Loading...
HomeMy WebLinkAboutWQ0038790_Tax Certification_20190318ROY COOPER Gorernot MICHAEL S. REGAN Secrelmy LINDA CULPEPPER Dn ector NORTH CAROLINA Envir Amental quality March 18, 2019 Kerry McGraw -Robertson Novo Nordisk Pharmaceutical Industries, LP (NNPILP) 3612 Powhatan Road, Clayton, NC 27527 Subject: Return of Application Tax Certification for Pollution Abatement Equipment Real and Personal Property Novo Nordisk Pharmaceutical Industries, LP Johnston County Dear Ms. McGraw -Robertson: We received your application for a tax certification for the listed facility in Johnston County. After review of your application, we have determined that this facility is ineligible for tax certification at this time. In accordance with GS 105-275(8), a facility must have wastewater abatement equipment on -site, and it must be required by either an appropriate NPDES wastewater or pretreatment permit. This facility does not appear to have a NPDES wastewater or pretreatment permit, because none of the permits listed in your application (WQ0039900, WQ0038790, Early Works JC#16-003-C, Jurisdictional Wetlands 401 #IWP000005/ Cert #4051, ACOE 404 #SAW-2015-02127, Air Permit #07239R08, and WQ0038791) fit into one of these categories. NPDES Stormwater permits (NCG01000) are ineligible and do not qualify for tax certification. As such, we are returning your application and materials with this correspondence. You may reapply for tax certification if the facility obtains a NPDES wastewater or pretreatment permit in the future. If you require any additional information, please feel free to contact Emily DelDuco at 919-707-9125 or emily.delducogncdenr.gov in rely, John E. Hennessy, Supervisor Compliance & Expedited Permitting Unit Division of Water Resources, NCDEQ Cc: NPDES Files D Q�� North Carolina Department of Environmental Quality I Division of Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919-707-9125 01 @ ( 16�TFMK -�R � ; For DWR User I TCN: R s�fl}pk This application is to be used only for waste treatment systems and equipment Rev. No under the authority of the NC Division of Water Resources (DWR) 01/29/2016 DIRECTIONS: Complete and mail signed copies of the application form and all supporting information to both: 1) the County Tax Administrator for the County in which the facility is located (one copy) AND 2) to the NC Division of Water Resources, Surface Water Protection Section, 1617 Mad Service Center, Raleigh, NC 27699-1617 (two copies). Type or print in blue or black ink A separate application package is required for each facility where property proposed for tax certification is located. THIS APPLICATION WILL NOT BE PROCESSED WITHOUT COMPLETE AND ACCURATE INFORMATION. If you have any questions regarding this application, please call the local tax office or the NC Division of Water Resources at 919/807-6300 or their web site at https:Hox deg prod.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/nodes-wastewater/tax- certification for more specific contact information Please Note: a) Tax Certifications will only be processed for facilities under the authority of the DWR and only if the DWR has found that the described property 1 Has been or will be constructed or installed, 2 Complies with or that plans therefore which have been submitted to the DWR indicate that it will comply with the requirements of the Environmental Management Commission, 3. Is being effectively operated or will, when completed, be required to operate in accordance with the terms and conditions of the permit, certificate of approval, or other document of approval issued by the DWR, and 4 Has or, when completed, will have as its PRIMARY rather than incidental purpose the reduction of water pollution, 5. Is being used exclusively (100%) for waste treatment. b) If approved, the Tax Certification issued will incorporate all requested assets at the facility that meet the criteria for Tax Certification by DWR. Therefore this application must include any new assets for which Tax Certification is being requested, as well as any assets previously receivinq Tax Certification from DWR for which Tax Certification is still needed. A. Applicant (Applicant is the owner of, and taxpayer for, the property described in this application for tax certification.) Name of Applicant: Name of Facility: Novo Nordisk Pharmaceutical Industries, LP (NNPILP) NNPILP DAPI WWPTP Address of Applicant, if different from facility where property located: Physical Address of Facility where property located (no P.O. Box) 3612 Powhatan Road, Clayton, NC 27527 3798 Powhatan Road, Clayton, NC 27527 (address) (city) (zip) (street address) (city) (zip) P Business Relationship of Applicant to facility where property located: Owner County where property located: Johnston Name of Contact Person at Facility where property located: Kerry McGraw -Robertson Does the Applicant hold any NC Division of Water Resources Permits? ® Yes / ❑ No Title: Sr Tax and Treasury Advisor Phone Number: 919-550-2214 If yes, please list Multiple, see attachment p RECEIVED/DENR/D11lWR Permit Nos : If approved, will this be the first Tax Certification issued for this Facility? If no, attach any previously issued NOV 19 2018 ® Yes / ❑ No tax certifications B. Complete this Section only if the Operator/User of the facility and equipment is different from the Owner of the facility. Name of Operator/User.pp_rmiftinq Section Operator/User Address: (address) (city) (zip) Operator/User Contact Name. Relationship between Operator/User of facility and equipment and applicant: "'ATTACH A PRO ' S Sf�HL-t,4ATI.CTO,YO-U[4,APPLiCATfO�4 Trie nurrbtsT at each, items fox Mich Tax Cefflficallon is beiffq reqwsW musf he, gkiaoitt, on the &Wma6c Application continues on Next page DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION Waste Treatment Systems & Equipment: Waste treatment systems & equipment must be used exclusively for the abatement of water pollution PAGE 2 Rev 09/01/2013 ForDW Was asset listed in Asset Number, % of time Item is Is this asset For County Use only Only"AUsa Approved T' Description of Waste Treatment Systems or Equipment the permit (Yes/No) Vehicle Identification How is this equipment used for pollution abatement? used for pollution Year of Original Historical replacing a prior Disapproved Number (VIN) abatement Acquisition Cost" asset? Complete regional Wastewater PreTreatment Facility, to service our 1 INFLUENT EQUALIZATION TANK, TRAIN 1 IC-2000 Yes (directly/indirect T-2100 Pharmaceutical Manufacturing Facility 100 2018 $ 695,322 41 No Complete regional Wastewater PreTreatment Facility, to service our 2 INFLUENT EQUALIZATION TANK, TRAIN 2 IC-2000 Yes (directly/indirect T-2200 Pharmaceutical Manufacturing Facility 100 2018 $ 695,322 41 No Complete regional Wastewater PreTreatment Facility, to service our 3 BIOREACTOR ZONE No 1, Train 1 IC-3000 Yes (directly/indirect T-3101 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 4 BIOREACTOR ZONE No 2, Train 1 IC-3000 Yes (directly/indirect T-3102 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our s BIOREACTOR ZONE No 3, Train 1 IC-3000 Yes (directly/indirect T-3103 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 lNo Complete regional Wastewater PreTreatment Facility, to service our s BIOREACTOR ZONE No 4, Train 1 IC-3000 Yes (directly/indirect T-3104 Pharmaceutical Manufacturing Facility 100 2018 $ 159,829 99 No Complete regional Wastewater PreTreatment Facility, to service our BIOREACTOR ZONE No 5, Train 1 IC-3000 Yes direct) findirect T-3105 Pharmaceutical Manufacturing Facility 100 2018 $ 561,263 46 No Complete regional Wastewater PreTreatment Facility, to service our e BIOREACTOR ZONE No 6, Train 1 IC-3000 Yes direct) /indirect T-3106 Pharmaceutical Manufacturing Faalily 100 2018 $ 273,197 78 No Complete regional Wastewater PreTreatment Facility, to service our s BIOREACTOR ZONE No 7, Train 1 IC-3000 Yes direct) /indirect T-3107 Pharmaceutical Manufacturing Facility 100 2018 $ 221,160 10 No Complete regional Wastewater PreTreatment Facility, to service our 10 BIOREACTOR ZONE No 8, Train 1 IC-3000 Yes (directly/indirect T-3108 Pharmaceutical Manufacturing Facility 100 2018 $ 59,471 62 No Complete regional Wastewater PreTreatment Facility, to service our 11 JBIOREACTOR ZONE No 1, Train 2 IC-3000 Yes direct) !indirect T-3201 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 12 BIOREACTOR ZONE No 2, Train 2 IC-3000 Yes (directly/indirect T-3202 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 13 BIOREACTOR ZONE No 3, Train 2 IC-3000 Yes direct) /indirect T-3203 Pharmaceutical Manufactunng Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our a BIOREACTOR ZONE No 4, Train 2 IC-3000 Yes direct) hndirect T-3204 Pharmaceutical Manufacturing Facility 100 2018 $ 159,829 99 No Complete regional Wastewater PreTreatment Facility, to service our 15 BIOREACTOR ZONE No 5, Train 2 IC-3000 Yes direct) /indirect T-3205 Pharmaceutical Manufactunn Facilit 1001 2018 $ 561,263 46 No Attach additional pages if necessary • If the asset is listed in the DWQ permit, the description must be identical as listed on the current permit If the asset is not specifically listed in the DWQ permit, the applicant must attach detailed information as to why the asset should qualify for Tax Certification "When certifying systems or equipment, DEN is not certifying the cost of the equipment or the year of acquisition Facilities: To qualify for tax certification, the building or section of building being applied for, must be used exclusively for water pollution prevention. A sketch of the building, square footage along with details as to how the building is used for water pollution prevention, is required Land: To qualify for tax certification, the land must be used exclusively for water pollution prevention. A schematic diagram of the facility detailing the land being applied for is required. The amount of land (acreage) is required and how this land is being used to prevent water pollution For wastewater treatment and irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks. SIGNATURE: I hereby certify that the above equipment, facilities and/or land are used for the purpose stated, and that the information presented in this application is accurate Furthermore, I certify that any portable or mobile equipment listed on this application will be used exclusively in the state of North Carolina Applicant Signature: NOTICE: The penalty for false statement, representation or certification herein includes imprisonment and / or the assessment of civil penalties. McGraw -Robertson Title: senior Tax and Treasury Advisor (print name also) Of: Novo Nordisk Pharmaceutical Industne, LP (Name of Applicant Business Entity) Date: 11/13/2018 Tc wo DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION Waste Treatment Systems & Equipment: Waste treatment systems & equipment must be used exclusively for the abatement of water pollution PAGE 3 Rev 09101/2013 FOrDWRUse Was asset listed in Asset Number, % of time Item is Is this asset Forceunry use only Only *A" Approved `D Description of Waste Treatment Systems or Equipment the permit (Yes/No) Vehicle Identification How is this equipment used for pollution abatements used for pollution Year of OriginalHistorical replacing a prior Disapproved Number (VIN) abatement Acquisition Cost" asset? Complete regional Wastewater PreTreatment Facility, to service our 16 BIOREACTOR ZONE No 6, Tram 2 IC-3000 Yes (directly/indirect T-3206 Pharmaceutical Manufacturing Facility 100 2018 $ 273,197 78 No Complete regional Wastewater PreTreatment Facility, to service our 17 BIOREACTOR ZONE No 7, Train 2 IC-3000 Yes (directly/indirect T-3207 Pharmaceutical Manufacturing Facility 100 2018 $ 221,160 10 No Complete regional Wastewater PreTreatment Facility, to service our 1e BIOREACTOR ZONE No 8, Train 2 IC-3000 Yes (directly/indirect T-3208 Pharmaceutical Manufacturing Facility 100 2018 $ 59,471 62 No Complete regional Wastewater PreTreatment Facility, to service our 1e CLARIFIER TANK No 1 IC-4000 Yes (directly/indirect T-4001 Pharmaceutical Manufacturing Facility 100 2018 $ 265,575 26 No Complete regional Wastewater PreTreatment Facility, to service our 20 CLARIFIER TANK No 2 IC-4000 Yes (directly/indirect T-4002 Pharmaceutical Manufacturing Facility 100 2018 $ 265,675 26 No Complete regional Wastewater PreTreatment Facility, to service our 21 AEROBIC DIGESTER TANK NO 1 IC-8002 Yes (directly/in irect T-7100 Pharmaceutical Manufacturing Facility 100 2018 $ 666,961 80 No Complete regional Wastewater PreTreatment Facility, to service our 22 AEROBIC DIGESTER TANK NO 2 IC-8002 Yes direcll /indirect T-7200 Pharmaceutical Manufacturing Facility 100 2018 $ 666,961 80 No Complete regional Wastewater PreTreatment Facility, to service our 231 DAF FLOAT TANK IC-8001 Yes (directly/indirect T-8100 Pharmaceutical Manufacturing Facility 100 2018 $ 311,299 46 No Complete regional Wastewater PreTreatment Facility, to service our 24 WWPTP Plant(Building) Yes(directly/indirectly) Pharmaceutical Manufacturing Facility 100 2018 $ 12,299,559 78 No 25 26 27 28 29 30 Attach additional pages if necessary • If the asset is listed in the DWQ permit, the description must be identical as listed on the current permit If the asset is not specifically listed in the DWQ permit, the applicant must attach detailed information as to why the asset should qualify for Tax Certification •' When certifying systems or equipment, DENR is not certifying the cost of the equipment or the year of acquisition. Facilities: To qualify for tax certification, the building or section of building being applied for, must be used exclusively for water pollution prevention. A sketch of the building, square footage along with details as to how the building is used for water pollution prevention, is required. Land: To qualify for tax certification, the land must be used exclusively for water pollution prevention A schematic diagram of the facility detailing the land being applied for is required. The amount of land (acreage) is required and how this land Is being used to prevent water pollution For wastewater treatment and Irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks SIGNATURE: I hereby certify that the above equipment, facilities and/or land are used for the purpose stated, and that the information presented in this application is accurate Furthermore, I certify that any portable or mobile equipment listed on this application will be used exclusively in the state of North Carolina. Applicant Signature: NOTICE: The penalty for false statement, representation or certification herein includes imprisonment and / or the assessment of civil penalties. McGraw -Robertson Title: Senior Tax and Treasury Advisor Date: 11/13/2018 (print name also) Of: Novo Nordisk Pharmaceutical Industrie, LP (Name of Applicant Business Entity) MWo List of Permits 1. Pump and Haul #WQ0039900, 24 April 2018, Novo Nordisk 2. Sewer Extension #WQ0038790, 27 July 2017, Novo Nordisk 3. Early Works JC#16-003-C, 08 February 2016, Novo Nordisk 4. Jurisdictional Wetlands 401 #IWP000005 / Cert #4051,10 October 2016, Novo Nordisk 5. NPDES General #NCGO10000, 01 August 2016, Novo Nordisk 6. ACOE 404 #SAW-2015-02127, 23 May 2016, Novo Nordisk 7. Air Permit #07239R08, 23 September 2016, Novo Nordisk 8. Wastewater Collection Extension #WQ0038791, 22 May 2017 — Novo Nordisk For 0WR User TCN: This application is to be used only for waste treatment systems and equipment Rev. �� :-� >�:`.'�•- ��°' under the authority of the NC Division of Water Resources (DWR) 01/29/2016 DIRECTIONS: Complete and mad signed copies of the application form and all supporting information to both- 1) the County Tax Administrator for the County in which the facility is located (one copy) AND 2) to the NC Division of Water Resources, Surface Water Protection Section, 1617 Mad Service Center, Raleigh, NC 27699-1617 (two copies). Type or print in blue or black ink. A separate application package is required for each facility where property proposed for tax certification is located THIS APPLICATION WILL NOT BE PROCESSED WITHOUT COMPLETE AND ACCURATE INFORMATION. If you have any questions regarding this application, please call the local tax office or the NC Division of Water Resources at 919/807-6300 or their web site at httos//ox.deo.orod.nc.aov/about/divisions/water-resources/water-resources-permits/wastewater-branch/nodes-wastewater/tax- certification for more specific contact information Please Note: a) Tax Certifications will only be processed for facilities under the authority of the DWR and only if the DWR has found that the described property- 1 Has been or will be constructed or installed; 2. Complies with or that plans therefore which have been submitted to the DWR indicate that it will comply with the requirements of the Environmental Management Commission; 3 Is being effectively operated or will, when completed, be required to operate in accordance with the terms and conditions of the permit, certificate of approval, or other document of approval issued by the DWR, and 4 Has or, when completed, will have as its PRIMARY rather than incidental purpose the reduction of water pollution; 5. Is being used exclusively (100%) for waste treatment. b) If approved, the Tax Certification issued will incorporate all requested assets at the facility that meet the criteria for Tax Certification by DWR. Therefore this application must include any new assets for which Tax Certification is being requested, as well as anv assets previously receivinq Tax Certification from DWR for which Tax Certification is still needed. A. Applicant (Applicant is the owner of, and taxpayer for, the property described in this application for tax certification. Name of Applicant: Name of Facility: Novo Nordisk Pharmaceutical Industries, LP (NNPILP) NNPILP DAPI WWPTP Address of Applicant, if different from facility where property located: Physical Address of Facility where property located (no P O. Box): 3612 Powhatan Road, Clayton, NC 27527 3798 Powhatan Road, Clayton, NC 27527 (address) (city) (zip) (street address) (city) (zip) Business Relationship of Applicant to facility where property located: Owner County where property located Johnston Name of Contact Person at Facility where property located Kerry McGraw -Robertson Does the Applicant hold any NC Division of Water Resources Permits? ® Yes / ❑ No Title: Sr Tax and Treasury Advisor Phone Number: 919-550-2214 If yes, please list Multiple, see attachment Permit Nos : RECEIVEWDENPOWR If approved, will this be the first Tax Certification issued for this Facility? If no, attach any previously issued ® Yes / ❑ No tax certifications NOV s B. Complete this Section only if the Operator/User of the facility and equipment is different from the Owner of the facility. Name of Operator/User: 6 _ Operator/User Address: PO—rmittip@ (address) (city) (zip) Operator/User Contact Name: Relationship between Operator/User of facility and equipment and applicant: �TTAC t CC li' l[� fV' r UR APPLICAMON The ftamber of each itein for which T CdTfu%cation is beings t u t � must be showni our, the ffheMotic "" Application continues on Next page DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION Waste Treatment Systems & Equipment: Waste treatment systems & equipment must be used exclusively for the abatement of water pollution PAGE 2 Rev 09/01/2013 For county For DWR use Only -A. Was asset listed in Asset Number, % of time Item is Year of OriginalHistoncal Is this asset Use ony Approved •D' Description of Waste Treatment Systems or Equipment the permit (Yes/No) Vehicle Identification How is this equipment used for pollution abatement? used for pollution Acquisition Cost" replacing a prior Disapproved Number (VIN) abatement asset? Complete regional Wastewater PreTreatment Facility, to service our 1 INFLUENT EQUALIZATION TANK, TRAIN 1 IC-2000 Yes (directly/indirect T-2100 Pharmaceutical Manufactunn Facility 100 2018 $ 695,322 41 No Complete regional Wastewater PreTreatment Facility, to service our 2 INFLUENT EQUALIZATION TANK, TRAIN 2 IC-2000 Yes direcll /indirect T-2200 Pharmaceutical Manufacturing Facility 100 2018 $ 695,322 41 No Complete regional Wastewater PreTreatment Facility, to service our a BIOREACTOR ZONE No 1, Train 1 IC-3000 Yes (directly/indirect T-3101 Pharmaceutical ManufacturingFacility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 4 BIOREACTOR ZONE No 2, Train 1 IC-3000 Yes (directly/indirect T-3102 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our s BIOREACTOR ZONE No 3, Train 1 IC-3000 Yes direct) /indirect T-3103 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 61 1 BIOREACTOR ZONE No 4, Train 1 IC-3000 Yes (directly/indirect T-3104 lPharmaceutical Manufacturing Facility 100 2018 $ 159,829 99 No Complete regional Wastewater PreTreatment Facility, to service our T BIOREACTOR ZONE No 5, Train 1 IC-3000 Yes (directly/indirect T-3105 Pharmaceutical Manufacturing Facility 100 2018 $ 561,263 46 No Complete regional Wastewater PreTreatment Facility, to service our e BIOREACTOR ZONE No 6, Train 1 IC-3000 Yes direcll /indirect T-3106 Pharmaceutical Manufacturing Facility 100 2018 $ 273,197 78 No Complete regional Wastewater PreTreatment Facility, to service our e BIOREACTOR ZONE No 7, Train 1 IC-3000 Yes (directly/indirect T-3107 Pharmaceutical Manufacturing Facility 100 2018 $ 221,160 10 No Complete regional Wastewater PreTreatment Facility, to service our to BIOREACTOR ZONE No 8, Train 1 IC-3000 Yes (directly/indirect T-3108 Pharmaceutical Manufacturing Facility 100 2018 $ 59,471 62 No Complete regional Wastewater PreTreatment Facility, to service our - 1tI JBIOREACTOR ZONE No 1, Train 2 IC-3000 Yes (directly/indirect T-3201 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 12 BIOREACTOR ZONE No 2, Train 2 IC-3000 Yes (directly/indirect T-3202 Pharmaceutical manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 13 BIOREACTOR ZONE No 3, Train 2 IC-3000 Yes (directly/indirect T-3203 Pharmaceutical Manufacturing Facility 100 2018 $ 134,430 65 No Complete regional Wastewater PreTreatment Facility, to service our 1a BIOREACTOR ZONE No 4, Train 2 IC-3000 Yes (directly/indirect T-3204 Pharmaceutical Manufacturing Facility 100 2018 $ 159,829 99 No complete regional Wastewater PreTreatment Facility, to service our 15 BIOREACTOR ZONE No 5, Train 2 IC-3000 Yes direcll /indirect T-3205 Pharmaceutical Manufacturing Facility 100 2018 $ 561,263 46 No Attach additional pages if necessary • If the asset is listed in the DWQ permit, the description must be identical as listed on the current permit If the asset is not specifically listed in the DWQ permit, the applicant must attach detailed information as to why the asset should qualify for Tax Certification "When certifying systems or equipment, DENR is not certifying the cost of the equipment or the year of acquisition Facilities: To qualify for tax certification, the building or section of building being applied for, must be used exclusively for water pollution prevention. A sketch of the budding, square footage along with details as to how the building is used for water pollution prevention, is required Land: To qualify for tax certification, the land must be used exclusively for water pollution prevention. A schematic diagram of the facility detailing the land being applied for is required The amount of land (acreage) is required and how this land is being used to prevent water pollution. For wastewater treatment and irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks SIGNATURE: I hereby certify that the above equipment, facilities and/or land are used for the purpose stated, and that the information presented in this application is accurate. Furthermore, I certify that any portable or mobile equipment listed on this application will be used exclusively in the state of North Carolina Applicant 1�/ y A /I L Signature: V Kerry McGraw -Robertson Title: Senior Tax and Treasury Advisor Date: 11/13/2018 (print name also) NOTICE: The penalty for fa se statement, representation or certification Of: Novo Nordisk Pharmaceutical Industrie, LP herein includes imprisonment and / or the assessment of civil penalties. (Name of Applicant Business Entity) Tc-wQ DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION Waste Treatment Systems & Equipment: Waste treatment systems & equipment must be used exclusively for the abatement of water pollution PAGE 3 Rev 09/01/2013 For DwR use Was asset listed in Asset Number, % of time item is Is this asset Is Forcounry useony only•A• Approved°D° Description of Waste Treatment Systems or Equipment the permit (Yes/No) Vehicle Identification How is this equipment used far pollution abatemenl� used for pollution Year of OriginalHistoncal a prior Disapproved Number (VIN) abatement Acquisition Cost" asset? Complete regional Wastewater PreTreatment Facility, to service our is BIOREACTOR ZONE No 6, Train 2 IC-3000 Yes direct) /indirect T-3206 anufactunn Facility Pharmaceutical Manufacturing 100 2018 $ 273,197 78 No Complete regional Wastewater PreTreatment Facility, to service our 17 BIOREACTOR ZONE No 7, Train 2 IC-3000 Yes direct) lindirecl T-3207 Pharmaceutical Manufacturing Facility 100 2018 $ 221,160 10 No Complete regional Wastewater PreTreatment Facility, to service our 18 BIOREACTOR ZONE No 8, Train 2 IC-3000 Yes direct) /indirect T-3208 Pharmaceutical Manufacturing Facility 100 2018 $ 59,471 62 No Complete regional Wastewater PreTreatment Facility, to service our 19 CLARIFIER TANK No 1 IC-4000 Yes direct) lindirecl T-4001 Pharmaceutical Manufacturing Facility 100 2018 $ 265,575 26 No Complete regional Wastewater PreTreatment Facility, to service our 20 CLARIFIER TANK No 2 IC-4000 Yes (directly/indirect T-4002 Pharmaceutical Manufacturing Facility 100 2018 $ 265,575 26 No Complete regional Wastewater PreTreatment Facility, to service our 21 AEROBIC DIGESTER TANK NO 1 IC-8002 Yes direct) /indirect T-7100 Pharmaceutical Manufacturing Facility 100 2018 $ 666,961 80 No Complete regional Wastewater PreTreatment Facility, to service our 22 AEROBIC DIGESTER TANK NO 2 IC-8002 Yes direct) /indirect T-7200 Pharmaceutical Manufacturing Facility 100 2018 $ 666,961 80 No Complete regional Wastewater PreTreatment Facility, to service our 23 DAF FLOAT TANK IC-8001 Yes (directly/indirect T-8100 Pharmaceutical Manufacturing Facility 100 2018 $ 311,299 46 No Complete regional Wastewater PreTreatment Facility, to service our 24 WWPTP Plant(Building) Yes direct) lindirecl) Pharmaceutical Manufacturing Facility 100 2018 $ 12,299,559 78 No 25 2a 27 28 29 30 Attach additional pages if necessary • If the asset is listed in the DWQ permit, the description must be identical as listed on the current permit If the asset is not specifically listed in the DWQ permit, the applicant must attach detailed information as to why the asset should qualify for Tax Certification •' When certifying systems or equipment, DENR is not certifying the cost of the equipment or the year of acquisition. Facilities: To qualify for tax certification, the building or section of building being applied for, must be used exclusively for water pollution prevention A sketch of the building, square footage along with details as to how the building is used for water pollution prevention, is required. Land: To qualify for tax certification, the land must be used exclusively for water pollution prevention A schematic diagram of the facility detailing the land being applied for is required The amount of land (acreage) is required and how this land is being used to prevent water pollution For wastewater treatment and Irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks SIGNATURE: I hereby certify that the above equipment, facilities and/or land are used for the purpose stated, and that the Information presented in this application is accurate. Furthermore, I certify that any portable or mobile equipment listed on this/application will be used exclusively in the state of North Carolina Applicant Signature: NOTICE: The penalty for false statement, representation or certification herein includes imprisonment and / or the assessment of civil penalties. McGraw -Robertson Title: senior Tax and Treasury Advisor (print name also) Of: Novo Nordisk Pharmaceutical Industne, LP (Name of Applicant Business Entity) Date: 11/13/2018 Tc-wo