HomeMy WebLinkAbout240012_30 day POA_20180815PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-12 County: Columbus
Facility Name. Phil Creech
Certified Operator Name Phillip Creech Operator Number.
22379
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
L1
18.5
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
`if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Phil Creech Phone (910)647-6031
Facility Own onager (print)
Date. 8/15/2018
Facility Owner/Mana r (signature)
C �� Q �e �_
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID Lagoon 1
line m =
121.2 lb PAN
2.
Structure ID
line m =
Ib PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 121.21bPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BF APPI. IFn n11RING THIS 30 i PFRInn
O. tract #
p field #
q. crop
r. acres
s remaining IRR
2 PAN balance
(lb/acre)
I. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
6
Bermuda G
24.22
18000
4359.6
March -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4359.6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section 11) = 121.2 lb. PAN
POA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 4359.6 lb. PAN
y. Overall PAN balance (w - x) _ -4238 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and "
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
The fields listed above are all optional fields in the waste plan_ Remaining PAN is an estimate.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
Structure Name/Identifier (ID) I Lagoon 1
2_ Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.5 inches
19.0 inches
0.5 inches
221960 ftz
69178 gallons
180 days
g volume of waste produced according to structural design 25851 ft3
h. current herd # 3520 certified herd # 3520
actual waste produced = current herd # x line g = 25851 ft'
certified herd #
volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/19/2018
m_ ((lines e + k)/l000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
Oft3
19891.667 ft3
57026 gallons
0.96 Ibs/1000 gal.
121.2 Ibs PAN