HomeMy WebLinkAbout20190140 Ver 1_CAMA APPLICATION_ NC DOT- Ferry Division_20190225Carpenter,Kristi
From: Day, Susan
Sent: Monday, February 25, 2019 11:01 AM
To: J.D. O'Neal; Love-Adrick, Rache) A; Padrick, Lee; DCR -
Environmental_Review; Southerly, Chris; Cox, Heidi;
Staples, Shane; Harris, David B; Jenkins, Shannon;
Gupton, Sharon; Carpenter,Kristi; Ward, Garcy; Wilson,
Travis W.; Butler, Rodney A; Sams, Dan;
thomas.a.steffens@usace.army.mil
Cc: Brittingham, Cathy
Subject: CAMA APPLICATION: NC DOT- Ferry Division
Attachments: DOT Ferry Division Files.pdf; DOT Ferry Division
Maps.pdf; Comment Memo DOT Ferry Division.docx
Follow Up Flag: Follow up
Flag Status: Flagged
Hello All:
Please accept this correspondence as the official distribution of a CAMA
application from the NC Department of Transportation — Ferry
Division. Attachments include: Field Investigative Report, narrative, application,
workplans, comment sheet and any other document specifically for you.
NOTE: Please complete the bottom portion of the comment sheet with your
information and signature.
NO oversized workplans have been submitted by the
applicant
This email has a return receipt notification. Please accept the request, as we will
use it to log receipt of the application. As DCM moves forward in updating our
electronic permitting efforts this process will evolve, so we appreciate your
understanding as we move away from a paper-based application.
For questions or concerns, please contact Cathy Brittingham
at ��:I�_�.X.e_�_�irl��ii_�.�_�_�_�._�_�_�d�'_��.:.�_�v or (919) 707-9149.
Thanks and have a great day.
SlliJGrfZ S� �G�
Office Manager
Division of Coastal Manaqement
Department of Environmental Qualitv
400 �;�aim��n��ir�� Av�
Il�tair�lh�ad �;lity, N�; 2�557
252 ��� 2��� Ext. 206 taffu��
� u�_� �. u�.:_C� �.Y� u� � d� u� ir . a r� u
_
x�
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.