Loading...
HomeMy WebLinkAbout100005_Structure Evaluation_20180806 (53) Division of Water Resources Facility Number - O Division of Soil and Water Conservation / O Other Agency V Type of Visit: O Compliance Inspection 0 Operation Review^Structure Evaluation O Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral xEmergency O Other O Denied Access y��/� Date of Visit: 1"" (�� lAnr'rival Time" I Departure Timer County: /1,f F'.1// gion: tv V Farm Name: (!I e.{^y Y a,r I c,t,w Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish ]Layer Dairy Coati Wean to Feeder I INon-Layer I 1 1 Dairy Calf Feeder to Finish d Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Ca aci Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets I jBeef Brood Cow Turkeys Other Turkey Puuets Other Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? [:] Yes KNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? 0 Yes ❑ No ❑ NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Vq No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued