HomeMy WebLinkAboutNC0071323_Inspection_20190322EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0071323 19/03/20 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Etowah Sewer Company WWTP
Hwy 64
Etowah NC 28729
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
11:15AM 19/03/20 16/02/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Vincent L Edwards/ORC/828-697-3077/
Other Facility Data
12:00PM 19/03/20 20/11/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Ken Deaver,PO Box 63 Rutherfordton NC 281390063//828-657-1810/8286574664 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Self-Monitoring Program
Sludge Handling Disposal
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Daniel J Boss ARO WQ//828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3
3/22/2019
3/22/2019
NPDES yr/mo/day
19/03/20
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 3/20/2019, I (Daniel Boss) conducted a Compliance Evaluation Inspection at Etowah Sewer
Company WWTP. I met with the ORC,Vincent Edwards, for the inspection.
This facility appears to be operating well, but there are a couple minor repairs needed. The audio and
visual alarms need to be repaired at both the influent and effluent pump stations. There is some
grating that is rusted and collapsed at the old plant which needs to be replaced.
NC0071323 17
Page#2
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3
Permit:NC0071323
Inspection Date:03/20/2019
Owner - Facility:
Inspection Type:
Etowah Sewer Company WWTP
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
There is some rusted and collapsed grating at the old plant which needs to be replaced.Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
The audio and visual alarms do function, but not when the float is tripped. The alarm float is
functional though because the autodialer still calls the ORC when it is tripped.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Page#3
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3
Permit:NC0071323
Inspection Date:03/20/2019
Owner - Facility:
Inspection Type:
Etowah Sewer Company WWTP
Compliance Evaluation
Bar Screens Yes No NA NE
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The aeration basins for the old plant have low foam. The new plant aeration basins have
about 50% foam cover. Mr. Edwards says this is a seasonal issue and the foam typically
disappears in a couple weeks as the weather warms.
Old plant settleability- 320, new plant settleability- 250.
The following measurements were taken by Mr. Edwards on 3-19-19: Old plant: DO- 2.85,
pH- 7.09. New plant- DO- 2.41, pH- 7.86.
Also some of the grating at the old plant over the aeration basins is rusted and collapsed,
and needs to be replaced.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Page#4
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3
Permit:NC0071323
Inspection Date:03/20/2019
Owner - Facility:
Inspection Type:
Etowah Sewer Company WWTP
Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Each plant has 2 clarifiers in series.Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?4
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Comment:
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?2
Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
Page#5
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3
Permit:NC0071323
Inspection Date:03/20/2019
Owner - Facility:
Inspection Type:
Etowah Sewer Company WWTP
Compliance Evaluation
Aerobic Digester Yes No NA NE
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
The new plant just had a new flow meter installed on 3/11/2019.Comment:
Pump Station - Effluent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
The audible and visual alarms were not working.Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment:
Page#6
DocuSign Envelope ID: 15BBB3F0-33A0-4C3D-ADD6-1A8581AA8FC3