Loading...
HomeMy WebLinkAbout20090743 Ver 1_Staff Comments_2009080609-0743 The Villages at Hallelujah Acres AML Comments August 6, 2009 1. Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http://h2o.em•.state.nc.us/'newetlandsldocuments/"SMPRegLlirementsforAt)licants otherthanNC )OT.pdf. Please include an SMP that removes a minimum of 85 percent TSS from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://l12o.eni-.state.nc.us/sulbmp forms.litm.