Loading...
HomeMy WebLinkAbout20181393 Ver 1_More Info Received_20190318Strickland, Bev From: Suzanne Herron <Suzanne.Herron@eli-Ilc.com> Sent: Monday, March 18, 2019 2:46 PM To: David.E.Bailey2@usace.army.mil Cc: Homewood, Sue; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke- energy.com); Keith Gualtieri; Dietrich, Ned (Ned.Dietrich @duke-energy.com); Lemons, Elizabeth Pressley (Elizabeth.Lemons@duke-energy.com) Subject: [External] RE: PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 Attachments: 1.2_1626546_20190318_USAC E_Resubmittal_Rev_1.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment t ort.s am 1 1 Dave — Per your call earlier, I have revised the resubmittal package to reflect no impacts at Impact Site 19. Please let me know if you have additional questions. Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NQ 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne. Herron(@eli-Ilc.com From: Suzanne Herron Sent: Monday, March 11, 2019 3:25 PM To: 'Bailey, David E CIV USARMY CESAW (USA)' Cc: Homewood, Sue; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com); Keith Gualtieri (keith.gualtieri@eli-Ilc.com); Dietrich, Ned (Ned.Dietrich @duke-energy.com); Lemons, Elizabeth Pressley (Elizabeth.Lemons@duke-energy.com) Subject: RE: PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 Dave — Attached are the revised pages and information for the re-routes on the Line 446 project. Please let me know of questions. Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NQ 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne. Herron@eli-Ilc.com From: Bailey, David E CIV USARMY CESAW (USA)[mailto: David. E.Bailey2@usace.army.mill Sent: Wednesday, February 20, 2019 12:58 PM To: Suzanne Herron Cc: Homewood, Sue; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) Subject: RE: PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 Hi Suzanne. I reviewed the information you sent on 2/4/2019, as well as the information you sent to Sue Homewood (NCDWR) on other occasions. I appreciate the profile view related to the jack -and -bore crossing near Streams 31 and 32; this addresses my avoidance and minimization question. Further, although the Corps is still concerned about trenching through the confluence of Streams 31 and 32. 1 appreciate the stream restoration notes you provided. However, as far as I can tell I still need the following information to verify the use of NWP 12 for the sites that have changed based on reroutes: 1) Updated revised Sheets 79, 80, 81, 82, and 84, based on the more significant reroute areas (Impact Site 14 for Streams 31, 32, & 34 / Impact Site 19 where impacts appear to now be avoided), as well as smaller changes related to corridor width (Impact Site 15 for Wetlands 9, 10/11, & 12 and Stream 7/8 / Impact Site 16 for Stream 6) / Impact Site 18 for Wetland 5 and Stream 2/29). These sheets should have the same line/hatching styles as the currently permitted plans; 2) Updated Impact Table showing any changes to wetland and stream impacts for Impact Sites 14-16, 18, and 19. Please see the attached attachments from our original NWP 12 verification that now require revision. If you have any questions please let me know. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Suzanne Herron[mailto:Suzanne.Herron@eli-Ilc.com] Sent: Monday, February 4, 2019 1:32 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Cc: Homewood, Sue <sue.homewood@ncdenr.gov>; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke- energy.com) <alicia.depalma@duke-energy.com>; Suzanne Herron <Suzanne.Herron@eli-Ilc.com> Subject: [Non-DoD Source] PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 David — As we have previously discussed, Piedmont determined that the proposed permitted crossing of stream 31 adjacent to NC Highway 68 was not able to be constructed in the location that was initially proposed in the plans. Three new options, A, B, and C were proposed. Option A was located south of the access road south of the permitted crossing. This option would not cross stream 31 or 32. Space constraints in relation to a neighboring landfill property made this alignment undesirable and the property owner would not agree to this option. Option B was located north of the permitted crossing and property owners would not agree to this option. Option C, which is south of the permitted alignment, was selected due to constructability aspects for the bore. I have attached the Re -construction plan for the crossing of streams 31 and 32 near NC Highway 68. 1 have also attached the bore plan for the NC Highway 68 bore. As you can see from the bore plan, the bore cannot be extended to the stream due to the slope. Please let me know if you need additional information for the permit revision. Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NQ 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne. Herron(@eli-Ilc.com From: Bailey, David E CIV USARMY CESAW (US) [mai Ito: David. E.Bailey2@usace.army.mi1] Sent: Tuesday, December 11, 2018 12:41 PM To: Suzanne Herron; Homewood, Sue Cc: Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) Subject: RE: PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 Hi Suzanne. I would not need the entire PCN package re -submitted. Rather, I would just need the plans for the proposed revised crossings, detailed explanation of the reason for the route change, and the avoidance, minimization and compensatory mitigation proposals for the revised crossings. The re-route of the crossing at Stream 32 is a concern given that the corridor would impact the confluence point of 2 streams. My jack and bore comment sent in a previous information request would still be applicable here. Perhaps a profile view showing the jack and bore under the roadway might better explain why it isn't practicable to jack and bore the stream crossings too? If it is not practicable, we would need detailed restoration plans to ensure that the stream bank integrity at the stream confluence could be re-constructed/maintained. As you mentioned in your email, please also include the delineation of the add-on area around Stream 1 and any applicable wetland/upland data forms and stream forms. Thanks, and please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Suzanne Herron [mailto:Suzanne.Herron@eli-Ilc.com] Sent: Tuesday, December 11, 2018 12:02 PM To: Homewood, Sue <sue.homewood@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US) <David. E. Bai ley2@ usace.a rmy. mi I> Cc: Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) <alicia.depalma@duke-energy.com>; Suzanne Herron <Suzanne.Herron@eli-Ilc.com> Subject: [Non-DoD Source] PNG Line 446 (Belews Creek Gas Line) - SAW -2018-00885, DWR# 2018-1393 Sue and David — For the Line 446 gas line project to Belews Creek, we are looking at a couple of re-routes due to property issues and buffer requirement conflicts. For the buffer issue at Stream 1 that Sue and I have talked about, we are looking at a re-route instead of going to the committee for a variance. Rahlff Ingle is going to the field tomorrow to look at the area upstream of the crossing. I will let you know how we want to proceed. We are also looking at a re-route at Stream 32. 1 have attached a drawing showing the proposed alignment with the JD drawing and plan sheet. Please let me know if there would be permitting issues with this re-route. David, what information would I need to submit for these? Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NQ 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne. Herron@eli-Ilc.com ENERCrY LAND & INFR STRUC rURE PRIVILEGED AND CONFIDENTIAL COMMUNICATION - This electronic transmission, including any attachments, may contain confidential and/or privileged information. This communication is to be used only by the intended recipient. If you received this email in error, please notify the sender and delete the email. Any disclosure, copying, distribution, or use of information received in error is strictly prohibited. Revised 3/18/2019, Supersedes NWP 18 verification dated 12/412018 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-00885 County: Guilford/Rockingham/Stokes U.S.G.S. Quad: NC-Belews Lake/Ellisboro/Summerfield GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Piedmont Natural Gas Attn: Ned Dietrich Address: 4720 Piedmont Row Rive Charlotte, NC 28210 Size (acres) —125 Nearest Town Stokesdale Nearest Waterway Troublesome Creek River Basin Cape Fear/Dan River USGS HUC 03030002/03010103 Coordinates 36.254480 N, -79.947307 W Location description: The project area includes a 60 -foot wide permanently maintained corridor beginning at a new tap of the existing Williams -Transco pipelines near the intersection of US 158 and US 220 (36.238103 N, -79.922468 W) in Stokesdale, Guilford County, extending west across Rockingham County to its termination at the Duke Energy Belews Creek Steam Station (36.277656 N, -80.056404 W) in Stokes County, North Carolina. Description of projects area and activity: This verification authorizes the construction of the Piedmont Natural Gas - Belews Creek Pipeline (Line 446), including approximately nine miles of 24" natural gas pipeline, consisting of eighteen (18) distinct crossings (projects): 1) Site 1 (Wetland 26) requires the temporary discharge of dredged or fill material into 0.058 acre of herbaceous wetlands for pipeline construction access and installation; 2) Site 2 (Belews Lake) is a Horizontal Directional Drill crossing and no discharges of dredged or fill material are authorized; 3) Site 3 (Stream 26) requires the temporary discharge of dredged or fill material into 68 linear feet of stream channel for pipeline construction access and installation; 4) Site 4 (Stream 21) is a Jack and Bore crossing and no discharges of dredged or fill material are authorized; 5) Site 5 (Wetland 27) requires the temporary discharge of dredged or fill material into 0.019 acre of wetlands for pipeline construction access and installation, including the permanent conversion from forested to herbaceous wetlands; 6) Site 6 (Stream 25) requires the temporary discharge of dredged or fill material into 68 linear feet of stream channel for pipeline construction access and installation; 7) Site 7 (Stream 20/35) requires the temporary discharge of dredged or fill material into 97 linear feet of stream channel for pipeline construction access and installation; 8) Site 8 (Stream 19) requires the temporary discharge of dredged or fill material into 77 linear feet of stream channel for pipeline construction access and installation; 9) Site 9 (Wetlands WV & 20; Streams 16 & 17; Pond 4) is a Horizontal Directional Drill crossing and no discharges of dredged or fill material are authorized. However, this crossing requires the permanent conversion of 0.033 acre of wetlands from forested to herbaceous wetlands; 10) Site 10 (Stream 12) requires the temporary discharge of dredged or fill material into 126 linear feet of stream channel for pipeline construction access and installation; 11) Site 11 (Stream 13) requires the temporary discharge of dredged or fill material into 61 linear feet of stream channel for pipeline construction access and installation; 12) Site 12 (Stream 14) requires the temporary discharge of dredged or fill material into 97 linear feet of stream channel for pipeline construction access and installation; 13) Site 13 (Stream 33) requires the temporary discharge of dredged or fill material into 79 linear feet of stream channel for pipeline construction access and installation; 14) Site 14 (Streams 31, 32, & 34) requires the temporary discharge of dredged or fill material into 173 linear feet of stream channel for pipeline construction access and installation. Note that no discharges of dredged or fill material are authorized in Stream 31, as there is an existing driveway culvert in this location; 15) Site 15 (Wetlands 9, 10/11, & 12; Stream 7/8) requires the temporary discharge of dredged or fill material into 92 linear feet of stream channel and 0.068 acre of wetlands for pipeline construction access and installation. Wetland impacts include the permanent conversion from forested to herbaceous wetlands; 16) Site 16 (Stream 6) requires the temporary discharge of dredged or fill material into 96 linear feet of stream channel for pipeline construction access and installation; 17) Site 17 (Wetland 6/7; Streams 3, 4, & 5) is a Horizontal Directional Drill crossing and no discharges of dredged or fill material are authorized. However, this crossing requires the permanent conversion of 0.235 acre of wetlands from forested to herbaceous wetlands, 18) Site 18 (Wetland 5; Stream 2/29) requires the temporary discharge of dredged or fill material into 60 linear feet of stream channel and 0.097 acre of wetlands for pipeline construction access and installation. Wetland impacts include the permanent conversion from forested to herbaceous wetlands. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 9/28/2018 (received 10/2/2018), and additional information received 11/2/2018, 11/19/2018, 3/11/2019, 3/14/2019, and 3/18/2019, and the enclosed plans "Line 446 — Belews Creek Pipeline Erosion Control Plan", Sheets 67 through 89 and 94. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at 919-554-4884 extension 30 or David.E.Bailey2Ausace.army.mil. Digitally signed . GoverBAILEnment, o .=Doo, 83736 ou=PK DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, g /��v ou=USA, cn=BAILEY.DAVID.E.1379283736 Corps Regulatory Official: Date: 2019.03.18 15:04:33 -04'00' Date: 3/18/2019 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at hqp://corpsmEu.usace.gM.mil/cm_apex/V.p=136:4:0. Copy furnished: Suzanne Herron, PE, CPESC, Energy Land & Infrastructure, PLLC, 1420 Donelson Pike, Suite A-12, Nashville, TN 37217 Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Forms. The requirements of these forms, including any special conditions listed on the forms, are hereby incorporated as special conditions of this permit authorization. 2. Temporary discharge of excavated or fill material into wetlands and streams will be for the absolute minimum period of time necessary to accomplish the work (see "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 85), and such authorized crossings will be restored per the following: a. All authorized temporary wetland impacts will be returned to pre -disturbance grade and contour, and re -vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 87, and re - vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 89. In wetland areas where pipeline installation via trenching is authorized, wetland topsoil must be segregated from the underlying subsoil, and the top 6 to 12 inches of the trench must be backfilled with topsoil from the trench. b. All authorized temporary stream impacts will be returned to pre -disturbance grade and contour, stabilized per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 86 and "Line 446 — Belews Creek Pipeline, Stream Buffer Details" Sheet 94, and re -vegetated per "Line 446 — Belews Creek Pipeline, General EPSC Notes" Sheet 89. 3. The permittee shall use a contracted environmental compliance officer(s) who will remain on-site throughout the construction period. This individual will ensure compliance with all general and specific Department of the Army and North Carolina Division of Water Resources permit conditions and certifications. Once construction begins within crossings subject to this authorization, compliance reports must be submitted to the Corps of Engineers, Raleigh Regulatory Field Office and North Carolina Division of Water Resources on a bi-weekly basis, until construction within these areas is complete. 4. When directional boring or horizontal directional drilling under waters of the U.S., including wetlands, the permittee shall closely monitor the project for releases of drilling fluids. Any discharges of drilling fluids into waters of the U.S., including wetlands, shall be reported to the Corps of Engineers, Raleigh Regulatory Field Office and the North Carolina Division of Water Resources within 24 hours. All crossings of wetlands, streams, or other waters undertaken using Horizontal Directional Drill methods must abide by the attached "Horizontal Direction Drilling (HDD) Contingency Plan" (pages 1 through 7). Digitally signed by BAILEY.DAVID.E.1379283736 DIV: c=US, UGovernment, ou=DoD, ou=PKI, ou=USASA, cn=BAILEY.DAVI D.E.1379283736 Corps Regulatory Official: Date: 2019.03.1815:0455-0a'00' Date: 3/18/2019 Expiration Date of Verification: 03/18/2022 Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Natural Gas, Attn: Ned Dietrich Action ID: SAW -2018-00885 Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline County: Guilford/Rockingham Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03030002, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.401 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.401 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 10/31/2018 was included with the preconstruction notification. • This Form supersedes the Compensatory Mitigation Responsibility Transfer Form, dated December 4, 2018, included as part of the Nationwide Permit 12 verification dated December 4, 2018. Note that the compensatory mitigation required by this referenced form was satisfied by NCDMS via signature on March 13, 2019. • This DA permit modification results in a net DECREASE in the number of wetland credits required relative to the original Nationwide Permit 12 consisting of the reduction of permanent conversion from forested to herbaceous wetlands at a 1:1 ratio (0.031 fewer wetland credits required). This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd. tugweH@usace. army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Date: 2019.03.18 15:05:19 -04'00' 3/18/2019 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Natural Gas, Attn: Ned Dietrich Action ID: SAW -2018-00885 Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline County: Rockingham/Stokes Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03010103, Roanoke River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.053 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: See Comments/Additional Conditions section below Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.053 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. acceptance letter identifies a specific site, also list the specific site to be debited). For NCDMS, list NCDMS. If the NCDMS Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 10/31/2018 was included with the preconstruction notification. • Wetland credits may be provided in HUC 03010103, 03010104, or 03010102. • This Form supersedes the Compensatory Mitigation Responsibility Transfer Form, dated December 4, 2018, included as part of the Nationwide Permit 12 verification dated December 4, 2018. Note that the compensatory mitigation required by this referenced form was satisfied by NCDMS via signature on March 13, 2019. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd. tugwell@usace. army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Date: 2019.03.18 15:05:40 -04'00' USACE Project Manager Signature 3/18/2019 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Determination of Jurisdiction: A. ❑ There are waters including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ® The jurisdictional areas, beginning at the western terminus of PNG Line 446 and extending west to existing Duke Energy — Belews Creek Steam Station infrastructure, have been identified under a previous action. Please reference the Approved Jurisdictional Determination issued 11/26/2018. Further, please reference the Preliminary Jurisdictional Determination issued 12/3/2018. Action ID: SAW -2018-00885. Date of JD: 12/3/2018 Expiration Date of JD: Not applicable Line 446 Wetland Impacts for the PCN Stokes, Rockingham, and Guilford Counties * Roanoke River Basin ** Cape Fear River Basin Total: 2,160 20,105 19,743 SF SF SF 0.05 0.46 0.45 Acres Acres Acres SF in Roanoke 3974 River Basin 0.09 Acres SF in Cape Fear 15769 River Basin 0.36 Acres Area within Area within PermanentImpact- Permanent (P) or ROW Conversion Impact Site Wetland ID Lat Long Temporary (T) Resource Type Type of Impact Notes Temporary Permanent from Forested to Easement (SF) Easement (SF) Non -forested (SF) Wetland is within existing ROW. Disturbed herbaceous assemblage Non -Tidal Open cut, dewatering with a few scattered Impact Site 1 W26 * 36.27710847 -80.04999838 T Wetland structure, temporary crossing shrubs/saplings. Wetland continues 2,160 362 0 to northeast and eventually directly abuts an intermittent tributary. Open cut, dewatering Impact Site 5 W27 * 36.26997357 -80.0177573 P, T Non -Tidal structure, temporary Wet hardwood forest. Directly abuts 0 544 844 Wetland crossing, access Streams 22 and 23. clearin /ROW conversion Non -Tidal WV ,. T Wetland HDD Bore 0 0 0 Impact Site 9 Wet hardwood forest. Small W20 * 36.25833145 -79.97833151 T Non -Tidal HDD Bore depressional floodplain wetland. 0 1443 1.443 Wetland Separated from Stream 17 by distance of —25 feet. Open cut, dewatering Non -Tidal structure, temporary Wet hardwood forest. Directly W12 * 36.25473915 -79.94785152 P, T Wetland crossing, access abuts Stream 7. 0 1.687 1,687 clearing/ROW conversion Impact Site 15 W10/11 ** 36.25468143 -79.94759674 P Non -Tidal Access clearing/ROW Wet hardwood forest. Directly 0 172 172 Wetland conversion abuts Stream 7. Open cut, dewatering W9'""" W9 - 36.254452421-79.94741603 36.25445242 -79.94741603 P, TNon-Tidal P, T structure, temporary Wet hardwood forest. Directly 0 1,118 1,118 Wetland crossing, access abuts Stream 7. clearing/ROW conversion HDD Bore. Wetland in project corridor is a wet hardwood forest Non -Tidal community. Wetland in existing Impact Site 17 W6/7 ** 36.25035371 -79.9367198 P ROW conversion ROW is a beaver pond consisting of 0 10,258 10.258 Wetland open water and mixed herbaceous/scrub-shrub vegetation. Directly abuts Streams 3, 4, and 5. Open cut, dewatering Impact Site 18 W5 ** 36.24824553 -79.93156634 P, T Non -Tidal structure, temporary Wet hardwood forest. Directly 0 4,221 4.221 Wetland crossing, access abuts Stream 2. clearing/ROW conversion WX ** Avoid Non -Tidal 0 0 0 Wetland Impact Site 19 W1** 36.239916321-79.92456802 Avoid Non -Tidal Wet hardwood forest. Directly 0 0 0 Wetland abuts Stream 1. * Roanoke River Basin ** Cape Fear River Basin Total: 2,160 20,105 19,743 SF SF SF 0.05 0.46 0.45 Acres Acres Acres SF in Roanoke 3974 River Basin 0.09 Acres SF in Cape Fear 15769 River Basin 0.36 Acres Line 446 Stream Impacts for the PCN Stokes, Rockingham, and Guilford Counties Revised 3-11-2019 * Roanoke River Basin Total: 0 1094.4 ** Cape Fear River Basin Feet Feet ^ Subject to Jordan Lake 50 -foot buffer rule Permanent (P) Avg Avg Length Within Length Within Impact Site Stream ID Stream Name Lat Long or Temporary Perennial (P) or TOB Bank Impacts Notes Temporary Permanent Intermittent (I) Width Height Easement Easement (T) (ft) (ft) (ft) (ft) Impact Site 3 S26 Unnamed Trib of 36.27514545 -80.03027276 T P 15 5 Open cut, dewatering structure. 0 67.5 Belews Crk * temporary crossing Impact Site 4 S21 Unnamed Trib of 36.27286359 -80.02200739 N/A 1 3 2 Bore - no impact 0 0 Belews Crk Impact Site 6 S25 Unnamed T rib of 36.26525844 -80.0097791 T P 25 5 Open cut, dewatering structure, Highly disturbed by cattle. 0 68.3 Belews Crk * temporary crossing Impact Site 7 S20/S35 Unnamed Trib of 36.260359 -79.999276 T P 15 7 Open cut, dewatering structure, 0 96.9 Belews Crk * temporary crossing Impact Site 8 S19 Unnamed Trib of 36.25866886 -79.98991995 T P 14 7 Open cut, dewatering structure, 0 77 Little Hogans Crk * temporary crossing S16 Unnamed Trib of 36.25839645 -79.97866651 N/A P 3 3 Bore - no impact 0 0 9 Hogans Crk Impact Site S17 Unnamed Crib of 36.25832381 -79.97843172 N/A P 6 6 Bore - no impact 0 0 Hogans Crk Unnamed Trib of Open cut, dewatering structure, Upper reach in existing ROW is Impact Site 10 S12 Hogans Crk * 36.25912529 -79.97224976 T P 3 6 temporary crossing intermittent. Lower reach in 0 126.3 forested area is perennial. Impact Site 11 S13 Unnamed Trib of 36.25896925 -79.96886502 T P 12 2 Open cut, dewatering structure, 0 60.9 Hogans Crk * temporary crossing Impact Site 12 S14 Unnamed Trib of 36.25897358 -79.96767842 T 1 7 4 Open cut, dewatering structure, 0 96.9 Hogans Crk * temporary crossing Impact Site 13 S33 Unnamed Trib of 36.259739 79.962679 T P 20 g Open cut, dewatering structure, 0 79.1 Hogans Crk * temporary crossing S34 Unnamed Trib of 36.261515 -79.955965 T 1 20 15 Open cut, dewatering structure, Flows to S32 via Hwy 68 culvert. 0 95 Hogans Crk * temporary crossing Impacts to both sides of Hwy 68. Impact Site 14 S32 Unnamed Trib of 36.261509 -79.954914 T 1 6 7 Open cut, dewatering structure, Flows from culvert under Hwy 68. 0 78 Hogans Crk * temporary crossing Impact Site 20 S31 Unnamed Crib of 36.26179 -79.954757 N/A P 9 5 No new impact Existing culvert 0 0 Ho ans Crk Impact Site 15 S7/8 ^ Unnamed Trib of 36.25467754 -79.94766573 T P 4 3 Open cut, dewatering structure, 0 91.9 Troublesome Crk ** temporary crossing Impact Site 16 S6 ^ Unnamed Trib of 36.25223873 -79.94185597 T P 6 4 Open cut, dewatering structure, 0 96.z Troublesome Crk ** tempora crossing S5 Unnamed Trib of 36.25057158 -79.93738176 N/A 7 3 Bore - no impact Upper reach in existing ROW is 0 0 Troublesome Crk ** impounded by beaver dam. Impact Site 17 S4 Unnamed Trib of 79 93689481 -79.93712622 N/A 3 3 Bore - no impact 0 0 Troublesome Crk ** S3 ^ Troublesome Crk ** 36.25032582 -79.93689481 N/A P 15 4 Bore - no impact Upper reach in existing ROW is 0 0 impounded by beaver dam. Impact Site 18 S2/S29 ^ Unnamed Trib of 36.24830449 -79.93197609 T 1 3 1 Open cut, dewatering structure, Culvert road crossing between 60.4 Troublesome Crk ** temporary crossing S2a and S29a. Impact Site 19 S1 ^ Unnamed Trib of Haw 36.24004255[-79,9247786 T P 3 1 Open cut, dewatering structure, Culvert road crossing between 0 0 River **temporary crossing S1 i and S1j. * Roanoke River Basin Total: 0 1094.4 ** Cape Fear River Basin Feet Feet ^ Subject to Jordan Lake 50 -foot buffer rule LEGEND LEErnx.Eiwr .L IV,, \ \ ' \ \+ ® E, - --- I l / - - 1 -_' -- ------ -'- ILL, \ 1 c�-------- a ___ _ _-_______, - ' i "' I /\Cie\rFi1 .1c / _ t.fi„ 1 ---- - Y_ t� - - - \ \WETLAND 26B • IMPACT \`�\ --_ .s/�'-\ \N�_,` `• -'WETIAT$ TEMPORARY -_ - WETLAND $6B'`CONSTRUCTION ali/l l ; EASEMENT TEMPORARY F _ .. d},�-k\EN,7` ``_ IMPACT: TEMPORARY ;D`5 _�\^`._` $0'+CROSSING USING MATS • _`BRER1C\QFIG _lN N /r♦ l"i EPI-VO`E,S�-, '/ REQk 1�90 i .�, A�'b4 � e, � i SITE O NNS 0A5"`•_N _ i � i IN/�� / �b \ o ♦ - SB Fh , I GRAVEL PARKING AREA , 1, /PCI SF ',bfNG' di s ' 1 i ' / SB -- _-___ /, _ y8�' , ,EXP �N ________,, ___ ___ ______-__+r00 __ ___ _ c s90' :'/� T E ' (STP,20 0-Q449Q11 i T d« - _ _ -_`_� ___ _ _ _ « s7gDK�. -- y I / DUKE ENE'0'," -- /8,p -/ / PROPOSED-,RAILROADSPU\�\\_ TRACKS LINE ``____ ,-- 1\ EAASOE-MTEMNP _ p' /WETLAND \V 26A « - / ,- PERMANENT EASEgwr - I ` 1 \ \ ,; -_-� -_, ____ / TEMPORARY IMPACT: j , /\ /,� .: • / / OPEN CUT FOR GAS LINE, / \ -------------------- DEWATERING STRUCTURE / q 1 \ r V _- _-.___--_ -__ - PROPRIETARY 6 CONFIDENTIAL ALL RIGHTS RESERVE. • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) ROS"'•„ PIEDMONT'S NATURAL GAS FACILRY DRAWINGS ARE CONSIDERED CONFIDENTIAL�OM-1095• DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSERF-IO .-AGEMENT (RIM) POLICY IOD, P us cOR05aINFo. MAMA PNG-G-048-0001DOE PNG-G-046-0001009 A ZO QeoeEss yc ' ION(S) DESCRIPTON DESCRPTI ry ��� ����y�� .1 ^pwckll�u LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 67 90 DWG SCALE: AS SHOWN � AREA CODE 9335 .Nm"•^w• O owG GATE ovnMe Ko ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 DRAMNGNU.—UPENCEDED Evlsl R Dx ��,�,�� IWW�� DRAWING BV CPD .1 p"", �C83D wvvRlGxrm,�vleornoxr runRAL GAs coRP. STOKESDALE, NC C -446 - 0001062 1 CHECKED BY CPD wh ^"'"' "" WKG PRIrvaPgL 10/022018 �Ua�LA\ 1 E ^`O C.RP.DRrvE RESOURCE CENTER REIDSVILLE APPROVED BY WKG LEGEND LEE =3 7-7 - -- - - -- ---------------- 0 ----------- ------------ -------- ---------- --Y/ \\�i 'i Ali �i 11'%','/i "DUKEfENERGY', -D� -i;zI ,pEFkMANENT'1,\1,',,,,�% < ----------- A EASE A )==MSTA L T -------- -1 INSTALL SLIIHIE BIREAKEIiSPINATEI BA, 5, 1 ---------------- -l-lf3TkLLAMEItICAN,tXCVLSIORdURLIEX, I 1)11III1.,,1%\�,',,�",, IN IMPACT SITE 2 _-3 FI BI -fFIREFLNEI IIIII16INFER APPRGVEP' I RELEWS LAKE APROVED SEED LENT "D AS p 400m AS ----------- -------- WITHIN 7 DAYS.-_____ ------- --- ------ WITHIN WIT, III ii f E/ ----------------- ------------- - ------------ T, 0 ,PERMANENT' ------ ----6: 1 ------ -- 0 cc 00 SF --------- lb 0 -- -------- - - --------- ------------- -- ----- ------ ---------- IF ZV71 -------------------- ---------- - - -- --- -------- ---- -- -- -------- -------- ----- ---- ::: -------- - ---- ----------- ---- NOMPAQTi ---------- ------------------- ---------- ------------------------- ---------- ------------- ---- Nh Z 3 U WN PROPRIETARY I CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS GNILY REF. DWG(S) PIEDMONT'S NATURAL GAS FACIL-DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-ICBS) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRANING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 10DI PNG -446-0001008 PNG-G-446-0001009 N. I N(S)DEZ— BY —1-1 AIR—. SHEET 68 OF AS SHOWN 7 0-8 ISSUEDFIRI—IRM 2 2 1 EE�L C.E= IPWcknont rm LINE 446 BELEWS CREEK PIPELINE EROSION CONTROL PLAN U_ATE _1"S losIDWGSCALE: "" I I"11 BBUED IR I-11RUI—N R11111 I KL- -PD WE ACCO N NUMBER 10 ACCOUNT OUN—L !PR T 1(3,1 RANINGI4U.— EVISI GI TEC 11 Natural C mas N.rIER ."ZC vD RE C_D STOKESDALE, NC PNG- C -446- 0001063 0 CHECKED BY CPD ,AL ........... NZ��j NC —R�.— "1.1E`41E1.1p,"1NA1 CE RP RP7FO � E .. N,=V RESOURCE CENTER REIDSVILLE I APPROVED BY L ENG 0912112018 WA�� NEER CH—E, NC 1211 LEGEND __ _ -- ' l(1 "/:::/ 'i "-'-___` ` `\ `.` `\ \"` ``: ` \ `` \ \ ` -------------- : t ' , /�; " PROPOSED A`C _ \QPO$PR'dl�AIN I ® .Ewa.ow p _ - - - ------ �, :________:/;;;; /%:: r ROAD SB �E dLEA D@EDD,, \VNISPlDT10NN6 DRU$ EP&GRA-- \\ \\ po soe - ___-'- "-/ .SWA4EY$E�S+RAP \ °`♦ ^/�!/ �; ; i' % ///�'''f ' ' /�' /' ,. '/PROPOSED i RDAD __ IGRpbING Oµ --` -- I cxmxlc scA�x uN.sxTl .` • _ - ___- __ , _ _______ - - o _ ___ _ ___ -'_\\\------ vxuww[�vuu _ _ .� — _ �` ``\``�`�•�`' -__ _ \`�__ ``-_ - RSD- _ _ - - __ "__ \\ I _ _ 1` ____ / IMPACT SITE 2 ___ y----------- _ -----BELEWS LAKE � --- --__------------------- - - - __ _____ I I .\ _-_ -$F--- AR-D7%� / / / / IMPAG-oP�d777___ - ---_ _ �\ __- - TERHI _------------------- `\\ - __-- _ /�_ BELEWS LAKE .` �__ '/i ''��/-\`�' �S�RUCTURyi �TUlp/!(ENT` _ _ _ _ __�F.\ _ _- - _ __ HDD GROSSING -- -0 i i �' is i ` . \ `\ 1 \I _ ___-p__ ' g- _ / /� NO IMPACT ---- (�- ``'�'-'-_/ i 84, r ��(la'' N •C';; EAg_, ;' f e i---- _ _--_„`-�-; �' i r �MP CTS ---- 46P,// I, ___---__ _---_-_`'� C I ' / ' STEM / rr i .r. ------------------ i i i yy I n 3 ! t _ -- --- _ - Aro �a ` � � CLEAR%1Nb GR LL PERMANENT ` l ----------------- � Sg T LAKE -STA 63+001. � w ` ____-- _ \ - ILT FENCE AS THE AREA IS -'------- � - -- -- --'-- ,- \ __ CLEARED. INSTALL SLOPE - _ i� -------- BREAKERSIWATER BARS. INSTALL AMERICAN EXCELSIOR CURLEX 1 � FIBERNET OR ENGINEER APPROVEEQUIVD AS ANDSOON APPROVED SEED MIXTURE AS SOON AS POSSIBLE OR \ \�___ _------ MIXTURE WITHIN T DAYS.__ =8 � Wh �� _� WO Z6 Er i O $ a B PROPRIETARY A CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) ROS"'„ PIEDMONT'S NATURAL GAS FACILRY DRAWINGS ARE CONSIDERED CONFIDENTI& (OMANS)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF P us conosawpo.MaxA PROPRIATE DISCLOSERPREVIOUS MANAGEMENT (RIM) POLICY 10DI PNG-G-446-0001008 PNG-G-446-0001009 zO QeoeESs • y? - IONS) DESDRIPnory DE—PTI N pwhlm ��� �����y�,,.�11 LINE 446 — BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 69 GP g0 DWG SCALE: AS SHOWN W. AREA CODE 9336 ^^'^�'•^�'• DWG DATE Dunne s.U.UIEEDED NKc ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 ORAwixc rvGMseN EVISI 4� °" `°" ��,�xx� MGRIN E H NMUFy � DRAWINGBV cvD —STD -Rv.-rm�IPre0.p,. unRAL CAs CORP. STOKESDALE, NC C -446 - 0001064 1 CHECKED BY CPD wh ^"'"' "I"WKG pxlrvapgL 10/022018 �Ala1'\Y\`l E CORP. DRrvE RESOURCE CENTER REIDSVILLE APPROVED BY WKG LEGEND / -- -_ PRpostm a ® .exvaa.o. O ACCESS ROADAR- 072 � l _-, — _--` -- —'8 ® rew..wln...,.o..wx C] -- ��� `__ ` �" ���_ I 'B ' __ i'/ )'i// ---'P30 `'` SS __ � �,� � ----------- ..F....- _ " y/I _ -'- _� / , / / 4303 ' wwrv� Aoo o ., _ _- "'___'__ —_____ / /c evil --- @g _ / 1 _ _ " ITI eaussev, I I _IT) _ \ ------ No __ �/ ---------- _ _ ' 1p 1 1 , 8Fo 1 _� DINE ENEROX -- R -_, mS-------------- —✓ , .�\ ; .Bis \ j_ � \ ` \ \ `,�. \ :, � & m _ ----------B \ / Y / ---B. __ w, gni s- gg 0471; •/ \map.` ��¢` 8: 60 II •+ aL10�,'� 1 N Q�, al /, ''^/ / il, --_ -----_-__--'iii - —'---_; \� ,moo`,\ �__`��\ ,t� � ,g,•�/ �� / 1, 111 1 _ i - \ ' W @ ' ^SB /i , 11 p S•. _ ---- --- IoQQ�` l 6' �IEMP' / �, _g"_—� \\ m ' EASEMENT I II �'46sl--eAs _" Z+ ; , _ - / I \ ' 11� SB - 111 FLOW4b' TEMP I I T- 40'TEMP � � EASE / r Z bTRE 37 __ CX l'Ep>SEI1rENT � ,�/ y � � //`r D / ; ' JINiERMFTiENT� — - SF/ f� m mU - _ i 3g ! / 111 I MP NQ '�- _ ACT SITE / SPA" - '- 40' 7EN5P ' —� '- —' 1\ 11 ST — f r R M 2T. \ EgS�M , \ ' I 65'TEI EASEJNENT ///�� T E ! / EM WNT / /ir SF r ENT - -- ESTABLISR //�// ACCESS ,AD .: ;G / // _________ ---- A• 1 ____________ \\ `-----------_-' / EMPORAR� III _ —__- II 11 Il • II ` `W$ _ I I W — \\\ ` i Y L PROPRIETARY a CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMOM'S NATURAL GAS FACILRY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -INS)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATETO INSURE THERE IS NO RISK OF P us COR0581NF0. MANA INAPPROPRIATE DISCLOSERPREVIOUS MANAGEMENT (RIM) POLICY 10DI PNG-6-446-0001008 PNG-G-446-0001009 AZO QeoPEs3 v%s ' IO N(S)OESCRIPTION aPKeOo DESCRPTI N ,PWck LINE 446 — BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET TO GP g0 DWG SCALE: AS SHOWN AREA CODE 9336 ^�^�"•^�`• OwG GATE OvnMe sNu. EDED wxc ACCOUNTNUMBER 0107000 PROJECT NUMBER 1626546 oaAwixc rvUMeER EVISI 4C °" `°" ��,�,�� . MG%EcD N��a�ytu�,�1 INp0y1y� DRAWING BY cvD RECaSTD wvmlDxrml. vlEomoxr runaAL vas coaP. STOKESDALE, NC C -446 - 0001065 1 CHECKED BY CPD ax ^"'1�'� "I"'F� WKG ERN_AL 10/022018 �A1VO� k\I E coRv. oarvc RESOURCE CENTER REIDSVILLE APPROVED BY WKG LEGEND ------------- -------------- -------------- II --------- ------ ----------- ---= I :_— ---------- --------- 7 40' - ---------------- --- --- _-Z -------- --- --------- -- -- - ------------------ ------ •----------->40.__ ­ — — -- --- - — - - ------------------- ---------------------- ----------- - --------- - -------- — ---- ------------- -------- - ------------------------------------ - — — — ----------- ---------- ---- 775 -- ---- - ----- ------ ------ ------ ------ ----------------- - ------------------ ----- ------ ------ -- -- -- -- --- - - ---- ----------- ---------------- - --- ----- -- ------ --------- ----------------------- ----------- - - ------------ ----------- ---------- --04_ -- r -- - ------------------ - ------------- :Tv 3 -- - ------- - JEAM IZX,l ------ - --------- - --- ----------- - ------ E s� -- - ---- Lp E E NG' -- 14, ------ TUBE, Esp - - - - - - - - - ---------------------- \, ---------------- % I E T V" ---------- ---- SSIN' ---------------- ���..�.. _ L C J, 11 ,,, / f j , , , G0'jPRbP0SEI 2 WENT 0 Z 4-� 1 A N WI 7 F4, f Eon 4�q 7. v ------ 1 i ORO 11 1 v POSE GAS T., "F f ------------- "'A Ek.. "� 'TEMPORA RY /1 'L ------ NT 11 40� TEI R A"' ""�E'!INT AiCE63 RA 1 'FiliEMENT1 I DAD ------/ , M NED� --- - --- ----------------- R A T IMPACT: ........ .010 1 - IMPAASITE,5: I RQW CC*VER WQN'OF AR ---- WETLARQ 27A',, f 1 1, S. "WitTIL -278 WETLAND PROM 'AND I ------- %------ 4Ir" CONTRACTOR TO 414 ---------------------- ol� JMPOVEPATH AS -- I NECESSARY !F6R USE BY'VEHII;LES ----------- ---"'AND EQUIP Mi EN T ------ ----- --- - -- -/ ----- - -------------------- - -- ------------- ------------ PROPRIETARY I CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMOW'SNATURAL GAS FACll-DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-INS)- DRAWING IS CURRENT ONLY THROUGH THEL�ESTR�ISED�'�INSURE THERE ISNORISK OF INARPROPRIATE DISCLOSER ALL PREVIOUS PAPER 11PIE1 IF THIS DRAWING IUST IE DEITROIED 11 ACCORCANIE IITH RECORDS I INFO MANAGEMENT (RIMI FOU'll 1111 PNG -446-0001008 PNG-G-446-0001009 1­1-1 DE­ I APPROIU-S 7-- PWdMont ral LINE 446 BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 71 OF go DWG SCALE: AS SHOWN I UEDF.R.-.TRU.T'.N I -- I W- I AREA CODE 1 9 •RE.,:= EN DIG DATE =1118 I SUIENCE.E. I I... I UlDFORCONSTRUCTIOIR-5- 1 J" 1 cm 1 � I ACCOUNT NUMBER 0 1037'0'0 0 PROJECT 1 1 RAMNG.U..EREvlsl , lG%TEH NaWrW COS C,,ZC N.78ER cvD RE D NT.HIPIE .... TNATURAL.A.C.RP. _'.RF.FO.E­0lIED STOKESDALE, NC PNG- C - 446 - 0001066 1 ICHECKED BY I CPD - ........... 'FIN AL NO L­AR I 'Srl E 'NEE 10/02/2018 WA�k�� .,NE F .. I.-D-E RESOURCE CENTER REIDSVILLE I APPROVED BY I WKG LEGEND/ _ __ ___----- 11/' :: - \\ ------------ — , _ ' ' -- - — r, ® C1 _ -� ` / / % i i \ p ) _— ') i / i -------- ----.o I � s 7 --_ - r / I--aw--� -. = - ' �. �`. \ :yob p. , 1 ,'j �// 'i! 1 - _ .:;- 1 _ ;- i / _____ ___------------------------------ ' _ - -_______________ ------/ . - ---- , - -----------`_ •�-'a2a-- - __------- _ �_� -� 820--_ � —.. � _ -_ - \I' 00 �— 1 , -- ao - ' - / r' f '71 r, sow .� _ �, 'r�', I ' 1 / 'I Go-P�tGPoSED ..ma`s'.,\ IND (h�vAG7/, 1 \ PERMANENT 1 UkE NE GY R �`,o; % i I I o I\ ow�� o i e ,'S/ a e(/ e e e e ee e e e e e e e 1��\ '// '� + + \\ __- +`� �. u �:' p--��..- 6� � M) e -� a •• r « � �� / �' I -�� C�/'/ 1 � �`•• __ $ \ \- .` w�f �<vf=teq - ` eo�eo�ev <o—.eo.eo—wry=yvo--cwi $� SF - 1 I` y �[ V ' \ --ems,. \ , / `, I �49� LEMR \ \\ `. \. \ \ PROPOSEQ GAS. `` \ 40' TEMP / i ,STREAM S N(yL\\ \\ EAS �E ' - --------- _Y �EREM ) 1 __- E N_T . 41NE 1 / ` �\ JJJ 'TEMPORARY UI C \ e� - OPEN CUT'fO�GAS ______ DEWATERING `. \\ ` \ I \ ------------ --_- •___ — STRUCTENT' / , \ ` -_'889 ...... CTL\ - '. `_ \ \\\\ EQUIPMENT \ : __, 475 // , I i // \ .` \\'\ `i \ CROSSINGIMAT.r1 PLACtENiENT I I . _ r I � ' m r psi / i ' ____ I - 1 ` { W I\ // \i�C \\ 1' / __.\ \ `• %'1 \tom i� , -_- _ __ x I� �l -------- a -------------- --- - _- ----�'------' _ - ----' i __—__ Z ' \ . i 'i ', 'I \ % ' —__ \ . \ �-_______ \\ � 90------ • \ I � , _,--------- _ ---- i ---- , , \ PROPaIETARva CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING• USE DIMENSIONS ONLY REF. DWG(S) ,�A ROS"'„ PIEDMONT'S NATURAL GAS FACILRY DRAWINGS ARE CONSIDERED CONFIDENTIA- (OM-INS) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE • TO INSURE THERE IS NO RISK OF R us conosawvo.MaxA INAPPROPRIATE DISCLOSERPREVIOUS MANAGEMENT (RIM) POLICY 10D1 PNG-G-446-0001008 PNG-G-446-0001009 - Qeoecss • y? lon(9) DEscRlRnon DeecRPn N APPSazo LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 72 GP g0 DWG SCALE: AS SHOWN � AREA CODE 9336 -11.^�„ REGIONAL I-G DATE =1118 swE EDED W ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 DRAxtxc rv0M9ER Evlsl 4� �� . MGRINEH IYpIy1y� DRAWING BY CPD �C83D wvmlDxrzal. vlEDBoxr runRAL vas co0v. STOKESDALE, NC C -446 - 0001067 1 CHECKED BY CPD a ^"'"' "I"'r� WKG vnwclvAL 10/022018 �AIa�LA1'�Il `l E coRv. DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY WKG PNI LEGEND N, - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------------- 7 f i i 11 0 f A---------- ------------------------- EXISTING- - ----------------- ACCESS ROO11 I AR-008 (PERMANENT) - ---------- 65 TEMP --- //---EASEMENT r", - --------- ------ ------ ......... -------------------------- --- V,------- "'TEMP "EMEN7 --- -- s 8. 0+ ------- P O 3 -V "QIIMIPANCT ------- j, PEk GUf c /-7 101 0 -WETLANP'22 STR '2?135 ----------------------- ---- -II,io IMPACT 65,T EASE N* - ------ ------------ --------------- 1 P OPEN - -------- 1 OAS ft. -111"IIIIIJENrCROISSIMMIMAT. ------- - -- ------- - ----------- PLACEMENT ---------- -- - - ------------------- ---------- -- ------ ROW 270- - --------- ------ - - - - - - - - - - 1-IN ----------- ------------ ----- ---- ------------------------------ PROPRIETARY CONFIDENTIAL ALL RIGHTS RESERVED• DO NOT SCALE THIS DRAWING• USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILTY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-INS) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF T INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUS BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 10DI PNG-G-446-oo 1oo8 PNG-G-446- 001009 o DATE ISION(S) —RIFTON BY HK1-1 DE— I AIR—. pwckllm rail LINE 446 BELEWS CREEK PIPELINE EROSION CONTROL PLAN DING SCA SHEET 73 OF LE: AS SHOWN _0 ISSUED F.R —TRU. JLI 2" AREA CODE 9335 REI:= EN _G ATE _j". jos U .. " .... 12-8 SSU DF-E. T!U M EET-R.I... 'K. V ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626546 .—NGI4 IG%T�E CD H NMurW Gas — DRAWING B CPD RE 'p 7=7 "N PIEII*"T-' CE STOKESDALE, NC PNG- C -446 - 0001068=1 CHECKED BY CPD - 'FINC AL W� , F 10/02/2018 W A� EN NZE RP FO. _ " E4 ED .. T=V RESOURCE CENTER REIDSVILLE APPROVED BY WpK a LEGEND - - - - - - - 7 -- ------ --- 1.0mo J 7�j ------- ----------- wwuwwEnw SIR EI ------- , ----------- ------------ ------- op --------------- % TEIVIP 'EASEMENT ------ OSED ..B, \ II ------ ------------ ----------- ------------- ------------ ------ -- -------- O ----- ------- 65- TEW -------- L11 E EASEMENT k + II ------- - I --------------- - ----- ------- ------- ---------- ---------- 0 11110A -- - ---------- - -4ACK BOB -------------- SlIANIBEIREI'VAIM )f4 EASEIIIIE7NT, ------ If ------ ------- pe T E So. PROPOSED\ t- ---- ---- --- PERmAN ENT _6 DUE TO THE STREAM DOWN SLOPE OF -------- --THE PIPELINE; INSTALL AMERICAN ------ EXCELSIOR�,VRLEX I FIBRENET OR NGINEERAPPR ED EQUIVALENT AN61� PROPOSE. A---- APPROVED SEED MIXTURE AS SOON AS ------------ i ACCESS AC ROAD-_ POSSIBLE AFTER PIPE INSTALLATION TO Ld., A A s STABILIZE T"EAREI --------- ------- ----------------- Dj...ENE,�131 A PERMANENT FOR MAINLINE VALVE) ----------- ------ -------------------- -------- ----- --- TC E -- ------- g-ST CT------- - \-?v -------- ---------- - -- STAM19 -------- STRIII -------------- NONIMPACTI\\ -------------- -------------- - - - REkMI ------------ - - - - (PERENNII TEMPORARY IMPACT: PEN,CUT FOR CIA S�L'.NE DEWAT R --------- Aft STRUCTURE, EQUIPMENT CROSSING/MAT R;ASICNEGINIAT ME T ---------- CONTRACTOR TO -------- STRIP,TOPSOIL ------ AND PLACE MI IN ------------- \FORUSE VEH.CLE: \EQUIPMENA. - - ----------- ---------- -------- -------- ------- ------ -------- ---------- ---------- PROPRIETARY I CONFIDENT- ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMOW'SNATURAL GAS FACIL-DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-ICBS) - DRAWING IS CURRENT ONLY THROUGH THEL�ESTR�ISED�'�INSURE THERE ISNORISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS D— MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 100I PNG-6-446-0001008 PNG-G-446-0001009 L' Dill BY —1-1 DE— I AP—S PWcknont rail LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET T ASS7 EE 14 OF OWN . M I UEDFDR—TR 1 1. .. I .. I AREA CODE I 9335 1— -N-11.1­ I REGION& ENGINEER D DATE _1O. I.SIDWGSCALE: I U... ISSUID FOR —SM R.I... 1 — cm 1 — A NUMBER PROJECT ROJECT NUMBER 0107000 1626546 .—NU"""" ... --- — 1-1-111"ITI IGI TE1H Natural Gas DRAWING BY cPD REC.ST. P—HT.NNE .... TNATURAL.A.C.RP STOKESDALE, NC PNG-C-446u- 00,106.71 CHECKED BY c 'ERIN CZE AL ., NEER 10/02/2018 kjjg�k�� EN N R ..RP. FT1. E 4D0,EE, —�.T,— . —E AR .2 11 RESOURCE CENTER REIDSVILLE APPROVED BY PN.-.1SCIPIINE--..E CENTER .... OR LEGEND ------------------------- M 0. LL =3 7 L] -------- ------- 'gis —z - -- ---------- - --- ----- -------------- ----------- -- -- - ------------- ------------ 30'PRDPO91E D/ ---------------- PERNIJIMENT 1 UIEMEN-f % - ---- N/ ------- -------------- -------- ---------- -- 7 41jr, ---- ---- ----- ----------- -------- -------- A -- -------- I I D16KE ENIII "': ---------------------- PROPO4ED GAS 1 I D -------- DRILLEXITLINE DO ROW 2,70' ----- --- 00 0 1 ee 1 0 + "T + + + + + + " A A '(* *qJ A . 4 X1'1 I I, A Po =TCE ' --- ------- ---- -- SS ,PIQPOS ED D it D GA31 P POSED " -LINE PE ;:PRoPosE6' ----------- 7TC7E Rh"ENT % --- E ING NO OR PA", ----------- - . 4 -TEMP --------------____ - .. .......... F.-IIISSMENT m 11 P .16PICNI.E., ACCEIto -- ----- CLEAR AND GRUB PULLP E _AS T "MENFIr (STA .4.+.. — "AN - EN AR 15p -GO5. STA 246�+o INOALLS","'PENCIE AS THE AR4 (PERMANENTW, BLEARIII INSTALL SLOPE CLEAR, GRUB AND ------- 'GRADE ------ BARS. LL GRAD NG P= FIBER I SHtET21; NET o f El UIVAUM N D ppfzo��P VIED TUBE A I ------------------------------------------------------------------------- ---------------------- — --------------------- yi PROPRIETARY a CONFIDENTIAL All RIGHTS RESERVED • DO NOT SCALE THIS DRAWING - USE DIMENSIONS ONLY REF. DWG(S) ..... PIEDMONT'S NATURAL GAS FAULTY DF— CONSIDERED CONFIDENTIAL (OM-IN5,)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE •- TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS D—ING MU T BE DESTROYED IN ACCORDANCE WITH RECORDS & INF.. MANAGEMENT (RIM) POLICY 10DI PNG-6-446-0001008 PNG-G-446-0001009 zo .... . -S A N. "S RIB ISION(S) DES— BY —1-1 DE— AIP— pwckllm r®l LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN s H�5 OF go �DWG SCALE AS SHOWN -L11 — FIR 1—TRU1 -ND w- I AREA CODE 9335 REI:= E" DATE =1118 � SUPE—E. 1— — FOR COHSTRUCTION R-5— 1 J" 1 cm —B !ACCOUNT NUMBER 010700 PROJECT NUMBER 1 1626546 D—NG.0 E �GR TECH Natural Cos DRAWING BY I c RD REC.STD � --...—PIED ... TNATURAL.A.C.PP STOKESDALE, NC C _44 0 PNG 6 001070 1 CHECKED BY CPD — E AL E'N.�I�NE`E A�L 10/02/20181 R 11-11-E-01IDDIM—B—D—E RESOURCE CENTER REIDSVILLE I APPROVED BY I WKG CONTOR.—OR LEGEND �� ® air vaeuow ® a rrwau — x L vuwxuiwr — YI H H „ Els n ® rewvwr^.nrµ.uoawo C�1 V h /+EIIN ETI LEEw n reawmwaxnuu o ❑ -� S3bOb ,qq q<s qua � 1 i I a _ _ WEcomTLAND 20A `-. l/ D � e� I S% � I � �, I I -' —• � J ,PERMANENT IMPACT:�IRQYY LAND , r_____ � � .ate_ � � 845 FROM I _ �90jTE' ��g FORESyED-TO / NOWFORESTED,EQWPMENT EAgEM€NTS _ N _ m `_M `' $ / ___, kLeiC CROSSINGIOAT PLACEMENT, �µ-'-,__, d —_—__ yy RLANa1F/V_-k' ,0 / ,' _ •y oqice' �` $� �Q _ AN I 4NDD ROSSING /m ��0 " -�-"- <: e I l r i i �O IMA� ' 40 N �00 ��-� \ r �p''� kE ENTRY p I � 253+oo N S DUKE ENERGY"'_'—�; --- w--------- J, �O \ `.\'• ' / / i /// \\ - R0�11270, ; 8TREA 72 8 al; - _ / 'IMP YBITE IO 1N S, REAM 12! \l O EN+CUWAND ao / —,_— — __— I — \ / TEMP Ry / e„ 1 r� , \ N(ETLq NO \EAisTlNO CUF�IERT // i _ _Y. ___ IMPACY r /' IMPAC`TSITE9' ``____ / � � WETLAND 19 PONUA �`. \ �` `.-/$'f{iEgM 77 y%' �'a Li �r-_�._.� _/_/', /I—J( — - s _____ ' _ oJ' 1 _ i ' _ _ - _ , ' P.0M1ID4 _—.--LPDCN0331NG•;' /I NOD9RQSSINfj" %WETLANDiNV N07M C I. i IMPACT ; ' t / / ; \ — __— -_ - -_ _ / - _ I r. / 1 _- STf.EEAM is _ ��,: _,_.. ; -<ea_ - I " a. ,STREAM 17 // I � WEA-AN&20A \ { � it � aeon 1 ry "`� Il S e5s , `.I I�\ A�1 APpRpI _i 1 '�I 7 CLEAR ASI D GRUB FU4L PERMANENt EASEMENT(STA 284+50 -STA P,54+7 __ 4�-_' / / i \'C\� —�/ 11 -_—"= I I 'INSTALL SILT FENCE AS THE AREA IS CLEARED. CLEARED. INSTALLAIHERICAN ACCESS R CUR 1 FIBERNET 0 `� S I ppgME ERCELSIQENT ------- -" I If �I I ENGINEERApp', RA APP..yVEOSEED MNLTURE ASSOONy14 ,1 '/ y-<� \ P SIBLE OR WITHIN 7 DAYS. "" I \ I `_ I , / �' \\ -�oy�' II1/ CONTRACTOR TOj' IMPROVE PATH AB NE¢IESSARY FOR '— USE BY VEXIGLES -_ -- AND EQ III, __ 11 �_ %% �`. I 1 1 �—BERNICE ROAD (EXISTING \\ -_y� ESTABLISHED ROAD( \\ It II II PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILRY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -INS)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF v us conosawvo.maxA INAPPROPRIATE DISCLOSERPREVIOUS NT(RIM) POLICY 10D1 PNG-6-446-0001008 PNG-G-446-0001009 ?ZO QeDeEss ;9'? �y�`4 IONISIDESCRPnory avKeDo DEeeRPn N ��^PWckn�u LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 76 OF 90 DWGSCALE: ASSHOWN 0-8 ISSUEDFIRIDNITRM AREA CODE 9336 -111"1^�„ OwG GATE DvnMe EDED wxc ACCOUNT NUMBER 0107000 PROJECT NUMBER 1626646 Nu.BUIE DRAwixc rvDmsER EVISI 4C °" `°" ����.w x®� mGRIN E H Wadiral C.TBS DRAWING BV cvo RE_STD covmlDxrmII v1EDmoxr runRAL vas coxv. STOKESDALE, NC C -446 - 0001071 1 CHECKED BY CPD wh x ^"'1'"�'� "I"'r� WKG vxwLIEE 10/022018 �A1Vu� k\I E coRv. DRV RESOURCE CENTER REIDSVILLE APPROVED BY WKG LEGEND ­ m I=woo I uxnsomuw� nm— Ell arc 1121) El E5 7 la) 0/ E 305. Mll ----------------- ------------- 3414 '43 PA pal ---------------- "aft ----------- -- - ------ ST EAM -----------STREAM43 ----- - - - - - - - - - - - ---------------- jjj ------- TEN I ---------------- _TEMPORARY tMPk 1. =R Cii, ----------- ----------------- --- - -- -- NO INE --------- ---------- =TER'l - - - - - - - - - - ------ - 0-11 --- ----- ____STAUCTURE, ------- ..... u --------- ut EcpjIPMENT 3E-. cltossl..­� ---- --- - -------------------- - -------------- -------------- ------------ TSC - ---- - ------ -- m N- SF P ------- --- - -- $o ----- -------------- ------- ------- -- --- z 905' oo A �j ---- , - ----------- 78 9 I Aa *_ 8 ­� --------- T - - - - - c So Sc TiATE0 IMPAC, PROPOSED IMPACT SITE PERMANENT �T�EIk4 12 ------ f ROPOiEF OAS I, I STREAM 14 ------------ -Do ------------------ ONE F W ------- ------ Du.. ENERGY' ROW 270' 17 ------------- ---------- % % Ak- ------------------- ------------ , r -------- ------- ----------- ------ -- --------- If J. PROPRIETARY I CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMOW'SNATURAL GAS FACll-DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-ICSS) - DRAWING IS CURRENT ONLY THROUGH THEL�ESTR�ISED�'�INSURE THERE ISNORISK OF INAPPROPRIAXE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAINING MUST BE DESTROYED IN ACCORDANCE W­ RECORDS & INFO. MANAGEMENT (RIM) POLICY 100I PNG -446-0001008 PNG-G-446-0001009 N. I N(S)DEZ­ "'S BY 1 -1-1 .E­­_11TI._N AIR-. PWcknorvt ral LINE 446 — BELEWS CREEK P IPELINE EROSION CONTROL PLAN SHEET 77 OF LE: AS SHOWN -1/18 MUEDF111-TRM RI 12F CODE '3" LIJ - U_ DATE _1"B IOSIDWGSCA Up'-"" 1 1"11 11 111TR­ R11111 D ACCO NT NUMBER OTOMM !PR T 1 1�r D-NGI4 U.— R`7 H IG%T�E 'D NgurW Gas N.rIER DRAWING RE - ` `H.'14 E1.1p, "T NA' C*RP STOKESDALE, NC PNG-C-446- 000107271 ICIHECKED BY I C CPD ^"'"'NCIPAL _W­A­_�­­k�3rj EPNR'GINEER 10/02/2018 1 RP FO E .. N1=VE F= RESOURCE CENTER REIDSVILLE _WpK_ I APPROVED BY I PNG-.ISCIPUNC­FCF LEGEND soe�r� - LEEwoo rnx.Erwr .L Sp $ 40'TEMP 30gx g EASEMENT A S ma m __ _ •iqC j��/ g�� $ g9 A 2� 04ma A M33� 6 ➢G N:� tee EM PORARY'IMPACT: \ o� OPEN CUT GAS S- Oaf'\ 3C C q 2 J Z�D� D F u+� Z -------------- "- $e LINE, DEWATERING O' PROPOSED �A STRUCTURE, PE NENT \\\\ O EQUIPMENT `1G1ROSSIN6IMAT \ PROP GAE NT / \ J d0 O e, rLACEM / Pal FLOW —OW e m% IfaPRACTI51TE i13: i r r \ 3 EA�h\19 r r r r t ` tl ` p xlA % g p0 ar C U all POJ 33 N' � 5 a SBS DD �xx DD j �l V ��*� �ry 8 t �$ c �I 'vW �V r SK W�LAND IT! NOAOT' IMP azt. q O WETLAND I6J Nrp IMPA�T�/ K r : / r 1 r e � ` ----------------- _ i \� r , PROPRIETARY a CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY - REF. DWG(S) PIEDMONT'S NATURAL GAS FACILHY DRAWINGS ARE CONSIDERED CONFIDENTIAL(OM-10 DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE• TO INSURE THERE IS NO RISK OF R us conosawvo.MNNA PROPRAJE DISCLOSERPREVIOUS MANAGEMENT (RIM) POLICY 10D1 PNG-6-446-0001008 PNG-G-446-0001009 / rG Qeoecss • y? 2/ lorv(sIDMCRIRnory aRKeoo DeecR PTI N AIR—. ISHEET r®' �����y�,,,.�11 PWcknon LINE 446 — BELEWS CREEK PIPELINE EROSION CONTROL PLAN 78 GP g0 DWG SCALE: ASSHOWN AREA CODE 9336 ^�^�-•^w• DWGDATE oM�'I'D swE EDED WKS ACCOUNTNUMBER 0107000 PROJECT NUMBER 1626546 .—NGNU— Evlsl 4� °" `°" ry� µs MORIN ECH Nato y � DRAWING BY cvD �C83D coP.RIGNT"I.IEPIEGMONTNAnRAL�AsCERF. STOKESDALE, NC PNG-C-446- 0001073 1 CHECKED BY CPD wh ""'"` "" WKGPRwcIRAL 10/022018 �Ua�LA1'\�G E coRR. DRrvc RESOURCE CENTER REIDSVILLE APPROVED BY LEGEND 0 �m�zmmmzmzE ® LEN="`m=` — — CLEAR AND GRUB FULL PERMANENT EASEMENT / (USE RAND TOOLS WITHIN 10' OF STREAM). STREAM 32 CROSSING NOTES: INSTALL SILT FENCE AS THE AREA IS CLEARED. 1, MATS WILL BE PLACED ACROSS THE STREAM TO CREATE WORKSPACE WHILE SLOPE BREAKERSAYATER BARS. INSTALLS ,,,,„„=,,,,Po,; _ .L \ \ THE BORE UNDER THE ROAD IS INSTALLED. INSTALL AMERICAN EXCELSIOR CURLER 1 FIBRENET OR ENGINEER APPROVED EQUIVALENT 2. ONCE THE BORE IS COMPLETED, THE CROSSING UNDER THE STREAM WILL BE O sm.araauo O / AND APPROVED SEED MIXTURE AS SOON AS CONSTRUCTED. \ / POSSIBLE OR WITHIN ]DAYS. ONCE THE PIPELINE IS INSTALLED, THE CURLEX AND GRASS C1 1 1 SEED SHOUL D BE RE-INSTALLED AS SOON AS t / POSSIBLE = o FIRST ROW OF SILT FENCE SHALL BE PLACED 15 FT FROM I/ / OO ^^ O TOP OF BANK OF STREAM o'°"x"xmxo` STREAM 32 (INTERMITTENT) I / / -------- _ enm.om.w TEMPORARY IMPACT: OPEN - \ \ CUT FOR GAS LINE, Y DEWATERING STRUCTURE, ® FM1m nw� .'_•- \ \\ EQUIPMENT CROSSING/MAT1�--�---- x{;x l mma.. /.a' s: l i y \ SEE DETAICS ON S}IEgT 9 l , _ __-___,' \ \ • \ •` `\ TRE LYE 11/1 - ---------------- ,F _-._� i' If�STOIiATIGF!ps/ \ �•- � ___ __— _ ---------------------- &PEPEi SBALI r / - _ -' '--' ' a---------- o \\ P.1EXTST ;oo �' "/` z ,' - Ek VEL �( --- / T z^ .CULVERT '8 1'arAr /Rzr- _ -! C7( _ 00 . 3��\ I ` 3 " ?y`/ ` r - y - /1 TCE II gyp/ `,` SB PLOW i { -_ $•�A N f �� �.A� _ � ev �.`<\ .( - _ •+ $g � 4� ,^ - - - - - BB �+'��. ., �� -' - STREAM 34 I' RyOT' ' (IaTERMITT�NT)'6.COY1_•V_O�G TE PORARY IMPACT: OPEN M LFTFOR GAS LINfc, E T\ QEWATERING'$TRUCTURE / S 12\` _ ,L5)O \\�\\\ \`` \\, e _ \ I moi , I* !` `SB \t\�� \ EQUIPMENT CROIBSING/MAT'// ~N t �N' _ \\ `` .p F --- -------- � $f Jo I 86 _ `M GH, W `•_ `, \_'-. \ _,- `-- L - _ ��. �'� /^�__ ^____ III '---`-__ \� - CG _______---_- FN 2, � ------ Et _\ ' \,\- _---------------- OIMPACIf f!-=' ---------- - _ S.ar+00 1 `� \..- -------- 1 '... , _, � �1� � ♦�ZIyP IZ F` 1 4.' I _N ��\,.��- 3?Q4.=• �7 .� F�---\`_ \ �; � II ;fig /, �/ � �\/' .E '/_// _ � �\\\\1, Y / /341 .-----' X PROPRIETARY a CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWINGUSE DIMENSIONS ONLY REF. DWG(S) „o`ZN ,'.ARO "•,,,INAPPROPRIATE PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTI& (OWIN5) • DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF DISCLOSERPREVIOUS MANAGEMENT (RIM) POLICY 10SI P us CORD581NF0. MAMA PNG-G-446-0001008 PNG-G-446-0001009 /Al— ?ZO QeoPEs9 9'%- ki a�y_ ION(s) DESCRIPTION QESCRPTI N r®' ��..1 ^PWcknnu LINE 446 — BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 79 OF 94 DWGSCALE: ASSHOWN : oMP,x EPEDRE IE DNSAn0R00TEREWSIDna DPD WKo AREA CODE 9336 WKD ACCOUNTNUMBER 0107000 WK GPROJECT NUMBER 1626546 ^^'�'•^�• DWGDATE D N1+P oED ow.wirvc rvOlneEn PNG- C - 446 - 0001074 evlsl R Dn 3 %'</''oInEE`.-� ".,, Y(•ITM'pPy`d ”"'•�mni n�„xs MGR TE H REDasD IWWIdIV� �°-.P. Tm+^PIEOMon*n^nR^L G^s=DRF. STOKESDALE, NC PNOA9 EPaDRDIEDNE KRR DPD WK ODRAWING BY IND CHECKED BY CPD wh " ^'�' 1• WKG PRIrv"EEAR 03/06/2019 �A1,�%+nYnkCl E ^`O SRP' oxrvE RESOURCE CENTER REIDSVILLE APPROVED BY LEGEND - - - - - - - - - - --------- WETLAND -ETI .'1011N v I .. ERIIEN, PERMANENT PERMANENT IMPACT: ------- --- WETLA,ND 12A PERMANEH / -1 ----- - EASEMENT TEMPORART i CONVERSION OF E )MPACT: OP -TOUT FOR GAS I FORE�STED TO NON FORESTED. LIN , DEWATERING_ STRUCTURE, EQUIPMENT ------- -CR WETLAND 4A-PERMANENT QSSINGfMATPLACEMENT -PERMANENT -------- EASEMENT TEMPORARY WETLAND 12B PEkMANE�NT- - IMPACT: OPEN CUT FOR GAS ------- ---------------------- ASEMENT PERMANENT LINE, DEWAT RING ACT. ROW CONVERSION STRUCTURE, EQUIPMENT '`IMPACT: oRE4TG _OFWETLANDIFROMF FORESTER- CROSSINGIMAT PLACEMENT. F ----MPORPR \ STAL --- TO NOK-�FORES ED. R ATER WETLAND G 9B PERMANE.11,,L ------------ PERMANENT CONVEYANCE EAEl�NT PE.RM ON F,- IMPACT.IIER 0 MF T..oW To_�, ------ _WETLANdllROM FORESTED ..4EMP LAND IMPACT NON -FORESTED. _/) ) 4o' -F FIRST ROW OF ----- ---------- EASEMENT --- SILT FENCE SHALL --- NO IMPAC -1 �EIE PLACED IS FT B, :MF FROM T OF STZ ....... .. j .1 'T ST �EA 718 v 67 �WE�ND9A t, S - WE)JAND4B D V, TLAND 10/11 WFT!4" ----------- ------ Nw 'A ETLA 1) 12 6 --- ------- 12B - \' TZN -W ---- -- t\ CULVERT rw IF PROPopim ------- NT 00 ETILAVID 8/13 IM SNSN 94 ------------------ NOIMPAC T ______- "_- -------- ------- TREAM 9 r ---- - _T 7 9T 71 -A— CUT T FOR GAS LINE.- --------- $s O 0 DEWATERING EQUIPMENT e� DUKE ENiRGY F PLACEMENT,/' ROW,1270' WETLAND 78 D ONO IMPAC - ----------- _-S > , ------ ------------ CLEAR AN; H.4' EIRMANENTEASEMENT 0 Rme EHAN F'ZZIFZ�_�P.N - F RE AND DV(s,'rALL,SILT FENCE THE AREA N IN - - ------- rtTL`BJ=o,(IHSlrALLMATS BETWEEN ol, --------- STT ONS` D 3 9+NODO STOPFROVGID ---------- ----- ---------- ------------- W91FLAND iEE �N A W S SOON z PIPELINE IS '-C-ZTP��'.BL=EETZ'NIRDEMIX�,'GRA D :SEE ------ IAW SHObLo BIjE IN TALL: AS ------ "ASO"0iiNSTATPOISSIBLE.( - ---------- ------ i I' 111 A PROPRIETARY A CONFIDENT- ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS GNIY REF. OWES) PIEDMOW-SNATURAL GAS FACIL-DRAWINGS ARE CONSIDERED CONFIDENTI& (OWINS) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE -TO INSURE THERE IS NO RISK OF RkPPROPFIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS A INFO. MANAGEMENT (RIM) -GY -1 PNG-6-446-0001008 PNG-G-446-0001009 N. AlE L__ -SI N(IS—RIPTION - BY I CHK JAIMPDJ DESCRIPTION AlP­ PWcknM LINE 446 — BELEWS CREEK PIPE LINE EROSION CONTROL PLAN SHEET 80 OF M DWG SCALE: AS SHOWN 7 0-8 I I"ll 2 BSUEDF111-TRM BBUED IR I-ITRUCTI*N R11111 BP. RMN.... AND -UTE RE-I.N. JLC jKc KRIS CIT CPD CPD WB AREA 9335 WK6 ACCOUNT NUMBER 107000 WK PROJECT NUMBER 1626546 REI:= EN. D- DATE -9 � SUPE-E.E. - DRAW-H—ER PNG- C -446- 000107 57 R_`­ 3 11R TE`H RED.ST D NaturW Clas — "HIPIED-T-1 C*RP STOKESDALE, NC _.N. -KA DRAWING BY CPD CHECKED BY C R N 7%��13r 'EM, 'N IPAL 0310612019 EER _.E4.0"ED ... =�E �P7 RESOURCE CENTER REIDSVILLE APPROVED— " BY LEGEND A A R, 0 END OF GXlS`FNGCESS ROAD GRAVEL AC -CE­ ED M 7 g T' CONTRACTOR TO PE RD LAKE z "'T IMPROVE AS R . ZONE 1: 3 4 A NECESSARY FOR o!UFFER FROM 3TR AM BANK, BE . I­ USE BY VEHICLES I AND EQUIPMENT ZONE 2.50'FROM 3TR MBANK 2 2 -------- STREA114 6 STREAIII 4 OPEN CUT FOR GAS LIN (INTERMITTENT) DEWATERI MOOR STRUCTUR:' HOD GRE NO IMPAC B EQUIPMENT CROSSINGIMAT ------- PLACEMENT ir It WETLAND617 PERMANENT EASEMENT T PE RMANE NT I MPACT: ROW CONVERSION FROM EXISTINGD FORESTED ROD TO NON-FORESTED ACC: SS ROAD TEMPORAK ExIT STREAM NSTALL TEMP INSTALL TEMPORARYINSTALL AR-a#03 -- TO DETAIL STORM.ATER ST EA M5 (PER NNIAL TORMWATER ONVEYANCE ORMWATER ONVEYANCE 65' TEMP (REFER 40N SH EET 5 CONVEYANCE 40' TEMP -6G'PROPOSE (INTERM IR TTENT) H D BORE NO HOD BORE oIMPACT ssl SEMENT °- PERMANENT NOI PACT O 0 1. EASEMENT A 0 00 00 0 1. 0. N B iO [4k] 00 1 SB 313SC lssl 4.502 AC CD PROPOSED GAS DA = 0.992 AC I t E ------- I FIR ----------- T GUIKE-E6ERGY STIR M6 ROW 270' ---------- ---- --- -------- IMPA SIT s NIS EAM4 CLEAR AND GRUB 30' EASEMENT CENTERED o SEE DETAIL 2 ON SHEET 9 GAR I INE "A'HAND TGGLSWITHIN 10OF WETLANDS AND DO NOT REMOVE ROOTS. --- ---- FORS SAM BUFFER Zo;:.- INSTALL SILT FENCE AS THE AREA IS CLEAREOr INSTALL APPROVED UPLAND AND WETUk N6 ------- ---------- ---------------- -- --- ----------------- SEEDIM.10RE-A. S. Po SSMLE�40 NOT- T PLACE MATS ACROSS WETLAN "OR/ACCESS. ---------- OGBUFN MILL ROAD ...... lssl EXISTING G GRAVEL ACCESS ROAD 1-T T 'A MATCHLINEA-A PROPRIETARY a CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENT & (ONLINS) • DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF H-PROPIUATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS A INFO. MANAGEMENT (RIM) POLICY 10SI PNG-6-446-0001006 PNG-G-446-0001009 I BY I CHKI-1 DESCRIPTION Al­ SHEET III OF LE: AS SHOWN `Aj PWcknoffl ral I LINE 446 - BELEWS CREEK PIPELINE EROSION CONTROL PLAN I I... l.UEDF... T.2 MR MMEM! REV... EP.-I.-ARD-UTERE.-N. JKC RDPD cm 1 W� AREA CODE MG ACCOUNT NUMBER 01'037'0'00 H. PROJECT NUMBER 1626546 REI:= NoED DWG.ATE .-N.Hu-P R­­ � II.R.T.EI.H RE .09 NMUrW C EP.. REM.- I KRR 10. 1 - IDRAWING BY CPD 11PE .... T NATURAL BA. CORP. -P.-7.-I.E4.0 STOKESDALE, NC PNG- C - 446 - 0001076 3 CHECKED BY c C PIED ... I.OW.-E RESOURCE CENTER REIDSVILLE I APPROVED BY P-C-PUNCGE.-FOG CENTER .... OR 0311612119 WA'V� ENGINEER H--E, N� .21. LEGEND arc G ���,� O / LEE 7 �cRA.H�c'sr,A�E ON EEE 'Ell Eml 0 m 1 ------------- --- F*L —CLEAR AND GRUB 30- EASEMENT CENTERED ON I Y O GAS LINE. USE HAND TOOLS WITHIN 10- OF WETLANDS AND NO NOT REMOVE ROOTS. SILT FE CE AS THE AREA IS CLEARED. :N:ToTALL LL APPR VED UPLAND AND WETLAND SEE D MIXTURE POSSIBLE. Do - -- NOT PSTRAW LACE MATS ACROSS --- WETLAND FOR ACCESS. BEEF A1C3 6N, F SHEET 94, IQ ------- 71\ sp STREAM 3 ------ ----0 ... MPAGr ------ 0 odl`_ No I LW 'IMPACT SITE A, �, 8 kk� \, � =ETL��5; "TIA 'D 1\ STWEA10 4�qB I.E eLA.`BSA PERMANENJ (INTIERBII;7ENT)1,I EASEMEOTTEMPORARY $e ------ QPEN T"F' GAS 4 ItAP*CT:',OPEN CUT FOR GAS, LINE,gUEWATER.4. E, DEWATERMG !SETBi KFAOM STkUCTUR 25'�SETBim FigM 5 UCTURE, EQUIPMENT TOWER EXIiTINGI1,0. Nt—A,­1 RX08EI0I_qAS EQUIPMEN I R 5 /mATARLACEMONT. MA41 P!AZ1"E% T No IiIED B E ------ ENT E`Hf'PEPER PERMANENT 'IMP T: ROW CONVERS Ac ACCESS ROAD' vj rL -- ------------ - AR -002 (REFER 'A kET 5) C E, ---------- ------- ---- ----- --- — 1%\ ----------- -------- -- -- ---- -EX[STjN ACr - ------------- ------ ------------ ---------- 'N E xIITING _ -------- --- -QUARRY A\ PROPRIETARY & CONFIDENTIAL All RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • LISP DIMENSIONS ONLY REF. DWG(S) A ROS"'.,INAPPROPRIATE PIEDMONT'S NATURAL GAS FACILITY U—N.-IS CONSIDERED CONFIDENTIAL (OM -1.1) � DRAWING IS CURRENT ONLY THROUGH THE —EST REVISED DATE TO INSURE THERE IS NO R- OF PNG-3-446-00oloO8 DISCLOSER ALL P—IOUS PAPER COPIES OF THIS DRAWING MUST �E DEST—ED IN ACCORDANCE WITH RECORDS A INFO. MANAGEMENT (RIM) ­1GY 10DI PNG-G-446-0001009 NO ATE ZIO8 RE ISION(S) DESCRIPTION I BY I CHK JAPINDI DE8CRIPTION AIP­ pwckllm rail LINE 446 — BELEWS CREEK PIP PIPELINE EROSION CONTROL PLAN SHEET 82 OF M JIDWGSC LE: ASSHOWN —I I... I -HO. ­UED FIR IONSTMWC I.N ­UE—R—STRUI INRISN111 P- AND -UT. ...I.N. I RR 2T I—JAREACODE 1 9335 I ACCOUNTNUMBER 0107000 ..IP T 1626546 I 1— 1 REGIONAL ENGINEER DWG DATE LOS.1. � SUP. D—N.NU..MROED PNG_ C -446- 0001077 R -G- 3 N, y�, 11R TE' H RED.ST D Natural GaS DP a CE RP STOKESDALE, NC KRR NGrBER D=C RD ICHECKED BY I C� 612D19 7A,�7 — ININCIAL 0310612019177AAE7(� —EEF Rp7"1.1E`41ED01""TNA1 OFS . ED .. =, CHARL-OTTE, NI 1211 RESOURCE CENTER REIDSVILLE APPROVED BY PNG-­CIPUNCRC­11E ­TER-N—ER LEGEND 0PE\PRffgiRA5312@FOR __` 1 C00 F FFtNGE.l AI61NN MAT SB u5E$i �r I„-_-- T DNCk uSEO` ` po .w,sow -m- / i� _ � SSE pGEO PGREOVIPMER�EIN�' _ ND --'`i <i<<<< �l _ <�< .Y VEN CIS`•' L01N gBPREPO M THE �E401L YRS NO po wr«,Eww. O � n p99 79 e�" `. ' -i ii< �' ' 1 P{.iER �= �`� `___`_ t tp55t 5\SiA8 3 ------------ RI r Ism , i i i I \\' \I / $iA ACK q�R gyK,. -_-` - Imo_` / % 'k�"__ _ _ x1 I 1�, - A� T \ /, /$< x __ . -- JACK 8 BARE I i 1 1 1 i / ___ ___ `- _/ - p_ ' SIg d � C CO S' TEP \��pEA9EMENT. PROPO6EU LAB. LINE __-_: s' '. ,vrEruxD 1�Q IMPACT _ a - ` 1 EXISTING \\ `SB It 1gy1EEbFOME P \FENCE ', F-_ �\ �l � � ; ' SF T EABE EN r _ I 1'(1 PROPOSED DSAS' .__ _' �•L�.:.. s /`� _ oOLINE__- EASEMENT`„ '41% SF SB ---------------- "j,", ,_ ______' _ _ -------------- PERMANENT zza ,- - ------------- f ' PROPRIETARY & CONFIDENTIAL All RIGHTS RESEFVED• DO NOT SCALE THIS DRAWING•USE DIMENSIONS ONLY REF. DWG(S) „o`ZN•�ARO�"'., PIEDMONT'S NATURAL GAS FACILNV DRAWINGS ARE CONSIDERED CONFIDENTIN- (OWINS)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF P us eORDsaINFo. MAMA PROPRIATE DISCLOSER PREVIOUS NT(RIM) POLICY too, PNG-6-446-0001008 PNG-G-046-0001009 / QeoeEss y -'c ��y4OI IONS) DESCRIPTION DBBCRPTI n AIPAZO r®' p��w�yck�,l,.�11 ^nu LINE 446 — BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 83 GP 94 DWG SCALE: AS SHOWN T PMP,", BPBDREIBmNBANDBOUTBREWBIDNa DPD WKO AREACODE 9336 WKO ACCOUNTNUMBER 0107000 WK D PROJECT NUMBER 1626646IWWIdI� �. DWG DATE 03ro�,> DED DRAwirvG rvUMBER - C -446- 0001078 BVISI N Dx 3APPROVED "-,,,5(•1TH -„ ° n�„ s —STD r'MNNTEER -P.—HTm,<PIBDMDNTNATDRALDABCD RP. STOKESDALE, NC BNONe BPBDRB�IBmne NRR DPD WK ODRAWING BV CPD CHECKED BV CPD whw "'w"""" �\WKG 03/06/2019 �A1JLnYnRG `r\ SRP' DRWB RESOURCE CENTER REIDSVILLE BY P—DSCIPUNCRE—ROP CENTER .... OR LEGEND ------------------ --- ----- Lo] ------ -- `--TO-MOBILE -n, EXISTING DRIVE ROME '-PARK-- 7 -ToN ------ -- .Li'iNTANG P. CONTRACTOR TO STRIP ------ \% ---- TOPS L.AND=.r.KDP.ILE 1".. ONE -- I _.o D B A ALTER COMIIS WAY ME F CE. STOCKPILE SHG.L I D . ILIZED USING TEMPORARY RA SEED AAMST W. MATS SHOULD BE, 1, PLACED A=:.— EBY VEXLCL .I, EQUIPMENT.0 4 USED, T, i THE SITE [S-N�O GEN=DG THE TOPSOIL =N BE S ACROSSTHE IF PERMANENTLS AN Y AR.001.' (PERMANENTY c Kul i I 'It 13 Et^= RADE A AD 6W PROPOSED A PERMANENT o AL _N4 ---------- c RE NNIAL) ------------- (PE 'PROPO§ED\'gA'4 ..6 ------- LINE IPSTING S I SLIME ENE �oc S P 40' TOMP EASEMqNT A_ 4 4, EX IN C LV u B, 6 - -x_______-____ - - T_ -------- -PROPOSED TRAI METIER STATION & P" A STATION I DEFER, 0 P PL 1. P N TO TE LBOP "NAT.0 J ----------- t E' RZ WET, IMPAC�\Sl'�t 1�"' PLAN34R#QZI�8 FOR OMPLET < ----- A 0 START T STREAV, WE"NDIA WETTL�ANDIVXA WE AND * B ----------- -------------- ------- - -------- ----- ---------- ------------------------------ ---------- ----- ----------------- -------------- - ----------- -- ---------- - - -- ------------- - - - ------- ------- -------------------- --- --------------- PROPRIETARY 6 CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS GNILY PIEUMONT'S NATURAL GAS FACILOY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OWINS) • DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE - TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS A INFO. MANAGEMENT (RIM) PCLIGY -1 REF. DWG(S) PNG-6-446-0001008 PNG-G-446-0001009 kit ll- N' RENISION(S) —RIFION I BY I CHKI-1 DE -111- I APPROWU-S I PWcknM ral I LINE 446 BELEWS CREEK PIPELINE EROSION CONTROL PLAN SHEET 84 OF 94 DWGSCALE ASSHOWN' .2-1 I I... BSUEDF.— T BBUED R.-TENZ! REV... IPBC AND -UTI I JKC ,, R cm 12 1.21W�JACCOUNTNUMBE C I WKB I AREA CODE 9335 0107000 I ACCOUNT NUMBE 1626646 PROJECT NUMBER E. REGIONAL E-NOE _ I DATE -B � SUPENCE.E. NAWN.NU..ER R_ -N �.R TEC. Ngural Cos __N. KRR CPD W" DRAVVING BY CPD RED— -P— �P7 " l.lE`41El.lPEDNAl CE RP. . _ . N,=V STOKESDALE, NC PNG- C - 446 - 0001079 �PN,,lPllNCZO­E.ENTER 3 CHECKED BY CED PRINCIPAL I APPROVED BY .... OR 0310612019 ENGINEER RESOURCE CENTER REIDSVILLE A, THIS JEROSION AND SEDIMENTATION CONTROL PLAN WILL DISCUSS A PROPOSED PROJECT TO CONSTRUCT A NATURAL GAS PIPELINE IN GUILFORD, NOCKINGHAM, AND STOKES COUNTY NORTH CAROLINA, THE OPOSED PROJECT WILL CONSTRUCT A N' GAS LINE APPROXIMATE LY 9.28 MILES. THE LINE 448 OPP ON (IRA 0215379) AND BELEWS CREEK M & R STATION NEI 1626517) PROJECTS WILL BE CONSTRUCTED IN CONJUNCTION WITH THIS PROJECT. PLANS FOR THOSE PROJECTS WERE PREPARED SEPARATELY AND ARE CONTAINED IN THEIR OWN PLAN SETS, THE LIMITS OF DISTURBANCE FOR THE LINE 446 OPP ON IS APPROXIIMTELY 5.5 ACRES AND HAS BEEN INCLUDED IN THE LIMITS OF DISTURBANCE FOR THE LINE 448 BELEWS CREEK PIPELINE PROJECT. .RED ON THE AREA OF THE PERMANENT AND EMO RAN EASEMENTS, THE AREA FOR HELINE 446 BELEWS GREEN PIPELINE PROJECT I8 APPROXIMATELY 115 ACRES, ADDITIONALLY. THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES. INCLUDING 1, TEMPORARY GRAVEL CONSTRUCTION ENTRNCFJEXIT-PRACTICE 606 NT RANCFJ EXITS WILL BE PLACED AT VNIOUS PoINE ALONG THIS LINEAR PROJECT TO PROVIDE A BUFFER HERE VEHICLES GIN I`=OP THFIR MUD RIND SEDIMENT TO AVOID TRNSPORTING IT ONTO PUBLIC ROADS, TO CONTROL EROSION FROM SURFACE RUNOFF, ND TOHELPCONTROL DUST. THEY ARE DESIGNATED ON THE PLEAS WITH A GRAVEL SYMBOL, WATER WILL BE SUPPLIED TO THE AREA SO THAT WHEELS CAN CLEANEDBE 2 EMPORNN YSTREAM CROSS G PRACTICE670 TEMORARY STREAM AND WETLAND CROSSINGS PROVIDE AWAY FOR CONSTRUCTION VEHICLES TO CROSS STREAMS WITHOUT MOVING SEDIMENT INTO 3. STRR AMS, DAMAGING THE STREAMBED OR CAUSING FLOODING. TEMPORARY STREAM AND WETLND CROSSINGS ARE PLANNED FOR THIS PROJECT. PRACT 62 SILT (SEDIMENT) FENCE RETAINS SEDIMENT FROM SMALL DISTURBED AREAS BY REDUCING THE VELOCITY OF SHEET FLOWS TO ALLOW SEDIMENTDEPOSITI N. SILT EIS TO BE WETLAPLACED AT THE EDGE OF THE EASEMENTS ALONG THE PROJECT SILT FENCE IS NOT TO BE PLACED ACROSS STREAMS, DITCHES. WATERWAYS 4. DEWATERING DEVIC-EDIMENT FILTER BAG -CONCEPTS FROM PRACTICE BOO THE D TOSCUT DEVICE FILTER BIG ARE USED TO DETAIN SEDIMENT FAIDEN RUNOFF T ALLOW SEDIMENT BEFORE IT E NSCHARGEDp HESE )STRUCTURES WILL BE USED TO ALLOW SEDIMENTS TO FILTER OUT OFWA ER THAT HAS BEEN PUMPED OUT OF ANR AREA OR HASBEEN USED FOR HYDROSTATIC TESTING, THESE STRUCTURES WILL BE PLACED AS NEEDED AND ARE NOT SHOWN ON THE PLANS. DEWATER DE"C'S AND SEDIMENT FILTERBAGSILA PUT STREAM 5. ROLLED EROSION CONTROL PRODUCTSUEMPORARY MATT IN GQPRACTICE617 FEN _ARV MATTING WILL BE USED WHERE NECESSARY TO REDUCE SOIL EROSION AND ASSIST IN THE GROWTH, ESTABLISHMENTND PROTECTION OF 6, TEMPORARY SEEDING -PRACTICE 6.10 L. NA.TIC 8. S PROPOSED CONSTRUCTION SCHEDULE: 1. OBTAIN EROSION AND SEDIMENT CONTROL PLN APPROVAL AND OTHER PERTINENT PERMITS. 2. SCHEDULE MANDATORY PRE -CONSTRUCTION MEETING WITH NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY(NCDEQI DIVISION OF ENERGY.' MINERAL, AND AND ES (DEMUR), LAND QUALITY SECTION, WINSTON-SALEM REGIONAL OFFICE (336-7-60) 48 HOURS PRIOR TO CONSTRUCTOR O DISCUSS EROSION CONTROL PLAN. HOLD PRE -CONSTRUCTION MEETING. 3. A RIPARIAN BUFFER SHALL BE ESTABLISHED AND MAINFAINED56FO01' LANDWARD OF ENVIRONMENTALLY SENSITIVE AREA BOUNDARIES THROUGHOUT THE LTSFDSTUANCE'ENIING AN PERIMETER EROSION CONTROL MEASURES SHALL BE INTHESTALLEBUFED. GRUBR "ALLBING OR BELOW GROUND BE CLEARLY DEMARCATEOV GIE AWTH �ON REMOVAL SHOULD SE LI RANGE SAFETY CONSTRUCTMI TED TO THAT D NECESSARY FOR INSTALLATION OF EQUIPMENT CROSSINGS ND TRAVEL LANES WITHIN BUFFER. ADDITIONAL GRUBBING PRIOR TO PIPELINE INSTALLATI)N` SHALL BE R -_ED AMID APPROVED NME 4. ENVIRONMENTALLY SENSITIVE ARNSBINCLUDE�BUT ARE NOT LIMITED TO THE EE IFOLLOWING: STREAMS, CREEKS, WETLANDS, LAKES, AND PONDS. 5. INSTALL CONSTRUCTION ENTRANCES ND ACCESS ROADS PER PLANS AS NEEDED, IMPROVEMENTOR REPLACEMENTOF EXISTING CULVERTS FOR ' ACCESS ROAD' IS EQTED To THE DUBACEING DIMENSIONS IN WETLANDS NO STREAMS AS SHOWN ON PENS. ANY OTHER DISTURBNCE MUST BE Sy 6. INSTALL PERIMETER EROSION AND SILTATION CONTROL(E&SC) MEASURES SUCH AS SILT FENCE AND SILT SOCK PRIOR TO CLEARING AND GRUBBING ` HERE PRACTICAL AND 'INIIRRENTLY WHEN ILEARINI 11 REQUIRED TO INSTALL PERIMETER MEASURES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CLEARING SHALL NOT OUTPACE THE INSTALLATION OF PERIMETER CONTROLS. 7. INITIATE RING ANDGRUBBING WITHIN LIMITS OF DISTURBANCE. GRUBBING SHALL BE MINIMIZED WHERE PRACTICAL WITHINS FEET OF ' ENVIRONMENTALLY COMPLETE GRUBBING AS NECESSARY AS PIPELINE INSTALLATION APPROACHES THE BUFFERS AND MINIMIZE DURATIONBARE SOIL CONDITIONS. INSTALL REMAINING EBSC MEASURES SUCH AS DIVERSIONS, SILT FENCE CHECK DAMS, J -HOOKS, WATER BARS, CONSTRUCTION ENIT3ANCES, TEMPORARY RIDGES AT STREAM CROSSINGS, TIMBER MATS, ETC. AS CLEARING AND GRUBBING I8 COMPLETED < 9. ALL WATER BARS SHOULD INCLUDE AN OUTLETCONTCOR. iD SEDIMN TTBUILD-UP TO EXCEEINIPETLD 50%CAPACITY OF MEASURES. STORE REAND ER MOVED SE DIME NT IN UPLANDSIR TOCKPILE INA EI HOUR SNNAEPL NO APOYTEMPORARY < G. 11 BILTDFIENC AS(BTREAMS AND WETLANDS) WILL BE REINFORCED WITH STEEL MESH. ` 2.DOUBLE ROWS OF SILTF NCE WITHIN 60 FEET OF ENVRONIMENTALLV 8EN81TNE AREAS, OR AS SHOWN ON PIANS, SHALL INCLUDE A PRIMARY NOW OF 1 REINFORCED SILT FENCE AND A SECONDNRY ROW OF UNSUPPORTED SILT FENCE. COMPOST FILTER SOCK OR REINFORCED SILT FENCE CAN BE 13.CONTRACTT ED ORISHALL SEQUENCE ANN SECOND D CONDUCT I BED IN LAND DISTURBING AND CONSTRUCTION ACTIVITIES IN A MANNER THAT MINIMIZES THE AMOUNT OF BARE SOIL EXPOSED 14TETEMP TEMPORARY E SEEDING DURING DISTURBED OFHE AREAS STER THE GENERAL SEEDING SPECIFICATIONS. IT IS RECOMMENDED THAT SLOPES OF 4 TO 1 OR ` L BE NS (PAD TRENCH BOTTOM, LOWER IN PIPE AND TIE-IN PIPE, TAKE SURVEY SHOTS ALONG THE'AS-BUILT' SE CT IONERS OF PIPE, PAD AN BACKFILL WITH SUBSOIL). PERMANENT TRENCH BREAKERS WILL BE INSTALLED AS DIRECTED BY HE ENVIRONMENTAL INSPECTOR OR OWNER'S REPRESENTATIVE20 AT. RESULT OFPPEOIN NSTALL �TAL AOT ON. FOLLOWINGNSTALLATIONNl, TRENCH BREAKERS LOFTRENCH BREAKERS THE TRENCH WIE NSTALUED SUCH THAT THE ILLOGY IF LLBF BACKFIELED.TU EISNOTIMPACTEDASA 21.PIPELINE INSTALLATION WITH IN ENVIRONMENTALLY SENSITIVE AREAS SHOULD BE CONDUCTED IN A MANNER TO MINIMIZE DURATION OF OPEN TRENCH AREAS AND ESE ND UTILIZE AODITD"'ACHAT &SC UED AND ESASBNE ESSARV.SOON AS PRACTICAL CON TRACTOR TO MONITOR WEATHER WHEN WORKINGIN THESE 22.AFTER TRENCH IS BACKFILLED, STABILIZE AND RESTORE TO ORIGINAL GRADE. STABILIZE AND EMPoRNY SEED WORK AREA AS SOON AS PRACTICAL At 23.CONSTRUCTION ACTIVITIES ROUIRING HORIZONTAL DIRECTIONAL DRILLING OR CONVENTIONAL BORES WILL BE PERFORMED IN ACCORDANCE WITH ALIGNMENT SHEET SPECIFICATIONS. ­""'WILLBE RESTORED TO ORIGINAL GRADE, CONTOUR, AND ON (VEGETATION, PAVING, DITCH LININGS, ETC.) IN ACCOONCE WITH APPLICABLE PERMITS. CULTIVATED AGRICULTURAL FIELDS DO NOT REQUIRE TEMPORARY OR PERMANENT GROUND COVER STABILIZATION. 25.IN AREAS WHERE SEGREGATION OF THE SUBSOIL AND TOPSOIL IS NECESSARY, THE TOPSOIL WILL BE REPLACED LAST. AFFECTED AREAS WILL THEN BE CLEANED TO RESTORE HE ROW ASC ­ AS POSSIBLE TO PRE -DISTURBANCE CONTOURS AND CONO, TION10L LWE S�NO MULCHING WITHIN WETLANDS IS ALLOWED HING COVER (80%COVERAGE), CONTACT NCDEO LAND QUA LTTYSECTION,WINSTON-SALEM REGIONAL OFFICE (336_69800) FOR FINAL SUE INSPECTION. UPON APR =RE NEW CDEO LAND QUALITY SECTION, WINST.N-SALEM REGIONAL OFFICE INSPECTORS, REMOVE SILT FENCING AND OTHER EROSION CONTROL S, AR D STURBED RING THIS PROCESS SHALL BE RESEEDED EROSION CONTROL DEVICE NOTES 2. ALL STREAM CROSSIVETLA NGS WILL BE OPEN -CUT UNLESS OTHERWISE NOTED ON PLANSPPROXIMATE. 3. SEDIMENT FILTER BAG SHOULD BE USED WHEN WATER IS BEING PUMPED FROM THE TRENCH. ANY 5. ADDELYITION. EROSION CONTROL DEVICES SHALL BE IFAILURE OF ANY EROSION 11 -OL DEVICE ToNSTALLED IMMEDIATELY AFTER GFUNCTION AS INTENDED FOR ANYROUND DISTURBANCE OCCURS"ON SHALREPIRTE' TTHE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE D ED GE PA THE DRAINAGE PATTERNS CREATED AT VAOUURIN RIS STAGES DG GONTRACTOR'S RESPONSIBILITY TOACCOMPLISH EROSION CONTROL FOR ALL e. CONSTRUCTION ENTRANCE LOCATIONS ARE SHOWN AT APPROXIMATE LOCATIONS, F AL LOCATIONS WILL BE DETERMINED IN THE FIELD. ALLTMBER E FIN. DF AY P IMMEDIATELY AFTER T CROSSING IF SEDIMENT DEPOSITEDBEFORE OR DUN GARAIN F HT SEDIMENT REMOVED FROM BRIIOGES MUST OFD PLACED IN A CONTAINED AREA AWAY FROM 8. EROSION EEL OR APPCTIGNAL ROVED EQUALRTRENCH EISS MNA"ETHOD SSTRUCHALL UTILIZED INSIDE WETLANDS IN PLACE OF SILT FENCE . 9. TREES IN WETLANDS INSIDE THE CORRIDOR MAY BE REMOVE TO GROUNDLEVEL GRUBBIrvG OF STUMPSNwETLArvOS SHALL BE LIMITED TO THAT RELINEHE DED­NSTALLTHE 10,STRIPPING TOPSOIL WITHIN WETLANDS ALONG HE UTILITY CORRIDOR IS NOT PERMITTED, 11.HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FIN& STABILIZATION ON STEEP SLOPES OVER 15%. MAINTENANCE 1, ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER SEVEN CALENDAR DAYS AND e ND OFRTHE ADR DS INCH PER 24 HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR 2, CONSTRUCTION ROADS ANO PARKING AREAS SHOULD BE INSPECTED PERIODICALLY OR THE CONDITION OF SURFACE. TOPORESS WITH NEW GRAVEL AS oGlERS ONED AREA`S "PRDUCING AREA RE AND ASSHOULDABEOTRE TEDRIMMED ATEODUCING AI NS. MAINTAIN ALL VEGETA N 3. LY TEMPORARY STREAM CROSSINGS SHOULD BE INSPECTED AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL. EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAR DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE 4. MAINTENANCE ON SILT FENCES. SHALL BE PERFORMED AS NEEDED. CAPTURED SOIL MATERIAL SHALL BE REMOVED WHEN'BULGES' DEVELOP IN THE SILT FENCEAND" WHEN EVIDENCE LTER "' 5, NSPECTDEWAERNGDEVICESANDFSEDIMENTTRAPSIAFTEREACH USE AND EACH SIGNIFICANT RAINFALL EVENT AND MAKE NEEDED REPAIRS IMMEDIATELY. REMOVE SEDIMENTAND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN NEEDED. ROCK DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY 6. INSPECT ROLLED EROS ON CONTROL PRODUCTS(RECP) AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (D OR GREATER) RAIN FALL EVENT. MAKE DMUST BE MAINTAINED AND EROSION MUST NOT OCCUR BENEAH HE HELP. ANY AREAS OF DUE TO PROPERLY CONTROLLED PRANAGE THE EM SHALL BE FIXED AND THE ERODED AREA PROTECTEDGROUNDS- BE MONITOR EROSION AND STAPLED IF MONITOR AND REPAIRT EECP ASNECESSARY UNTIL GROUND COVER IS ESTABLISHED. F- IERNNTFO -NN TIE IR -0. EERNIT -NTN.F.P­E COMPLETE AFPUGYN­ G- VS. IRIOR TO .11 Ly HE PERSON TO CONTACT SHOULD ANY EROSION AND SEDIMENT CONTROL ISSUES ARISE DURING I -AND -DISTURBING ACTIVITY: MICHAEL REIKOWSR EM2L8) 48841654 EMAIL. mlcM1ael.rcikowsky®Fake-exergy.com NFRASTRUCTURE, PLLC PIED# ILA (OM -1095)' DRAWING IS CURRENT ONLY THROUGH RISK OF VC LICENSE#P-1289 O INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH R RECORDS INFO. MANAGEMENT (RIM) POLICY 1001-77777 0 NO DATE IONISI OESCRIPBON oESCRIPTI WILLIAM K. GUALTIERI PoAREACODE 9335 "'""e""""" LINE 446 - BELEWS CREEK PIPELINE SHEET 65 OF g0 DWG SCALE: AS SHOWN Ug/2, 120,8 Piedmont DWG DATE 09121118 SUPERSEDED NORTH CAROLINAFOR WANG ACCOUNT NUMBER 0107000 "N�" s E.1y. /±� GENERAL EPSC NOTES SEAL 023466 PROJECT NUMBER 1626546 Natural Ca88 oRAwNG NUMBER EMS) DRAWINGBY JKc STOKESDALE, NC CHECKED BY SBH ^n..'^"". CDR_ NRIVE PANG -C-446- 0001086 R 1Dry ROFEss1oNAL ENr✓aRCRsramP APPRnvc.. RV .Nn NGNEER - cxaRLOTTE. Nc 1.1. RESOURCE CENTER REIDSVILLE PNCDISCIPMNE-EESOUROE CENTER NUMBER SFF nuw OF ��Sww Exc c"S F J I �6S F—S§FSF g.I:; BF °" w SF `sursacE mruaw_: NA (D STREAM CROSSING (PUMP DIVERSION WITH EQUIPMENT CROSSING) (TSC) L �o mmmii� TYPICAL UTILITY LINE CREEK AND WETLANDS CROSSING (TSC, TWC) e STREAMBANK STABILIZATION (TSC) �PreaPo PxMP DIBCHARDE HoaE ioIOF MIN w—AN.I GROLONPEINE J I—ION t0'MIN. S FROM STREAMS Zrov of BANK 1 PLAN VIEW e CURLEX CHANNEL APPLICATION DETAIL (TSC) NOTES: onoFTHE VARIES WITH GROUND LINE SLOPE SILTS AVER DEWATER FILTER BAG )2 MIN. 1 10,0• 50 MINIMUM SEDIMENT FILTER BAG MINIMUM 2-li'MIN. 0'F"MIN. RIES BUFFER NIERRICITivvB Illi SILTFENCE GEOTEXTILE wDx Ri ciinllorvl 6'MIN. en r 2'MIN. TC, OF BAN, OR EXISTING VE cwolnnixN x S. N--OaouxttME ore ExISTINsvFCET TA Ellp SECTION A TYPICAL SEDIMENT FILTER BAG (TSC) INOT Tos , - NFRASTRUCTURE, PLLC VC LICENSE#P-1289 PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEOM AL (oM-t 0351' DRAWING IS CURRENT ONLY THROUGH ISN OF O INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF PHIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH R CORDSBRINFO. MANAGEMENT (RIM) POLICY 100108 REF. UWG(S) WILLIAM K. GUALTIERI 09/2112018 NORTH CAROLINA SEAL 023666 ROFEss1o�A1 ENF✓ARc"A_ N.REVIspN(s( DESCRPTON aPw oEscRIPTI ux Piedmont 01 �1` IW ran ` CGRP NR1VE - cxaaLOTTE. rvc I— LINE 446 — BELEWS CREEK PIPELINE GENERAL EPSC DETAILS STOKESDALE, NC RESOURCE CENTER REIDSVILLE SHEET 86 OF g0 DWG SCALE: AS SHOWN AREA CODE 9335 "'"""'"""" ACCOUNT NUMBER 0107000 oe DWG DATE -2111- SUPERSE Deo "N�" PROJECT NUMBER 1626546 DRAWING BY JKc DRAWING NUMBER PNG-C-446-0001087 PNCDISCIPMNE-RESOURE CENTER NUMBER sI RODN ^n��'"^`�` CHECKED BY CF APFRGVFn RV .1. ErvcINEER ___�BEEDETAIL SILT FENCE PLACE. WITHIN WETLANDS. S ­ERS OR RIPARIAN IN CROSSING' BE 11111 '-hEhnND--- 0 3 coMPLErED. At' L CONSTRUCTION THE C. TO LL WH CH W LL BE DIETTSBUTED WITH PI-ACEHOLIDE 1 s.-WfP?NnFILE sPoER y fs. S �BENTONRE .I I__GORD PORPAv e TYPICAL WETLAND CROSSING DETAIL (TWC) ESTABLISHED THISSEED I. WILL BE C .. K.ED W TH THE E.CEPT.. OF THE P.CER­EF SPEC I ADDITIONAL MEASURED I BE NECESSARY IN NETILAT­ .1 111E GHPLL BE CONDUCTED IN THE STOCKPILES IND REPLACED IN THE GAME A USE -- v - - - v - - v v--v---v---v---v--v---v--- / / AE MLPGFBANK per\ \ (1 UP. GAS LINE ERMANENTEA3EMENT as \ TEMPORARY BUFFER N.TRU BASEMENT CTION BUFFER BUFF /J e STREAM BUFFER DETAIL SWALE OR OTHER SEDIMENT Co 1OTRCONSTRUCT SEDIMENT n�.IER =.'ENTTRA➢PINGUVICE 20' R Mllf.'u �SUPPLY WHEELS 11 NECESSARY 0 MIN. PLAN VIEW ORIGINAL GRAGE FILTER F—FIC swssspv SECTION A N CONSTRUCTION SPECIFICATIONS: STORE OR LARGER. PUBLIC 10 1 EN WASHING SHALL BE ON N ST., = 4, MAII - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR PLO OF EDIIINI INTO PUBLIC R ­ THIS MAY RI- PERIODIC TIP IRERBING W =111NAL STONE AS 1011111 11DANl==1LEAROUT.FANYV—UGESUE TOT SEDIMENT ALL BED,.:.DTESF ULED D D. OR TRAlKEG ONTO PUBLIC R 0 W, MUST BE REMOVED I..­ eT TYPICAL GRAVEL CONSTRUCTION ENTRANCE/EXIT (TICE) ® p BACK NO LF -GRADIENT TO, AND ALONG THE PG.ME7FR OF AD'RON SHEET FLOW ONLY 'BE SILT FENCE "'" "RE JACENT TO THE PRWECTRIGHTOFWAY. OR SILT I H. ALL REPERI. I FAR oPENCE ON U_ SIDE SHALL BE Z. ETt AS BEHIND MEASURED ALONG GROUND SURFACED EILTFENFPEB RIC TOTAL WTOTH BBQ THE BOTTOM OF THE TRENCH WIFE To THEM YoVE W N, BE OULD SE VENLv SPACED WITH AT LEAST SIX PER POST. 0' MIN. STEEL FORT(BTD. R"OR'U'SECTION) FENCE BACIINI W T1 'HE TIES ALONGTOPANOMIDSECTION. AGED EVERY 2a INCHES 5 STOP SILT FENCE AT PAVED CROSSINGS, USE TH0. E VEABSEMBL'RTIGL(ANGLED�OWMUFLROw) SILT FENCE WITH WIFE ICIIN=.0 FFLOW WILL RUN TY WHEN EYISTINGGRO :14. PAFRALLELTTOATHE TIOEOF♦HEFE SHEET g7 OF g0 DWG SCALE: AS SHOWN —FILLWITHCOMVA MAINTENANCE: rvR 1 OR SILT PENCE WITH Et HL COMPACTEA.KFILL. 2 SHOULD THE FABRIC OF1 SEDIMENT FENCECOLLAPSE, SECTIONAL VIEW TEAR DESE—BCOMEINEFFECTIVE REFUGE IT C. I REMOVE IEII"E' IEP""' NECESSARY TI=T.E.UATE STORAGE VOLUME FOR = N— _UNDER. THE ON N. LIT HMWIFE F - ary PON END AREAS , 2" MIN. ___1 21 SUN, TIEBACK BETWEEN FENCE ZB' FABRIC OVEROUND)O BE O S I025RI HMLOW111 BHOPE W Y WRAPPING TENSILE STRENGTHDIZX U o5 l �sE LorvGINTO GROUND - SILT FENCE TIEBACK cGRourvD A v FT WIRE MESH NE OR SII_TGOCK STEEL tES moo,®� ❖:❖:❖:❖-�; L 1111INTIONT OL—NELTIRE T 1 FT MIN ��'=iii�11 IT VIN CONSTRUCTION SPECIFICATIONS. WATER FLOW 1ITS IN • ALL TREES, BRUSH, STUMPS, OBSTRUCTIONS, AND OTHER OBJECTIONABLE MATERIAL SHOULD BE REMOVED AND DISPOSED OF SO AS NOT TO INTERFERE WITH THE PROPER FUNCTIONING OF THE CIVFRA ON •M"T BE EXCAVATED OR SHAPED TO LINE, GRADE. AND CROSS SECTION AS WILL MPEDE NORMAL FLOWECRITERIA SPECIFIED HEREIN AND BE FREE OF IRREGULARITIES THAT W IN 2FT STEEL POST 2FT DEPTH • ALL FFLLSS IDFLD EMACHINE COMPACTED AB NEEDED TO PREVENT UNEQUAL SETTLEMENT THAT IF STONE IS USED ­ CAUSE DAMAGE IN THE COMPLETED • ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHOULD BE SPREAD OR DISPOSED OF • BPR_ DEO THAT IT ILNOT INTERFERE WITH THE IVERSIONINGOFTIT DIVERSION. DING AND 1. UBENO.SORNO. 57 STONE FOR SEDIMENT CONTROL STONE. ITSILTSOCKMAVALSOBEUSE 10 THAT IT WILL ENT ROOM AROUNDTHEDIUNCTINTO PERMIT MACHINE REGARDINGNOTES DIVERSION CHANNELS SHOULD BE STABILIZED IN ACCORDANCE WITH DESIGNED PLANS AND 2. USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 1,S INCH MESH OPENINGS. SPEC FCA MAINTENANCETIONS TO BE F.TENED 3 LY TO FENCEPOSTS WITH WI RE TIES. THE WIRE FASTENER1RO11lHON TOP FAGHNI WIFE 10 THEM I RE MESH S SHOULD BE EVENLY SPAC LY ED WITH . WOVER RE FENCE AT LEAST PER POST. REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIRTHE DIVERSION RIDGE IF NECESSARY. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED, WHEN THE AREA PROTECTED IS a. SPACEPOSTA—MU13FT. PERMANENTLY GROUND'EVELSANDIAPPROPRAQTELYSVETHE TABIILIZE DGEATND ECHPNNEL TO BLEND WITH THE NATURAL 5 ONEACH SIDEOFSPECIALNS SEDIMENT CONTROL STONE A MINIMUM OF 121N WIDTH e EGMENT MSILT FENCE CHECK DAM (SFCD) CLEAN WATER DIVERSION (CWD) ENERGY LAND & INFRASTRUCTURE, PLLC NC LICENSE#P-1289 PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONT'SAL (OM--) - DRAWING IS CURRENT ONY THROUGH RISKOF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH R CORDSBRINFO. MANAGEMENT (RIM) POLICY 10010R REF. DWG(S) PNG-6-446-0001008 PNG-6-446-0001009 WILLIAM K. GUALTIERI 09/21/2018 NORTH CAROLINAUS.FOR SEAL 023464 NO DATE IONS) DESCRIPTION OESCRIPTI P� oM �.1y. /±� ` ral Gin �� coBP UBH,E - LINE 446 — BELEWS CREEK PIPELINE GENERAL EPSC DETAILS STOKESDALE, NC RESOURCE CENTER REIDSVILLEPNG-DIGCIPUNELREWURCE SHEET g7 OF g0 DWG SCALE: AS SHOWN WKG AREA CODE 9335 "'"""'"""" WNG ACCOUNT NUMBER 0107000 DWGDATE M1115 SUPERSEDED "N�" s PROJECT NUMBER 1626546 MGRIO ECIx DRAWING BY JKC B„E RED3STO DRAWNG NUMBER PNC- C - 446- 0001088 -G R 1 DN CHECKED BY SBH °P1 w0".La<"" WKG pglNgpal APPROVED BY WKG 09/21/2018 `AIJIIAAYTVkG E CENTER NUMBER CURLEX SLOPE APPLICATION DETAIL (CX) �BORPIPBUNB�BNOH �NBI Stoa�RS ONMATERIAL M z ICER a._ A PLAN VIEW FIBER BAFFLE(TYP) HEIG MIN2' INSTALL MIN 12' EXCELSIOR ((PAME) APPLIED TO TOP SID D� 0 WATfLLC AFTER EACH RAINFALL EVENT SEDIMENTPITS X3W X3'D) —11 NIH "LTR— COMPOST FILTER S ­ OR ENGINEER ROVED EQUIVALENT (TYP) GW_COMPOSTECC, P�PRP�To W OF STAKOK 2' XxSECTION AREA To SE vxOTemED S.". sNBET FLOW a MA% \ COMPOST SOC \ c\ \ \ \ wosrcenrn 21 SIDE SLOPE (3:1 SIDE SLOPEWHERE YS OIEDO TEC PsIDe or wnn TRAFFIC IS EXPECTED) ANDVEHICULAR 1­2OZ OF PAM IN FRONT OF AND BEHIND /TV\ MIN e' OIL MATERIEL WgnLE(SEE NOTE S). .. �3 SEDIMENT PIT "MIN S MINS 1T'EXCELBIORTEMPORARY WATTLE I■ WATER BAR NUTTINGOR IN APPROVED 1 CHANNEL QUTALENT �f S• STALL COIR FIBER BAFFLE CROSS SECTION B -B MIDDLE OF SEDIMENT PIT OR EOUEXIELI�NALENRLExI SEDIMENT PIT PROFILE VIEW CIC OILIT FE UTLETNCE DIVERS NL)OPE SLOPE (%) SPACING (FT) s 125 S10 WATER BAR 00 0-20 IS BACKFILLED PIPE TRENCH 2P33 EO ISOMETRIC VIEW f/ 1. INSTAL WATER BARS ON SLOPES PER NC DEO'S'RIGHT-OF-WAY DIVERSIONS (WATER BARS)" DETAIL ON SPAC NG CONSTRUCT ARS OR COMPACTED EARTH. WATER BARB MUST BE A MINIMUM OF I8 -INCH 2 DFROM HA MEASURED PIT A EL BOTTOMTO TOPOFBERM. 3. INSTALLSEDIMENT PMS1EACH OU OFWATER ES(P IINSTALL AMINIMUM PALITO TOTONCH EXCELSIOR �P FRONTOF o A WATRE USE 2 - INCH BY I2 -IN CH HARD WOODEN STAKES TO) ANCHOR IN PLACE WITH A MINIMUM 2 -FT SPACING. SILT FENCE OUTLETS SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER WHERE OUTLETS DISCHARGE OFFSITE. h 8 BILT FEN E'l-H­ SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF WATER. SILT FENCE -L-HOOKS' SHALL BE SPACED BASED ON CONDITIONS IN THE FIELD,ENT LADEN S BEE eel' CHN'520 �MNy,00t'NBH WgTER BAR INSPECTION 8 MAINTENANCE" v nun nrraa ansa an.uan.. n'auT TunT arraane n s 'u/ 1 EAABEKAxouTEREACN RLAIE sLOPELENG uxoOKS IFTI =OEDURINGCI1".NAETER THEcoxrRleorwGORAINT EAREA.E xAsEx PROPEUY O e J -HOOK DETAIL (SFJ) @) TYPICAL SLOPE BREAKER (SB) UNTRENCHED INSTALLATION PLAN e SILT SOCK INSTALLATION DETAIL (SS) MOTTO SCALE) SECTION VIEW C' ISENc. PIPELINE ELEVATION PIPE Ir.''S, NG (L) AND MATERIALS FOR TRE11" TRENCHSL OPE Ix) L(FEEr)SEIRCKTE OR FILLED W- ST. @)TRE NCH BREAKER DETAIL INFRASTRUCTURE, PLLC INC LICENSE#P-1289 PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED -DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDM CONFIDENTIAL DRAWINGRISK OF O INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITHR CORDSBRINFO. MANAGEMENT(RIM) POLICY 10010 WILLIAM K. GUALTIERI NORTH NORTH CAROLINA SEAL 023464 oFESSioNALENr✓a TA Mm . vnu In •v LINE 446 — BELEWS CREEK PIPELINE GENERAL EPSC DETAILS STOKESDALE, NC CENTER REIDSVILLE AREA CODE 9335 °^'^� •^'�= NEER ACCOUNT NUMBER 0107000 a PROJECT NUMBER 1626646Wdmont DRAWING BY JKC �,E .N� REC„sTD _ CHECKED BY SBH n"" A0X`"""'" 11 (� l�WKG PRINCI AL APPROVED BY WKG 09/21/2018 `AI>uAAYhh VMoDJB� E � - f�PtifQi- ri !A[ LOL 1St «� r ns •� `Yi Nxts qp CURLEX SLOPE APPLICATION DETAIL (CX) �BORPIPBUNB�BNOH �NBI Stoa�RS ONMATERIAL M z ICER a._ A PLAN VIEW FIBER BAFFLE(TYP) HEIG MIN2' INSTALL MIN 12' EXCELSIOR ((PAME) APPLIED TO TOP SID D� 0 WATfLLC AFTER EACH RAINFALL EVENT SEDIMENTPITS X3W X3'D) —11 NIH "LTR— COMPOST FILTER S ­ OR ENGINEER ROVED EQUIVALENT (TYP) GW_COMPOSTECC, P�PRP�To W OF STAKOK 2' XxSECTION AREA To SE vxOTemED S.". sNBET FLOW a MA% \ COMPOST SOC \ c\ \ \ \ wosrcenrn 21 SIDE SLOPE (3:1 SIDE SLOPEWHERE YS OIEDO TEC PsIDe or wnn TRAFFIC IS EXPECTED) ANDVEHICULAR 1­2OZ OF PAM IN FRONT OF AND BEHIND /TV\ MIN e' OIL MATERIEL WgnLE(SEE NOTE S). .. �3 SEDIMENT PIT "MIN S MINS 1T'EXCELBIORTEMPORARY WATTLE I■ WATER BAR NUTTINGOR IN APPROVED 1 CHANNEL QUTALENT �f S• STALL COIR FIBER BAFFLE CROSS SECTION B -B MIDDLE OF SEDIMENT PIT OR EOUEXIELI�NALENRLExI SEDIMENT PIT PROFILE VIEW CIC OILIT FE UTLETNCE DIVERS NL)OPE SLOPE (%) SPACING (FT) s 125 S10 WATER BAR 00 0-20 IS BACKFILLED PIPE TRENCH 2P33 EO ISOMETRIC VIEW f/ 1. INSTAL WATER BARS ON SLOPES PER NC DEO'S'RIGHT-OF-WAY DIVERSIONS (WATER BARS)" DETAIL ON SPAC NG CONSTRUCT ARS OR COMPACTED EARTH. WATER BARB MUST BE A MINIMUM OF I8 -INCH 2 DFROM HA MEASURED PIT A EL BOTTOMTO TOPOFBERM. 3. INSTALLSEDIMENT PMS1EACH OU OFWATER ES(P IINSTALL AMINIMUM PALITO TOTONCH EXCELSIOR �P FRONTOF o A WATRE USE 2 - INCH BY I2 -IN CH HARD WOODEN STAKES TO) ANCHOR IN PLACE WITH A MINIMUM 2 -FT SPACING. SILT FENCE OUTLETS SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF SEDIMENT LADEN WATER WHERE OUTLETS DISCHARGE OFFSITE. h 8 BILT FEN E'l-H­ SHALL BE USED TO FILTER AND REDUCE THE VELOCITY OF WATER. SILT FENCE -L-HOOKS' SHALL BE SPACED BASED ON CONDITIONS IN THE FIELD,ENT LADEN S BEE eel' CHN'520 �MNy,00t'NBH WgTER BAR INSPECTION 8 MAINTENANCE" v nun nrraa ansa an.uan.. n'auT TunT arraane n s 'u/ 1 EAABEKAxouTEREACN RLAIE sLOPELENG uxoOKS IFTI =OEDURINGCI1".NAETER THEcoxrRleorwGORAINT EAREA.E xAsEx PROPEUY O e J -HOOK DETAIL (SFJ) @) TYPICAL SLOPE BREAKER (SB) UNTRENCHED INSTALLATION PLAN e SILT SOCK INSTALLATION DETAIL (SS) MOTTO SCALE) SECTION VIEW C' ISENc. PIPELINE ELEVATION PIPE Ir.''S, NG (L) AND MATERIALS FOR TRE11" TRENCHSL OPE Ix) L(FEEr)SEIRCKTE OR FILLED W- ST. @)TRE NCH BREAKER DETAIL INFRASTRUCTURE, PLLC INC LICENSE#P-1289 PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED -DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDM CONFIDENTIAL DRAWINGRISK OF O INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITHR CORDSBRINFO. MANAGEMENT(RIM) POLICY 10010 WILLIAM K. GUALTIERI NORTH NORTH CAROLINA SEAL 023464 oFESSioNALENr✓a TA N. wn(S) DESCRrnon oeSCRIPTIDx WKS P S.1y. /±� Natural Cas CORP oRrvE - cxAR'20 xc 11— LINE 446 — BELEWS CREEK PIPELINE GENERAL EPSC DETAILS STOKESDALE, NC CENTER REIDSVILLE AREA CODE 9335 °^'^� •^'�= NEER ACCOUNT NUMBER 0107000 a PROJECT NUMBER 1626646Wdmont DRAWING BY JKC �,E .N� REC„sTD _ CHECKED BY SBH n"" A0X`"""'" 11 (� l�WKG PRINCI AL APPROVED BY WKG 09/21/2018 `AI>uAAYhh VMoDJB� E PNG-6-446-0001008 SHEET 88 OFg0 DWG SCALE: AS SHOWN DWG DATE 09 l,S SUPERSEDED O—NI PNG- C-446MBE0001089 R ODN GENERAL 8EEDINO REQUIREMENTS FOR DPL.AW ARfA9 PERWNENT LIPLI4ND5EEDIN6 SPECIMATEM Sd1 AVRMPISFMS{iEMGCSLLl11'ul1ANQ56LyI/j ra,rwrww ars aw uw W.�o � µY pn.>r ae uLro ry ernP.„w:a,:.vdwr� la lrYmar'[ .r �.a.. PROPRIETARY N.c.wsrwr�n•w.rr. DRAWING' USE DIMENSIONS ONLY r'eq.s u �PlIL�>•ee��l�Nodra lardran PIEDM O IAL (OM -1 OBS)' DRA THIS RISK OF VC LICENSE# P-1289 NAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF DRAWING MUST BE DESTROYED IN ACCORDANCE WITHTRECORDS BRINFO. MANAGEMENT (RIM) POLICY 10010 WILLIAM K. GUALTIERI SKIN(S) uBSCRrnon ..r. e...x. r,r Y•n.ra.n..,. ��; .rrru. P WdMOM LINE 446 — BELEWS CREEK PIPELINE wwAnaemaw.re.•r PROJECT NUMBER 1626646 EN w” �" rrxw.. ril NM /±as Natural Ca88 GENERAL EPSC DETAILS SEAL 02CAROLINA SEAL 023464 PtOJEC!ACCOUNTNUMBER DRAWING BY 1626"0 JKD wsc.e .walree.w�r.e•.r,r Meslera...r W.AhVN1w1�11pWw!¢YlNI!llRrq rAwsw it STOKESDALE, NC rlerelr .wr�a .eaww^lw�1u n� eK,re YraRR.k ulwo. rlane4eG�w n,rYrrr nwlrwr +r•rua•alPanw.IWr,le llad nlld•ara. •a, a ,r w,e � ynpA• i�•��u�Y�rr�r�,rea�Y.Fr.�i. 'ri 9!®!Yne4 nLan�D1rU11Grr�rrL rtwwT�. awW> �r.sa��iiv�..�m wi�iarpimu, «aeanr•�r errrc.rcw dsUrWrlvr W..[.vd�wr ww _ ,W+4,�if r�Jra�.vwwr�wmea rww _ o1Nre++nael�+raADn �.i.�Wo��m.�� lry�rin wn'irpTr�rp una _ •IMa � yB�rJa➢y��.rp�i��ey�wrR•��lew� ' MIaYMI RVerYLV�i.MYa.wfYlr. IFr`IYIRP'FFM,4��ti, �.ar M.P Mr.w•eer�wow'.. �f ��s�+.ayeas reed VDY fr�xw�DOPiY,DirgR�+�Iiwwxrrli �orvw d�u dPOA1 HMn.rA�HMeuYl �e rr.[ awx,eiSa • I grgar,DDacaaF ___ owwn w �ar.To��.e _ _ Iw�nprD arorergr �I~w Orn ern wn�� e !�!�� iavr�awx�+�warr�iu yF! Ir�aar Dwcnm Rprq. en�r. Nn lle�a w! IRrFr4VA•A•A l,rresln!ler a..rnalwxrlJ �•a wo w>eldirler is W ww �r w �aia�releen�e.rw• w rc+,p nvG�eu• m. • iM rrwi wao .Y,D ..�� rw.r �.a.mn•,.a..oarrT,an.a er+o.�r r.�.P.waw..w.. n..r. nn.."`"`e.w.w�l�.°..YO.: i".`ei,�•. :'mow � u' od iwu�uw. w°r�r�w a"�r"em' -�N.mmvr �.a �e.D».., n.P �Io.•r..r riSwwr� Ir11/C�MAk R RC•1.Yp � >LPIYaWAhFeYP�e[ _ a. n•1 M rR+r ror•wYr. MIrrFM w r,lrlpr wrFl ►r ��a�reI! iwlNCla�ra.6NnlEwfnMcare lFYYWn6��r+mYRA ron.wwMM ePtr�r nn ��tPr4. YPa�viww �rw�rw�wnveyn�i.Y•aM.]s.C..YeY wwhera.wrlm�-x i on .. i.. h.xa wn� �wa4armn.anaKlrwaTrwo�YMwa •m.wrs Y[uer4 r.w frs � � twwoKboirt.upMwf•Yn. ryRwHlnr.MY xyrorv[.vsracr�I.+waJ.+.a+n �i1Rff L¢PISI ••+n MM1NeNvs arn,Pnr n•®w,rorc xT, — _— __— - unrwareiaaYenR _—..--_.._—. _— __._ u,•am uM rn�xrr awexrw.xewmrlx.lobavfwd �.y y�Ar rr•Fi.r rc nw,Yarar•e R+.-tatvs _ rnr.sm,+Inw.NlrA aePNnmr nan ra,wmolWaaw Mr rw.e� r �PY[Ww YY'Mrh.+.M•aYw Nrq.. Plre.rf �iW iDiVoah �rg...,yuyrrRwa �.ry�m•.w�F]N a.r� .n.e.rFn+r rr�nwY.w•-+wa.r.prsep++ wY�4^n.nrn[e%nw,rn Hl�awro.o. sl wrw�.0 a,Q rntl �a+rrul nlrir...w•. ax,fuADlraiw•le.r ArDwar�rrW,rf4Yorr�arrR>•rr imr� TFh11DIxAT UPtI1i65EED11YG SROF1GShcr Sd1 AVRMPISFMS{iEMGCSLLl11'ul1ANQ56LyI/j ra,rwrww ars aw uw W.�o � I �rn pn.>r ae uLro ry ernP.„w:a,:.vdwr� la lrYmar'[ .r PROPRIETARY 4 DRAWING' USE DIMENSIONS ONLY r'eq.s u �PlIL�>•ee��l�Nodra lardran aa�s..oa Iwe e�w rrrwtia IIRIILFIIINY111 LIIQIlOYYO G!'1�Q�1S110N 0lOr. r�nWi.��P�w!gyyy�9y��� �MlFF*a�F e Nwhalnaawverw i.rdrunc .warwr yes n i +lalYArr,ur mM.e�I lIIIlr ! or.aeer++ aw,ewartlmuMe r.rP,aew. wr.v.pu,aww ��rrrwrrwlcro-...rr....i ..Le n. •va ...,.r em� r.Ia�.rPaa�a.+w r.w.rr>arn.e.r.nRrr rr,�ir�N eewaFWr.1sW-r+[as irtadrur o.ssrnauu ar•eN •le.b�llN t �.� nldre lMa.LsdfraYr.�dn,TrnnW mom ur4arniurKwmram aon.+war rrr •w• .rT`o••nm trwaaea�R argrra.wwa.sra.aa PNG-6-446-0001008 SHEET 89 OF g0 IDWG SCALE: AS SHOWN DWGDATE 09I31I18 SUPERSEDED DRAWING NUMBER PNG- CNE 446DED0001090 REVISION almll ulXaP w a!r► �� Sw =NERGY LAND & PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY NFRASTRUCTURE, PLLC PIEDM O IAL (OM -1 OBS)' DRA THIS RISK OF VC LICENSE# P-1289 NAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF DRAWING MUST BE DESTROYED IN ACCORDANCE WITHTRECORDS BRINFO. MANAGEMENT (RIM) POLICY 10010 WILLIAM K. GUALTIERI SKIN(S) uBSCRrnon DESCRIPn != !AREA DN s336 a P WdMOM LINE 446 — BELEWS CREEK PIPELINE PROJECT NUMBER 1626646 EN w” �" rrxw.. ril NM /±as Natural Ca88 GENERAL EPSC DETAILS SEAL 02CAROLINA SEAL 023464 PtOJEC!ACCOUNTNUMBER DRAWING BY 1626"0 JKD MGR TECH HED>`sTD STOKESDALE, NC CHECKED BY _..___ SBH ...._ WKG °P1 `"'"`"""'"""" IPAL ................ �. r1. .._Vi`.,.� PRINc, f^ wavRlDHr xorS PIEDMoxr uAnru.L CAs coRP. coxa.omcsa 20 nsDMoxT xow Dxrvs RESOURCE CENTER REIDSVILLE PNG-6-446-0001008 SHEET 89 OF g0 IDWG SCALE: AS SHOWN DWGDATE 09I31I18 SUPERSEDED DRAWING NUMBER PNG- CNE 446DED0001090 REVISION F»�.:. .... �...:.s---------- OF ----+ - _ 5 ............. ss 310 TSCI so SF k1 CO aFd II r .........,..� .......�� �r-.•..... n.w .......... ��. DL LL y _ �AVACi SITE 16 IwEax. ea Tina iat![p-'E. xE� •• Fur rl.a.la Lrrlx - _ o.siA�aiee�i� =3= ----------- Piedmont re ox awinF.F•••• Piedmon aa�Af a Natural Gas ._... r..� - krc..Ya ui a ..:',f"'"i_ NaturalGas . e STREAM 7/8 BUFFER DETAIL e STREAM 6 BUFFER DETAIL e STREAM 1 BUFFER DETAIL 9 ` �yC PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED -DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONTNL IDM -t oasl-DRAWINO IS CURRENT ONI THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO FU.R OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 O~ 59 �%YlrM1a prt4wwF n�i.mn:. r. EscRlpn RENSED DAS APEkR1E •••••••• f $B _ - f /R- "rw.rw n.LM.r ...... 94 OF 94 DWG SCALE: AS SHOWN �w��kKrrs4acrrwc r i kr ]IIsi r. M'r ouoi�� ` K�Ci*H•IFMi ... /� _ / -• �/ J� —E LOD LOD — OD D— LODoI— 0 r<HECN wMIIYp.I _ S � axa IF.r<WT*�+11 TEwgEV[I Rett ol`ENWF uR D.4 _ �'�+eTw�iiw. "`. .. ... - ... ...... ----- �. !�1{ CHECKED BY ca0 °^'� °°^"n^"^ wKG , IN_ L APRROVFn Rv wltn 02101/2019 (U�WAYh I\n ENGINEER S STRkCTMC604PW r✓ [ iaau.fnw.r�nl _--- r.r-L_-- --'- 3r y�-��-_---- Sal �a».�•w.i IMvhoiT BITE. I9 1 1 RE'n 9FP PCR MC IAtP n 1 .�`••W `+�• . _ ...» �.. - ` �E#CEFT STREM1 BUFFER MO p 2] e+n+ 1 uh! [w rut wr v:! tr ^n�r1 Ni ..r1AMrDF.FRM.. aIMa1, Pitt _N � .4 Ea�wa eRE ee 2rEiixi F nBwlL,u EFMPi]grRL-.. °"" "°°" PI@f#rlprlt rt� ]xtF — , Natural Gas ._._. Natural Gas e STREAM 1 BUFFER DETAIL 9 cxE«wM nYp.1��0 O LED NIE LA 9— 1. LEDI1 1 1'GRAVELM II GRAVEL ACCESS a.is 1E—.1 ` �yC PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED -DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONTNL IDM -t oasl-DRAWINO IS CURRENT ONI THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO FU.R OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 O~ 59 TSG TIRG6 EscRlpn _ CT 5,TE.4 M N -RE AY �! EiLAIRI u WETLAlIG l9 "rw.rw n.LM.r ...... 94 OF 94 DWG SCALE: AS SHOWN Piedmont �e- Natural Gas wNc AREA CODE 9335 ^"'""'"""" WHO ACCOUNTNUMBER 0107000 STREAM 2/28 BUFFER DETAIL —E LOD LOD — OD D— LODoI— 0 r<HECN wMIIYp.I cxE«wM nYp.1��0 O LED NIE LA 9— 1. LEDI1 1 1'GRAVELM II GRAVEL ACCESS a.is 1E—.1 e STREAM RESTORATION PLAN (STREAM 31& 32) e 24" RCP STORM PIPECULVERT PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED -DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONTNL IDM -t oasl-DRAWINO IS CURRENT ONI THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO FU.R OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-446-0001008 PNG-6-446-0001 D09 EscRlpn pp_SHEET IGNnMR �� PIE!�IttOrit Natural Gas YFIGCORI DRWE - c._OTrE.xr. xax.n LINE 446 - BELEWS CREEK PIPELINE STREAM BUFFER DETAILS STOKESDALE, NC RESOURCE CENTER REIDSVILLE 94 OF 94 DWG SCALE: AS SHOWN wNc AREA CODE 9335 ^"'""'"""" WHO ACCOUNTNUMBER 0107000 DWG DATE °�DB.tx SNPERBE DiO Na PROJECT NUMBER 1626646 ` ""'""'"""" MGRITE H DRAWING BY JKC ^ x. REC&STD DRAWING NUMBER PNG- C - 446- 0001093 prvc DlsclpurvEftEsouacE CENTER rvuMBER ­SION R 3°N CHECKED BY ca0 °^'� °°^"n^"^ wKG , IN_ L APRROVFn Rv wltn 02101/2019 (U�WAYh I\n ENGINEER HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY HDD is a common method used to install underground utilities through heavily developed areas, roadways, waterways, steep slopes, and environmentally sensitive areas to minimize the surface disturbance that traditional open -cut trenching methods typically require. HDD construction generally limits disturbances along project corridors which may result in a smaller environmental footprint. HDD operations have the potential to release drilling fluids into the surface and subsurface environments through nearby utilities, unconsolidated sediments, fractured bedrock and faulting or other local structural features. The drilling fluid typically will flow into the surrounding rock and sand and travel toward the ground surface. The drilling fluid, a bentonite slurry (other additives may be included as well), is used as a lubricant during the drilling of the bore hole, enabling the rock and soil cuttings from the drilling process to be carried back to a containment bay at the ground surface at the drilling site. It also builds a borehole mud cake or lining which can act as a seal to prevent migration of fluids either into or out of the borehole and enhance the stability and integrity of the bore hole. Bentonite is a non-toxic, naturally occurring clay commonly used for agricultural purposes such as decreasing water loss in ponds and soils. Other common additives include: Additives Functions Polymers Aids in maintaining borehole integrity; control of fluid loss; management of fluid viscosity; cuttings encapsulation; viscosifier, friction reduction and flocculant Clay Inhibitors / Surfactants Reduces swelling and sticking tendencies during drilling operations and down time; torque reduction Drilling Detergents Reduces surface tension and sticking tendency of clay cuttings; aids in prevention of bit balling and mud rings; torque reduction Pyrophosphates Dispersant; aids in thinning and reduction of flocculation in the drilling fluid; aids with bit balling Soda Ash Reduces hardness of make-up water; aids the yielding process Note that there is no hydraulic fracturing of shale for oil or gas production associated with this method of directional drilling on the site. The HDD bores should be designed to provide sufficient depth below water crossings and/or wetlands to reduce the risk of drilling fluid releasing into such features. While drilling, fluid seepage away from the borehole is most likely to occur near the bore entry and exit points where the drill head is shallow; although seepage can occur in any location along an HDD. This Horizontal Direction Drilling Contingency Plan (Plan) establishes operational procedures and responsibilities for the prevention, containment, reporting and cleanup of fluid loss incidents associated with an HDD project. Project drawings and specifications also provide details of the HDD portion of the project. The contractor responsible for the work must adhere to this Plan during the HDD process. Although HDD Contingency Plans are not routinely reviewed or commented upon by regulatory Page 1 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY agencies during project review and approval processes, such plans are often requested by regulatory agencies when Inadvertent Releases (IRs) occur. Therefore, the Plan and IR reports may come under regulatory review during regulatory visits, inspections or IR response actions. The specific objectives of this plan are to: 1. Minimize the potential for a drilling fluid release associated with HDD activities; 2. Protect environmentally sensitive areas; 3. Provide for the timely detection of drilling fluid releases; 4. Ensure an organized, timely, and efficient response in the event of a release of drilling fluid; and 5. Ensure appropriate notifications are made immediately to appropriate Duke Energy project and environmental support staff. Duke Energy will be responsible for notifications to appropriate regulatory agencies. Pre -Construction Measures Before any HDD commences, an environmental safety meeting will take place. This Plan will be discussed, questions answered and any potential conflicts reconciled. The Site Supervisor shall ensure a copy of this Plan is available (onsite) and accessible to all construction personnel. The Site Supervisor shall ensure all workers are properly trained and familiar with the necessary procedures for response to a drilling fluid release prior to commencement of drilling operations. Other best -management measures are listed below: 1. Anticipated drilling fluid mixtures descriptions are to be provided during the project review process, including all product Safety Data Sheets (SDSs) of commercial mud mixes and additives. All such SDSs shall be maintained at the project site. 2. Appropriate HDD drilling fluid spill response items (See Appendix A) shall be kept onsite and used if an IR of drilling fluid occurs. 3. Prior to construction, the work areas must be flagged and the environmental limits defined (wetland boundaries, setbacks, etc.). Erosion and sediment controls will be placed on downgradient sides of the drilling rig location and around the drilling fluid containment bays as a preventative measure against drilling fluids leaving the drill rig site. If the project has not necessitated the preparation of a formal Sediment & Erosion Control Plan, Best Management Plan (BMP) details for appropriate controls should be reviewed and considered from the Duke Energy Construction Stormwater Planning Manual (April 2017; Document GDLP-ENV-EVS-00006). Additional details regarding environmental sensitive areas and construction activities can be found in this document. Fluid Loss Response and Measures The response of the field crew to a drilling fluid loss shall be immediate and in accordance with procedures identified in this Plan. All appropriate emergency actions that do not pose additional threats to sensitive resources will be taken, as follows: 1. Containment bays will be in place at both the drill entry and exit points to prevent drilling fluid from leaving the drill rig site at the entry and exit points. Sufficient freeboard (two (2) feet) shall be maintained in all containment bays. Silt fences, Page 2 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY wattles, or other appropriate measures shall be placed along the downgradient boundaries of the drill rig site. 2. The viscosity, pressure and volume of drilling fluids will be closely observed by the drilling contractor during HDD activities to watch for indications of fluid loss or developing borehole conditions that could increase the likelihood of an Inadvertent Release. 3. Drilling operations will be halted by the drill rig operators immediately upon detection of a loss of circulation, a drop in drilling pressure or any other indicator of fluid loss. The loss of drilling fluid to the surface is typically greatest at shallow locations, typically near the entry and exit points of the HDD. 4. Characterization and documentation of any inadvertent release shall begin immediately. The Site Supervisor and Site Environmental Inspector shall be notified immediately. Once IR identification occurs, the Site Supervisor shall immediately notify Duke Energy Environmental support staff. Photographs, details of the release, location, volume released, receiving stream characteristics and other important information should be collected and reported immediately to the appropriate Duke Energy Environmental staff. Containment efforts in accordance with this Plan shall commence immediately but clean-up of drilling fluid IRs must wait until appropriate consultation and concurrence from Duke Energy Environmental support staff. 5. In the event of a loss of drilling fluid, the Site Supervisor and Site Environmental Inspector shall conduct an evaluation of the situation and direct recommended mitigation actions, based on the following guidelines of the severity of the fluid loss: a. If the loss of drilling fluid is minor, easily contained, has not reached the surface and is not threatening environmentally sensitive areas, drilling operations may resume after use of an approved leak stopping compound, redirection of the bore or alteration of drilling techniques as applicable based on site geological conditions and equipment or operator capabilities. b. If drilling fluid reaches the land surface, the area will be isolated with silt fence, wattles or similar measures to contain drilling fluid. i. A containment or relief bay may be installed on high ground to keep drilling fluid from reaching environmentally sensitive areas and removal will begin by vac -truck or hand tools. J. In areas that cannot be reached by a vac -truck for drilling fluid removal, a tiered system of contained areas will relay drilling fluid to a location accessible by a vac -truck and removed. iii. If it is not possible to relay drilling fluid to a suitable location for removal by a vac -truck, drilling contractor workers will use hand tools and vacuums to remove the drilling fluid from contained areas. iv. Any material coming into contact with drilling fluids shall be removed to a depth where there are no visible signs of the spilled material, contained and properly disposed of, as required by Duke Energy policies. The drilling contractor shall be responsible for ensuring that the drilling fluid material is either properly disposed of at an approved Page 3 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY disposal facility or properly recycled in an approved manner. Contractor must provide Duke Energy with documented proof of disposal. c. If drilling fluid reaches the surface in surface waters or wetlands, the following actions will be initiated. i. For low volume, low flowing streams, a coffer dam (or equivalent) for containment will be installed downstream. ii. Photographs, details of the release, location, volume released, receiving stream characteristics and other important information should be collected and reported immediately to the appropriate Duke Energy Environmental staff. iii. For higher volume, larger flowing streams, a coffer dam (or equivalent) may be installed both upstream and downstream. Consideration should be given to use of bypass pumping to ensure no flooding or potential loss of containment. iv. Removal of drilling fluid released to high -ground will begin by appropriate equipment or hand tools immediately. If the fluid loss is widespread, the Site Supervisor may discuss the use of a vac -truck with Duke Energy Environmental staff. v. Due to potential adverse environmental impacts, no released material located within streams or wetlands shall be removed without prior discussion with Duke Energy Environmental support staff. vi. Duke Energy Environmental support staff will be responsible for any regulatory notifications. Response Close-out Procedures When the IR has been contained and cleaned up, response closeout activities will be conducted at the direction of the Site Supervisor and Site Environmental Inspector and shall include the following: 1. The recovered drilling fluid will either be recycled or hauled to an approved facility for disposal. Contractor shall provide Duke Energy Environmental support staff with documented proof of disposal. No recovered drilling fluids or materials will be discharged into streams, wetlands, storm drains or any other environmentally sensitive areas; 2. All spilled drilling fluid excavation and clean-up high ground sites will be returned to pre - project contours using clean fill, appropriate seeding activities, as necessary. Clean up to areas within wetlands, streams or other sensitive environmental areas will be on a site specific basis in consultation with Duke Energy Environmental support staff and regulatory agencies, if appropriate; and 3. All containment measures (wattles, straw bales, silt fences, etc.) will not be removed until the site is properly stabilized and such removal is authorized by Duke Energy Environmental support staff. Page 4 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY In addition to the HDD IR Documentation Form (See Appendix B) the Site Supervisor and Site Environmental Inspector shall record narrative details of drilling fluid losses or IRs in their daily log. The narratives shall include any notes or details regarding containment, characterization, cleanup or stabilization activities not otherwise captured from the HDD IR Documentation Form. Construction Re -start For small releases which do not reach surface waters, wetlands or other environmentally sensitive areas, drilling may continue if the release is promptly contained and cleaned up, and at least one member of the clean-up crew remains at the drilling fluid loss location throughout the remainder of the drilling of the bore. For all other releases which impact environmentally sensitive areas, construction activities will not restart without prior approval from Duke Energy Environmental staff. IRs into environmentally sensitive areas will require at least one member of the clean-up crew to remain at the drilling fluid loss location throughout the remainder of the drilling of the bore as well as having one member track with, or slightly behind, the drilling head to observe any signs of potential releases. Bore Abandonment Abandonment of the bore will only be considered when all efforts to control the drilling fluid loss within the existing HDD have failed or borehole conditions have deteriorated to the extent that completing the bore is infeasible. The borehole will be completely abandoned and a new location determined. Any borehole abandonment locations will be documented and shown on any as -built documents. The following steps will be implemented during abandonment of the borehole: 1. Determine the new location for the HDD crossing. 2. Insert casing, as necessary to remove the pilot string. 3. Pump a thick grout plug into the borehole to securely seal the abandoned borehole. Communications During an HDD Project Communications for routine aspects of an HDD should be between the HDD Contractor Site Supervisor and Duke Energy/Piedmont Project Manager. During IRs, the Duke Energy Environmental Support staff should be incorporated into such dialogs for guidance and concurrence on IR response actions. The Duke Energy Environmental Field Support staff will provide IR details to the Duke Energy Water Subject Matter Expert (SME) for consultation and determinations regarding regulatory notifications and response activities. The Duke Energy Water SME will consult with appropriate Duke Energy management representatives regarding verbal and/or written regulatory notifications and guidance for any response actions. Design consultant should also be integrated into the activities to benefit from experience or educational opportunities to improve or enhance HDD design or construction aspects. Page 5 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY Appendix A - HDD Drilling Fluid Spill Response Items Containment, response, and clean-up equipment will be readily available at the HDD site to assure a timely response to IRs. Equipment may include, but is not limited to: - shovels, push brooms, squeegees, trowels, pails and/or other appropriate hand tools - hay or straw bales, wattles and wooden stakes - silt fence, T -bar posts, post pounders - plastic sheeting or geotextile fabric - sediment/silt curtains, sand bags, absorbent booms or pads - pumps with sufficient suction & lifting heads; control & check valves and leak -free hoses - tanks for non -potable water and/or waste mixture storage - extra radio, cellular phone(s), batteries, flashlights, lanterns - wetland mats for worker foot -traffic into wetlands - wetland mats for equipment - earth moving equipment (backhoes, dozers, skid -steers, as appropriate) - standby generator(s), light plant, lights and towers, electrical cords - secondary containment for all on-site mobile equipment, fuel, lube or other chemical storage containers - vacuum truck (or on 24-hour call) - boat with oars or outboard motor (or on 24-hour call) - SDS sheets for all on-site materials Page 6 July 12, 2018 HORIZONTAL DIRECTION DRILLING (HDD) CONTINGENCY PLAN DUKE ENERGY Appendix B - HDD Inadvertent Release Documentation Project Name/Number: Location/Address (Narrative description if necessary, project drawing #, station #, lat/long, GPS coordinates, etc.): Include County of incident Project type: Resource Center or Major Project? Site Supervisor / Contractor / Cell Phone Number: Reported By / Cell Phone Number: Release Date (mm/dd/yyyy): Release Time (hhmm): Estimated Impacted Area (Dimensions - length, width (ft) & depth (in.): Characterization (fluid type) and Estimated Release Volume (gallons) Estimated Duration of Release (min.): Potential or Actual Environmental Impacts (wetlands, waterbody (stream name if known), drainageways, or other areas within 100 feet of water): Contained To Permitted ROW? (Yes/No) Assessibility Requirements (4x4, equipment or worker access mats, hose length, etc): Proposed method of drilling fluid / waste recovery: Proposed waste material storage or disposal plan: Proposed disposal site for waste material: Photo Documentation (provide pre -cleanup photos of IR, upgradient, downgradient views, impact areas) Page 7 July 12, 2018 Action ID Number: SAW -2018-00885 County: Guilford/Rockingham/Stokes Permittee: Piedmont Natural Gas (Attn: Ned Dietrich) Project Name: Piedmont Natural Gas / Line 446 / Belews Creek Pipeline Date Verification Issued: 3/18/2019 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date ENERGY LAND & INFRASTRUCTURE March 18, 2019 Mr. David Bailey, PWS Regulatory Project Manager U.S. Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RE: REVISION PACKAGE SAW -2018-00885 PIEDMONT NATURAL GAS, LINE 446 BELEWS CREEK GAS LINE PROJECT GUILFORD, ROCKINGHAM, AND STOKES COUNTIES, NORTH CAROLINA Dear Mr. Bailey: Per your February 20, 2019 email, I am enclosing information on the project revisions. Sheets 79 — 82, 84, and 94 are attached. Additionally attached is the spreadsheet showing the stream and wetland impacts. The changes to the plans are: • Sheet 79 — The alignment has been moved to the south and will impact stream 32 and stream 34. The stream restoration plan has been shown on sheet 94. The revised stream impacts are shown on the spreadsheet. • Sheet 84 — The alignment has been moved to avoid impacts to Impact Site 19. The spreadsheet has been revised to show no impacts to the stream and wetlands. The Jordan Lake buffer details are also shown on sheet 94 for your reference. If you have questions or need additional information please contact me at (615) 383-6300 or by email at suzanne.herron@eli-Ilc.com. Sincerely, ENERGY LAND & INFRASTRUCTURE, PLLC Suzanke . Herron, P.E., CPESC PE 040556 Enclosures cc: Ms. Alicia DePalma, Environmental Siting and Licensing, Piedmont Natural Gas Ms. Sue Homewood, NC DWR 1420 Donelson Pike, Suite A-12, Nashville, Tennessee 37217 www.eli-lic.com GIS.383.G300 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL Line 446 Wetland Impacts for the PCN Stokes, Rockingham, and Guilford Counties * Roanoke River Basin ** Cape Fear River Basin Total: 2,160 20,105 19,743 SF SF SF 0.05 0.46 0.45 Acres Permanent Impact - Acres Area within Area within Permanent (P) or ROW Conversion Impact Site Wetland ID Lat Long Resource Type Type of Impact Notes Temporary Permanent Temporary (T) from Forested to Easement (SF) Easement (SF) Non -forested (SF) Wetland is within existing ROW. Disturbed herbaceous assemblage Non -Tidal Open cut, dewatering with a few scattered Impact Site 1 W26 * 36.27710847 -80.04999838 T 2,160 362 0 Wetland structure, temporary crossing shrubs/saplings. Wetland continues to northeast and eventually directly abuts an intermittent tributary. Open cut, dewatering Impact Site 5 W27 * 36.26997357 -80.0177573 P, T Non -Tidal structure, temporary Wet hardwood forest. Directly abuts 0 844 844 Wetland crossing, access Streams 22 and 23. clearing/ROW conversion Non -Tidal M* T HDD Bore 0 0 0 Wetland Impact Site 9 Wet hardwood forest. Small Non -Tidal depressional floodplain wetland. W20 * 36.25833145 -79.97833151 T HDD Bore 0 1,443 1,443 Wetland Separated from Stream 17 by distance of -25 feet. Open cut, dewatering Non -Tidal structure, temporary Wet hardwood forest. Directly W12 * 36.25473915 -79.94785152 P, T 0 1,687 1,687 Wetland crossing, access abuts Stream 7. clearin /ROW conversion Non -Tidal Access clearing/ROW Wet hardwood forest. Directly Impact Site 15 W10/11 ** 36.25468143 -79.94759674 P Wetland conversion abuts Stream 7. 0 172 172 Open cut, dewatering Non -Tidal structure, temporary Wet hardwood forest. Directly W9 ** 36.25445242 -79.94741603 P, T 0 1,118 1,118 Wetland crossing, access abuts Stream 7. clearing/ROW conversion HDD Bore. Wetland in project corridor is a wet hardwood forest community. Wetland in existing Non -Tidal Impact Site 17 W6/7 ** 36.25035371 -79.9367198 P ROW conversion ROW is a beaver pond consisting of 0 10,258 10,258 Wetland open water and mixed herbaceous/scrub-shrub vegetation. Directly abuts Streams 3, 4, and 5. Open cut, dewatering Impact Site 18 W5 ** 36.24824553 -79.93156634 P, T Non -Tidal structure, temporary Wet hardwood forest. Directly 0 4,221 4,221 Wetland crossing, access abuts Stream 2. clearing/ROW conversion WX ** Avoid Non -Tidal 0 0 0 Wetland Impact Site 19 Non -Tidal Wet hardwood forest. Directly W1 ** 36.23991632 -79.92456802 Avoid 0 0 0 Wetland abuts Stream 1. * Roanoke River Basin ** Cape Fear River Basin Total: 2,160 20,105 19,743 SF SF SF 0.05 0.46 0.45 Acres Acres Acres SF in Roanoke 3974 River Basin 0.09 Acres SF in Cape Fear 15769 River Basin 0.36 Acres Line 446 Stream Impacts for the PCN Stokes, Rockingham, and Guilford Counties Revised 3-11-2019 * Roanoke River Basin ** Cape Fear River Basin ^ Subject to Jordan Lake 50 -foot buffer rule Total: 0 1094.4 Feet Feet Avg Avg Length Within Length Within Permanent (P) Perennial (P) or TOB Bank Temporary Permanent Impact Site Stream ID Stream Name Lat Long or Temporary Impacts Notes Intermittent (1) Width Height Easement Easement (T) (ft) (ft) (ft) (ft) Unnamed Trib of Open cut, dewatering structure, Impact Site 3 S26 Belews Crk * 36.27514545 -80.03027276 T P 15 5 temporary crossing 0 67.5 Unnamed Trib of Impact Site 4 S21 Belews Crk * 36.27286359 -80.02200739 N/A 1 3 2 Bore - no impact 0 0 Unnamed Trib of Open cut, dewatering structure, Impact Site 6 S25 Belews Crk * 36.26525844 -80.0097791 T P 25 5 temporary crossing Highly disturbed by cattle. 0 68.3 Unnamed Trib of Open cut, dewatering structure, Impact Site 7 S20/S35 Belews Crk * 36.260359 -79.999276 T P 15 7 temporary crossing 0 96.9 Unnamed Trib of Open cut, dewatering structure, Impact Site 8 S19 Little Hogans Crk * 36.25866886 -79.98991995 T P 14 7 temporary crossing 0 77 Unnamed Trib of S16 * 36.25839645 -79.97866651 N/A P 3 3 Bore - no impact 0 0 Impact Site 9 Hogans Crk Unnamed Trib of S17 Hogans Crk * 36.25832381 -79.97843172 N/A P 6 6 Bore - no impact 0 0 Unnamed Trib of Open cut, dewatering structure, Upper reach in existing ROW is Impact Site 10 S12 Hogans Crk * 36.25912529 -79.97224976 T I/P 8 6 temporary crossing intermittent. Lower reach in 0 126.3 forested area is perennial. Unnamed Trib of Open cut, dewatering structure, Impact Site 11 S13 Hogans Crk * 36.25896925 -79.96886502 T P 12 2 temporary crossing 0 60.9 Unnamed Trib of Open cut, dewatering structure, Impact Site 12 S14 Hogans Crk * 36.25897358 -79.96767842 T 1 7 4 temporary crossing 0 96.9 Unnamed Trib of Open cut, dewatering structure, Impact Site 13 S33 Hogans Crk * 36.259739 -79.962679 T P 20 8 temporary crossing 0 79.1 Unnamed Trib of Open cut, dewatering structure, Flows to S32 via Hwy 68 culvert. S34 Hogans Crk * 36.261515 -79.955965 T 1 20 15 temporary crossing Impacts to both sides of Hwy 68. 0 95 Impact Site 14 Unnamed Trib of Open cut, dewatering structure, S32 Hogans Crk * 36.261509 -79.954914 T 1 6 7 temporary crossing Flows from culvert under Hwy 68. 0 78 Impact Site 20 S31 Unnamed Trib of * 36.26179 -79.954757 N/A P 9 5 No new impact Existing culvert 0 0 Hogans Crk Unnamed Trib of Open cut, dewatering structure, Impact Site 15 S7/8 ^ Troublesome Crk ** 36.25467754 -79.94766573 T P 4 3 temporary crossing 0 91.9 Unnamed Trib of Open cut, dewatering structure, Impact Site 16 S6 ^ 36.25223873 -79.94185597 T P 6 4 0 96.2 Troublesome Crk ** temporary crossing Unnamed Trib of Upper reach in existing ROW is S5 Troublesome Crk ** 36.25057158 -79.93738176 N/A 1 7 3 Bore - no impact impounded by beaver dam. 0 0 Impact Site 17 S4 Unnamed Trib of 79.93689481 -79.93712622 N/A 1 8 3 Bore - no impact 0 0 Troublesome Crk ** Upper reach in existing ROW is S3 ^ Troublesome Crk ** 36.25032582 -79.93689481 N/A P 15 4 Bore - no impact 0 0 impounded by beaver dam. Unnamed Trib of Open cut, dewatering structure, Culvert road crossing between Impact Site 18 S2/S29 ^ Troublesome Crk ** 36.24830449 -79.93197609 T 1 3 1 temporary crossing S2a and S29a. 0 60.4 Unnamed Trib of Haw Open cut, dewatering structure, Culvert road crossing between Impact Site 19 S1 ^ River ** 36.24004255 -79.9247786 T P 3 1 temporary crossing S1 i and S1j. 0 0 * Roanoke River Basin ** Cape Fear River Basin ^ Subject to Jordan Lake 50 -foot buffer rule Total: 0 1094.4 Feet Feet LEGEND CLEAR AND UB FULL PERMANENT EASEMENTED1 L21M E EmP�Yt0N9�u�l�E� ® DNEDKD� O (USE HAND TOOLS WITHIN 10' OF STREAM). ) STREAM 32 CROSSING NOTES: LO7o LIM—DI:,DAaNLDE -LUD- —1-E — — \ INSTALL SILT FENCE AS THE AREA IS CLEARED. 1. MATS WILL BE PLACED ACROSS THE STREAM TO CREATE WORKSPACE WHILE INSTALL SLOPE BREAKERS/WATER BARS. p s,L,F x E,NDD — sF L F sILTF N EU T T p F1 slLTso �� F.71sILTEDID�TPUo,EODUN (1 THE BORE UNDER THE ROAD IS INSTALLED. INSTALL AMERICAN EXCELSIOR CURLEX I \ ET ENGINEER APPROVED EQUIVALENT 2. ONCE THE BORE IS COMPLETED, THE CROSSING UNDER THE STREAM WILL BE / CONSTRUCTED. ANDAPPROVED SEED MIXTURE AS SOON AS AND A / \ FlElsEU,MEDTNL,EA�D \ \ POSSIBLE OR WITHIN 7 DAYS. ONCE THE T—U,UraND—l- =_ / \ PIPELINE IS INSTALLED, THE CURLEX AND GRASS 1/ SEED SHOULD BE RE-INSTALLED AS SOON AS \ \ sLO aANEA� Q T11-ea .. ® \ POSSIBLE \ \ / i / / 6RP,PHIC SCALE (IN FEET) - TE,wTDEDDxaUU o DU111—E1T %/ FIRST ROW OF SILT FENCE / o� \ SHALL BE PLACED 15 FT FROM / I/ M KRNMENTIDE11IG F7q coxC—TRUDu HOUT TOP OF BANK OF STREAM ; 1 mon= on. /. o ­LE TD T© TEDD. EosEn,EHT 99 STREAM 32 (INTERMITTENT) - ® TEMPORARY IMPACT: OPEN CUT FOR GAS LINE, .1'.U'"BENE"T DEWATERING STRUCTURE, EQUIPMENT CROSSING/MAT \ = CyED MEE )--( \ ` SEE DETAIL 5 ON SF(EOT 9 \ ,'•\ \ - -,FOR STREAM 31L31 ' y e/-- _ - -_ - "o IESTORAT(ON PLA g95 ----------------- (PERENNNCL) -- h' --- ( r E FSSING Y%iL D v `--.,CULVERT ! ' / „ \\ E , — -. yp qb ' '„ C� O v v--------------- v r ,� — CTC Gp = t ; "o l d' V -� / o — I�' \ �^� STREAM 3T TIC it 1 Q'/ g6 , s` I )FLOW�Ii� t S\ --' J✓4 \ ��Q ` ''4 �e� - _, - C �sit I 5� 740'TEMP EASE ENT NO P — / Y d / / \/ / I„ I \ f / \ w J x � \1 \\/ ' z '� i `,,III\ /(ff I � JGI \� 'y�O-----'� )tROPGS ✓/ ---�, STREAMS 34 �'/f �A VA A V �, �ir� ,f I v pv (IATFRMITT(ENT) F �I,1 v IE CESS KILIAFSF I TEMPORARY IMPACT: OPEN,/ p'1 \ ` Zf4 (R E Td \ \ �\ \ >< - --' O ' o` + O -- \\` 3 CUT_FOR GAS LINE, / '1`1 - 7L \ \\ _\\\ \ O o _ DEWATPRIN(a STRUCTURE,; 5) \ \\\ \ \ \, /—\ N EQUIPI)IrENT CROSSING/MA�' / � Q � - _ -- _ v �► p1 I ��y,'SB ''` PLACE ENT / ='} per, °°o S° A\ _ 1 vv �, V eq �p�reO M – , 4 —_ \, EE \ - -- `\\ m `` \`\ �s -`oe ES / 9 y `bey g4,, \ ` _, _ - -------moi, _---- - _------ _ -925 , - CHIN H \ '--,rte -- / --_-- \' / \ -. _ J t PA�TSITE-`4: ,, y- '- _ _ ----_---/ \ _ °z tax! , ST' 3 00 , I -------------- - a AT M 34 I ` \ -------- --------' $`l 5 \ \\'!S'rRE�iM4 ' RE_ ----------'" t4 ," --a'lI \ \ \ \ ---- ----- MPAGT'------- 1------- - N 4 _ -_- 030 ° -� r \\ I' \\� \',', `\�/�✓\\ ____. M'Igyr. �\\�1 3, � 1111 \ I I'1 I I �`- /'/, �'/ �\\\x,11 __ 945 I ® \\\I`\I I/ I \ 'pt � apG oxo � s\\1;4 \�\ ft -00 \I , / 1 \ \ / / ' \ 7/ 1 //'•-/ / / / III` , N60'S0 "49'W' \ / i' , // , //V PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATETO INSURE THERE IS NO RISK OF REF. DWG(S) PNG-G-446-0001008 N C?RO4 , INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS 10 9' ° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �yy�p� ' ■ ledmat 'Natural LINE 446 - B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET 79 OF 94 DWG SCALE: AS SHOWN 0 09121/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 03/06/19 SUPERCEDED 1 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 2 02101/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD WKG PROJECT NUMBER 1626546 Dn TE R+Tuae`lan'us SIG—RE DRAWING NUMBER REVISION ��/�� MI6/`F" Gas %`/°•NC INET.°IY\; ••....°�*�. „ KEITH MGR TECH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG- C -446- 0001074 3 3 03100/19 EPSC REVISIONS KRR CPD MG DRAWING BY CPD CHECKED BY CPD OATE 03/06/2019 SIGN4TUREIN.- WKG I . � 'e � �_� W'\ \ v PRINCIPAL ENGINEER " loll IIIII,I" , CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND o A E o / 1IN— I-EIs F.71 SILTS—INLETI—N EDa -----------_" 0/ _ I / \ _ I I - F Q T11-eaEnl�a ® .E,w T ICIIUU o // p`I °/' / ____, -____� - ,- _--_-_ --- �\ \ i ------ vv - --_-__,WETLAND 12A PERMANHti T WE 71LAND110/11 i GRAP/IC SCALE (IN FEET) ; PERMANENT EASEMENT, ° r ' PERMANENT IMPACT:1RW ----- --__"_ \\ UU11-111, EAMNEMSEEUIUU / \ `-'-' _ \ EASEMENT TEMPORARY\ CONV/ERS16NOFWETLAND-FROI�II finch 100 a. \\ UUMs .AU°kw�xUU. ❑ wM e E ro © — l IMPACT: OPEN -CUT FOR GAS \ —\ LINE DEWATERING FORSTED TO NON -FORESTED. .M.IM, I" ENT >•Haaucx wEnnrv° __ _ STRUCTU ,EQUIPMENT \\\ �\ _, ; =c M ET'lN`c ,_- C�tQSSING/MAT PLACEMENT. WETLAND 9A -PERMANENT \VA ® Hr,AEa°N 10N — 3 \\CWD\ vv__. '---'" A3 -__ - "------ WETLANP 12B PERMANENT--_ \ � \\ \\ ; EASEMENT TEMppRARY / IMPACT: OPEN CUT FOR GAS " -`- \\\ ------\\\ \ EASEMENT PERMANENT --------------- ---- 19 '--- \ 'fMPACTe ROW CONVERSION / LINE, DEWATERING '/ / STRUCTURE, EQUIPMENT __ '-0F WETLAND- ROM FORESTED---, --, TO NOWFORESTED. \ CROSSING/MArPLACEMENT. s, ---" -'--,` -------- ------ ORAR INSTALWA ER \ __ \ -- -- WETLAND 9B PERMANENT ,.= _ "STQRM NCE g , \ WETLAND 14— EASEMENT PERMANENT .-'' _ - ---' IMPACT: ROW CONVERSION OF,-' +1 TEMP CONVEYA / -- ' o \ NO IMPACT \ a A, ® FIRST ROW OF -------------- y g __WETLAND 15 _„� /\ \ EILT FENCE SHALL JNETLAND`FROM FORESTED TO'-, 65' NON-FORESTED.-��-EASEMENT ' 40'TEMP � ;EASEMENT ', ---- O \ NO IMPACT,- " \\ BE PLACED 15 FT i _— i V A \ FROM TO IF BANK OF SiNEAM - -------------- . \ ---- o _ p IM PA C A , - �-- '��p4' ��w — -` se -� SWC\-- ' S O — ---- - _ / \i ,'' .-' DSA + - - , WEIELAN FI ---------- �0 . -_ ---' -" WE�TiAND D W� '' / � \ 3 � TLAND 10/11 WE1'JJ►N - ,- ---� 4��;:::: _ �� # F �� WETLAND 12A ) _ I _ e� CD NO 12B EXI CULVERT � s� ��'" - \ \ -- _ �\ ------ --'" I�s - SB _60' PROPOSED- \ _ f�ERMANENT� dl' 374+00-�WF,TL-AWD8/13 "---' --_ SB I —�� ,✓111_--_-- d IMP ON SHEET 94 _� �� r \ / +00 73 V— + O ST/tEAM BUFFER SE-,F,rDETAIL`'I _ ®- FZONES _ ----------------- _ �- -,-- \ NO IMPACT o o _ STREAMS p o + �' + NOIMPACTo O `\ I�SB \ a— a+o � � F �I I _ _ _- ------------------ / ---- -------'----, __—`�—--10PENCUT FOR GAS'LINE,.-'" '------ --------- - ---- \\\ Lam— J �� DUDE ENERGY p + A O to oto= —� —� 5720 —------- t� / 00+��� _ �� ri +` 4= --- - - $F ---------- DEV'IATERING STFfUCT1lRE, --- : i /EQUIPMENT CROSSMIG/MAT" _ ',PLACEMENT,' /--- ROW;270' --- .- �X� // ----- -- 1 _ M WETLAND 76 CD _-""- --- ------- - - - _ —, `— ________-- 0" ---_+_--- --- - __ -- -- o� '� / NT EASEMENT \\ CL'EAR AND GrtU�f�1L4 PERMANE __ SEHANDT�01jsWITHIN/10'OF§TREANI�SAND ----"- _ -- — CX `BB �koQ� I T LL SILT FENCE'AS THE AREA WETLAND4ANSI /ly 1 \ �4 c ------- \ �j /\ \ IS CLE� �> IN ALL' MATS BETWEEN ST TIONS; 76+bD'AI�D 3 9+00 AI;�D APPROVED \ '� WETLAND �E ED �WIII�TU AND STRAW AS SOdN \I ; -'----------------------- ' I` _\ i ,'—"" ; "'"" AS POSSIBLE) ONCE, THE PIPELINE IS \ 4NSTA `LED,TWE WETLAND MIX,1`GRASS SEED , "- -- i \ --_'_-----'' ✓ I � !►N D'STRAWSHOULd BE RE -INSTALLED AS - -- ' SOON ASPQ$SIBLE.1 I I _ I I J PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF REF. DWG(S) PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS 10 9' ° - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS ' ' F%dmoM LINE 446 — B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET $0 OF 9¢ DWG SCALE: AS SHOWN 0 09121/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGNATURE REGIONAL ENGINEER DWG DATE 03/06/19 SUPERCEDED 1 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 2 02101/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD WKG PROJECT NUMBER 1626546 Te NATURE/wnlus DRAWING NUMBER REVISION ��/�� 6/`1G F" MI4 Natural Gas I .......*,� „KEITH MGR TECH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG-C-446- 0001075 3 03106/19 EPSC REVISIONS KRR CPD MG DRAWING BY CPD CHECKED BY CPD °ATE 03/06/2019 sICNATURE/wmus WKG I . � 'e � �_�(� W'\�v PRINCIPAL ENGINEER ” II 11111,11" , CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 RESOURCE CENTER REIDSVILLE APPROVED BY PING -DISCIPLINE -RESOURCE CENTER -NUMBER LEGEND \\ A A o TEMPO -CON -10 EN-® .— p Os.TSOF nR—E \ \ \ \ \\\ r \ \ END OF EXISTING GRAVEL ACCESS ROAD \ --LOD- sF� \\ \� E-1 sIrFRKEN — sl,vrosIT­ 0 177 1 ® s�rs°ex xlEra"mEcn°ry n I \ (\ GRAP IC SCALE M (N FEETI' n am \ / F rN PoF FrN F°�N ® rowFnrzvvrEnnx°cFossxc \\ 1 nch-100ft. , 4 \ WW r"Ex°"eaEA.F Qrwvwvavraexcx Rua o cuuaauce"Exr �� W W A NO W m W a ♦ c°"°� *""°kw�"°"r ❑ w a+o W ao M AA I \ VAY' _------- % °� '� I A CONTRACTOR TO PER ,I RDQN'LAKE / / BUFFER RALE. ZONE 1: ® Z , H � warneRr°ter ® Z VA V AA I \ \ .IMPROVE AS _ / / 30' FROM STREAM BANK, / , V rRwPoFaF. E�EME"r "°°°"wEr "° ERG"EN EasE"R ® i1AN0 R Z � U H H VA I \ `��' VA VAS I � N m I NECESSARY FOR USE BY VEHICLES AND EQUIPMENT 090 , ZONE 2:.,50' FROM I STRE M BANK F Q �- I ® °�"wA,Ea°N-°" —°w°— ® �N��cE Nw.EF � VA. I —� VA I , VA _, I STREAM 6 VA4a A (PERENNIAL) OPEN CUT F§R GAS LINE,\ \ , -- -_ � � STREAI�14 (INTERMITTENT) \\\ I DEWATERING STRUCTURE, \\ \ \ — -_- - HDD BORE / m NO IMPAC ----_-----/ AA EQUIPMENT CROSSING/MAT PLACEMENT � SS �Lo V----� \�VA WETLAND 6/7 ----- PERMANENT EASEMENT PERMANENT IMPACT: ROW CONVERSION EXIASRT�G �v \ �\ FROM FORESTED -HOD TO NON -FORE STED , VA .%��p�o�+.- TEMPORARY _♦♦♦♦♦4'''D �ACCESS RO D INSTALL TEMPORARY � \ INSTALL TEMPORARY _ EXIIT f — STREAM 3 ATER V NCE STORMWATER \\ REFER TO DETAIL ( \4 ON SHEET 5 CONVEYANCE6WTEMP ATER )l1� CONVESTORMYIANCE 60'PROP® (STREAM) /(PERENNIAL) —aa, —� a �cW�M INTERMITTENT HDD BORE/; HDD BORE kCON 0 i+ V A 40 TEMP EASEMENT + EASEMENT 011 o 0 0 0o 0 1 V O O� PERMANENT ®o 0 0 0 Q SB -' NOIMPACT E _NOIMPACT 0 O O" O + o o 0 0 0 +II + + + + + + '. + + o 0 0 +�- _ + + + 0 0 0' o _. + + + +nr �.> Qo ate, aha 01 \ M M M t1', _Jo+-- th r1 N �1 aw SWCO SWCO ®W O' SB a Or n a a SB SB lit �! aaa - — q- II 1-- z 17 1 a IF 8 __._ F S eF e F IF -'- SWC DA = 5.202 AC aga k0� rtOR —.:' SWC S SB \ S$ C SB SB S '� W,'I DA=4.50:AC _...- DA = 34.302 AC F F CD .�i S i �� / 9 ." .w — PROPOSED GAS „" DA = 0.992 AC '"_ .: - — -' - C S�TE16- ---_ S - ---- — ; 1 "EI�IER GY ROW 270' j — IMPAC SfT _ -_ --- --- �, - ---- - _ SEE DETAIF. � ON SHEET I ------------- a= a= 94 I — CLEAR AND GRUB 30' EASEMENT CENTERED O RE -A' — GAS LINE. USE HAND TOOLS WITHIN 10' O a. WETLANDS AND DO NOT REMOVE ROOTS. _ _ -- -S OF ', F01R EAM� FER ZO ,, � E S — I INSTALL SILT FENCE AS THE AREA IS C 1EARED: - ----y_---- — �.—II — — — — �- V -'- ,` �� INSTALL APPROVED UPLAND AND LADI� / _ G SEED MIXTURE AS SOON AS POSE LES@ -NOS = PLACE MATS ACROSS WETLAN OR/AC/CESSAl . , , i xl b / ------------ OGBURN MILL ROAD -0� Fss I I EXISTING GRAVEL ACCESSROAD/�JI IX A —�--- -- MATCHLINEA—A SCALE 1"=100' / -- \ —� i , i , , , I � I \ PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING • USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 �.`.0A C?RO%,, INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ'�FESS IO ° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS F%dmorrt��/��1 INIaWral LINE 446 - B E L E W S CREEK P I P E L I N E SHEET $1 OF 9¢ DWG SCALE: AS SHOWN 0 09121/18 ISSUED FOR CONSTRUCTION JKC CPD WKS AREA CODE 9335 E SIGNATURE/INITIPLS REGIONAL ENGINEER DWG DATE 03/06/19 SUPERCEDED 10/02118 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 010]000 6/`"2 Gas EROSION CONTROL PLAN 02101/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD WKG PROJECT NUMBER 1626546 on Te slc NATURE,wnlusMGR DRAWING NUMBER REVISION %`/°•.YC INET.°��\` TECH 3 03106/19 EPSC REVISIONS KRR CPD MG DRAWING BY CPD .....-°�*,� „KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC f PNG—C-446— 0001076 3 CHECKED BY CPD DATE SIGNATURE,DIRIALS WKG I.�'e ��_� (� All PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY PNG-DISCIPLINE-RESOURCE CENTER -NUMBER 03/06/2019 W \'\ ENGINEER CHARLOTTE, NC 28210 LEGEND , / o TEMP—�UNE�N�IDNEN,�x� ED ® �EcxD o , o IIM—DI—E DD- FEE 1 sIrFR�E — sF� F EIIrF ED EIIrFR�ED r� o / 17771 ON o sEo ° :AxGR MT. TN,PoRARr�,R�N�R.I. =_ / ' MI. TRE-xxN �R \\ IC '1 1 ; \ \ \ GRAPHIC SCALE (IN FEE �. , MR �EReAxExrs DOU o - —�- -- -- _- - 1.0=lGa9f cUN R .RN xW sxU r ❑ Fp L-j ---- __ "-__------ - --- ® —NWATERDWERSIDN /`Y j'a -CLEAR AND GRUB 30' EASEMENT CENTERED ON v N GAS LINE. USE HAND TOOLS WITHIN 10' OF I' WETLANDS AND DO NOT REMOVE ROOTS. INSTALL SILT FENCE AS THE AREA IS CLEARED. INSTALL APPROVED UPLAND AND WETLAND SEED MIXTURE AND STRAW AS SOON AS POSSIBLE. DO NOT PLACE MATS ACROSS \ I 8 WETLAND ® T - ---\ ,/i \'I \I 4 FOR ACCESS. ,1 i r a \ \ ----- ,; \\; \ \ \ \ :r '" � I SEEg1L 3 ON \ \ / o 1 0\ \ \\ \ SHEET 94 q TR \ --- ---_-_"" -�A�\ ° pie -\� �\o� 'BUfF�RZONE `' \\`'`\`\`:\\ \' \ \\ o / e + ro+=r°wa $g�'_.n \ �xQO ------------ /,''/ \� - -_., - -- SF \ ` ME T- o ------ - _ k 3AL / -- -, --- -4 / p o `\\ STREAM 4y / - s - 'PERENNIAL) i / ------ -- xa (� l + Q11:::a:` IC/ / \ ` -I_ \ // ---- �\ ; I ' -- SB NODBORII:IMPACT / o Z o_ ' o SB , A. \ %V i' o \ \ -- o _-- %v l ;e =" — ----- - �,. — � Fir 87C /IMPACT SITE, ` / ' /' c' / 1 SB I l /29 ykOV� I �` T 3 i WETLAND 5A FLOW WETLAND 5B � F \ �' / CqBTR�EAo 2(29 \ WE•�LAND'SA PERMANE _ / SB I;r_ $ ; % (INTERI)IIITTENT) \ \�I EASEMENT TE 1-4\ V _ x00 PEN UT/FOIL GAS,' I)NP' \ O T:IOPEN CUT FO 1 i - ��� LINE, EWIATERI G `. -- $B `I I ' ,w�""� -� I I i 1 \ �1�` NE, DEWATERING _, \ --�25'$ETBACK FROM-' 1$ ��� STRUCTURE ��- � 8 RUCTURE, EQUIPM INT _ � \ / EXI ING\ TOWER 9i PROPOSED GAS i J- �1 EN I CULVERT �R�S G/MArV4 -CEM INT. \ LINE - - CROSSING/MAT _ HDD ENTRY / / ; �LACEM Nrt % `b0' -PROPOSED F+1- I,�t- - WETLiIND $B PERMANENT ��m� /� /E/IbEMEPFT PERMANENT PERMANENT� i �`i�� -,-- -- 1_--` / i IMPACT:{LOW�ONVERSIONOF_-:,--"---' /-- ACCESS ROAD ' �.r - ,_ `, - dAIETLANq RQMfORESTD-FfY ___�� _ __- AR-002(REFER TO_�_- ��- '_-_- V� �- --,_ ---- - "- - -' v " �`, _ - - - ------ -----' - NAN-FORE-- _ .- �- ---- v A v -- ) '`--------_- ----- ---- /--'SHEET 5) ��`, -__ --- - ---------- --- – ',.090'__–'_____ I /: --' 1 I --------I \\ \ /'� _– ––__-�_– ' i I may_---yam i \i /// ,\`' I/ �\ 900. / i \'V /' / / 1` '�–_– 1'I\ V /9p999 _ ` \ a'--- ;\; EXISTJNlG.\ACC;ESS – _ '\_____— \\ --' // /• "RRY' \\\\ ' EXISTING VULCAN MATERIALS ---- , i ,- , ----- QUARRY / , - \ `` ` t'\II -i PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED DO NOT SCALE THIS DRAWING USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE TO INSURE THERE IS NO RISK OF PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 `=OQ°�FESS/° 9' ° 4 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �yy�p� ■ �Vdmorrt 111INaftrall SHEET $2 OF 9¢ DWG SCALE: AS SHOWN LINE 446 — B E L E W S CREEK PIPELINE DWG DATE 03/06/19 SUPERCEDED 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIG—REIINITIPLS REGIONAL ENGINEER 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 ��/�� MI6/`F" Gas EROSION CONTROL PLAN DRAWING NUMBER REVISION 2 02101/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD WKG PROJECT NUMBER 1626546 on Te slc ro`TuaE/wnlnLs %`/.•NC INET•°��\` MGR TECH 3 03/00/19 EPSC REVISIONS KRR CPD MG DRAWING BY CPD ••...-•�*,, KEITH REC&STD COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE NC , PNG-C-446- 0001077 3 CHECKED BY CPD OATE SIGN4TURE,N.— WKG I . � 'e � �_�(� PRINCIPAL , CORP. OFFICE 4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE APPROVED BY 03/06/2019 W ��'\�v ENGINEER CHARLOTTE, NC 28210 PNG-DISCIPLINE-RESOURCE CENTER-NUMBER LEGEND ) 1 1 ( ., 1 ; �\-----------__ _ . _------ \\ 1 1 - i, --- ---- , A asn>: o TEMP—CON-11 Q a[MLOD 1c�x o xI iERKE x99 - •F sliExEai O O F. lx iPx /S , Bs------ EXISTING DRIVE L1,rERCO)V T C' II TO MOBILE HOME PARK ox.Ix iNE x�o p I i -v �' i --_ ------ - J MPox xr �N xx 1x ® iEravaxutvvrEnnxx CxosswG i_ 177 1 p ixExCx—NEx FTI iR x xoxRoo o `xx P xExi �� Fp �xMNExisEExlxc O oox .xx xw�xoxi \ (\ / I . _-� -" --905'' ---- '/ ^\ 3 I\` \ ;--- NOTE: EQ IPMENTAND PIPE ------ \ TCE \\ \ STORAGE. CONTRACTOR TO STRIP -- — 9U°'/ \ i \ i/ / I� I I i' G awc\SCAL�LNFEEi> — j \off\ FFp\ TbPS LAND STOCKPILE IT, ONE ° — o IL ALTER COMBS WAY .1 i� L�C TION SURROUNDED BY S[LT / 895 \ mon-loon. ' 4 °O — F CE. STOCKPILE SHOULD BE - - ASILIZED USING TEMPORARY wxi��rol�T ® \ o \ V 'SEEO ANDST i .89 �lW. MATS SHOULD BES / O itLAC ACROSS$FTE FOR USEAY-- -- � i/I VEHICLESAND E UIP _— / eQ MENT.ONCE i _ ."ACCESS ROAD `, --'-- TMxoxox ENExT ® o�xxwATExoNEx•lox —�wo— fi\ THE Si—TIEIS-NO LONGER�EING USED, _ ____,= ;` y I AR -001,' - / �_ � / THE TOPSOIL WILL BE SPREAD � � f I - ° CD _ ERMANEN T ACROSS THE S AND ( Y \ \ PERMANENTLY ST�►BILIZED� \ \ GRADELEARACCESS, ROAD X\1 _60'PROPOSED PERMANENT 31F 3g .- i /��\ `, \NI i lIo/y1 \' l I � � \ °q � �y�'-`� � `�---' -- ' 1 I OfJ �� • �`� � ��-�''�_ �1 „�`, � ��al // - - • " 1 ------------"' pp �° py% F '--'------------'/STREAMT -- 36 CD � _ , - � � A \ \0^. It n� I� /.� 1 T \\\ \ -, l Hyl XISTING GAS \\ \\ `�♦ \\ %Op l REN ,-_ ------ --- (PE NYAL)/ pROPd$ED'PA� 11 1 + � \�I � /I I; w� $5' E --____ -''--' � %' `,/- I (9 LINE 1 \ ' I i IPELINE EASEMENT T r %� % sEMENk� �-------_ za - of 3B F 40' TEP, c o / EASEM NT �o o + a J W v / A — C�` �---� _ _00T °ol �. x°0'1 aao'I ° - $F' 'i \ \\ eo__,�', e_ 9+00 q E _ _ 89+28 --------------/ '� �PRiOSEDTRANSCO STUyG oo — /— �m T �F�CE i3e Ck I..°. `.':.: --I------ _ -- -v__- �: 1� --- � i v OR STATION SATE REFER ��A I _, '- ----------_ ----- \Q�\ T LINE 448 OPP STATIO `" - \ o�� - -- - '----- N \ \\ \\ --- g\F 11#02153`/8 FOR \\ Al \ - - '-- -- , - ----------\\ l I 1 I _ \ SEE ETAIL 4 — - =� �� ----------_ X \\ O0 g�/ S�IEET9\4 FOifSTREAM__ - - �` \ _ -.__ - _tri _ OMPLETE GRADING P,__ AFI \ \ \ 0 $uFFER ZONES :\`.\ \\111�ETL'AND__ ---- i `��` �. ---___—_ —� _ START PR0.IECT �\ sF 1E • °0 \ W \------- IMPACTiSITE 19: / \ STRE \ WE}1LAIN 1A WETFP,NDWXA-- --'-- a n ii, WET ND VV`J,03 / --= - - _ 111II `i II ILOW \_, ----- -_ _ s - __ 10� _� _'v I I A4 \ i I i - 1 �l \l--'. -- -- ----------- goo — — gU `'--"^ / \ i' / eco ------ _, — — -- E0\ --- _______________-"-_________________________ ___-_ / ____ 1111 i -------- '.__ ---------------__ _ . PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED • DO NOT SCALE THIS DRAWING. USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF REF. DWG(S) PNG-G-446-0001008 INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-G-446-0001009 ,04 - NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �yy�p� ' ' ■ �Vdmorrt LINE 446 — B E L E W S CREEK PIPELINE EROSION CONTROL PLAN SHEET $¢ OF 9¢ DWG SCALE: AS SHOWN 0 09/21/18 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 E SIGN4TURE/INITIPLS REGIONAL ENGINEER DWG DATE 03/06/19 SUPERCEDED 1 10/02/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER 0107000 2 02/01/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD MG PROJECT NUMBER 1626546 TE -TUREiwnlus MGR TECH DRAWING NUMBER REVISION �/� 6/`N•' Natural Gas 3 03/00/19 EPSC REVISIONS KRR CPD WKG DRAWING BY CPD '�, 9,yj °•••••°*.� REC&STD COPYRIGHT2014PIEDMONT NATURAL GAS CORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE STOKESDALE NC f RESOURCE CENTER REIDSVILLE PNG-C-446- 0001079 CHECKED BY CPD OATE El— WKG U(� PRINCIPAL APPROVED BY PING -DISCIPLINE -RESOURCE CENTER -NUMBER 03/06/2019 I.�'e ��_� W ��'\1\v ENGINEER CHARLOTTE, INC 28210 ,r ••• TP "He rr.eT neanNP..T.L,c.. �,I P ..��SF W.;.1.. FA.[EIHAINAr "A[eN..r. xi: 11 rA=nn:T [3F �r ee��Iseor-... •a i, �I*-sitl �T, �SFQ — e STREAM 7/8 BUFFER DETAIL GRAPHIC SCALE pN FEI.ET)No 1 ✓nch •IOD A. S13 LINE 446 BELE W S CREEK PIPELINE STREAM 31 & 32 RESTORATION PLAN REVISED GAS • � '.� it[rAR,aR,AHI:P.N DATE 1lt812G19 r, 111 l t`; TAxL.NrrLAAML. RAaP, .TA=R NoHIrADT 1 ALIGNMENTIN :1-11-4101 a4 {� ARIA I_=RNeI.PEA..AHA[T til SILT SOCK erg —E'-- :..•' °`°, A. i ,.PPM AT �,DREr:PO. IMWT A1 sICHATUP6nNinus REGIONAL ENGINEER $ FQ] ISSUED FOR CONSTRUCTION REVISION JKC M DHE E.1— M T �T `� ACCOUNT NUMBER �a 2 02/01/19 EPSC REVISIONS AND ROUTE REVISIONS KRR GRAPHIC SCALE Ie? FEET) f l � .,.. 1 IAN • t00 R LINE 445 BE LEWS CREEK PIPELINE SIGNATURE,NITMLS IMPACT SITE 19: REVISED FOR NO IMPACTS STREAM BUFFER MAP Piedmont Natural Gas - � ERER6Y IANO G +ryPRA STRUETtlRE PL[E G"k 1Nr' ,.,W,rI„•...,. - DATE QQM V2919 SEE TneLE FOR euFFER AREAE REv'�ED x4REDIr 1. PERM. WIDTH DORR14P4NOs ro4HEe*w SHEET 1 OF 4 �SFQ — e STREAM 7/8 BUFFER DETAIL GRAPHIC SCALE pN FEI.ET)No 1 ✓nch •IOD A. S13 _iWNI, PIK. IMPACT _ mNLx PIRN -1A 1 A -P REPAei mHE a. TeuP. uPACT sa ss fay} IL EM PACT SITE 76: STREAM 6 s$ ss C) GRAPHIC SCALE ,IN FEETI 1 Incn = $$ { V l I— LINE 445 BELEWS CREEK PIPELINE 7 M FF MAP'"inR'o" $RER BUFFER P"E'p�le�.� aYYI F RlF FL ERER6r Lpryp E. +Arf'AASTRUCiu RE vLLC OAT 2!0111 EEE TneLE FOR euFFER AREAE I EO 9 m AID TO Rico[ NAM. WIDTH Natural SHEET 2 OF 4 CCRRliP4H04 MSI61r 41 0111 • �•�`r�l G e STREAM 6 BUFFER DETAIL R{ ORDER OF OPERATIONS: CCNTAACTOR TO CORFMM -Ib RECORD -- 07HEAN BANK BIAIENSgHS ARD DOCUMENT EXISTING CONYITIONS WITH PHOTOGRAPHS. CLEAR AND GRUB FULL PERMANENT EASEMENT IUSE HAND TOOLS WITHIN 10' OF STREAM}. INSTALL SRT FENCE AS THE AREA W CLEARED. INSTALL SLOPE RREAKERSNIATER BARS. INSTALL AMERICAN EYCELS16R CURLE%I FIBRENET OR ENGINEER APPROVED E4UIvALENr AND APPROVED SEEP NIkrVRE TO DIGTURSED RHEAS AS SOON A9 POSSIBLE OR W.THW T DAYS. FOLLOWMG SOA ING / .OPERAMN3 AT NC6B. OP EN CUT AND INSTALL PIPELINE. ONCE THE PIPELINE IS INSTALLED, THE STREAM IS TO BE RESHAPED PER DIMENSH]NS AHD PHOTOS. TME CURLEK A" GRASS SEED SHOULD GE F RE •INS FALLS D AS SOON A S POSSIBLE. O HFNi R L�/ aREn # R _— ' PECEIVINT PIT ' SORE u Ln AOAO II PROPCSEO GAS PIPELINE , ' PER. EASENEHT Pit N�HIHG TEMP. — — EXTENTS EASEMENT TRNP. SHOWN -c— EASE14ENr ' I IN GRAY An" % , Qb — ' b x �' R[CE 6S DkwE ' `_ U m Sn x i �m .... / TENP EASEMENT EeEENENr STREAMS 31 & 32 ARE11 � (INTERMITTENT)TEMP IMPACT: OPEN CUT FOR G LINE, DEWATERING STRUCTURE. EQUIPMENT 0 — PERM. EASENEHT , AREA LINE 446 BELE W S CREEK PIPELINE STREAM 31 & 32 RESTORATION PLAN REVISED GAS • � '.� / C as DATE 1lt812G19 _FILTER SOCK PIPELINE —_ NOTE: ALgNMENT REVISION IMPACTS TO STREAM AND IMPAN. CTS TO TO STREW WETLAHOS. THE NSW ARE AYENT NASA SMALL OUTLET PROTECTION ALIGNMENTIN — pw — Vr _ r ARFAOFPER. THIS •IPALi IN 20HE 2. THIS CRAWING SHOWS THE NEW- µquMENT — LOD OD LOD SILT SOCK erg —E'-- :..•' °`°, A. WKG AREA CODE 1r _ erl1 K+rra A1 sICHATUP6nNinus REGIONAL ENGINEER 1 10102/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER �a 2 02/01/19 EPSC REVISIONS AND ROUTE REVISIONS KRR ' eu[vl Ar IGNq S iiI FunNH _ zeNe 1: PIrrE..uAer _mHE: rERu.I.PA[ 6 SIGNATURE,NITMLS IMPACT SITE 19: REVISED FOR NO IMPACTS � I._--JmHE11E IMPACT EPSC REVISIONS KRR WKG [EXCEPT STREAM BUFFER nl r aNP ,,PACT JKC ' ZONE 2] CHECKED BY CPD LINE 446 SELEWS CREEK PIPELINE STREAM SUFFER MAP .�N,TDPEI�N�TIAL6 WKG �U G Piedmont Natural Gas ENERGY LAAO Z INFRAS TRUCTYRF. PICC DATE 021D112010 SEE TABLE FOR soil Ea AREAS REHNEe TO nvO108fREAM SHEET 4 OF 4 cDIR4s1DKDSTo 6HFF*.. WKG ........ •.c...,o.+•N. u ,� W _iWNI, PIK. IMPACT _ mNLx PIRN -1A 1 A -P REPAei mHE a. TeuP. uPACT sa ss fay} IL EM PACT SITE 76: STREAM 6 s$ ss C) GRAPHIC SCALE ,IN FEETI 1 Incn = $$ { V l I— LINE 445 BELEWS CREEK PIPELINE 7 M FF MAP'"inR'o" $RER BUFFER P"E'p�le�.� aYYI F RlF FL ERER6r Lpryp E. +Arf'AASTRUCiu RE vLLC OAT 2!0111 EEE TneLE FOR euFFER AREAE I EO 9 m AID TO Rico[ NAM. WIDTH Natural SHEET 2 OF 4 CCRRliP4H04 MSI61r 41 0111 • �•�`r�l G e STREAM 6 BUFFER DETAIL R{ ORDER OF OPERATIONS: CCNTAACTOR TO CORFMM -Ib RECORD -- 07HEAN BANK BIAIENSgHS ARD DOCUMENT EXISTING CONYITIONS WITH PHOTOGRAPHS. CLEAR AND GRUB FULL PERMANENT EASEMENT IUSE HAND TOOLS WITHIN 10' OF STREAM}. INSTALL SRT FENCE AS THE AREA W CLEARED. INSTALL SLOPE RREAKERSNIATER BARS. INSTALL AMERICAN EYCELS16R CURLE%I FIBRENET OR ENGINEER APPROVED E4UIvALENr AND APPROVED SEEP NIkrVRE TO DIGTURSED RHEAS AS SOON A9 POSSIBLE OR W.THW T DAYS. FOLLOWMG SOA ING / .OPERAMN3 AT NC6B. OP EN CUT AND INSTALL PIPELINE. ONCE THE PIPELINE IS INSTALLED, THE STREAM IS TO BE RESHAPED PER DIMENSH]NS AHD PHOTOS. TME CURLEK A" GRASS SEED SHOULD GE F RE •INS FALLS D AS SOON A S POSSIBLE. O HFNi R L�/ aREn # R _— ' PECEIVINT PIT ' SORE u Ln AOAO II PROPCSEO GAS PIPELINE , ' PER. EASENEHT Pit N�HIHG TEMP. — — EXTENTS EASEMENT TRNP. SHOWN -c— EASE14ENr ' I IN GRAY An" % , Qb — ' b x �' R[CE 6S DkwE ' `_ U m Sn x i �m .... / TENP EASEMENT EeEENENr STREAMS 31 & 32 ARE11 � (INTERMITTENT)TEMP IMPACT: OPEN CUT FOR G LINE, DEWATERING STRUCTURE. EQUIPMENT 0 — PERM. EASENEHT , AREA LINE 446 BELE W S CREEK PIPELINE STREAM 31 & 32 RESTORATION PLAN MainaturalGas iedmont . ENERGY LANG L INFRASTRUCTURE. PLLC DATE 1lt812G19 _FILTER SOCK e STREAM 1 BUFFER DETAIL e STREAM RESTORATION PLAN (STREAM 31& 32) surnR,uLa ,, �w= �[A11 se r .:..a� Gp ex cx Sg r TSG L —W CI [RANCI l IMPACT SITE 1B: S STREAM 2129 WETLAND 5A rLAea.anT". �.•, WETLAND 5B .nf) GRAPHIC SCALE IHr FEET 1 Inch . ieD R *F_j LINE 446 BELEWS CREEK PIPELINE STREAM BUFFER MAP ti piedmont ENEPET LARD L INFRASTRIICTIIRE. PLIC DATE 021012019 REEIMID TO OPAUFFPERAEAe REweO TO RlODCI PERM Whin Natural Gas SHEET 3 OF 4 COIIRISPDNDST04Nl[f ax rxrenu,•w=r,m,=•wr Fus e STREAM 2/28 BUFFER DETAIL ----------------- IN 10 LF OF CLASS "A-1" DITCH (SEE SECTION BELOV O RIP- AP APRON OR OTHER NO DATE _FILTER SOCK APPROVED METHOD OF UNCOVERED LOD C A OUTLET PROTECTION SECTION OF PIPE � % PLAN VIEW — LOD LOD OD LOD SILT SOCK CPD WKG AREA CODE O CHECK DAM(TYP.) DITCH CHECK DAM(TYP.)__ C EDGE OF EASEMENT LOD LOD TIGHTLY ABUT FILTER SOCK TO PIPE (TYP) � yJ U TALL TO BE 1' GRAVELMIN M INSTALLED GRAVEL ACCESS 3:1 SLOPE (TYP.) VEE DITCH 24" RCP STORM PIPE CULVERT DITCH (SEE SECTION BELOV O 18" COMPOST NO DATE _FILTER SOCK CHK SILT SOCK LOD C A LOD 9 G� cT m 0 � % PLAN VIEW By�Ep��� /y'�} a iwilm /a t I NaturalGas COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 U TALL TO BE 1' GRAVELMIN M INSTALLED GRAVEL ACCESS 3:1 SLOPE (TYP.) VEE DITCH 24" RCP STORM PIPE CULVERT i PNG-G-446-0001008 PNG-G-446-0001009 SHEET 94 OF 94 DWG SCALE: AS SHOWN DWG DATE 03/06/19 SUPERSEDED DRAWINGNUMBER PNG- C -446- 000109;7 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER ' N .... Oz R0z'''%, -`0 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED `DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE - TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 - oFESS/� •,i/,/% Q� �.9> ���IA,\, !�•.'1'GINE�.'�\,� '''KEITH �'\``• NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS By�Ep��� /y'�} a iwilm /a t I NaturalGas COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. CORP. OFFICE 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 LINE 446 - BELEWS CREEK PIPELINE STREAM BUFFER DETAILS STOKESDALE NC 1 RESOURCE CENTER REIDSVILLE 0 09121118 ISSUED FOR CONSTRUCTION JKC CPD WKG AREA CODE 9335 re sICHATUP6nNinus REGIONAL ENGINEER 1 10102/18 ISSUED FOR CONSTRUCTION REVISION JKC CPD WKG ACCOUNT NUMBER O107000 2 02/01/19 EPSC REVISIONS AND ROUTE REVISIONS KRR CPD WKG PROJECT NUMBER 1626546 6 SIGNATURE,NITMLS MGR TECH REC&STD 3 03/06/19 EPSC REVISIONS KRR WKG WKG DRAWING BY JKC CHECKED BY CPD DATE 02/01/2019 .�N,TDPEI�N�TIAL6 WKG �U G PRINCIPAL ENGINEER APPROVED BY WKG i PNG-G-446-0001008 PNG-G-446-0001009 SHEET 94 OF 94 DWG SCALE: AS SHOWN DWG DATE 03/06/19 SUPERSEDED DRAWINGNUMBER PNG- C -446- 000109;7 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER s"Rune,. Y� � . ,-� ., ; lt�- ,, -`