Loading...
HomeMy WebLinkAbout20190339 Ver 1_PCN Form Submission_20190315D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190339 Is a payment required for this project?* f• No payment required f Fee received f Fee needed - send electronic notification Select Project Reviewer" Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: Replacement of Bridge #590097 over Lanes Creek 1a. Who is the PrimaryContact?* Larry Thompson - NCDOT Division 10 1b. PrimaryContact Email:* Ithompson@ncdot.gov Date Submitted 3/15/2019 Nearest Body of Water Lanes Creek Basin Yadkin-PeeDee Water Classification WS-V Site Coordinates Latitude: 34.912167 A. Processing Information County (or Counties) where the project is located: Union Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: Ve rsion# * 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 1c. PrimaryContact Phone:* (704)983-4400 Longitude: -80.362945 :: WBS # (�) 17BP.10.R.134 1a. Type(s) of approval sought from the Corps: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 10 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 716 Main Street Address Line 2 �Y Albemarle Fbstal / Zip Code 28001 2e. Telephone Number: (704)983-4400 2g. Email Address:* r 401 Water Quality Certification - E�ress r Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: (704)982-3146 x C•' Yes C' No G Yes C' No scole@ndot.gov C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/town: Marshville 2. Project Identification 2a. Propertyldentification Number: N/A 2c. Project Address Street Address SR 1929 (Philadelphia Church Road) Address Line 2 �Y Marshville Fbstal I Zip Code 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Lanes Creek 3b. Water Resources Classification of nearest receiving water:* WS-V 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050602 4. Project Description and History 2b. Property size: 5.5 State / Rovince I f�gion NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Exsting conditions include SR 1929 and Bridge #890097, undeveloped forest, a powerline easement, agricultural land, and disturbed/maintained right-of-way. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes �' No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) R_134_Brid ge97_F ig u re 1_USGSMap. pdf 2.83 MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) R_134_Bridge97_Figure2_SoilsMap.pdf 2.91 MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.04 4g. List the total estimated linear feet of all existing streams on the property: 495 4h. Explain the purpose of the proposed project:* To remove Bridge 890097 and replace with a new, modern bridge structure. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Erosion and sedimentation control measures will be installed. Bridge demolition will include the removal of the bridge deck and the removal of the piers and the bridge abutments, and temporary impacts to 139 linear feet of Lanes Creek may result. Bridge replacement construction using heavy equipment from the upland roadway approaches. Deck drains are proposed but will not discharge directly to the creek. Runoff from the bridge will be routed to a traffic bearing grated drop inlet and discharged to the stream floodplain downstream of the bridge. The proposed bridge will be built on the same alignment with a temporary off-site detour. 4j. Please upload project drewings for the proposed project. (SF-890097)_HYD_SMPv2.08_(20180506)(Apr2018).pdf R.134_Permit_Pla ns_2019-03-15. pdf 5. Jurisdictional Determinations 179.26KB 1.63 MB Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?" � Yes r No Comments: See attached WeUand Determination Forms, Photographs, Stream Form and Figure 3- Approximate Potential Waters of the U.S. and Wetlands Boundary Map Sb. If the Corps made a jurisdictional determination, what type of determination was made?" � Preliminary r Approved � Not Verified � Unknown r WA Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Brandon Phillips, CHMM STV Engineers, Inc. C' Unknown Sd1. Jurisdictional determination upload R_134_Bridge97_Figure3_WatersMap.pdf 3.58MB NCDWQ RPW A- Lanes Cr.pdf 73.04KB R134 DP 1 Wetland data sheet.pdf 387.42K6 R134 DP 2 Upland data sheet.pdf 368.97KB R134 Photopages.pdf 19.28MB 6. Future Project Plans 6a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands I17 Streams-tributaries r Open Waters I� Pond Construction 3. Stream Impacts Reason for impact ('') demolition type" I�3a Type of impact" �I3d. S. name Creek r Buffers 3e. Stream Type" 3f. Type of (�) Jurisdiction" Perennial � Both S. width" II3h. Impact .* 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 0 139 3i. Total stream and ditch impacts: 139 3j. Comments: Temporary impacts are associated with the demolition of the ebsting bridge and piers and the construction of the proposed bridge. No permanent impacts to Lanes Creek will result from this bridge replacement. � E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replace bridge in-place was incorporated to minimize impacts. The bridge span length was extended to avoid permanent impacts. The proposed pier is located outside of the jurisdictional waters and riprap at the bridge abutments is minimized to avoid surface waters. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. Top down demolition and construction methods will be used to minimize impacts. 0 139 Average (feet) (linear feel) �. � 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: No permanent impacts to jurisdictional waters or weUands �nnll result from this bridge replacement project. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes r No If no, explain why: Project Is located in the Yadkin-Pee Dee basin and is not subject to riparian buffer protection rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* F Yes r No Comments: Stormwater runoff from the proposed bridge will be routed to a traffic bearing grated drop inlet with double frame and grates southeast of the bridge and discharged to the floodplain downstream of the bridge. Please see attached Stormwater Management Plan for details on the minimization of water qualiry impacts. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federallstate) land?* � Yes r No � h 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* � Yes r No Comments: x Bridge replacement project that will require the preparation of a Minimum Criteria Determination Checklist. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * C' Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?" � Yes r No 3b. If you answered "no," provide a short narrative description. Project involves the replacement of an existing bridge and is not anticipated to affect future development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No � fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * � Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?" � Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Asheville Sd. Is another Federal agency involved?" r Yes Se. Is this a DOT project located within Division's 1-8? f Yes r No r No C' Unknown Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No Sg. Does this project involve bridge maintenance or removal? � Yes r No Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to Sg(1), did you discover any signs of bat use? � Yes r No � Unknown Sh. Does this project involve the construction/installation of a wind turbine(s)?* C' Yes r No Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? � Yes r No S. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP data and site specific surveys. See Supplemental Information attached under Miscellaneous for threatened and endangered species write-ups and biological conclusions. Consultation Documentation Upload NCNHP_Repo rt_01162019. pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 66. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?'� NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 815.42KB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* See attached "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes No Survey Required Form." 7c. Historic or Prehistoric Information Upload PA 16-01-0081 Union (NSR).pdf 16-01-0081ResubNoSurvey.pdf 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* � Yes r No Sb. If yes, explain how project meets FEMA requirements: NCDOT Hydraulis Unit Coordination w�th FEMA. Sc. What source(s) did you use to make the floodplain determination?* FEMA FIRM maps Miscellaneous 7.86MB 1.89MB Comments Additional Miscellaneous attachments include Supplemental Information regarding the Threatened and Endangered Species that are listed in Union County. Miscellaneous attachments not previouslyrequested. T&E Supplemental info for R134 ePCN Form.pdf Signature * fJ By checking the box and signing below, I certify that: 92.32KB . � • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction° subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature c�C� ��, ./� (-'J//d�f7�rrdN Date 3/15/2019