Loading...
HomeMy WebLinkAbout20190289 Ver 1_PreApplication Documents_20190123Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) < David.E.Bailey2@usace.army.mil > Sent: Wednesday, January 23, 2019 8:55 AM To: McCall, Jeremy Cc: Guffey, Jay; Spillman, Virginia; Hamilton, David; Johnson, Ron; Weikmann, Amanda; Homewood, Sue Subject: [External] RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Hi Jeremy, Based on the conceptual map you sent, the project (blue and red lines) that the City would propose matches future outfalls shown in the 2011 Master Plan to an extent that appears to be justifiable as a project with independent utility. Thank you for your coordination efforts. Please let me know if you have any questions, and I will look in the near future for the JD request. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: McCall, Jeremy [mailto:Jeremy.McCall@arcadis.com] Sent: Tuesday, January 22, 2019 4:17 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: [Non-DoD Source] RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility David, I have revised the Exhibit to show the sections of the sewer outfall that the City of Greensboro will design and permit. The proposed routes in red and blue will be permitted by the City of Greensboro. We would like to request that these sections be considered an independent utility. Please feel free to give me a call if you have any questions. Thank You, Jeremy McCall PE CDT I Senior Water Engineer I jeremy.mccall@arcadis.com Arcadis I Arcadis G&M of North Carolina, Inc. 7029 Albert Pick Road, Suite 101, Greensboro, NC, 27409, United States Office +1336 292 2271 1 Direct +1336 443 2459 1 Mobile +1336 870 0940 Professional Engineer / PE -NC 036233 1 PE -VA 048357 -----Original Message ----- From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Tuesday, January 15, 2019 10:28 AM To: McCall, Jeremy <Jeremy.McCalI@arcadis.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility Thanks Jeremy. With the goal being to justify that the proposed project has independent utility, the trick for the City will be to justify that they would construct the western outfall line only to collect from this one service line, irrespective of Publix. Certainly that would be an easier sell if additional portions of the outfall modeled in the 2011 Master Plan were included in the proposed project. Also, make sure that you either eliminate the notes stating "Proposed Route to be permitted by Publix" or restate to "Proposed Route to be constructed by Publix", since we would be unable to segment out just those portions in Publix's application; it would all need to be applied for by the City. Please call if you have any questions. Thanks. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttps://na0l.safelinks.protection.outlook.com/?url=http%3A%2F%2Fcorpsmapu.usace.army.mil%2Fcm_apex%2 Ff%3Fp%3D136%3A4%3A0&am p;data=02%7C01%7CJeremy. McCall%40arcadis.com%7C2b2fce4619d04660ad3e08d67af e66c4% 7C7f90057d3ea046feb07ce0568627081b%7C0%7C0%7C636831630410185048&a m p;sdata=SSZV4u N rv% 2B4zsD i5pVm%2FPjOyiYji7vzgXwCeHW7Dj90%3D&am preserved=0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: McCall, Jeremy [mailto:Jeremy.McCall@arcadis.com] Sent: Monday, January 14, 2019 4:31 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: [Non-DoD Source] RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility David, Thanks for talking with me on Thursday. Attached is the revised proposed route for the Birch Creek Sewer Outfall. The 2011 Sewer Master Plan shows the outfalls for each basin but it is modeled to include sewer flows from all areas with population. The master plan just doesn't show the collection lines for each basin. The model includes serving the residential homes along Spruce Tree Drive. We would like to permit any impacts associated with the service line along Burlington Road up to Spruce Tree Drive to serve that basin. Please let me know if you have any questions or concerns. Thank You, Jeremy McCall PE CDT I Senior Water Engineer I jeremy.mccall@arcadis.com Arcadis I Arcadis G&M of North Carolina, Inc. 7029 Albert Pick Road, Suite 101, Greensboro, NC, 27409, United States Office +1336 292 2271 1 Direct +1336 443 2459 1 Mobile +1336 870 0940 Professional Engineer / PE -NC 036233 1 PE -VA 048357 -----Original Message ----- From: Bailey, David E CIV USARMY CESAW (US)<David.E.Bailey2@usace.army.mil> Sent: Friday, December 28, 2018 10:02 AM To: McCall, Jeremy <Jeremy.McCalI@arcadis.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility Jeremy, As a follow-up, and as a way to answer the question I asked on 12/12/2018, could you provide us with a close up of the Birch Creek gravity lines (2011 Master Plan) overlaid with what Greensboro proposes to apply for at this time? Thanks. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Bailey, David E CIV USARMY CESAW (US) Sent: Wednesday, December 12, 2018 8:23 AM To: 'McCall, Jeremy' <Jeremy.McCalI@arcadis.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: RE: City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility Thanks for the description and information from the 2011 master plan, Jeremy. Were the City of Greensboro to request authorization from the Corps and NCDWR for sewer improvements to the Birch Creek Basin in the coming months, what would be the scope of the project? Would it include all of the improvements shown on the Birch Creek Projected Flow Map? -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: McCall, Jeremy [mailto:Jeremy.McCall@arcadis.com] Sent: Tuesday, November 27, 2018 12:03 PM To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Guffey, Jay <Jay.Guffey@greensboro-nc.gov>; Spillman, Virginia <Claudia.Spillman@greensboro-nc.gov>; Hamilton, David <David.Hamilton@arcadis.com>; Johnson, Ron <Ron.Johnson@arcadis.com>; Weikmann, Amanda <Amanda.Weikmann@arcadis.com> Subject: [Non-DoD Source] City of Greensboro Birch Creek Sewer Outfall -Justification for Independent Utility David/Sue, Arcadis is submitting this email to request that the Birch Creek Sewer Outfall to be considered as an independent utility separate from the Publix development. The purpose of the Birch Creek outfall is to serve the entire basin and to abandon the Birch Creek Lift Station. The planning efforts to abandon the Birch Creek Lift Station was initially planned prior to the Sewer Master Plan for the City. In the 2011 Sewer Master Plan, you can see that the proposed sewer outfall was modeled to serve the entire basin and to allow for the decommissioning of the existing Birch Creek Lift Station. The route of the proposed outfall is in a similar location if not the same location as the route that was modeled in the 2011 Sewer Master Plan. The sewer basin flow schematic (figure 6) and the Proposed Improvements Overall Map (figure 8) from the 2011 Sewer Master Plan is attached. The projected planning period (Y2050) flows for the outfall were modeled in the 2011 Sewer Master Plan and based on population data (TAZ) from NCDOT. Flows from the Birch Creek Pump Station abandonment to the outfall were projected to be 0.76 MGD and the projected flow for the proposed outfall downstream close to Knox Road was projected to be 1.39 MGD. The projected flows at full build out for the area where Publix will sit and surrounding property south of US 70 were projected to be 0.42 MGD of average daily flow. This only accounts for 30.2% (0.42/1.39) of the total flow planned for the outfall. The actual flow from the Publix Development will be much less than the projected flows that were modeled in the 2011 Sewer Master Plan. We do not have the actual flows from Publix at this time but will forward that information to you as soon as we receive that information from Publix. Attached you will find a map showing the planning period (Y2050) projected flows. The Birch Creek Outfall would be constructed by the City of Greensboro without the construction of Publix. The Publix project only accelerates the timeline for construction. Thank You, Jeremy McCall PE CDT I Senior Water Engineer I jeremy.mccall@arcadis.com <mailto:jeremy.mccall@arcadis.com> Arcadis I Arcadis G&M of North Carolina, Inc. 7029 Albert Pick Road, Suite 101, Greensboro, NC, 27409, United States Office +1336 292 22711 Direct +1336 443 2459 1 Mobile +1336 870 0940 Professional Engineer/ PE -NC 036233 1 PE -VA 048357 This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business of Arcadis are neither given nor endorsed by it. This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business of Arcadis are neither given nor endorsed by it. This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business of Arcadis are neither given nor endorsed by it. 6 Homewood, Sue From:Norton, April R Sent:Friday, July 27, 2018 9:03 AM To:Homewood, Sue Subject:U-2581BA Joint Review w/Distro Center Attachments:U-2581BA Project Status Update 7-27-18.pdf; u2581BA_25% Plan Sheets.pdf; U-2518BA P&Nrev.pdf Hi Sue, During the conference call today, it was decided that this project will most likely become a joint review. NCDOT is going to contact the distributor to discuss further. I’ll keep you in the loop as I receive more information Thanks, April April R. Norton Environmental Senior Specialist Transportation Permitting Unit Division of Water Resources NC Department of Environmental Quality 919-707-9111 office 919-710-6516 mobile april.norton@ncdenr.gov th 512 North Salisbury Street, 12 Floor (physical) 1617 Mail Service Center (mailing) Raleigh, NC 27699 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 vhb VHB Engineering NC, P.C. (C-3705) Venture 1 940 Main Campus Drive, Suite 500 Raleigh, NC 27606 919.829.0328 • Fax 919.829.0329 www.vhb.com Memorandum To: U-25818 Project Team Date: February 9, 2018 From: Lauren Triebert, PE VHB Engineering NC, P.C. VHB Project 38265.00 No.: Re: U -2581B — US 70 Improvements Guilford County, North Carolina Purpose & Need and Logical Termini This memorandum is to outline the proposed Purpose and Need for U-2581BA, which includes the widening of US 70 to a five -lane facility from Mt. Hope Church Road (SR 3045 /SR 2819) to Birch Creek Road (SR 3175/SR 2826). It is critical that the extents demonstrate a single and complete project and the project meets a defined Purpose and Need with defensible logical termini to meet permitting requirements of the US Army Corps of Engineers (USACE). Project Purpose & Need Traffic congestion is expected to be a concern along this corridor in the future. At this time, a formal forecast or traffic estimate has not been prepared for this project with its current extents. However, a review of the existing AADT's (2016) and the current version of the Piedmont Triad Regional Model (PTRM v.4.2), indicates that the 1.2 -mile corridor would carry enough traffic in the future to warrant two through travel lanes in each direction. Preliminary traffic projections indicate a 2040 future year demand of approximately 20,000 vehicles per day (VPD) on this segment of US 70, which would warrant the five -lane section that is being proposed. A forecast and traffic capacity analysis were completed in 2011 and 2012, respectively, for the combined U-2581B/R-2910 project. The results of these technical studies support these preliminary findings at the corridor level of service (LOS) and intersection LOS level when evaluating a 2035 Build Year, that additional capacity is needed beyond the existing two-lane facility and that an additional lane in each direction would meet this need at the desired LOS D or better efficiency. In addition, a review of PTRM v4.2 does not show a notable change in land use within this segment. Should the land use be changed from the current low density residential nature it has today to a use with a more intense generation of daily trips or a notable upwards change in truck percentages, that would further warrant the need for increased capacity. Independent Utility U-2581BA is considered to have independent utility as the usefulness of this project is not dependent on the construction of any other projects in the area. While US 70 to the east may be widened in the future through other sections of U -2581B, the BA section, which is a continuation of the existing typical section of US 70 to the west, will serve a distinct purpose of providing increased future capacity for this segment regardless of when or if this additional widening takes place. Logical Termini The U-2581BA project begins at Mt. Hope Church Road (SR 3045 /SR 2819) and extends to Birch Creek Road (SR 3175/SR 2826), including some distance beyond Birch Creek Road to transition back to existing alignment. West of Mt. Hope Church Road the facility is 5 -lane divided, so it is reasonable to begin a Page 1 of 2 Date: February 9, 2018 Project No.: 38564.10 widening effort of the existing 3-lane section at this point. Birch Creek Road is one of the four major cross streets along U-2581B. The other cross streets (Knox Road and Rock Creek Dairy) represent the other break points along the corridor resulting in reasonable project lengths for construction. Currently the NCDOT STIP group is working to update the STIP to reflect these project breaks. See image below. a - � I 8 � n 5 3 i 0 Sedalia . POC Pa-MbB11 Park Q J 3 �. ad ® 0 The information presented in this memo justifies this project, U-2581BA, as a single and complete project, from Mt. Hope Church Road (SR 3045 /SR 2819) to Birch Creek Road (SR 3175/SR 2826). Page 2 of 2 Vhb, Meeting Agenda Date: July 27, 2018 @ 8:30am Agenda Prepared By: Lauren Triebert, PE Place: Conference Call Project No.: 38656.04 1. Introductions 2. U-2581BA Overview a. Description b. Project work to date i. Environmental Review ii. Design c. Current Schedule 3. Permitting a. USACE b. DWR 4. Action Items U-2581 BA (Mt. Hope Church Road to Project Name: Birch Creek Road); Guilford County \\vhb\prcj\Ra1eigh\38656.04 NCDOT U-2581 BA US 70\NCDOT\PDEA\Project_Development\Project Restart Nov2017\USACE Coordination\U-2581 BA Project Status Update 7-27-18.docx N Z O N LU w 0- a, co 0 Q ►r W W 2 L'))W W N N J W F'— _Z —� J U SPENCE & ROBINSON REAL ESTATE, LLC DB 6647 PG 925 7 101 IAU H_ 0VFRRY H CorP--,'i' "CONDUITOPPER -L- CURVE DATA Pl Sta 29+53.33 w a D = (7) CF, N N 337.17' 0 J� -0 r_- 03 03 -oo J� O7� w Yt9 N ?fi0 d �< N J OD ;V Nr'i N >.tD � o rn m ama N G I J r rn �00 SPENCE & ROBINSON REAL ESTATE, LLC DB 6647 PG 925 7 101 IAU H_ 0VFRRY H CorP--,'i' "CONDUITOPPER -L- CURVE DATA Pl Sta 29+53.33 A = 7'06'08.9(LT) D = 2° 06'23.T L = 337.17' T = 168.80' R = 2,720.00' SE = 0.04 RO = 168' 8 FRANCES H. OVERBY WYRICK HOMER OTTIS WYRICK DB 2598 PG 551 ARLEY GLENN REESE, JR. DB 3161 PG 59 DB 3164 PG 762 tj ARLEY GLENN FONDA T. \DB 36651 PB 17 PI PROP. SAG LOCATION —L— POT Sta. 30+19.12 ELEV= 731.26' (LOW POINT) —L— VPI Sta. 28 + 80.00 w S 83°10'11" E 151.04' m m N ti = O N M DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED vhb VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 Raleigh, NC 27606 PROP. CREST LOCATION ELEV=733.83' (HIGH POINT) —L— VPI Sta. 36 +10.00 LARRY W. MCMASTERS DELORES 0. MCMASTERS DB 4749 PG 1557 PB 105 PG 93 m o REESE, JR. V m 'v uo vvai Urs 513, rli 19b f MASON MASON �o DB 5406 PG 392 co FONDA T. REESE N THERESA PG 1892 PB 17 PG 94 PB 17 PG 94 BOBBIE L. LYNN o THERESA RICH PB 17 PG 94 0 o DB 5443 PG IIO 92 RICH o o N PB 17 PG 94 DB 4595 PG 413 a - 16A 16 Z PB 17 PG 94 DB 6263 DB 6263 15 PG 309 PG 316 I n PB 17 PG94IPB1�7PG 94 N 82°51'24" 124.87' ROGER SCOTT APPLE TONILYN J. APPLE DB 4010 PG 675 N 83°13'19" W 182.10' DONNA G. BATES WITT DB 7382 PG 885 res I i ru y9 m� N d: PROJECT REFERENCE NO. SHEET NO. U-2581BA 5 R/W SHEET NO. wcn ROADWAY DESIGN HYDRAULICS V)to in o w— ENGINEER ENGINEER S 82°5 INCOMP LE to 206 lE PLANS NS r rn �00 DO NOT USE FOR % W ACQUIISITI®N DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED vhb VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 Raleigh, NC 27606 PROP. CREST LOCATION ELEV=733.83' (HIGH POINT) —L— VPI Sta. 36 +10.00 LARRY W. MCMASTERS DELORES 0. MCMASTERS DB 4749 PG 1557 PB 105 PG 93 m o REESE, JR. V m 'v uo vvai Urs 513, rli 19b f MASON MASON �o DB 5406 PG 392 co FONDA T. REESE N THERESA PG 1892 PB 17 PG 94 PB 17 PG 94 BOBBIE L. LYNN o THERESA RICH PB 17 PG 94 0 o DB 5443 PG IIO 92 RICH o o N PB 17 PG 94 DB 4595 PG 413 a - 16A 16 Z PB 17 PG 94 DB 6263 DB 6263 15 PG 309 PG 316 I n PB 17 PG94IPB1�7PG 94 N 82°51'24" 124.87' ROGER SCOTT APPLE TONILYN J. APPLE DB 4010 PG 675 N 83°13'19" W 182.10' DONNA G. BATES WITT DB 7382 PG 885 res I i ru y9 m� N d: m v 0 N H Z wcn w d V)to in o w— 004 S to N -<0 wa- r rn �00 J m 7 O N � I 1 rn \ 1 ,I 1 1 `-' I— W W M N W W N O O O O + M a N I J I W Z J U Q G V) Z O Lu w a, 00 -L- CURVE DATA P1 Sto 47+75.70 P1 Sta 53+54.53 FOR -L- PROFILE SEE SHEET 12 FOR -Y3-, -Y4- & -YS- PROFILES SEE SHEET 15 PROJECT REFERENCE NO. A = 5° l7' 14.8" (RT) Z�, = 6° I9' 47.5" (LI m D=2°06'23.3" 54 D=941'55.4" ROADWAY DESIGN DOLORES 0. MCMASTERS HYDRAULICS ENGINEER L = 251.01' L = 905.91' DEBORAH 0. WAY T = 125.59' T = 453.42' DO NOT USEFOR SHIRLEY OVERBY w R = 2,720.0(Y R = 8,200.00' DB 7584 PG 548 w w� SE = 0.04 SE = NC N 6' on - (.0 RO = 168' PROJECT REFERENCE NO. SHEET NO. U-2581BA m R/W SHEET NO. 54 ROADWAY DESIGN DOLORES 0. MCMASTERS HYDRAULICS ENGINEER BARBARA 0. COOK ENGINEER RONNIE D. OVERBY DEBORAH 0. WAY ]E PLA NS CONNIE 0. MISENHEIMER DO NOT USEFOR SHIRLEY OVERBY w CHARLES R. OVERBY, JR. Na) DB 7584 PG 548 w w� PB 83 PG 93 07'N� w �, w i w N 6' on - (.0 N d- in PROJECT REFERENCE NO. SHEET NO. U-2581BA 6 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMP L]E ]E PLA NS DO NOT USEFOR % W ACQUIISIITI®N I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared by Vh b M ;n m VHB In NC, P.C. (C 3705) N O_ 940 Main Campus Drive, Suite 500 O Raleigh, NC 27606 w w z J N N O / W o � C>CID rn Lo zoo, 0 23 z �u- 0a RONNIE D. OVERBY CLONNIE J. / � / � _ a m - - o _ DB 7901 PG 1539 OVERBY BURKE - DEBORAH 0. WAY FRED E� BURGI ' / �� m -L POT Sta. 37+89.85 PB 83 PG 93 DB 2951 PG 943 -L PC Sta. 46+50J1 CHARLES R. OVERBY, JR. KATHY M BU N / m -Y3- POT Sta. 10+00.00 z `-_ DB 7901 PG 1530 JAMES�eA� �/ o o m _---------------------------------- PB 83 PG 93 JUDY B. AL ED/ - - - - - - - ----------------- GR_ --- i i ,� - - - DB 5168�P 12x3 Izo L , ,' --_= ---_- / I �.' �,' -L- PO � Sta. 47+70.07 S 84°35'05" E EIP PB 13/8 / i91 31 3 " C33 ----''�R " -Y5 PO Sta.10+00.00 EIP 45.87' - - --- GR - �° -L P/RC Sto. 49+OJ2 Lr)-1�----- - "' " -L- POT Sta. 42+86.77= ------- _______ �R====-___--__ - r W "" - GR -Y4- POT Sta.10+00.00 / rFir rrP ° �m o \ p) O z / \ o� Lu --------- ------ /� � / / IO Nm w � � � \ \ o - N ""'' p � WOODED 0 / / R WOODED -- - - /� /� / / \ � z " 1-1-1 / w / WOODED E r� ___ M : WOODED Lu i' \ F --------- ----------- ----E--------- / YY F- ---------- ---- �a o I �� �/ W N GRASS---/-\�-� ----mss -- -��--------------- o z 2SBK �� \ I R ��'/ GRASS c= o �, ABAND I `� \ \ IS EXISTING R/W _ - - / o~ _ _ - - _ ISTING /W " EIP /� ~ EIP EXISTING R W 0 O _ _ _ - - - - - - - - - - - - - - _ - - - - - - - - - O _ _ BL -106 �� _ - - - - - City o- Greensboro, 16 % DIP o ' n 4- N� i Q g Q - - _ EI TO R W - _ _ %city of cI- 0 0 + In - - - - - o - ONC HW - 00 - - + _ _ _ L0 N .03 " A3 - 1 -- _ 7�7')�3r --- -----FSS---------- FSS- - - - - - - -- - --FSS -- __---TE ----- - - - - --- - -- J Ss-- - ii�,' - - - - F - - _ -- -- -- - - - 1 - -- - - - - - - - �T- - - - - - - - "----- - nON4 IS AT T Cor - - T 0 Fw400 PAIR o c I� - c0 E .0 citZ Ci of Greens oro I H/ E 0 ` GF GRAS.I h .02 v - i ------r-- J J f /2 GRA �' I WOODED BST I GRASS coNC t� GRAS / - - -� - - F� = 80.3 U I = AT&T Corp., 600 PAIR COPPER I I +85 \ °0 � ��� o / I _ 72 CHL & 3SB I i C W I - / / ' __GATE W BST N CONC ALD L_ L �j00 R Z AT&T Corp., 2 , COND IT �� )- - - J °W / / AZEL J. PO ELL I Ncilyv Q X48 W I Z N\ , TONYA Q. COLE , o r II i --- �� �' �/ DB 3002 PGLO o , I DB 6958 PG $49 _HTR _ - _ _ E / _ c it+09 = WOODED OW I PB 17 OG 914 v \ I X €�`- SHED ISFD Ic I w i U I z PB 17 PG 94 50 00' �s ROBERT C. MCDONAcr- LD �' I I PLANTER 28 Q I� I o DB 1458 PG 131 � I I 0 �� \ I = 1 ?� R GRc� I I ~ IX / I' ,� N o PB 17 PG 94 1 o o \ a 2 L i b� x WORDED' o w 115" M I S I II 43 `� RONNIE D. OVERBY / \ DARRYL L. BEAN o o ,, O w ' I \ ,�'�� o 0 o RONNIE D. OVERBY o �o DB 4515 PG 2171 � CON II 2 I \ I II 1 dB�776`9IE G OVERBY31 0 �, TDBR 73 4 PG 2672 I ------- 0 --- = D �- , o N 2� DBPB707 17 PG 94 35 N I PB 17 PG 94 0 `�- I I i c' PSB 17 PG 94 0 � PB 17 PG 94 2 .0 1 7 -__ GR __---- o cAf2AGE ALINE REID COOPER RICKY N. SMITH \ - �- -- \ I , /2 1 26 �� J DB 3572 PG 4 DB 407 PG 1635 � \ 2' - ---� 19 0 �, 21 \ \ � 27J11 Lu T s Ps G 94 n \ v� Ln m o I I \ T. o n • 29 N '�� 0 IMOTHY A. AYERS o W \! \ X I \ I N 1 7 I NORMA J. AYERS o\ I \ IOQ(4 E 0.68' R/W TO MON D13 6020 PG 1128 ti W o 102 I 3 \�_ \150001z W c� o PB 17 PG 94 � o � o /8`------------- I m / a � I x ROGER SCOTTPL� I +40 \ c I ; = > ` � I w TONILYN J. A E I N 82°54'53" W N 82°54'53" W --- N 82°57'58' W 82° 58" W x 1 °j 0.55' R/ TO EIP S 82°45'39" E DB 4010 PG 675 N --- 174.44' .50' 57.50' 156.44' u - "4T53" W 124.92 100.00, 108.00' I N END CONSTRUCTION � I I LGR � j' CONC I WI - - - - - rL` - _ I I O o o -Y5- E III w° o I o oPOT Sta.11 +85.00 w CON L, m I I DAVID D. HARRIS �, o END CONSTRUCTION I III o DAVID E. RYALS o - ------ o / I I KRISTIE H. HA30 RRIS _ _ + LAURA F. RYALSCD (23 °�' w z o p O o DB 4553 PG 2076 Y4 POT Sto. l2 43.00 I � s 82 57 58 E 0 � _ �, W o / 0 N I m PB 17 PG 94 N Z oo' � DB 5071 PG 916 o L o w n / I I O N PB 17 PG 94 � 217.23 I ROY ALAN VILSON LSON Rzl:N / N' I I o o w Z o, BARBARA SUE , MARTHA F. �' I m Q - S 82°54'53" E 224.82' I N o � W/ I o 18 o w --1 o O GAULDIN 3 J DB 2579 PG 733 o ARY P. I .'- 1 0 o E PB 17 PG 94 ,,nr�--,, 2 /2 r- o �u _ / o i- � DB 6347 PG 981 � M .0 c -� Ln HOBBS cr-CO ,� � 1 O PB 17 PG 94 z 117.04' 0 N 82°54'53" W 224.96' 2002-E-1217 I- , ; N 82°57'58' W 217.16' N S 82°45'39" E N-83`r3'I1�' III BST N 82°54'53" W 224.79' z II BST N v, w 48" CHL 172.67' T1 BDA-ONN�G- coN II 11 / O Fji 48'�jyW DAVID E. RYALS N _ DB 7 PG 885 �/ N L ? 0 _-_-- _ _ • _ w WINFRED LEE RIGNEY � "I c� LAURA F. RYALS N o 1-------- GR BRIAN KELLY D N `------------- ti- PATRICIA KELLY `� MARY ANN RIGNEY (/� n DB 5071 PG 919 W I ~ x °� W I I W PB 17 PG 94 N s 82°57'58" E 216.86' Y DB 7941 PG 959 `� r / f08 I I o I' DONALD G. o o DB 2949 PG 963 0 0 o o o BATES 48 CHL PB 17 PG 94 N L J ERNESTINE C. BATES 0 o PB 17 PG 94 N R LEH ELS � ri 3N 20.5 0 II DB 2601 PG 742 z "' m N V N41 W \ 0 I I PB 17 PG 94 °� • N 82°57'58" W 217.33' DPG �4 4 _ m u-\ C3 _ �� _ - Ln PB 17 PG 94 R/W 43000 _ EA S m N 82°54'53" W N 82°54'53" W GR BST SHIRLEY M. N N J ♦ ,,''' 1 R/W TO EIP 224.18 224.66 I TAYLOR o S 82°57 58 E 216.68 a 1L o I - I _ o on -------------- � N a. r --�'� END CONSTRUCTION 70 DB 7046 PG 2194 0 n l- - �� GR - -- I - ' n PB 17 PG 94 V) a; c/) I N _ S 82°45 39 E --- --I� -Y3- POT Sta. 14+40.00 -`�� RACHEL M. LEVENS I w 192.30' 03000M p o DONALD G. BATES �INFRED LEE RIGNEY ��, N O N x2°57 5x„ W DB 1907 PG 655 _ _ C R/W m + o ERNESTINE C. BATES MARY ANN RIGNEY - _ Z w "____-- 217.50' PB 17 PG 94 FA ° Y5 POT Sto.14+9/.06 lC) m o o DB 2388 PG 757 ---- �\ . I SHIRLEY M. - 0 *CD DB 2793 PG 171 o PB 17 PG 94 �' I 1 PB 17 PG 94 - `� `� o I TAYLOR o - MEGAN J/T R/S EIKER �' `� `� - _ _ _ _; �, DB 2569 0 o coNc W DEBORAH H. COLEY o Q \ \ ' r - PG 104 0 DB 4901 PG 1222 N p SHAUN J/T R/S EIKER I I \ \ I `-' PB 17 PG 94 o DB 7347 PG I n 219.50' N \ \ _ S 82°57'5x' E PB 17 PG 94 L �, �LO � PB 17 PG 94 �' 15.55' R/W TO EIP N 82°54'53" W - o \\ \ 0.28' R/W N 82°53'29" W 217.33' - 216.32' w m I I o m ; \�� -Y4- POT Sty. 15+46.72 o g \� r 50 DO, I O m _L_ vDi m O O x ° �Sl I m 0 � s 1� SNI �N �.. o� Iw Z O LU w S 87°37'27=E 315.00' -L- CURVE DATA Pl Sto 53+54.53 Pl Sta 6/+02.09 A = 6° l9' 4'S (LT) 0 = 12° 22' 56.-4(LT) D=94/'55.4" D=Z06'23.3" L = 905.9/' L = 587.83' 'p p9 T = 453.42' T = 295.06' R = 8,200.00' R = 2,720.00' SE = NC SE = 0.04 I\ RO = 168' I\ \\ \\ W m N 07 \ 32CO zo \ '� � LORIA POOLE CORIA 'OOL DB 3812 N "'• \ DB 3B PSG 1556 O N GLORIA POOLE ' PG 20 DB 3207 PG 975 N S 39 \ 31 PB 70 PG 53 s OSS TRIAD WORSHIP CENTERLO CHURCH OF GOD a o DB 7215 PG 1959 PB 139 PG 91 mm o (� a c� � wa °O >- m w I ISBKD o 110 'v I a ISBKD N 0 I O I , 1 z BM3 WOODED W 1 1 N I II W I 1 m I I 20' CITY OF GREENSBORO �3 GRASS I PERMANENT UTILITY EASEMENT w¢ N S 03°22'48" 1 �1 vt I DB 4500 PG 329 or I C� W I W W I { C3 15.03' 1 / GRASS N Taw r - --�cT'�a.,_E.Q„ BURIED - W EM I OW G R/W_ _ _ EIP pw:ef-��- DIRECT- � 12" CLAY --�ip�T75-R�-- -- -- cul -T2 "RCF --- O - -T F0- - - T FO- - O N + � j - US 70/BUR 33' BST T=F=CL- -- -- N W -- - _--------- _.T FO- - I J I W C - - - _ _ - - AT&T Corp., COPPER Z ---------C - - -F GREU TL -3 WOODED U ---- - /I E , ALINE REID COOPER / DB 3572 PG 4 / 3 I � I PROP. SAG LOCATION -L- POT Sta. 55 + 70.31 \ ELEV = 678.74' (LOW POINT) \ -L- VPI Sta. 56 + 36.00 ��� : \ \m �I II II I I II /LI I PROJECT REFERENCE NO. SHEET NO. U-258/BA 7 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER S 87°39'27" E INCOMP L]E //lE l�l[,A1 s TV) NTrr�rr uTq] Wf)P ta m(-0TTTgTrrTf)NT a ; N O O - tn DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared by Vhb E/ VHB Engineering NC, P.C. (C-3705) 0 �J 940 Main Campus Drive, Suite 500 5 Raleigh, NC 27606 / N 2/ Y J / � o�� w ow -L- PT StG. 63+94.85 0 o J W m c\jvLq N 0-J M O Q N oN V -C Ca W w CALVARY PAPTIST CHURCH, INC. w 35 w w w OF MCLEANSVILLE 5+00 36 N DB 5726 PG 196 Q 6 PIERRE A. GORIA 33 0 . N 38 CAROLYN E. GORIA N N ° NSR COMPANY, LLC z 3T DB 3818 PG 1989 O o `V MARY T. z N m 34 N DB 7079 PG 711 W Z WEDDINGTON 1 J m } � TURNER OODE � PG 160 :D DAVID. MARYVID. T. EDDINGTON o BAY TAPER N 03 49'20" E Fp- • i I PB 101 PG 8 a DB 7355 PG 452 I 0 100 1.21 F 1 I Uj PB 101PG8 I � WOODED 1'I o =L- PCC Sto. 58+07.03 I I 200' RIGHT TURN N I 1 GRASS 1 E, N M 10 tV 30'\ � - WOODED ATS 1 \ EIP EI EXI TING R/W � -4-- F O- S BST \ - - EIPO F'-� �b�4'39'r� _ _ _ - _ _ - - 6� � 20.07 FO- BU D - _ _ _ _ - -RCP -T FO- - - T FO- rr 02 0' � N 02°30'4 Q Q BL -II 2 E IP 1 I _-- T R ABOVE GROUfD CAT -1 42' INC. _ Fwz. _(TYP.)_------------- - - - - - - - R THOMAS G. LOWDERMILK 97 PG 550 CD DBPB692 PG 49 I I 4 O � o I I + 39 THOMAS R. LO DER ILKAN�D ZD rn I I WIFE, REBEC. LO DERMILK N N CA DB 2153 PG 286 0 1 ; DB 3697 PG 546 • Z � I 2SBKD m L O o� m N O O M CULVERT #1 ONE BARREL S 6j%9 3p6 399n F FOR -L- PROFILE SEE SHEET 12 NORTH EAST ELEV. CUL1 850457.15 1802690.62 664.40 CUL2 850455.93 1802700.54 664.41 CE1 850456.41 1802695.58 670.38 HW1 850456.41 1802695.58 672.31 CUL3 850502.29 1802696.27 664.72 CUL4 850501.04 1802706.22 664.73 CE2 850501.60 1802701.71 670.71 HW2 850501.74 1802701.77 672.66 S 6j%9 3p6 399n F FOR -L- PROFILE SEE SHEET 12