HomeMy WebLinkAbout100005_5 day POA_20180801 F-2r6r4-ed 115u' IQ
kj
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 10-5 County: Brunswick
Facility Name: Robert Gene Ward Farm
Certified Operator Name: Robert Gene Ward Operator Number:
1. Current liquid level(s)in inches as measured from the current liquid level in the lagoon to the
lowest pant on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: RGW
Spillway(Y or N): N
Level(inches): 6
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour stone elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWO prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding animal units and dates fro depopulation
'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As weathertfield conditions allow
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action,and to the best of my knowledge and ability,the information is
accurate and correct.
Robert Gene Ward Phone: 910-233-6525
Facility Owner/Manager(print)
Robert Gene Ward Date: 7/31/2018
Facility Owner/Manager(signature)
PLAN OF ACTION(POA)FOR FREEBOARD AT ANIMAL FACILITIES
FIVE(5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier(ID): Robert Gene Ward Farm
2. Current liquid volume in structural freeboard
a. current liquid level according to marker F------6-ol inches
b. designed structural freeboard zone 12.0 inches
(Normally 12 inches or greater)
c. line b-line a (inches within structural freeboard)= 6.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 105,000 ft
e, line c/12 x line d x 7.48 gallons/ft' 392700 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 208117 ft3
h. current herd# 6080 certified herd# 6080
actual waste produced =current herd# x line g = 208117 ft'
certified herd#
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 107465 ft3
k. (lines h+ i +j)x 7.48 x 5 days/line f= 65571 gallons
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e+ line k= 458271 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA(5 Day)2/21/00
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL.FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: Robert Gene Ward Farm line I= 458271 gallons
2. structure ID: dine I= gallons
3. structure ID: line I= gallons
4. structure ID: line I= gallons
5. structure ID: line I gallons
6. structure ID: line I= gallons
n. lines 1 +2+3 +4+5+6= 458271 g4Ilons
a. Hne>n 127154= 16.88 acre-inches
Ill. TOTAL.ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD',2
'While this section deals with hydraulic loading capacities,applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAID balance, no receiving crop, and/or completely saturated are
not considered.available to.receive.waste.
p.tract# q.field# r. soil type s.'crop t.acres u.remaining v_maximum %v.maximum
IRR-2 PAN application rate application
balance 0whi) amount(inches)
(Ib/acre)
PP3.Rains Soybeans 36.80 126.75 D.A� 1.
PP5 Lynchburg Soybeans 26.66 128.57 0.5 1
X.total acres available during 5 clay draw down(sum Of column t)= 63.46 acres
IV.FACILIT1rS PoA OVERALL HYDRAULIC LOAD TO BE LAND-APPLIED PER ACME
PoA Da 2/12 ine o 0.27 inches per acre to be applied in 5 days
y)
ti
line x
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and haul,depopulation, herd reduction,etc. For pump S haul and herd reduction options,
recalculate new hydraulic load based on new information.
Irrigation will begin as field and weather conditions permit.
Plan to land apply hydraulic load:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
ui ment mar down in field- "trafficabili 'across soils will soils absorb application without runoff, etc.
Farm has received rainfall about every day since mid-Jury(approximately 15 inches in the last two weeks).
2. Date and amount of last rainfall event?
DATE: 07/31/18 AMOUNT: 3.70 inches
3. Dates of last waste application event per field:
Last irrigation event was 7110118(Pivot)
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
line"n"at appropriate seasonal i.e. winter application rates within 5 days?
Will irrigate as weather and field conditons permit (Pivot)
S. Irrigation schedule for next 5 days-include daily schedule; proposed application rates and amounts
per irrigation event; changes made in gun sizes, nozzles,"o" rings, operating time, travel speed,etc.to
meet proposed changes in application rates and amounts and any other information for consideration.
Will irrigate as weather and field conditions permit (Pivot)
PoA(5 Day)2/21/00
ff. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure'll): Robert Gene Ward line rn= 1814.8 lb PAN
2. Structure ID: line rn= lb PAN
3. Structure ID: line rn= lb PAN
4. Structure ID: line rn= lb PAN
5. Structure ID.- line rn= lb PAN
6. Structure ID: line rn = lb PAN
n. lines I +2+3+4+5+6 118114.8 lb PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o.tract# p.field# q. crop r. acres s.remaining IRR.t TOTAL PAN u.application windowl
2 PAN balance BALANCE FOR
(lb/scre) FIELD(lbs.)
column r x s
PP3 Soybeans 36.80 120.00 4416.0 4/01-9/15
PP5.Soybeans 26.66 116-00 3092.6 4/011-9115
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period,
v.Total PAN available for all fields(sum of column t)= 7508.6 1b.PAN
IV.FACILITY'S PGA OVERALL PAN BALANCE
W. Total PAN to be land applied(line n from section 11)= 1814,8 1b.PAN
PoA(30 Day)2/21/00
x. Crop's remaining PAN balance (line v from section 111)= 7508.6 lb. PAN
y. Overall PAN balance(w-x) _ -5694 ib.PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to to included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
remywrin facility
NARRATIM
New waste sample has been submitted to NCDA(thru Brunswick County Cooperative Ext. Office). Irrigation will
begin as weather and field conditons permit.
PoA(30 Day)2/21/00