Loading...
HomeMy WebLinkAboutNC0081621_Authorization to Construct_20190313 1.1.1 uuillis ENGINEERS March 13, 2019 1968.015 (34) Mr. Ron Berry Division of Water Resources WQ Permitting Section—NPDES RECEPVED/DENR/DWR 1617 Mail Service Center Raleigh, North Carolina 27699-1617 MAR 15 2019 Subject: Water and Sewer Authorityof Cabarrus CountyWater Resource Permitting Section Muddy Creek WWTP Authorization to Construct NO. 081621A02 Engineer's Certification Dear Mr. Berry, In accordance with Authorization to Construct No. 081621A02, attached please find the Engineer's Certification for the subject project. Should you have any questions, please advise. Yours very truly, WILLIS ENGINEERS 7We'te Greg . Wells, P.E., BECC Attachments cc w/Attachments: Mr. Chad Von Cannon, P.E., WSACC 10700 Sikes Place,Suite 115 Charlotte, North Carolina 28277 704.377.9844/NC License F-0114 Water and Sewer Authority of Cabarrus County Muddy Creek WWTP Authorization to Construct No. 081621A02 Issued December 19, 2016 Engineer's Certification I,' C • , as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe 43eriodicall weekly/full time) the construction of the modifications and improvements to the Muddy Creek WWTP,located in Cabarrus County,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the following construction: Replace influent pumps with two(2)new 730 gpm submersible non clog pumps;replace existing fine screening equipment with a new manual by pass screen and a 30-inch diameter inclined drum screen with a 1.5 MGD hydraulic capacity; install two(2)new 730 gpm equalization basin pumps in addition to the two(2)existing; install an additional flow meter to monitor the flow out of the EQ basin; modifications to the existing modular package treatment units to include removal of sludge handling and surge basins and associated mechanical equipment to expand the aeration volume into four(4)units creating a total capacity of 250,000 gallons with course bubble diffusers;replace the three(3)oldest blowers with new 1,350 SCFM blowers; install-two(2)forty-foot diameter secondary clarifiers with 12-foot side water depth; install three(3)new 730 gpm RAS pumps and new RAS and WAS flow meters; install a third cloth filtration unit with a 400,000 gpd hydraulic capacity; convert four(4)7,600 gallon secondary clarifiers to sludge holding tanks for a total of 30,400 gallon capacity; install a new pre-engineered chemical storage enclosure; and replace UV treatment system with a new 1,460 gpm UV treatment system. I certify that the construction of the above referenced project was observed to be built within substantial compliance,intent and in conformity with all applicable regulations and statutes and the project plans,specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Z °oot999991.09 °� �N CAP ° Z °o. Date � i✓IR2- Z,)r� e0o Q�•,..•...0... �y® �`�••�OO••e y o Mail this Certification to: Attn: Ron Berry ,Va.•;. Complex Permitting Unit t • 41. DEQ/DWR/Water Quality Programs �••;�GdN 1617 Mail Service Center Raleigh, NC 27699-1617