' 2 � � .�' TO BE REMOVED � �' / I RETAIN O ��� Q-'T � N���.�.��--------��- \ 1 r � /RETAIN EXISTING CIEXISTING CI RP ''TOC=336 \ . .' .54 TOC=336.36 TREE -__-' OUT=333.36 IN=332.14 ' O ° �,� sxoc •' HLEY R. COX & INV 330.68' .-' m OUT=331.19' 1 BR DFORD A'COX 1 6121 ATTLEFORD DR. ��� 1 I CURB AND GUTTER TO BE Z 5+,gyp �' GUY MICHAEL GALA I, JR. & PIN: 797215870 LOD _ MARGARETH SPENCER ALARDI �3 LOD I REMOVED AND REPLACED 6105 BATTLEFORD R. SIDEWALK TO BE REMOVED I� PIN: 07972123 9 AND REPLACED A- X cr w NOTES: 1. UNDERGROUND UTILITY LOCATIONS APPROXIMATE. CONTRACTOR TO VERIFY ALL LOCATIONS PRIOR TO CONSTRUCTION. 2. MORPHOLOGICAL DATA COLLECTED BY: WARD CONSULTING ENGINEERS, P.C. 4805 GREEN ROAD, SUITE 100 RALEIGH, NC 27616 3. PROPERTY BOUNDARY SHOWN BASED ON PLANEMETRICS EXCEPT WHERE EIP LOCATED BY SURVEYOR. 4. PROPERTY TOPOGRAPHIC SURVEY BY: STEWART ENGINEERING, 10-4-2018 DATUM: HORIZONTAL NAD83 VERTICAL NAVD88 CONTROL POINT NORTHING EASTING ELEVATION DESCRIPTION TBM 1 771999.77 2092354.51 ELEV=339.47 MARK IN SIDEWALK TBM 2 771815.29 2092248.84 ELEV=334.99 60D 20 10 0 20 40 PLAN VIEW - SCALE 1"=20' LEGEND: SEAL: -358 - EXISTING SURVEYED CONTOURS 358 NC FLOOD MAP CONTOURS _- _---- PROPERTY LINE ---- BUFFER LIMITS ss ss EXISTING SANITARY SEWER ° EXISTING FIBER OPTIC EXISTING TELEPHONE EXISTING ELECTRIC ------------- EXISTING STREAM CENTERLINE — EXISTING TOP OF BANK LOD— LOD— LIMITS OF DISTURBANCE 0 TBM TREE REMOVAL CONCRETE REMOVAL AND REPLACEMENT CRITICAL ROOT ZONE �t, t O II 11110"f/ CAR®����'/ 13344 c3 •' a rr t�i�intrtiN PERMIT SET I DATE: 3-8-2019 REVISIONS: (DRAWN BY- JSV I EXISTING CONDITIONS AND DEMOLITION PLAN SCALE: 1 "=20' SHEET NO. 2 i DISCHARGE WITH STABLE OUTLET (NOTE 3) OR ON BEDROCI PUMP ACTIVE WORK ZONE 250' MAX OR POOL ,ry WF INTAKE HOSE DISCHARGE HOSEII DEWATERING \ ASDNEEDE�MP�-FLOC SPECIAL STILLING BASIN DIVERSION PUMP BASP WITH ROCK PAD E FLOW NOTES: 1. WORK AREA TO BE STABILIZED AT THE END OF EACH WORK DAY. 2. ROCK SILT SCREENS REQUIRED FOR PUMP AROUND OPERATIONS ARE CONSIDERED INCIDENTAL TO PUMPING. 3. STABLE OUTLET TO CONSIST OF ROCK PLACED IN CHANNEL FOR ENERGY DISSIPATION AND 45' ELBOW INSTALLATION AT THE END OF THE PIPING SO THAT THE WATER DISCHARGES VERTICALLY UP IN THE AIR. THE OUTLET WILL BE APPROVED BY THE DESIGNER PRIOR TO PUMPING. TYPICAL PUMP AROUND OPERATION SCALE: NOT TO SCALE Table 6.10a Temporary Seeding Specifications for Winterand Early Spri ng Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 Seeding dates Mountains >2500ft 15 -Feb to 15 -May <2500 ft 1 -Feb to 1 -May Piedmont 1 -Jan to 1 -May Coastal Plain 1 -Dec to 15 -Apr Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoringtool.Use 400 gallons of tack per acre or straw covered with pinned netting, Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10b Temporary Seeding Specifications for Summer Seeding mixture Species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 501 b/acre. Seeding dates Mountains 15 -May to 15 -Aug Piedmont 1 -May to 15 -Aug Coastal Plain 15 -Apr to 15 -Aug Soil amendments Follow recommendations of soil tests orapply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoringtool.Use 400 gallons of tack per acre or straw covered with pinned netting. Maintenance Refertilize if growth is notfully adequate. Reseed, refertilize and ,mulch immediately following erosion orotherdama e. Table 6.10cTemporary Seeding Specifications for Fall Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50lb/acre. Seeding dates Mountains 15 -Aug to 15 -Dec Coastal Plain and 15 -Aug to 30 -Dec Piedmont Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10fertilizer Mulch Apply 4,000lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. Use 400 gallons of tack per acre or straw covered with pinned netting, Maintenance Repairand refertilize damaged areas immediately. Topdress with 50lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb/acre Kobe (Piedmont and Coastal Plain) late February orearly March. TEMPORARY SEEDING SPECIFICATIONS SCALE: NOT TO SCALE CONSTRUCTION SEQUENCE: 1. OBTAIN A LAND DISTURBING PERMIT. 2. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (NCGO10000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. 3. PRIOR TO BEGINNING CONSTRUCTION, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-1308 TO SCHEDULE AN ON-SITE PRECONSTRUCTION MEETING. 4. INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. 5. CALL THE RAPID RESPONSE NUMBER (919) 857-4412 TO SCHEDULE A STORMWATER SITE INSPECTION. 6. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY. 7. GROUND COVER SHALL BE PROVIDED AS FOLLOWS: A.FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF FOURTEEN (14) DAYS. B.PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE SITE UPON WHICH FURTHER LAND -DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN WITHIN FOURTEEN (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. C.ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN (14) CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR PRIOR TO FINAL INSPECTION. 8. INSTALL ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES AND/OR INCREASE MAINTENANCE FREQUENCY WHERE APPROVED MEASURES FAIL TO PREVENT ACCELERATED EROSION, OFF-SITE SEDIMENTATION, OR REPETITIVE NON-COMPLIANCE ISSUES. 9. MOBILIZE TO THE WEST SIDE OF THE STREAM AT 6319 GAINSBOROUGH DRIVE. 10. REMOVE EXISTING CONCRETE DRIVEWAY AS SHOWN ON THE PLANS TO THE NEAREST CONTROL JOINT. 11. REMOVE RETAINING WALL AS SHOWN ON THE PLANS. STORE MATERIAL FOR USE IN RESTORE THE RETAINING WALL SHORTENED END TO A FINISHED CONDITION. 12. INSTALL SILT FENCE AT TOP OF EXISTING BANK AS SHOWN ON THE PLANS. 13. MOBILIZE TO THE EAST SIDE OF THE STREAM AT 6121 BATTLEFORD DRIVE. 14. INSTALL SILT FENCE AND PERFORM TREE REMOVAL OPERATIONS, CLEARING AND DEBRIS REMOVAL WITHIN THE FLOODPLAIN AS SHOWN ON THE PLANS. 15. INSTALL STREAM PUMP AROUND AND REMOVE ROCK DEBRIS IN CHANNEL AT STATION 3+00. MATERIALS TO BE RE -USED IN CONSTRUCTED RIFFLE. 16. INSTALL CONSTRUCTED RIFFLE FROM STATION 2+84.5 TO 3+23.5. 17. INSTALL ROCK TOE RIGHT BANK ALONG RIFFLE. 18. BEGIN FLOODPLAIN CUT AND REPAIR OF LEFT STREAM BANK STATION 2+80 TO 3+50. 19. CONSTRUCTION WORK TO BE STABILIZED DAILY WITH SEED, MATTING, AND ROCK AS CALLED FOR ON THE STABILIZATION PLAN AS WORK PROGRESSES UPSTREAM. 20. CONTINUE FLOODPLAIN CUT AND BANK REPIARS FROM STATION 2+80 TO 1+90. 21. COMPLETE FLOODPLAIN GRADING AND BANK STABILIZATION LEFT FROM STATION 2+00 TO 1+30. 22. COMPLETE FLOODPLAIN STABILIZATION AS CALLED FOR ON THE STABILIZATION PLAN. 23. RESTORE EXISTING RETAINING WALL TO FINISHED CONDITION. 24. RECONSTRUCT CONCRETE DRIVEWAY, SIDEWALKS, AND CURB AND GUTTER DISTURBED DURING CONSTRUCTION. 25. SEED ALL REMAINING DISTURBED AREAS. 26. INSTALL WOODY VEGETAION AS CALLED FOR ON THE PLANTING PLAN. 27. MODIFICATIONS TO THE APPROVED AND PERMITTED PLANS SHALL BE APPROVED BY STORMWATER INSPECTIONS PRIOR TO REMOVAL OR INSTALLATION. CONTACT THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-1308 TO REQUEST AN INSPECTION AND OBTAIN A STORMWATER INSPECTOR'S SIGN -OFF ON THE PLANS OR AN APPROVED FIELD REVISION. 28. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. SILT FENCE, INLET PROTECTION, AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. SILT FENCE CAN NOT HAVE HOLES OR TEARS. 29. ONCE GRADING IS COMPLETE AND THE SITE IS STABILIZED, CALL THE STORMWATER INSPECTIONS REGIONAL COORDINATOR AT (919) 279-1308 TO REQUEST AN INSPECTION AND OBTAIN APPROVAL TO REMOVE TEMPORARY MEASURES. DO NOT REMOVE TEMPORARY MEASURES WITHOUT PRIOR STORMWATER INSPECTOR APPROVAL. 30. ONCE GRADING IS COMPLETE, TEMPORARY MEASURES ARE REMOVED, AND THE SITE IS STABILIZED, CALL THE RAPID RESPONSE NUMBER (919) 857-4412 TO SCHEDULE A STORMWATER FINAL INSPECTION. 31. ONCE THE STORMWATER FINAL INSPECTION IS APPROVED, CLOSE THE GRADING PERMIT AND OBTAIN A CERTIFICATE OF COMPLETION. GENERAL NOTES: 1. TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE OF THE LIMITS OF DISTURBANCE. THE CONTRACTOR TREE ROOTS EXPOSED AND/OR DAMAGED DURING CONSTRUCTION SHALL BE PRUNED USING EQUIPMENT SPECIFICALLY DESIGNED FOR PRUNING. ALL PRUNING SHALL BE ACCOMPLISHED BY AN ISA CERTIFIED ARBORIST. 2. GRASSED SURFACE RESTORATION: ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION ARE TO BE SEEDED AND MULCHED PER THE SPECIFICATIONS UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR AS DIRECTED BY THE ENGINEER. 3. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF RALEIGH AND/OR NCDOT STANDARD DETAILS AND SPECIFICATIONS. 4. ANY DISTURBANCE WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED TO BE REPLACED TO THE CITY OF RALEIGH AND/OR NCDOT STANDARDS AND INSPECTED. 5. CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE LATEST CITY OF RALEIGH STANDARD DETAILS AS FOUND ON THE CITY WEBSITE: HTTPS://WWW.RALEIGHNC.GOV/BUSINESS/CONTENT/PLANDEV/ARTICLES/DEVSERV/DRAWINGSSTANDARDDETAILSINDEX.HTML LIMITS OF DISTURBANCE = 0.40 AC., 17,422 SF. LEGEND: -358_ EXISTING SURVEYED CONTOURS 358 NC FLOOD MAP CONTOURS -------- BUFFER LIMITS _SS: EXISTING SANITARY SEWER F1- EXISTING FIBER OPTIC EXISTING TELEPHONE EXISTING ELECTRIC PROPOSED STREAM CENTERLINE - PROPOSED TOP OF BANK - Loa Loa- LIMITS OF DISTURBANCE TREE REMOVAL TP TREE PROTECTION PROPOSED CONSTRUCTED RIFFLE CONSTRUCTION ENTRANCE CHECK DAM INLET PROTECTION SF SILT FENCE 20 10 0 20 40 PLAN VIEW - SCALE 1"=20' WARD CONSULTING Q�ENGINEERS, P.C. FIRM LICENSE NO: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com Z IL J 0a:H Z 0U Z O O ac W SEAL: c 13344 c3 •' a rr r V e� t�i�intrtiN PERMIT SET DATE: 3-8-2019 REVISIONS: (DRAWN BY: JSV I EROSION CONTROL PLAN SCALE: 1 "=20' SHEET NO. 3 7A 340 335 0 6 6 325 CROSS SECTI❑N 1+48 AS VIEWED L❑❑KING DOWNSTREAM w 70 75 80 85 90 95 100 105 110 CROSS SECTI❑N 1+76.5 AS VIEWED L❑❑KING DOWNSTREAM 340 335 330 6 325 115 340 335 330 325 120 2.3' 7.8' 6.4' 3.2' TIE INTO i .� CLASS II 5 j/ ROCK TOE EXIS ING GRADE U �i ' H � INSTALL C700 c 0 V EROSION CONTROL 041 M 325 W W J N J N 70 75 80 85 90 95 100 105 110 115 i1plf, 125 CROSS SECTI❑N 2+02,5 AS VIEWED L❑❑KING DOWNSTREAM 335 330 7A 65 70 75 80 85 90 95 100 105 110 115 120 125 CROSS SECTI❑N 2+34 AS VIEWED L❑❑KING DOWNSTREAM 95 CROSS SECTION 2+65 ZAA AS VIEWED L❑❑KING DOWNSTREAM i 340 335 330 325 34A i 33 7 A A 331 32 32Y30 135 130 125 120 -,�3+185, % EJB �LEV. 1 13+8¢%- -3 60 3+60 �3 1 � I EXIST 10"DBL TOE .� HW I 15 HW DOWNSTREAM RIFFLE TAIL ft3+23.5 9"TRP k TREE 20 10 0 20 40 PLAN VIEW - SCALE 1"=20' CROSS SECTI❑N 3+00 AS VIEWED L❑❑KING DOWNSTREAM WARD N 0066CONSULTING ' =ENGINEERS, P.C. o -o 34� C 50 FIRM LICENSE N0: C-2819 to 0 !121E"A�ml 01 raffmm",Ul N-1 n0 = 4805 Green Rd, Suite 100 j Raleigh, NC 27616 a MA MA M �i (919) 870-5359 RMCINN STALL C7 w 70 75 80 85 90 95 100 105 110 CROSS SECTI❑N 1+76.5 AS VIEWED L❑❑KING DOWNSTREAM 340 335 330 6 325 115 340 335 330 325 120 2.3' 7.8' 6.4' 3.2' TIE INTO i .� CLASS II 5 j/ ROCK TOE EXIS ING GRADE U �i ' H � INSTALL C700 c 0 V EROSION CONTROL 041 M 325 W W J N J N 70 75 80 85 90 95 100 105 110 115 i1plf, 125 CROSS SECTI❑N 2+02,5 AS VIEWED L❑❑KING DOWNSTREAM 335 330 7A 65 70 75 80 85 90 95 100 105 110 115 120 125 CROSS SECTI❑N 2+34 AS VIEWED L❑❑KING DOWNSTREAM 95 CROSS SECTION 2+65 ZAA AS VIEWED L❑❑KING DOWNSTREAM i 340 335 330 325 34A i 33 7 A A 331 32 32Y30 135 130 125 120 -,�3+185, % EJB �LEV. 1 13+8¢%- -3 60 3+60 �3 1 � I EXIST 10"DBL TOE .� HW I 15 HW DOWNSTREAM RIFFLE TAIL ft3+23.5 9"TRP k TREE 20 10 0 20 40 PLAN VIEW - SCALE 1"=20' CROSS SECTI❑N 3+00 AS VIEWED L❑❑KING DOWNSTREAM CROSS SECTI❑N 3+28 AS VIEWED LOOKING DOWNSTREAM 335 330 325 WARD N 0066CONSULTING ' =ENGINEERS, P.C. o -o 34� C 50 FIRM LICENSE N0: C-2819 to 0 n0 = 4805 Green Rd, Suite 100 j Raleigh, NC 27616 a MA MA M �i (919) 870-5359 RMCINN STALL C7 CROSS SECTI❑N 3+28 AS VIEWED LOOKING DOWNSTREAM 335 330 325 1 7 1 7-- �33 31- E _ _ `------f---= I—I / 8_ H���� '' STING 18"R -� 24"M v 'z 0 may J* I < p I r , v V EXISTING CI I ' TOC=336.54 OO IN=332.14' cj)Q '- OUT= 331.19 O O----------- EXISTING SURVEYED CONTOURS 358 NC FLOOD MAP CONTOURS 0.j-� a: ------------- BUFFER LIMITS O U ss — EXISTING SANITARY SEWER a EXISTING FIBER OPTIC h EXISTING TELEPHONE v Z EXISTING ELECTRIC Q ----- PROPOSED CENTERLINE OF STREAM �+ — PROPOSED TOP OF BANK M O Lon Lon LIMITS OF DISTURBANCE TREE REMOVAL cRZ- CRITICAL ROOT ZONE V CUT FILL PROPOSED ROCK TOE (CLASS II) PROPOSED ROCK TOE (BOULDER) NOTE: CONTRACTOR TO REPLACE ANY EXISTING 5 DOWNSPOUT CONNECTION PIPES AND OUTLET AT BOULDER TOE. SEAL: 340 335 330 325 115 110 105 100 95 90 85 80 tieeviiief/ 13344 c3 •,a`� •' a rr r V e� 'yiintrtiN PERMIT SET 0 DATE: 3-8-2019 in REVISIONS: LO o w J �— Q U U W V) V) J VQ V) U DRAWN BY- JSV CD U CHECKED BY: BLW U PROPOSED PLAN AND CROSS SECTIONS 5 2.5 0 5 10 SCALE: AS NOTED CROSS SECTI❑N SHEET N0. - H❑RIZ❑NTAL SCALE: 1"=5' 4 WARD N 0066CONSULTING ' =ENGINEERS, P.C. o -o 34� C 50 FIRM LICENSE N0: C-2819 to 0 n0 = 4805 Green Rd, Suite 100 j Raleigh, NC 27616 Phone (919) 870-0526 W —340Fax v (919) 870-5359 bward®wce-corp.com 1 7 1 7-- �33 31- E _ _ `------f---= I—I / 8_ H���� '' STING 18"R -� 24"M v 'z 0 may J* I < p I r , v V EXISTING CI I ' TOC=336.54 OO IN=332.14' cj)Q '- OUT= 331.19 O O----------- EXISTING SURVEYED CONTOURS 358 NC FLOOD MAP CONTOURS 0.j-� a: ------------- BUFFER LIMITS O U ss — EXISTING SANITARY SEWER a EXISTING FIBER OPTIC h EXISTING TELEPHONE v Z EXISTING ELECTRIC Q ----- PROPOSED CENTERLINE OF STREAM �+ — PROPOSED TOP OF BANK M O Lon Lon LIMITS OF DISTURBANCE TREE REMOVAL cRZ- CRITICAL ROOT ZONE V CUT FILL PROPOSED ROCK TOE (CLASS II) PROPOSED ROCK TOE (BOULDER) NOTE: CONTRACTOR TO REPLACE ANY EXISTING 5 DOWNSPOUT CONNECTION PIPES AND OUTLET AT BOULDER TOE. SEAL: 340 335 330 325 115 110 105 100 95 90 85 80 tieeviiief/ 13344 c3 •,a`� •' a rr r V e� 'yiintrtiN PERMIT SET 0 DATE: 3-8-2019 in REVISIONS: LO o w J �— Q U U W V) V) J VQ V) U DRAWN BY- JSV CD U CHECKED BY: BLW U PROPOSED PLAN AND CROSS SECTIONS 5 2.5 0 5 10 SCALE: AS NOTED CROSS SECTI❑N SHEET N0. - H❑RIZ❑NTAL SCALE: 1"=5' 4 BANKFULL ELEV. VARIES EROSION CONTROL FABRIC C-700 COIR MAT STREAM BANK CLASS II ROCK TOE N 65% CLASS II RIPRAP 25% CLASS B RIPRAP 10% #57 STONE MIX PRIOR TO PLACEMENT 1V L 2H 24" END TOE PROTECTION AT BANKFULL ELEVATION SEE CROSS SECTIONS PLAN SHEET 4. STREAM CHANNEL ROCK TOE PROTECTION (CLASS II) 3' MAX HEIGHT SCALE: NOT TO SCALE Depth IIB" w (i n) 11 25 13 o_ RIPARIAN LAWN SEED 0 N MATTING 0 PLANT PLUGS NOTES NOTES: SEED (SY) FESCUE (SY) MULCH (SY) 1. MINIMUM BOULDER SIZE 2'X2'X3' 0 C-700 COIR MAT 2. CLASS II ROCK MIX: (SY) (SY) (EA) 65% CLASS II RIPRAP 30% CLASS B RIPRAP 2H 5% #57 STONE �1 4' 3. STAGGER BOULDERS FRONT AND BACK. 160 I I 1 V I11 ■IIIIIIIII������ 4. FILL VOIDS BETWEEN BOULDERS WITH CLASS II ROCK MIX. III 5. COMPACT SOIL BEHIND BOULDER TOE TO INSIDE BOULDER 380 470 ELEV 331/330. SEE PLAN CROSS SECTIONS. SPACING 5' OC �1 •vi1i�`II j �i •��a ���, 6" 6. SET BUILDERS AT A 6" DEFLECTION FROM VERTICAL. ELEV.=331.0 FT. (VARIES*)---' NCDOT TYPE 4 SEPERATOR FABRIC III m_ SET INSIDE BOULDER ELEV.=328.0 FT. (VARIES*) SET OUTSIDE BOULDER ELEV.=326.5 FT. (VARIES*) BOTTOM OF EXCAVATED TRENCH ELEV. 325 FT.(VARIES*) 2' I Im4I CHANNEL ELEV. 327 (VARIES*) CLASS II ROCK MIX FORM BASE PRIOR TO BOULDER INSTALLATION *SEE CROSS SECTIONS FOR VARIATIONS IN ELEVATIONS BOULDER TOE PROTECTION SCALE: NOT TO SCALE 5' TAIL LENGTH (TYP.) � w Q J � w w J U_ STREAM FLOW 0 Arm o SLOPE 0 w RIFFLE PROPOSED CHANNEL CENTERLIN TAPER ROCK FROM//' I / ACJ BOTTOM OF TRENCH SLOPE 3H:1V RIFFLE TO DEPTH "B" AT STONE MIX END OF RIFFLE LONGITUDINAL VIEW N TS (TYP.) CHANNEL SECTION VIEW "A—A" NTS TABLE 1.0 — CONSTRUCTED RIFFLE DIMENSIONS Class Length "LII Width "A" Depth IIB" (ft) (ft) (i n) 11 25 13 24 TABLE 2.0 — CONSTRUCTED RIFFLE MIX Riffle Mix Chart Percent of Mix NCDOT NCDOT NCDOT NCDOT NCDOT Riffle Class Boulder Class II Class I Class B Class A #57 Riprap Riprap Riprap Riprap Stone 11 0% 65% 0% 30% 0% 5% PROPOSED CONSTRUCTED RIFFLE SCALE: NOT TO SCALE ACEMENT )F ROCK TOE g D TIE INTO EXISTING RIPRAP BANK acn� QOI. ._ QOl _ \Z; __-' �_---- ---- - - s STA 318STA 3215 ♦/cam t �.� \\\\ \ \ \� 3� —� ZONE Al -334 \ 33 _ I I 33 \\\\ \ 33 \ \ . 4 i _--332:1 �- I-330' 113+8 3+60 =330\ �-I � 2e, /(32 -3320. PROPOSED CLASS II ROCK TOE TO ELEV. 330.0 F;T 1 PROPOSED CLASS II ROCK fi0E 5 TO TOP OF BANK ELEV. 331.0 F.T 1 20 10 0 20 40 PLAN VIEW — SCALE 1"=20' PLANTING NOTES: 1. WOODY SPECIES TO BE PLANTED WITH A COMBINATION OF THE FOLLOWING SMALL TREES/SHRUBS: (ROOTED PLANT PLUGS/TUBELINGS — 12"-18" IN HEIGHT. LIVE STAKES MAY BE USED UPON APPROVAL BY THE DESIGNER). SPECIES SUBSTITUTIONS REQUIRE PRIOR APPROVAL FROM THE DESIGNER. CONTRACTOR TO SUBMIT PLANT QUANTITIES BY SPECIES AND ZONE FOR APPROVAL PRIOR TO PLANTING. AMELANCHIER ARBOREA — SERVICE BERRY LINDERA BENZOIN — SPICEBUSH ILEX VERTICILLATA — WINTERBERRY CEPHALANTHUS OCCIDENTALIS — BUTTONBUSH CALYCANTHUS FLORIDUS — SWEET—SHRUB CORNUS AMOMUM — SILKY DOGWOOD ALNUS SERRULATA — TAG ALDER PHYSOCARPUS OPULIFOLIUS — NINEBARK FRAXINUS PENNSYLVANICA— GREEN ASH 2. STREAM BANKS TO BE MATTED WITH FIBERWONDERS COIR MAT C-700 OR APPROVED EQUAL. PLACE RIPARIAN SEED, EROSION CONTROL SEED AND THIN LAYER OF STRAW PRIOR TO MATTING INSTALLATION. SEE CORI MATS CHANNEL INSTALLATION DETAIL SHEET 6. 3. BANKFULL BENCH TO BE MATTED WITH AMERICAN EXCELSIOR CURLEX II EROSION CONTROL BLANKET OR APPROVED EQUAL. THE USE OF C-700 MATTING MAY BE SUBSTITUTED FOR AREAS DESIGNATED FOR CURLEX BY THE CONTRACTOR. SEE INSTALLATION DETAIL SHEET 6. 4. PLANTING STOCK TO BE GROWN BY NURSERIES WITHIN THE SAME PHYSIOGRAPHIC REGION (PIEDMONT) AND WITHIN 200 MILES OF THE PROJECT SITE. 5. FERTILIZER RECOMMENDATIONS CONTRACTOR TO FIELD VERIFY WITH ON SITE SOIL CONDITIONS: LIME X TON/AC PHOSPHATE 20-40 LBS/AC POTASH 50-70 LBS/AC WATERING REQUIREMENTS ONCE/WEEK IF NO RAIN 6. RIPARIAN SEED MIX ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX OR APPROVED EQUAL BY DESIGNER. APPLICATION RATE 25 LBS/AC. 7. TEMPORARY SEED TO BE PLACED IN ALL ZONES SEE EROSION CONTROL SHEET 3. 8. SEE PLANTING ZONE TABLE THIS SHEET. PLANTING ZONES SHEET N0. C700 CURLEX ROOTED RIPARIAN LAWN SEED STRAW ZONE MATTING MATTING PLANT PLUGS NOTES SEED (SY) FESCUE (SY) MULCH (SY) (SY) (SY) (EA) SPACING 3' OC -SHRUB A 130 160 I I 1 III I I' l i l I11 ■IIIIIIIII������ III SPECIES ONLY Al 380 470 100 SPACING 5' OC �1 •vi1i�`II j �i •��a ���, I ��' • • j�l� 1 �A%sa�?��-�. Ss:�����=..��..r_Drr±���1�1�111•�IIi1Ij1�1�1�1 C 330 `� �� "71 • • � 100 .., �� _\�l X1/111• 111 I i g D TIE INTO EXISTING RIPRAP BANK acn� QOI. ._ QOl _ \Z; __-' �_---- ---- - - s STA 318STA 3215 ♦/cam t �.� \\\\ \ \ \� 3� —� ZONE Al -334 \ 33 _ I I 33 \\\\ \ 33 \ \ . 4 i _--332:1 �- I-330' 113+8 3+60 =330\ �-I � 2e, /(32 -3320. PROPOSED CLASS II ROCK TOE TO ELEV. 330.0 F;T 1 PROPOSED CLASS II ROCK fi0E 5 TO TOP OF BANK ELEV. 331.0 F.T 1 20 10 0 20 40 PLAN VIEW — SCALE 1"=20' PLANTING NOTES: 1. WOODY SPECIES TO BE PLANTED WITH A COMBINATION OF THE FOLLOWING SMALL TREES/SHRUBS: (ROOTED PLANT PLUGS/TUBELINGS — 12"-18" IN HEIGHT. LIVE STAKES MAY BE USED UPON APPROVAL BY THE DESIGNER). SPECIES SUBSTITUTIONS REQUIRE PRIOR APPROVAL FROM THE DESIGNER. CONTRACTOR TO SUBMIT PLANT QUANTITIES BY SPECIES AND ZONE FOR APPROVAL PRIOR TO PLANTING. AMELANCHIER ARBOREA — SERVICE BERRY LINDERA BENZOIN — SPICEBUSH ILEX VERTICILLATA — WINTERBERRY CEPHALANTHUS OCCIDENTALIS — BUTTONBUSH CALYCANTHUS FLORIDUS — SWEET—SHRUB CORNUS AMOMUM — SILKY DOGWOOD ALNUS SERRULATA — TAG ALDER PHYSOCARPUS OPULIFOLIUS — NINEBARK FRAXINUS PENNSYLVANICA— GREEN ASH 2. STREAM BANKS TO BE MATTED WITH FIBERWONDERS COIR MAT C-700 OR APPROVED EQUAL. PLACE RIPARIAN SEED, EROSION CONTROL SEED AND THIN LAYER OF STRAW PRIOR TO MATTING INSTALLATION. SEE CORI MATS CHANNEL INSTALLATION DETAIL SHEET 6. 3. BANKFULL BENCH TO BE MATTED WITH AMERICAN EXCELSIOR CURLEX II EROSION CONTROL BLANKET OR APPROVED EQUAL. THE USE OF C-700 MATTING MAY BE SUBSTITUTED FOR AREAS DESIGNATED FOR CURLEX BY THE CONTRACTOR. SEE INSTALLATION DETAIL SHEET 6. 4. PLANTING STOCK TO BE GROWN BY NURSERIES WITHIN THE SAME PHYSIOGRAPHIC REGION (PIEDMONT) AND WITHIN 200 MILES OF THE PROJECT SITE. 5. FERTILIZER RECOMMENDATIONS CONTRACTOR TO FIELD VERIFY WITH ON SITE SOIL CONDITIONS: LIME X TON/AC PHOSPHATE 20-40 LBS/AC POTASH 50-70 LBS/AC WATERING REQUIREMENTS ONCE/WEEK IF NO RAIN 6. RIPARIAN SEED MIX ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX OR APPROVED EQUAL BY DESIGNER. APPLICATION RATE 25 LBS/AC. 7. TEMPORARY SEED TO BE PLACED IN ALL ZONES SEE EROSION CONTROL SHEET 3. 8. SEE PLANTING ZONE TABLE THIS SHEET. PLANTING ZONES SHEET N0. C700 CURLEX ROOTED RIPARIAN LAWN SEED STRAW ZONE MATTING MATTING PLANT PLUGS NOTES SEED (SY) FESCUE (SY) MULCH (SY) (SY) (SY) (EA) SPACING 3' OC -SHRUB A 130 160 160 SPECIES ONLY Al 380 470 100 SPACING 5' OC B 500 500 C 330 330 100 SPACING 5' OC Totals 840 500 830 160 470 360 LUIt N C - 333--\ ) ) `.i_ I ca D N � qL (A (0-00 342 C a)0 Win= A v (A — 340 / I PLANTING ZONES ZONE A ZONE Al ZONE B ZONE C ROCK TOE/BOULDER TOE CONSTRUCTED RIFFLE r7�Q7WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce—corp.com SEAL: Q N J m I �J �tlileeliil��ef/ CAR 13344. c3 •' a rr t�i�intrlN PERMIT SET DATE: 3-8-2019 REVISIONS: (DRAWN BY: JSV I STABILIZATION PLAN SCALE: 1 "=20' SHEET N0. WARD CONSULTING �I�ENGINEERS, P.C. LL�� FIRY LICENSE NO: C-2619 4805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NOTES: 8' MAX. 1. ENSURE THAT CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECT TO VARIABLE AS DIRECTED BY THE ENGINEER DAMAGE OR BLOCKAGE FROM DISPLACED STONES. STEEL POST 2. THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 50' MIN. PLASTIC OR / WIRE TIES 3. KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUTMENTS A AND SUFFICIENT TO KEEP MINIMUM OF 1.5 FEET TO AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. 000 SEDIMENT ON SITE NOTES: 0p000 0000000 000S��o� �b000 0 0o goo 1. SILT FENCE SHOULD BE INSTALLED TO ENSURE >- 000 $ 0000 00 00 0 000 0 �p o 0 CONSTRUCTION ENTRANCE IS USED. o 000 WOVEN WIRE FABRIC TREE PROTECTION AREA Q 000000 000 0 0000 0 0 o 00 25' OR FULL WIDTH 0o WARNING SIGN Q �00_0000 00 0 3" - 4" STONE TO BE USED 0o OF PROPOSED STREET 2. IF MUD IS NOT REMOVED FROM THE VEHICLE TRAVELING 0 000 o 0 MIN. 10 GA. DO NOT ENTER MIN. 12-1/2 GA. LINE WIRES INTERMEDIATE 1.5' MIN (SEE NOTE 3) p0 oo o o OVER THE STONE, THEN THE TIRES OF THE � o000000 o (SURGE STONE OR 0o OR ENTRANCE, 0 0o N FILL SLOPE WIRES 12" OF NCDOT #5 0000000 VEHICLE MUST BE WASHED BEFORE ENTERING THE z o 00000000 RAILROAD BALAST) 0000 o WHICHEVER IS � 00000000000 0 0o GREATER. PUBLIC ROAD OR THE LENGTH OF THE CONSTRUCTION 0 " SILT FENCE FABRIC INSTALLED TO SECOND 9" MIN OR #57 WASHED STONE 1.5' X o00000 o 0 0000 0 0 0000 0 00 000 0 ENTRANCE EXTENDED. LU 00 00000 000 0 00000000$00 0 000 0 0 0O WIRE FROM TOP GRADE GRADE o �pp�p °g �° o =IIIII=IIIII =IIIII=IIIII-IIIII=IIIII=IIIII=IIIII-IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII -IIIII=III ��ppp��OQ�7J0����'70 ���� C�0��0°oa000�a�'�<q 2' MAX AT 0 MIN = IIIII = IIIII - - J41 8 FILTER CLOTH FSP CLASS "B" �T CENTER �1 PLAN IIIII IIIII N o°°°QQQQqFILTER CLOTH '�v^^^^SILT FENCE SEE NOTE 1 ( ) �SILT FENCE GEOTEXTILE FABRIC IIIII = IIIII = FRONT VIEW I(TII ILII ILII ��QvV� O 4' TO 6' O _ '1111 '1111 PROVIDE WARNING LANGUAGE IN BOTH PLAN VIEW ^j �� ENGLISH AND SPANISH, SIDE VIEW CROSS-SECTION VIEW w NEW CONSTRUCTION AS SHOWN MAINTENANCE: CLEAN OUT AT 50% CAPACITY LIFE OF FENCING: 6-9 MONTHS 40" MAINTENANCE: CLEAN OUT SEDIMENT AND DEBRIS AND REPAIR WASH OUTS. EXISTING ROADWAY 35MIN. 15' MIN. DO NOT DISTURB TREE CONSERVATION AREAS SILT FENCE SHOULD NOT BE USED ALONE BELOW 1u�1 V ,�, 0000 0000 0$00 0 :)o 00 0000 00000 0�8 12" MIN. o00 0,00000"'s, GRADED SLOPES GREATER THAN 10' IN HEIGHT. inTREE PROTECTION AREA DO NOT ENTERT PURPOSE: TO REDUCE EROSION IN A CHANNEL BY MATTING / L THE DISTANCE SUCH THAT POINTS u u 1■1"I�r'1I^T, 000 I 6" MIN. <Po a°o ee°s 00o o0000� 0p08 00 0 000 ° 0 00 0000go00000 0-00,5005, 0 000cPoO000 cf�o �o I I 0 000 00 0 0 oIIII- _A CONTACT INFORMATION: STABILAZATION REDUCING THE VELOCITY OF FLOW. AND B ARE OF EQUAL ELEVATION h I I I =I III IIII=I III IIIII= I I =I III- IIII CITY OF RALEIGH PARKS, RECREATION AND ��� ZONA DE PROTECCION CULTURAL RESOURCES DEPARTMENT °�o°=° DO NOT USE CHECK DAM IN INTERMITTENT OR _ a°o°Op °O 0000 A B II'I�������� - IIII- URBAN FORESTER: PARAARBOLES - NO ENTRE PERENNIAL STREAMS. L '�'I- FABRIC UNDER STONE TREES@RALEIGHNC.GOV NOTES: �� WWW.RALEIGHNC.GOV 1. TREE PROTECTION FENCING MUST BE INSTALLED AT A MINIMUM RADIUS OF THE CRITICAL ROOT ZONE WARNING DETAIL _ �����"II- _ °0000°00 o$ IIII�IIII _0 0 0o O oo aoo0° O O SIGN ( SEE DETAIL TPP -02 FOR EXAMPLES) 2. THE TREE PROTECTION FENCING MUST REMAIN IN PLACE FOR THE DURATION OF THE PROJECT "II CITY OF RALEIGH ����-���� CITY OF RALEIGH MAINTENANCE: UNLESS OTHERWISE APPROVED BY URBAN FORESTRY STAFF. CITY OF RALEIGH 3. APPROVED IMPACT PROTECTION DEVICES MUST BE REMOVED AFTER CONSTRUCTION WHEN APPLICABLE. STANDARD DETAIL PROFILE VIEW STANDARD DETAIL CROSS SECTION ADD ADDITIONAL STONE AND "FLUFF" TOP 4. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' STANDARD DETAIL O ^ DRESSING WITH 2" STONE. REVISIONS DATE: 8/1/18 NOT TO SCALE5. ON CENTER FOR THE REMAINDER FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTED AREA. REVISIONS DATE:8/1/18 NOT TO SCALE 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. REVISIONS DATE 811118 NOT TO SCALE SEE N.C. DEQ EROSION and SEDIMENT CONSTRUCTION CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; 7. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH BASED ON ACTUAL FIELD CONDITIONS. STANDARD TEMPORARY 8. SIGNS ARE TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL WITH LETTERS A MINIMUM OF 3" HIGH, CLEARLY LEGIBLE (SEDIMENT/SILT) / TREE AND AS CHECK DAM SEE N.C. DEQ EROSION and SEDIMENT Q h ENTRANCE SPACED SHOWN. CONTROL PLANNING and DESIGN MANUAL v PLANNING CONSIDERATION & DESIGN CRITERIA. PROTECTION FENCE 9. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. FOR CONDITIONS WHERE PRACTICE APPLIES; SW -20.09 p 10. SEE NC STATE DENR PRACTICE STANDARDS % SPECIFICATIONS SEDIMENT FENCE SET FOR CONDITIONS WHERE TPP -08 OAPPLIES; THE ;PLANNING CONSIDERATIONS & DESIGN CRITERIA. ( HOWEVER, FLOW SHALL NOT RUN PARALLEL WITH THE TOE SW -20.08 PLANNING CONSIDERATION & DESIGN CRITERIA. r411 J RESIDENTIAL CONSTRUCTION ENTRANCE 1 STANDARD TEMPORARY SEDIMENT SILT TREE PROTECTION FENCE 2 � / )/ CHECK DAM 3 c c v T v ' SCALE: NOT TO SCALE SCALE: NOT TO SCALE 1�1 M 0 Kf50MMj\i\\\��iAYI\' LONGITUDINAL ANCHOR TERMINAL SLOPE AND CHANNEL STEEL POST TRENCH ANCHOR TRENCH WOVEN WIRE FABRIC TAKE AT 3'-5e a INTERVALS N S" FILL SLOPE MIN 2:1 SLOPE HARDWARE CLOTH (1/4" - 1/2" WASHED STONE FILTERED WATER MESH OPENING) OVER CURB INLET SEDIMENT r \ DEWATERING HOLES 60� lu GRADE � RUNOFF OVERFLOW 2"X4"r� CONCRETE STUD BRACE r �, r F�6 MIN BLOCK ;: . o °° CHECK SLOT AT Ste' MIN SILT FENCE GEOTEXTILE FABRIC °° 4 ° ° °I=1 25' INTERVALS (MIN) O I I I=II I I-°°° °0 ° I -I I =II I ISOMETRIC VIEW WOODEN STAKES ,��•+ +I+�+IAllF?o:'/1' MAINTENANCE: CLEAN OUT AT 50% CAPACITY LIFE OF FENCING: 6-9 MONTHSoo, 80 �o�g? - I II=I �'` 'V• �i.� o SIDE VIEW vv�u.}O oo , cboo o o o,R o boo 8o'ooOc�cY� ,00, cao88�8��0� �o ° HARDWARE CLOTH 1/4" - 1/2" r °°° ° NO. 57 MESH OPENING) OV _ , , ° I I " - _ - yq �w/� 8' MAX.\/6 WASHED STONE DEWATERING HOLES CONCRETE GUTTER ° / /4Q ° �Y2" ' ; // / // // '•. VARIABLE AS DIRECTED BY THE ENGINEER CURB INLET \//\//\//\// \\\/j\/ \ • �/%\/ \\/j j%\i�\ / //\//\// /\\\\\ �ir�(r1'°�.�GIDC'.,�.I'•'^�Q'�'. PERSPECTIVE VIEW /\\ \\ \\ \\/\\ �/\ \\ 6„ /\\ \\ \\/ ''��'•LYN��v�`` PLASTIC OR CROSS SECTION VIEW /WIRE TIES INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT Vim PERMIT SET MIN. 10 GA. MIN. 12-1/2 GA. LINE WIRES INTERMEDIATE DATE: 3-8-2019 WIRES SILT FENCE FABRIC NOTES: INSTALLED TO SECOND NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT REVISIONS: WIRE FROM TOP GRADE 1. TWO CONCRETE BLOCKS SHALL BE PLACED ON THEIR SIDES ABUTTING THE CURB AT EITHER SIDE 25 INTERVALS. -IIIII=IIIII -IIIII-IIIII-IIIII=IIIII=IIIII=IIIII-IIIII=IIIII-IIIII=IIIII-IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=1ll1 =IIIII=III OF THE INLET OPENING, A x STUD SHALL BE CUT AND PLACED THROUGH THE OUTER HOLES OF 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS = ILII = IIIII THE SPACER BLOCKS TO BRACE THE FRONT BLOCKS. FRONT BLOCKS ARE PLACED ON THEIR SIDES AT 5' INTERVALS. II III IIIII ACROSS THE INLET AND ABUTTING THE SPACER BLOCKS. FRONT VIEW IIIII III 2. WIRE MESH OR HARDWARE CLOTH WITH 1/4" - 1/2" OPENINGS SHALL BE PLACED OVER THE OUTSIDE 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. ILII ILII VERTICAL FACE (WEBBING) OF THE BLOCKS, TO PREVENT STONE FROM BEING WASHED THROUGH THE 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL IIII ITn CITY OF RALEIGH CITY OF RALEIGH HOLES IN THE BLOCKS. 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF NOTES: STANDARD DETAILSTANDARD 1. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. DETAIL 3. STONE SHALL BE PILED AGAINST THE WIRE TO THE TOP OF THE BLOCK. (NO. 57 WASHED STONE) DOWNSTREAM MAT. DRAWN BY: REVISIONS DATE. 8/1/18 NOT TO SCALE 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. REVISIONS DATE:811118 NOT TO SCALE 4. CHECK DEVICE AFTER EACH RAIN AND REPLACE WASHED STONE IF IT CLOGS WITH SEDIMENT. 6• MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. +JSV CHECKED BY: BLW 3. SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION STANDARD TEMPORARY SPECIFICATIONS, WHERE PRACTICE APPLIES AND PLANNING BLOCK AND GRAVEL INLET (SEDIMENT/SILT) FENCE CONSIDERATIONS. PROTECTION FOR CURB INLET 4. SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED SW -20.01 SLOPES GREATER THAN 10' IN HEIGHT. SW -20.26 COIR MATS CHANNEL INSTALLATION DETAILS STANDARD SILT FENCE BLOCK AND GRAVEL INLET PROTECTION SCALE: NTS SHEET N0. SCALE: NOT TO SCALE SCALE: NOT TO SCALE SCALE: NOT TO SCALE 6