Loading...
HomeMy WebLinkAbout310386_2018 FB and Rainfall_20190320 FORM FRB®-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 - 386 Operator Melissa Wallace MonthNear Jan-18 Day Waste Structure Freeboard inches 1,2 Precipitation Initials #1 #2 # # # # (inches)3 Comments 1 2 3 4 5 6 7 16 16 8 9 10 11 12 3 172 13 14 16 16 15 16 17 18 19 20 21 17 22 22 23 24 25 26 27 28 18 26 V2- 4 29 L31 30 ' 1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock 31 Facility Number - 386 Operator Melissa Wallace MonthNear Feb-18 Day Waste Structure Freeboard inches #1 #2 Precipitation Initials # # Comments # # (inches) 1 2 3 4 16 22 1/2 �6 5 6 7 8 9 10 11 18 22 �6 12 13 14 15 16 17 18 18 22 19 20 21 22 23 24 25 19 22 26 a 27 28 29 30 31 Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3. Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 386 Operator Melissa Wallace MonthNear. Mar-18 Day Waste Structure Freeboard inches t2 Precipitation Initials #1 #2 # # # # (inches)3 Comments 1 2 3 4 19 22 5 6 7 8 9 10 11 19 22 �d 12 13 14 15 16 17 18 22 21 19 1/2 20 21 22 23 24 112 25 22 18 26 �6 27 28 29 30 31 Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2. Freeboard levels must be recorded at least weekly. 3. Rainfall must be recorded for every rain event. FORM FRBD-9 Waste Structure Freeboard and Daily Precipitation Record _. Farm Owner William Edward Brock Facility Number 31 - 386 Operator Melissa Wallace MonthNear A r-18 Day Waste Structure Freeboard in hes'�2 Precipitation Initials #1 #2 # # # # (inches)3 comments 1 22 18 2 3 4 5 6 7 1 1/2 8 28 18 9 4/10 10 11 12 13 1 1/10 14 15 28 18 16 17 18 19 20 21 22 24 19 . 23 24 1/2 25 26 27 28 29 24 19 t 0. 30 31 Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily precipitation Record Farm Owner William Edward Brock Facility Number 31 - 386 - Operator Melissa Wallace Month/Year Ma -18 Day Waste Structure Freeboard inches ',2 Precipitation Initials#1 #2 # # # # (inches) Comments 1 2 3 4 5 6 22 26 7/10 C 7 8 9 10 1'1 12 13 22 27 - Cz 14 16 17 18 19 rat}Ls 20 20 27 21 22 23 24 25 26 27 20 2g 28 29 3 1/2 30 31 12/10 Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm owner William Edward Brock Facility Number 31 - 386 Operator Melissa Wallace Month/Year Jun-18 Day Waste Structure Freeboard inches 1.2 Precipitation Initials #1 92 # # # # (inches)a Comments 1 2 - 2/10 3 18 19 4 5 6 7 8 9 10 19 20 11 4/10 12 13 14 ,... 15 1 1/2 16 17 19 20 18 19 20 21 22 23 24 25 22 } 25 26 6110 27 28 2 29 30 31 Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 - 386 Operator L Melissa Wallace Month/Year Jul-18 Day Waste Structure-Freeboard inches 1 2 Precipitation Initials #1 #2 # # # # (inches)3 Comments 1 26 19 c 2 3 4 5 6 7 8 26 20 9 10 11 12 13 -------------------- 14 15 25 25 �+ 16 17 1 18 19 20 21 - 22 26 26 . 23 1 24 1 25 26 6/10 27 28 1 29 26 22 excess of rain 30 31 --1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2. Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM l`:RBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Ed-ward Brock Facility Number 31 - 386 Operator Melissa Wallace MonthNear Aug-18 Day Waste Structure Freeboard inches 1.2 Precipitation Initials #1 #2 # # # # (inches 3 Comments 1 3/10 2 1 1/2 3 4 5 14 16 4, 6 6/10 7 8 5/10 9 2110 10 7/10 11 12 13 18 13 14 15 16 17 18 19 20 �t 21 22 t23 24 25 26 l fm 27 28 29 30 31' 9.,I-agoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. or lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded, 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-9 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 -� 386 Operator Melissa Wallace Month/Year Se -18 FayWaste Structure Freeboard inches 1'2 Precipitation Initials #2 # # # # Onches)3 Comments 2 25 31 ? 3 4 5 �x rn r . 6 vt, � 4 7 8 g€ 9 25 1 38 a 10 11 12 13 Hurricane Florence approaching 14 Hurricane Florence arrives 15 Hurricane Florence still dum in 16 29 42 30 inches e"'$ Hurricane still dumping rain 17 rain has slacked up from storm 18 NO RAINIII!!I 19 Reported to DVVQ lagoon readings 20 during this time.Told to save the 21 lagoon from breeching. 22 23 0 1 14 24 ry,i..ylSf,:.L. QiL r F 25 26 27 28 29 L31 30 1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3. Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 - 386 Operator MonthNear Oct.2018 Da Waste Structure Freeboard inches'2 Precipitation Initials y #1 #2 # # # # (inches)3 Comments 1 2 Working with DWQ to save the 3 integraty of la on 1.Water from 4 the hurricane filled the la on and 5 flooded it. 6 Working on gettig water down. 7 24 19 eb 8 9 10 11 12 13 14 24 19 eb 15 16 Move nvkaa 17 3/10 inches 18 19 20 21 19 32 eb 22 23 24 25 26 1 inch 27 28 19 32 eb 29 30 31 1.Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock Facility Number 31 - 386 Operator Month/Year Nov.2018 Da Waste Structure Freeboard inches '2 Precipitation Initials Comments y #1 #2 # # # 1# (inches)3 1 2 3 4 19 32 eb 5 6 7 2 ihehet 8 9 10 11 18 30 eb 12 13 14 15 4/10 inches 16 17 OiloV� 18 18 32 eb started agitating sludge in la on1 19 to get ready to remove sludge 20 i n IJ2C. 21 22 23 24 25 18 32 eb 26 27 28 29 30 31 1.Lagoon freeboard is the difference between the lowest.point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2. Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event. FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner William Edward Brock I Facility Number 31 - 386 Operator MonthKear Dec.2018 Day Waste Structure Freeboard(in has)',' Precipitation Initials Comments #1 #2 # # 1# # (inches)' 1 8/10 inch 2 3 4 1 32 eb Marker in La on one was tom 5 down due to trying to get sludge 6 out of la on. F r rv, 7 8 9 10 3 inches 11 30 eb 12 13 14 15 16 17 18 30 2inches eb 19 20 21 22 23 24 K n 25 29 eb c.4.r• rV10.IQ r 26 27 28 29 30 31 1. Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways,the difference between the level of liquid and the bottom of the spillway should be recorded. 2.Freeboard levels must be recorded at least weekly. 3.Rainfall must be recorded for every rain event.