HomeMy WebLinkAbout310386_2018 FB and Rainfall_20190320 FORM FRB®-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31 - 386
Operator Melissa Wallace MonthNear Jan-18
Day Waste Structure Freeboard inches 1,2 Precipitation Initials
#1 #2 # # # # (inches)3 Comments
1
2
3
4
5
6
7 16 16
8
9
10
11
12
3 172
13
14 16 16
15
16
17
18
19
20
21 17 22
22
23
24
25
26
27
28 18 26 V2-
4
29
L31
30
'
1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock 31
Facility Number - 386
Operator Melissa Wallace
MonthNear Feb-18
Day Waste Structure Freeboard inches
#1 #2 Precipitation Initials
# # Comments
# #
(inches)
1
2
3
4 16 22
1/2 �6
5
6
7
8
9
10
11 18 22
�6
12
13
14
15
16
17
18 18 22
19
20
21
22
23
24
25 19 22
26 a
27
28
29
30
31
Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3. Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31
386
Operator Melissa Wallace
MonthNear. Mar-18
Day Waste Structure Freeboard inches t2 Precipitation Initials
#1 #2 # # # # (inches)3 Comments
1
2
3
4 19 22
5
6
7
8
9
10
11 19 22 �d
12
13
14
15
16
17
18 22 21
19
1/2
20
21
22
23
24
112
25 22 18
26
�6
27
28
29
30
31
Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2. Freeboard levels must be recorded at least weekly.
3. Rainfall must be recorded for every rain event.
FORM FRBD-9
Waste Structure Freeboard and Daily Precipitation Record
_. Farm Owner William Edward Brock Facility Number 31 - 386
Operator Melissa Wallace MonthNear A r-18
Day Waste Structure Freeboard in hes'�2 Precipitation Initials
#1 #2 # # # # (inches)3 comments
1 22 18
2
3
4
5
6
7 1 1/2
8 28 18
9 4/10
10
11
12
13 1 1/10
14
15 28 18
16
17
18
19
20
21
22 24 19 .
23
24 1/2
25
26
27
28
29 24 19 t
0.
30
31
Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily precipitation Record
Farm Owner William Edward Brock Facility Number 31 -
386 -
Operator Melissa Wallace
Month/Year Ma -18
Day Waste Structure Freeboard inches ',2 Precipitation Initials#1 #2 # # # # (inches) Comments
1
2
3
4
5
6 22 26 7/10 C
7
8
9
10
1'1
12
13 22 27
- Cz
14
16
17
18
19
rat}Ls
20 20 27
21
22
23
24
25
26
27 20 2g
28
29
3 1/2
30
31
12/10
Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm owner William Edward Brock Facility Number 31 -
386
Operator Melissa Wallace
Month/Year Jun-18
Day Waste Structure Freeboard inches 1.2 Precipitation Initials
#1 92 # # # # (inches)a Comments
1
2
- 2/10
3 18 19
4
5
6
7
8
9
10 19 20
11
4/10
12
13
14
,... 15
1 1/2
16
17 19 20
18
19
20
21
22
23
24 25 22 }
25
26
6110
27
28
2
29
30
31
Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31 - 386
Operator L Melissa Wallace Month/Year Jul-18
Day Waste Structure-Freeboard inches 1 2 Precipitation Initials
#1 #2 # # # #
(inches)3 Comments
1 26 19 c
2
3
4
5
6
7
8 26 20
9
10
11
12
13
--------------------
14
15 25 25 �+
16
17 1
18
19
20
21 -
22 26 26 .
23 1
24 1
25
26
6/10
27
28 1
29 26 22 excess of rain
30
31
--1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2. Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM l`:RBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Ed-ward Brock Facility Number 31 -
386
Operator Melissa Wallace MonthNear Aug-18
Day Waste Structure Freeboard inches 1.2 Precipitation Initials
#1 #2 # # # # (inches 3 Comments
1
3/10
2
1 1/2
3
4
5 14 16 4,
6
6/10
7
8
5/10
9
2110
10
7/10
11
12 13 18
13
14
15
16
17
18
19
20
�t
21
22
t23
24
25
26 l
fm
27
28
29
30
31'
9.,I-agoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
or lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded,
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-9
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31 -� 386
Operator Melissa Wallace Month/Year Se -18
FayWaste Structure Freeboard inches 1'2 Precipitation Initials
#2 # # # # Onches)3 Comments
2 25 31 ?
3
4
5 �x rn r .
6
vt, � 4
7
8 g€
9 25 1 38 a
10
11
12
13 Hurricane Florence approaching
14 Hurricane Florence arrives
15 Hurricane Florence still dum in
16 29 42 30 inches e"'$ Hurricane still dumping rain
17 rain has slacked up from storm
18
NO RAINIII!!I
19 Reported to DVVQ lagoon readings
20 during this time.Told to save the
21 lagoon from breeching.
22
23 0 1 14
24
ry,i..ylSf,:.L. QiL r F
25
26
27
28
29
L31
30
1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3. Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31 - 386
Operator MonthNear Oct.2018
Da Waste Structure Freeboard inches'2 Precipitation Initials
y #1 #2 # # # # (inches)3 Comments
1
2 Working with DWQ to save the
3 integraty of la on 1.Water from
4 the hurricane filled the la on and
5 flooded it.
6 Working on gettig water down.
7 24 19 eb
8
9
10
11
12
13
14 24 19 eb
15
16 Move nvkaa
17 3/10 inches
18
19
20
21 19 32 eb
22
23
24
25
26 1 inch
27
28 19 32 eb
29
30
31
1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock Facility Number 31 - 386
Operator Month/Year Nov.2018
Da Waste Structure Freeboard inches '2 Precipitation Initials Comments
y #1 #2 # # # 1# (inches)3
1
2
3
4 19 32 eb
5
6
7 2 ihehet
8
9
10
11 18 30 eb
12
13
14
15 4/10 inches
16
17 OiloV�
18 18 32 eb started agitating sludge in la on1
19 to get ready to remove sludge
20 i n IJ2C.
21
22
23
24
25 18 32 eb
26
27
28
29
30
31
1.Lagoon freeboard is the difference between the lowest.point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2. Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.
FORM FRBD-1
Waste Structure Freeboard and Daily Precipitation Record
Farm Owner William Edward Brock I Facility Number 31 - 386
Operator MonthKear Dec.2018
Day Waste Structure Freeboard(in has)',' Precipitation Initials Comments
#1 #2 # # 1# # (inches)'
1 8/10 inch
2
3
4 1 32 eb Marker in La on one was tom
5 down due to trying to get sludge
6 out of la on. F r rv,
7
8
9
10 3 inches
11 30 eb
12
13
14
15
16
17
18 30 2inches eb
19
20
21
22
23
24 K n
25 29 eb c.4.r• rV10.IQ r
26
27
28
29
30
31
1. Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid.
For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded.
2.Freeboard levels must be recorded at least weekly.
3.Rainfall must be recorded for every rain event.