Loading...
HomeMy WebLinkAbout20140574 Ver 5_SSB-PH17-EROSIONPLAN-20190111_20190318l 60+00 61 0 \ CD - CV U EROSION CONTROL- LEGEND z NOTE: NOT ALL ITEMS ARE SHOWN ON OVERALL PLAN PHASE LINES z LIMITS OF DISTURBANCE TEMP. DIVERSION DITCH J @ft ROC*HECK DAM CLEAN WATER DIVERSION DITCH IOUTLET SILT FENCE, OUTLET, AND COIR WATTLE Z® TEMPORARY INLET PROTECTION OTEMPORARY SEDIMENT BASIN -- RIP -RAP OUTLET PROTECTION m CONSTRUCTION ENTRANCE 0 TARP LINED DITCH (4' WIDE) Ir ❑D CONCRETE WASHOUT STATION 0 O ROCK CHECK DAM U 277 CO UATIX GRA ING FR01 APPROVED PL ENVIRONMENTAL LEGEND . / WETLANDS ..... APPROVED BY: RJB RIPARIAN501 NEUSE BUFER- PRIMARY DRAINAGE/EROSION CONTROL NOTES: 1. A PRE -CONSTRUCTION MEETING WITH THE TOWN OF FUQUAY-VARINA AND THE TOWN Storm Drainage Summary - Sunset Bluffs Phase 17 ENVIRONMENTAL INSPECTOR WILL BE REQUIRED BEFORE BEGINNING ANY CONSTRUCTION. FEMA FLOODWAY 2. INLET PROTECTION WILL BE PROVIDED AROUND EACH CATCH BASIN AND STORM INLET SHOWN ON THE CONSTRUCTION DRAWINGS. SQL Storm Drainage Summary ioo-YEAR FLOODPLAIN MAINTAINED BY THE PROPERTY OWNER AND SHALL BE DESIGNATED DRAINAGE EASEMENT" ON A RECORDED PLAT. & FEMA SPECIAL FLOOD HAZARD AREAS (ZONE AE) 4. SEE DRAINAGE DESIGN CHART ON SHEET C-2.0 FOR ALL STORM ELEVATIONS, PIPES AND SLOPES. FEMAZONEX 5. TEMPORARY DRAINAGE DITCH OUTLETS ARE TO BE TARP -LINED OR PROVIDED WITH RIP RAP FUTURE CONDITIONS FROM THE TOP TO THE BOTTOM OF TEMPORARY BASIN SIDE SLOPES TO PREVENT EROSION. TOTAL OPEN SPACE 000000000000000 Summary of Pipes - 1/10/2019 GREATER THAN 25% 7. SILT FENCE IS TO BE PLACED AROUND PERIMETER OF RIP RAP DISSIPATERS FOR TEMPORARY PIPING, BUT IS NOT TO BE PLACED ACROSS FLOW LINE. Summary of Structures WILL BE DISTURBED AGAIN WITH THIS PHASE OF CONSTRUCTION ARE SHOWN CROSS- HATCHED calculated From To Rational Accumuated Time in Decreasing Area 0_10 Q Length Diameter DIA. Slope Invert Invert Structure Type Rational Area F 0_10 Reference Depth C Time Pipe Intensity (ac) (cfs) (cfs) (ft) (inches) (inches) (%) (From) (To) C (ac) (cfs) Elevation (ft) (minutes) (seconds) (in/hr) _ (Valley BOC) INTO PHASE 15 CB#132 CB#133 0.60 8.10 20 6.44 0.00 0.0 27.8 132 30 RCP 28.5 0.60% 373.21 374.00 CB#133 CATCH BASIN 0.60 0.00 _ 0.0 382.00 8.0 CB#133 CB#134 0.60 7.77 19 6.54 0.40 1.8 20.6 196 24 RCP 19.1 2.80% 374.50 379.99 CB#134 CATCH BASIN 0.60 0.40 1.8 390.79 10.8 CB#134 CB#135 0.60 7.45 23 6.63 0.13 0.6 19.3 162 24 RCP 22.6 1.00% 380.19 381.81 CB#135 5'x 5' CATCH BASIN 0.60 0.13 0.6 397.82 16.0 CB#135 CB#136 0.50 7.07 32 6.74 1.32 4.8 19.1 250 24 RCP 23.5 0.80% 382.01 384.01 CB#136 CATCH BASIN 0.50 1.32 4.8 392.18 8.2 CB#136 CB#137 0.50 6.53 126.90 0.40 1.5 11.9 93 18 RCP 14.7 3.80% 384.51 388.04 CB#137 CATCH BASIN 0.50 0.40 _ 1.5 394.80 6.8 CB#137 CB#138 0.50 6.33 8 6.95 0.76 2.8 10.6 89 18 RCP 13.3 5.00% 388.24 392.69 CB#138 CATCH BASIN 0.50 0.76 2.8 401.15 8.5 CB#138 EXCB#66 6.20 (from ph 11,' `6.99 8.0 154 18 RCP 11.6 6.00% 392.89 402.13 EXCB#66 _ EXISTING CATCH BASIN 0.00 0.00 0.0 408.60 6.5 CB#133_ CB#133A 0.80 5.00 7.34 0.75 4.4 4.4 24 15 RCP 14.2 0.60% 374.50 374.64 CB#133A CATCH BASIN _ 0.80 0.75 _ 4.4 382.00 7.4 CB#133_ YI#140 0.50 5.00 7.34 0.52 1.9 4.2 176 15 RCP 8.4 9.50% 374.50 391.22 YI#140 YARD INLET 0.50 0.52 _ 1.9 398.00 6.8 YI#140 YI#141 0.50 5.00 7.34 0.64 2.3 2.3 81 15 RCP 11.7 0.50% 391.42 391.83 YI#141 YARD INLET 0.50 0.64 _ 2.3 396.50 4.7 CB#136 CB#136A 0.80 5.00 7.34 0.56 3.3 3.3 24 15 RCP 13.3 0.50% 384.51 384.63 CB#136A CATCH BASIN 0.80 0.56 3.3 392.18 7.6 All pipe is RCP Type III IAII Catch Basins are standard Town 4'x4' unless otherwise noted l 60+00 61 0 \ CD - CV U EROSION CONTROL- LEGEND z NOTE: NOT ALL ITEMS ARE SHOWN ON OVERALL PLAN PHASE LINES z LIMITS OF DISTURBANCE TEMP. DIVERSION DITCH J @ft ROC*HECK DAM CLEAN WATER DIVERSION DITCH IOUTLET SILT FENCE, OUTLET, AND COIR WATTLE Z® TEMPORARY INLET PROTECTION OTEMPORARY SEDIMENT BASIN -- RIP -RAP OUTLET PROTECTION m CONSTRUCTION ENTRANCE 0 TARP LINED DITCH (4' WIDE) Ir ❑D CONCRETE WASHOUT STATION 0 O ROCK CHECK DAM U 277 CO UATIX GRA ING FR01 APPROVED PL ENVIRONMENTAL LEGEND . / WETLANDS ..... APPROVED BY: RJB RIPARIAN501 NEUSE BUFER- PRIMARY DRAINAGE/EROSION CONTROL NOTES: 1. A PRE -CONSTRUCTION MEETING WITH THE TOWN OF FUQUAY-VARINA AND THE TOWN OPEN SPACE ENVIRONMENTAL INSPECTOR WILL BE REQUIRED BEFORE BEGINNING ANY CONSTRUCTION. FEMA FLOODWAY 2. INLET PROTECTION WILL BE PROVIDED AROUND EACH CATCH BASIN AND STORM INLET SHOWN ON THE CONSTRUCTION DRAWINGS. SQL 3. ANY STORM DRAINAGE EASEMENTS LOCATED OUTSIDE THE RIGHT OF WAY SHALL BE "PRIVATE ioo-YEAR FLOODPLAIN MAINTAINED BY THE PROPERTY OWNER AND SHALL BE DESIGNATED DRAINAGE EASEMENT" ON A RECORDED PLAT. & FEMA SPECIAL FLOOD HAZARD AREAS (ZONE AE) 4. SEE DRAINAGE DESIGN CHART ON SHEET C-2.0 FOR ALL STORM ELEVATIONS, PIPES AND SLOPES. FEMAZONEX 5. TEMPORARY DRAINAGE DITCH OUTLETS ARE TO BE TARP -LINED OR PROVIDED WITH RIP RAP FUTURE CONDITIONS FROM THE TOP TO THE BOTTOM OF TEMPORARY BASIN SIDE SLOPES TO PREVENT EROSION. TOTAL OPEN SPACE 000000000000000 STEEP SLOPES oo°o°o°o°o°o°o° GREATER THAN 25% Yl #( °°x ,X C,3 140 k X 00+21 A TAIN EX CLE N 2 DER E- WIO PH 11 �! ET -1.1 �, YI 8 CK AM S RBED T WITHIN C 4 IJ RSI F 11 YI 1 11 # \ v o /J Q 1 G 0 K HEC D I EA W T SI N F OM 11 U STU BED J T U TI N 0 EM IN t l REM -01, K _2 `!!111101 01 1 - US ILL ►` `�. • , NI • ELWM EW SIL FENCE AND DISTURBED LETS NOTED REA LIMIT NEW 4 2$5 z L S XTEN EX. FES#TEMP1 BED TO E OF N SLOPE D RELOC E EX IP A RAP PAD + CA A - REMO B A D TEMP PIP TO SIN ORM DRA ARE CONNE THROUGH 15 STO E NEW U DISTUR ouTLETs AREA ON 1. ALL CONSTRUCTION' SHALL CONFORM TO TOWN OF FUQUAY-VARINA STANDARD SPECIFICATIONS AND CONSTRUCTION DETAILS, AND EROSION CONTROL MUST CONFORM TO NCESC PLANNING & DESIGN MANUAL AND THE TOWN S&EC PLAN REVIEW DETAILS. 2. SEE COVER SHEET FOR ADDITIONAL NOTES APPLYING TO THIS PHASE OF THE PROJECT. 3. SURVEY INFORMATION PROVIDED BY SULLIVAN SURVEYING IN SEPTEMBER 2015, AND IS IN NAD 83 COORDINATE SYSTEM. 4. THERE IS NO REFERENCED FLOODPLAIN WITHIN THIS PHASE, AS SHOWN ON FEMA FIRM #3720065800J, DATED MAY 2, 2006. 5. SEE SHEET C-2.0 FOR STORM DRAINAGE SUMMARY DESIGN INFORMATION. 6. STOCKPILE LOCATIONS WILL BE AS NEEDED AND DETERMINED IN THE FIELD DUE TO SOIL TYPES AND CONDITIONS. IF REQUIRED, ADDITIONAL AREA WILL BE SUBMITTED AND APPROVED BY THE () `� JC�T.� C O N S U LT I N G 2805 Tobermory Lane Raleigh, NC 27606 Phone No. (919) 618-0180 License No. C-2149 DRAWN BY: TOWN AND THE APPROPRIATE DISTURBED AREA FEE PAID BY THE DEVELOPER. APPROVED BY: RJB t+tk '�6i1l:If)I�ts�i �'t�A DRAINAGE/EROSION CONTROL NOTES: 1. A PRE -CONSTRUCTION MEETING WITH THE TOWN OF FUQUAY-VARINA AND THE TOWN �++an„� O�GQVk..;v :+ ENVIRONMENTAL INSPECTOR WILL BE REQUIRED BEFORE BEGINNING ANY CONSTRUCTION. ::,� SQA'° =. 2. INLET PROTECTION WILL BE PROVIDED AROUND EACH CATCH BASIN AND STORM INLET SHOWN ON THE CONSTRUCTION DRAWINGS. SQL 3. ANY STORM DRAINAGE EASEMENTS LOCATED OUTSIDE THE RIGHT OF WAY SHALL BE "PRIVATE 027445 �•. MAINTAINED BY THE PROPERTY OWNER AND SHALL BE DESIGNATED DRAINAGE EASEMENT" ON A RECORDED PLAT. �'•" " 4. SEE DRAINAGE DESIGN CHART ON SHEET C-2.0 FOR ALL STORM ELEVATIONS, PIPES AND SLOPES. �;; +^ +' 5. TEMPORARY DRAINAGE DITCH OUTLETS ARE TO BE TARP -LINED OR PROVIDED WITH RIP RAP FROM THE TOP TO THE BOTTOM OF TEMPORARY BASIN SIDE SLOPES TO PREVENT EROSION. 6. SILT FENCE IS NOT TO BE LAID BELOW TEMPORARY SEDIMENT DITCH OUTLET PIPE, BUT IS TO J ROUTE OVER THE PIPE TO NOT IMPEDE FLOW OUT OF THE TEMPORARY DRAINAGE BASIN. 7. SILT FENCE IS TO BE PLACED AROUND PERIMETER OF RIP RAP DISSIPATERS FOR TEMPORARY PIPING, BUT IS NOT TO BE PLACED ACROSS FLOW LINE. NOTE: AREA PREVIOUSLY APPROVED AS DISTURBED WITH ADJACENT PHASE CONSTRUCTION THAT WILL BE DISTURBED AGAIN WITH THIS PHASE OF CONSTRUCTION ARE SHOWN CROSS- HATCHED 1 10 1 2 n ---SCAL 1 " = 50' A EL E r REVISIONS 41 NOI DATE I DESCRIPTION PROJECT INFORMATION 1 188 PROJECT MANAGER: RJB DRAWN BY: AJF APPROVED BY: RJB DRAWING NAME: SSBSI I+CD-2019 PROJECT NAME SUNSET BLUFFS SUBDIVISION PHASE 17 FUQUAY VARINA WAKE COUNTY x NORTH CAROLINA ' OWNER/DEVELOPER SSBNC, LLC 110 SUNSET BLUFFS DR. FUQUAY-VARINA X NORTH CAROLINA 27526 DB. 117847 PG. 2769 PIN : 0658934778 SHEET NAME EROSION CONTROL AND GRADING DRAWING SCALE 100' 1 "=50' a�91b_W4 re .,,�0o PLAN SET CONSTRUCTION DRAWINGS DATE 1-11-2019 SHEET NUMBER C-200