Loading...
HomeMy WebLinkAbout20140574 Ver 5_SSB-PH17-SITEPLAN-20190111_20190318Summary -Open Space Types SITE DEVELOPMENT NOTES: / � ��6 E3 Phase 17 (sf) Phase 17 (ac) Total Open Space 89297 _l 2.05 Primary Open Space 58463 1.34 Secondary Open Space 30834 0.71 Common Green 0 0.00 `J \\ p ` / C 7x �� / �\\\��� \\�`.� , �'\' \�`� '' � p ' 0723 SITE DEVELOPMENT NOTES: / � ��6 E3 \ / i\� `\\ ` /' 0 , 1. STREET LIGHTING TO BE PROVIDED ACCORDING TO TOWN REQUIREMENTS, AS SHOWN ON MH#61 TO MH#66 W ° SHEET C-4.0 STORM CB#109-CB#110 2. ALL NEW UTILITY LINES MUST BE UNDERGROUND. MH#131-CB#132 CON 5 U LTI N G 3. A PRE -CONSTRUCTION MEETING WITH THE TOWN OF FUQUAY-VARINA AND �° `\ 2805 Tobermory Lane / i Aj i `\ TOWN ENVIRONMENTAL INSPECTOR WILL BE REQUIRED BEFORE BEGINNING ANY CONSTRUCTION. /> 15' REAR SETBACK Raleigh, INC 27606 STOP \� 4. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF FUQUAY-VARINA STANDARD ,/ /. Phone No. (919) 618-0180 `� 00 �� SIGN. SPECIFICATIONS AND CONSTRUCTION DETAILS. ,i �o� \\ 8 o License No. C-2149 5. SURVEY INFORMATION PROVIDED BY SULLIVAN SURVEYING IN SEPTEMBER 2015, AND IS \ o• IN NAD83 COORDINATE SYSTEM TIED TO NGVD88 VERTICAL DATUM. TEMPORARY BENCHMARK ,� Oxy, IS LOCATED AT THE EXISTING MANHOLE TO THE WETWELL AT THE PUMP STATION SOUTHOF PHASE 1 OF THIS DEVELOPMENT. 6. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES AND SHALL ,�i �,����tCAFi!(a, BE RESPONSIBLE FOR ANY DAMAGE RESULTING FROM HIS ACTIVITIES. CALL UTILITY \ / ' 80 WIDE b• �,°• ,y ••� ,/ 155' DEEP `�` p LOCATING SERVICE 48 HOURS PRIOR TO DIGGING. 1-800-632-4949. \, ,� �/ ,/ \\ .o- z e';Q.'; ,\ I _ _, Ss, A/y ° 7. ALL OPEN SPACE WITHIN THE SUBDIVISION THAT IS NOT DEDICATED TO THE TOWN OF �� ,� / \ Q ,' \ ---J FUQUAY-VARINA SHALL BE MAINTAINED BY THE SUNSET BLUFFS HOMEOWNERS ASSOC. , 6' SIDE ,,ETBACK SEA /A/ 8. WETLANDS AND NEUSE RIVER BUFFERS HAVE BEEN DELINEATED BY MITCHELL ` \ ' /' `\ � 027445 HAREWOOD STA. 17+7� 42 ENVIRONMENTAL, PA. \PLOWRIDGE STA. y6 g.•00 9. THERE IS NO REFERENCED FLOODPLAIN WITHIN THIS PHASE, AS SHOWN ON FEMA `\ ,� p ��,v O0� ,/' 29' ` FIRM #3720065800J, DATED MAY 2, 2006. °o• `\ ,' ���' �'�9'�16e �.... �{G�;.� �Z �� 10. SEE COVER SHEET FOR ADDITIONAL NOTES APPLYING TO THIS PHASE OF THE PROJECT. \\ ,� ,� f'�•,R FA'9tt+`� $ �,' �� B STOP 11. ONLY AREAS SHOWN OUTSIDE OF THE GRAY AREA AND ANY CALLED OUT EROSION CONTROL ' /' 15' FRONT SETBACK 00 2Z SIGN. MEASURES ARE TO BE CONSTRUCTED WITH THIS PHASE. `\ ^\ 00 - / - t ST / 9P`� `� ,' o° �, X AVERAGE 80' WIDE LOT (SIMILAR FOR 73' THROUGH 85 LOTS) o SIGN. 9'� 1 "=60' SCALE / \ \\ REVISIONS / � I 308 ' ' ' 00 40 x� � PHASE 12 \\ O OXO 273 309 10 \\ Sq00x6� S / O S33°46'00"E,�' ,/'''^ 56�2�2, �A6,, �• ���' , 33 8P I ' 2.2' 310 \ 20PUBLIC �\ \�'��,' �� 323 NO DATE DESCRIPTION RJB 8/7/18 SEWER LEG TO PHASE 17 SEWER MH#61 TO MH#66 STORM FES#100-CB#105 STORM CB#109-CB#110 STORM MH#131-CB#132 \\ \\ `FUTILITY 276 �<' 12,609 S.F.< / \ \ ASEMENT O \\ h6 ° 311 \\`\�\\ PROJECT INFORMATION �0' PUBLIC ox \\\ 20.0 0� ,� 2 h `�� ' \` v '' '' O� CP \ ' / > \ \\ UTILITY ,.� ,�� � A \\ ,' .20.0' � � ti EASEMENT .. \\\ �O. \\ 322 s 4p � gyp^ X00 ko� ` . �C, X� <� ` 28X) % O° IN \`\ 1 2, 61 4 S.`\ ` O S` ,'' % ' 277 �> 6y� //' i i \�� 24) ` 6,S. 2� S� \ `\ 312 �` , STOP 188 PROJECT MANAGER: RJB DRAWN BY: AJF APPROVED BY: RJB DRAWING NAME: SSBS1 1 +-CD-2018 \ �q 0) \ ; ,' `\ 3 eI 9� SIGN. / , R472.5' / 3 9 � CO 8 1 1 1 30 S. �. .�'�`♦' �'. \\ 11,733 S.F. �o 321 / , � s2, 0� 8 N �D�• 2 , \ �/ ` R485.5' ' /'9' I \�\♦ \ x, KKK � �� OOx 9 \\ /'' �' ' ' i \\\�1 S ` S 8 ' „ �5, 41 E X59° \`� /' O \ `\ \ �♦ �p� As 00 \RSoo.o' 13, 376 S. F.� , , r\ s �� 2 35 36 E ° N %6° g3 �'��\ ` its O 1 $ PROJECT NAME ♦�' �'�\ 9\`\ TRS 1 13. 87.82' N 89 8 17? E , 4 x'13 �\ ] \ ♦ \s / \ 27.75' 3 .v/ .i , , / I 3 74. 7 5� 1 c' i �\ \\ 313 ` 2 8 s 49 X SUNSET BLUFFS \ / / \ / , I \ \ \ \ \ 0 O \♦ \ 3 � o ' / � � __- 3. 8' 69.13' S 27 , \ ` � > 10 745 S.F. \ \ \ \ ,''' P� S °90 SPEED O ♦ VARIABLE I I -� r-----------1 r \ \\ \h \v, LIMIT > . . / I I I I I \ \ 10,500 S.F., `\ 9� WIDTH ES,KiI 13,336 S.F , , AS E I I I \ \ 314 �\ '>� R500.0' `> �` SIGN SUBDIVISION \\ , / �\ ,�' `\ 98 • \ / % 1 .m ! I j I I7 I \\ s 10,743 S.F. �\ R485.5' qi 2 .86 o 3 9 90 I I I I I \\ R472.5' T ° R514.5' ox m I PHASES 15&16 \ 20.0' � � W6 ��AN D S ,, �` / � 318 I � � � 315 \ .�,, \,, . ' 1�, � - �\\ /�, .� S8 3 2 , 12, 751 S. F. r ' I 1 \ ` 9° . /71 \\ R527.5' / I / 317 m I 316 I \ �f '!� e > » w�C\�/ \\ �/� /,� // / �\ `\\ / I I Q I I � 10,773 S.F. ° ' 11, 844 S.F. 5 279 q> , 1 11,157 S.F. i 11 192 S.F. i w .\\ 2 9 qg0 VARIABLE I U I T- 1 ' I r �s, �o " FUQUAY VARINA �w \ 11 488 S. F. ' 8 • , / o i I I -0 I \ �' / WIDTH ESM I I 1 -4 I I \ \ K + I I I \\ \\ ,- 12, D( \\ 292 '2X WAKE COUNTY �` \ ��`K •'' \\> °0x _ / � i ' i °90 i _ ' Pg0 'I� ��'/' \`\ \\ 16 723 S.F. 0° AT __ NORTH CAROLINA 9 STOP 47.45' 20� \ c?� �,�''//' i / % ,^�\\ q�2 '-� 1 J ---J L_ 5.0'- -------j I R514.5'`\ x „E E 4 13' 4" �• 280 ' 98, A57.32' 28.23' 7.0 A90 17 00 /, `\ 78.00' 8.00 A71.65' R527.5' `\ SIGN. OWNER/DEVELOPER \ 11,476 S.F. 00+ ENVIRONMENTAL LEGEND 30.0' .�" /` ? s s� \\\ �� co -4 Coy $' SS.o' GLAD MILL COURT °kZ� OO+S� , 29.0' 0 $� \ \\ \\ \\ \\ �,� . , WETLANDS ��� ' / i ; '�, q12 55 R/W 00+*229' B_B 00+s� P�2' - \ `\ \`\ \\ 291 �`. �`. P ;' SSBNC LLC o 281 �, , 9$'IN j/ 50' NEUSE RIPARIAN °49" S'�� \ 0 O 11,371 J.F. ��/O �/ �/ \\\\\ --__ A 72 . 92 ' A72 . $6 ;,\\ \\\ \\\ 14,485 S.F. \�\ \, '/, 110 SUNSET BLUFFS DR. BUFFER - PRIMARY N� 4 O 40.0' / j 282 j j j _-_ 7.0__75'00' 5.0' 51.64' A22.81 A72.91' - '\ \\ `\ `\ `\ `\ \ /' °° FUQUAY-VARINA OPEN SPACE ° , „ ' / , , � -� � __-- '``'x NORTH CAROLINA 27526 1 4 E STEEP SIS' ,'ES 13,636 S.F. / / i I -- i -- --- ' ' \\ \\ \� '' \ �ATE THAN 25%7 / i I i i i i i II \\\ \\\ \`\ �� 290 FEMA FLOODWAY 1 4 49 6 S.F. c� 9' IN �H I CATION �� ioo-YEAR FLOODPLAIN S68 ° 4 \ 2 \ ( / ' / / / ' ' I I I I I I II I \\\ �j� 289 & FEMA SPECIAL FLOOD �� 40 �, Z ^ 1 7. , 11 6 S ��40 PUBLIC U, �T L,�TY 8 3 I I I \\ HAZARD AREAS (ZONE AE) E S7g° 9 S1 °5 9p'E EASEMENT P ©VIDIN� .I , , 1 \ +� 14,494 S.F. 2739 'E �\ SEWER SE' ICE T�4,321 S.F. 284 �'' 285 Q 28� 28 ' 288 \\ \ xo T_. ] I \ ��$ �� DB. 11784 PG. 2769 FEMAZONEX 'o. \ RANSDEL /PARCEL ' ' 14 591 S.F. "� I 0 I 1 � \ \ FUTURE CONDITIONS \ / / I 1 2, 750 S. F.j 1 3, 1 88 S.F. f I 1 14,481 481 S.F. \\ \\ \V P96 .9 U r`.�N D S F/ OOL LOT 14,456 S.F. PIN : 0658934778 S 20 2 1 W �/\ s8\ I I I \\ TOTAL OPEN SPACE I I 1 1 \ \\ � 2• t e 1 e » G�%\l\ \ \ 2`3 S3 - /' /' ; i i i 1, i j ` Pg6 9 ° �J$ �0�� ' 0 SHEET NAME STEEP SLOPES 7.17' S 07 6 W �\\ \\\ 73.0$' I I I I I I '' O R� $ O �� 000000000000000 000000000000000 GREATER THAN 25% , „ u ____ I I ZZ S42°03 21 W Fs\ 37 94 -----65.68,---� L ------------U L _J _--_� 96 .39 P62 / / SITE PLAN 14.02' \ 40.0' \ 75.00' 55.53' 25 . 1 5 ' A96 79' OPEN SPACE LEGEND S65°04'05" vv 529.90 S 87',31'18" E + New TOTAL OPEN SPACE / STREAM BUFFER 00 DRAWING SCALE PRIMARY OPEN SPACE 1�k 00 / 62+00 i 3+ +00 / J5*25!! 0 50' 100' 1 11=501 No I / SCALE: 1 " = 50' 65+00 too -YEAR FLOODPLAIN I 66+00 67+00 70+00 68+00 &FEMA SPECIAL FLOOD / PLAN ET 69+00 z HAZARD AREAS (ZONE AE) RANS D ELL L - PRIMARY OPEN SPACE � CONSTRUCTION DRAWINGS J WETLANDS w PROPERTY DATE PRIMARY OPEN SPACE C/) w wSS�IBLE WETLANDS 6-25-2018, REV 8-7-2018 COMMON AREA GREEN w w W W W w w O 41SECONDARY OPEN SPACE - SHEET NUMBER CIOm AMENITY AREA = SECONDARY OPEN SPACE Fr WOODLANDS HERBERT AKI NS SCHOOL PARK 1 C-1 no IL Q r r r r SECONDARY OPEN SPACE 0