Loading...
HomeMy WebLinkAboutStout Landing Subdivision - 1283-Outlet protectionOUTLET PROTECTION DATE DESIGN PHASE DESIGN 06-28-18 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Stout Landing Subdivision 1283 REVISION / / LOCATION BY RECORD / / Hoke County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES-148 Q10/Qfull =0.30 Pipe Dia= 84 in V/Vfull = 0.87 Q10 =144.36 cfs V = 10.8 fps Qfull = 474.16 cfs Vfull = 12.30 fps From Fig. 8.06.b.1: Zone = 5 From Fig. 8.06.b.2:D50 =14 in DMAX =21 in Riprap Class = 2 Apron Thickness = 31.5 in Apron Length = 70.0 ft Apron Width @ Outlet = 21 ft Apron Width @ End = 77.0 ft Storm Outlet Structure FES No.= FES-147 Q10/Qfull =0.28 Pipe Dia= 72 in V/Vfull = 0.85 Q10 =85.55 cfs V = 9.1 fps Qfull = 301.91 cfs Vfull = 10.66 fps From Fig. 8.06.b.1: Zone = 4 From Fig. 8.06.b.2:D50 =10 in DMAX =15 in Riprap Class = 1 Apron Thickness = 22.5 in Apron Length = 48.0 ft Apron Width @ Outlet = 18 ft Apron Width @ End = 54.0 ft 1283-Storm Drainage for Spread.xls LATEST REVISION: 3/19/2019 6:27 PM PAGE 1 OF 2 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 06-28-18 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Stout Landing Subdivision 1283 REVISION / / LOCATION BY RECORD / / Hoke County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES-154 Q10/Qfull =0.85 Pipe Dia= 54 in V/Vfull = 1.12 Q10 =130.64 cfs V = 10.8 fps Qfull = 153.09 cfs Vfull = 9.61 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2:D50 =10 in DMAX =15 in Riprap Class = 1 Apron Thickness = 22.5 in Apron Length = 36.0 ft Apron Width @ Outlet = 13.5 ft Apron Width @ End = 40.5 ft 1283-Storm Drainage for Spread.xls LATEST REVISION: 3/19/2019 6:27 PM PAGE 2 OF 2