Loading...
HomeMy WebLinkAbout20190369 Ver 1_PCN Form Submission_20190322D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190369 Is a payment required for this project?* f No paymentrequired � Fee received F Fee needed - send electronic notification Reviewing Office * WinstomSalem Regional Office - (336) 776- 9800 Information for Initial Review 1a. Name of project: Rowan County-Access Road from Julian Road 1a. Who is the PrimaryContact?* Jon Swaim 1 b. Primary Contact Email: * jon.swa im@mcg illassociates.com Date Submitted 3/22/2019 Nearest Body of Water Town Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 35.625968 I A. Processing Information Longitude: -80.484528 County (or Counties) where the project is located: Rowan Is this project a public transportation project?" � Yes r No Is this a NCDOT Project?" � Yes r No 1a. Type(s) of approval sought from the Corps: CJ Section 404 Permit (�tlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? Ve rsion# * 1 What amout is owed?* r $zao.00 G $570.00 Select Project Reviewer* Dave Wanucha:eads\djwanucha 1 c. Primary Contact Phone:" (82S)386-1920 � �7 Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? G Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: �J 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after-the-fact permit application?" f Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? l' Yes r No B. Applicant Information 1d. Who is applying for the permit? rJ Owner rJ Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Rowan County 2b. Deed book and page no.: DB231 PG:7 2c. Responsible party: Aaron Church - County Manager 2d. Address Street Address 130 W. Innes Street Address Line 2 �Y Salisbury Postal / Zip Code 28144 2e. Telephone Number: (704)216-8180 2g. Email Address:" Aaron.Church@rowancountync.gov r 401 Water Quality Certification - 6cpress r Riparian Buffer Authorization S[ate / FYwince I Region NC Country US 2f. Fax Number: (704)216-8180 * C' Yes r No C' Yes r No 3. Applicant Information (if different from owner) 3a. Name: Aaron Church - County Manager 3b. Business Name: 3c.Address Street Address 130 W. Innes Street Address Line 2 �Y Salisbury Fbstal / Zip CDde 28144 3d. Telephone Number: (704)216-8180 3f. Email Address:* Aaron.Church@rowancountync.gov State / Rovince I F�gion NC Country USA 3e. Fax Number: C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (if appropriate) WA 1 c. Nearest municipality l town: Salisbury 2. Project Identification 2a. Propertyldentification Number: 40209Q 402C003 2c. Project Address Street Address 1455 Julian Road, Summit Park Drive Address Line 2 �Y Salisbury Fbstal / Zip Code 28146 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:" Town Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401030301 4. Project Description and History 2b. Property size: 10.8 S[ate / FYwince I Region NC Cauntry US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The proposed project site consists of a wooded natural area with a cleared utility right of way and an unnamed tributary with associated wetlands, and cleared areas between adjoining municipal and commercial properties. The project site is surrounded by �nrooded areas to the west and east, a large developed industrial area to the south, and commercial and municipal developed properties to the north. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Figures-USGS.pdf 464.43KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil_Map.pdf 477.65KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.4 4g. List the total estimated linear feet of all existing streams on the property: 367 4h. Explain the purpose of the proposed project:* The purpose of the proposed roadway is to provide an alternate access to tvYn critical County service centers and a commercial area, alleviating haffic issues and accelerated wear and/or damage to Julian Road, and providing an easier access point for large delivery trucks. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Rowan County is proposing to construct approximately 1,040 linear feet of paved roadway with associated appurtenances to connect Corporate Center Drive to Julian Road in Salisbury, NC. The proposed road heads northeast from Corporete Center Drive, crosses an Unnamed Tributary (UT) to Town Creek (S1), a riparian wetland area (WA), and a gravity sewer line before reaching a cleared developed area, then continuing northeast until reaching Julian Road (see Location Map, Plan Sheets). Ebsting sub-surface sew�r and water infrastructure within the project area will be encased for protection from the new road construction. The proposed project will result in permanent impacts to UT-1 Town Creek (Impact S1 - 120LF) as fill associated with 80LF of 54" RCP pipe with concrete headwalls and approx 25LF of rip-rap protection at the outlet end of the pipe. Rip rap will be applied to both stream banks belowthe outlet to prevent scouring and bank erosion. Rip rap will be 'keyed in' to match original streambank elevations, no rip rap will be placed in the stream bed. Approx. 30 LF of total temporary impacts are proposed for UT-1 Town Creek for pump around diversion and construction equipment access and maneuvering; Impact S2 (10LF) at the outlet end and Impact S3 (20LF) at the inlet end of the proposed pipe. Also, the project is proposing approx. 0.006-acres of temporary impacts to Wetland A(Impact W1) for grading associated with pipe placement. See Impact Map. Total proposed impacts include: 120LF of permanent stream impacts. 30LF of temporary stream impacts. 0.006-acres of temporary wetland impacts. All streambanks and v"�tlands receiving temporary impacts will be retumed to original grades and contours, matted with fully biodegradable matting, and seeded with a native NC riparian seed mix (see Streambank Stabilization Detail - Sheet C-503). The proposed 54" RCP will be buried at least one foot below the stream bed to maintain aquatic passage. A pump around or other diversion technique will be used to ensure that all in-stream v"nrk occurs in the dry (see Temporary Stream Bypass Detail - Sheet C-501). A temporary stream crossing may be used in the same location of the proposed pipe to allow for equipment access prior to pipe installation (see Creek Bank Restoration Detail - Sheet C-502). Erosion Control measures include grassed swales, erosion control matting check dams, silt fencing, and a temporary skimmer basin (see Sheet C-104). Proposed permanent stormwater measures include grassed swales, concrete storm drains connected to 18" RCP pipes, and rip-rap swales to divert and control run-off (see Sheet C-101). Typical construction equipment will be used on the project including, bull dozers, dump trucks, road graders, and paving equipment. 4j. Please upload project drawings for the proposed project. 1801404_Permit Plans.pdf 21.34MB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* F Yes r No Comments: Project area delineated by McGill Associates, PA, preliminary JD request submitted to ACOE 12/18/18 Sb. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved r Not Verified � Unknown r WA Corps AID Number: In process. Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jon Swaim Agency/Consultant Company: Mcgill and Associates P.A. Other: Sd1. Jurisdictional determination upload Rowan Counry - Julian Road Access - JD Request.pdf 6. Future Project Plans 6a. Is this a phased project?" f Yes r No 4.68MB r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): 17 Wetlands I7 Streams-tributaries r Buffers r Open Waters I� Pond Construction 2. Wetland Impacts 2a. Site #* (') 2a1 Reason (�) 2b. Impact type *(') 2a Type of W. * 2d. W. name * 2e. Forested * Zf. Type of 2g. Impact Jurisdicition*(') area* W1 Grading T Bottomland Hardwnod Forest Wetland A Yes Both 0.006 (acres) 2g. Total Temporary Wetland Impact 0.006 2g. Total Permanent Wetland Impact 0.000 2g. Total Wetland Impact 0.006 2h. Comments: 3. Stream Impacts ❑ 3a. Reason for impact (') 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact (?) Jurisdiction* length'� Road Crossin Permanent Culvert UT-1 Town Creek Perennial Both 3 120 S1 9 Average(feet) Qinearfeet) 82 Grading/Access Temporary Workpad/Causev✓ay UT-1 Town Creek Perennial Both 3 10 Average(feet) (linearfeet) S3 Grading/Access Temporary Workpad/Causev✓ay UT-1 Town Creek Perennial Both 3 20 Average (feet) Qinear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 120 3i. Total stream and ditch impacts: 150 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Proposed road was designed to cross UT-1 Town Creek at perpendicular angle, and designed to avoid Wetland A as much as practical. Permanent stormwater systems designed to intercept surface water and allowfor flowto UT-1 Town Creek while avoiding sedimentation and erosion of stream banks. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion control measures shall be used during culvert installation and grading to minimize impact to streams and wetlands, including a pump around or other diversion technique utilized to ensure that all work will occur in the dry. Post construction disturbed stream and wetland areas will be retumed to original conditions and stabilized tidth fully biodegradable matting and seeded with native plant seed mix. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f Yes r No 3i. Total temporary stream impacts: 30 � If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C' Yes r No 26. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? F Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federal/state) land? * f Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water qualit�/?* C' Yes r No 3b. If you answered "no," provide a short narrative description. The proposed road is intended to service existing infrastructure. Some future development may occur as a result of the proposed road, but any development should be designed and permitted through appropriate agencies. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No C' fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * f Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes r No Sd. Is another Federal agency involved?" � Yes r No 5e. Is this a DOT project located within Division's 1-8? C' Yes r No Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.? � Yes r No Sg. Does this project involve bridge maintenance or removal? C' Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* � Yes r No � Unknown Si. Does this project involve (7) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? C' Yes r No Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://www.Tivs.gov/raleigh/species/cntylisUrowan. html https://ncnhde. natu reserve. org/ https://ecos.fws.gov/ecp/reportltable/critical-habitat. html Project site will involve the removal of trees, hovsever, during site investigations no mature trees or trees containing dead snags, shaggy bark, or deep crevices were found within the project area. It is our opinion that no potential Northern Long Eared Bat habitat will be impacted as a result of the proposed work. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www. habitaLnoaa.gov/protection/efh/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status9* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* h tt p: //g i s. n cd c r. g o v/ h p o we b/ 7c. Historic or Prehistoric Information Upload Historic Info Map.pdf 564.45KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes r No 8c. What source(s) did you use to make the floodplain determination?* https://msafe ma. gov/porta I/sea rch Miscellaneous Comments Miscellaneous attachments not previouslyrequested. Agent Author Form Signed.pdf F ig u res-Locatio n. pdf Rowan County Road - Impact Map.pdf 519.57KB 321.43KB 1.16MB Signature � * fJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction° subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Jon Swaim Signature �/Ol/ ,� �JXrlrLfi'! Date 3/22/2019