HomeMy WebLinkAbout310386_Inspection 2019_20190320 Division of Water Resources /
Facility Number O Division of Soil and Water Conservation V/
O Other Agency
Type of Visit: Compliance Inspection Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: (3(
Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: ` / Arrival Time: OU Departure Time: County: Region:
Farm Name: I/ �rl�1�I►1 ��9>�< Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: pp Title: Phone:
tin
Onsite Representative: 44/ 1 9✓✓YI f.+C Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I ILayer I I I Dairy Co"
Wean to Feeder I INon-Layer I I I Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry capacity Pop. Non-Dairy
Farrow to Finish I Layers Beef Stocker
Gilts Non-Layers Beef Feeder
13o,r: Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes 9No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facili Number: 01 - Date of Inspection: 3-
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? �Yes ❑ No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?: g
Designed Freeboard(in): 7 .
21-7
Observed Freeboard(in): ' A-WT.0
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes hl0 ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [I No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes 00 No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes jo No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks) Vi
9. Does any part of the waste management system other than the waste structures require ❑ Yes 14 No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [�g No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �4 No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18.Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records&Documents
19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes [n No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE
Page 2 of 3 21412015 Continued
Facili Number: Date of Inspection: 3-90-
24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes P No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [�a No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 0 No ❑ NA ❑ NE
27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No NA ❑ NE
Other Issues �q
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes q No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [)3 No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [)I No ❑ NA ❑ NE
33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [� No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes [�j No ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
(one ,^�� K �, �� � , I c� S sti+ —� �-/�4 S li ./ !✓,
Reviewer/Inspector Name: / /Phone:
a
Reviewer/Inspector Signature: — `//� 9�ate: ZQ
Page 3 of 3 21412015