Loading...
HomeMy WebLinkAboutNC0071323_Inspection_20190322EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NC0071323 19/03/20 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Etowah Sewer Company WWTP Hwy 64 Etowah NC 28729 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 11:15AM 19/03/20 16/02/01 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Vincent L Edwards/ORC/828-697-3077/ Other Facility Data 12:00PM 19/03/20 20/11/30 Name, Address of Responsible Official/Title/Phone and Fax Number Ken Deaver,PO Box 63 Rutherfordton NC 281390063//828-657-1810/8286574664 Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Self-Monitoring Program Sludge Handling Disposal Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Daniel J Boss ARO WQ//828-296-4658/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3 3/22/2019 3/22/2019 NPDES yr/mo/day 19/03/20 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On 3/20/2019, I (Daniel Boss) conducted a Compliance Evaluation Inspection at Etowah Sewer Company WWTP. I met with the ORC,Vincent Edwards, for the inspection. This facility appears to be operating well, but there are a couple minor repairs needed. The audio and visual alarms need to be repaired at both the influent and effluent pump stations. There is some grating that is rusted and collapsed at the old plant which needs to be replaced. NC0071323 17 Page#2 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3 Permit:NC0071323 Inspection Date:03/20/2019 Owner - Facility: Inspection Type: Etowah Sewer Company WWTP Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? There is some rusted and collapsed grating at the old plant which needs to be replaced.Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? The audio and visual alarms do function, but not when the float is tripped. The alarm float is functional though because the autodialer still calls the ORC when it is tripped. Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Page#3 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3 Permit:NC0071323 Inspection Date:03/20/2019 Owner - Facility: Inspection Type: Etowah Sewer Company WWTP Compliance Evaluation Bar Screens Yes No NA NE Equalization Basins Yes No NA NE Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Comment: Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin’s surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/l) The aeration basins for the old plant have low foam. The new plant aeration basins have about 50% foam cover. Mr. Edwards says this is a seasonal issue and the foam typically disappears in a couple weeks as the weather warms. Old plant settleability- 320, new plant settleability- 250. The following measurements were taken by Mr. Edwards on 3-19-19: Old plant: DO- 2.85, pH- 7.09. New plant- DO- 2.41, pH- 7.86. Also some of the grating at the old plant over the aeration basins is rusted and collapsed, and needs to be replaced. Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Page#4 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3 Permit:NC0071323 Inspection Date:03/20/2019 Owner - Facility: Inspection Type: Etowah Sewer Company WWTP Compliance Evaluation Secondary Clarifier Yes No NA NE Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth) Each plant has 2 clarifiers in series.Comment: Disinfection-Tablet Yes No NA NE Are tablet chlorinators operational? Are the tablets the proper size and type? Number of tubes in use?4 Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de-chlorination? Comment: De-chlorination Yes No NA NE Type of system ?Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? Is storage appropriate for cylinders? # Is de-chlorination substance stored away from chlorine containers? Comment: Are the tablets the proper size and type? Are tablet de-chlorinators operational? Number of tubes in use?2 Comment: Aerobic Digester Yes No NA NE Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? Page#5 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3 Permit:NC0071323 Inspection Date:03/20/2019 Owner - Facility: Inspection Type: Etowah Sewer Company WWTP Compliance Evaluation Aerobic Digester Yes No NA NE # Is the odor acceptable? # Is tankage available for properly waste sludge? Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? The new plant just had a new flow meter installed on 3/11/2019.Comment: Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? The audible and visual alarms were not working.Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Page#6 DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3