Loading...
HomeMy WebLinkAbout20190121 Ver 1_WakeCountyStormwaterDesignToolV2.2_2019.1.14_20190307e�7K/KE rh Wl COUNTY —It, I1 C4❑(H.I- SITE DATA Wake County Stormwater Hybrid Tool Version 2.2 Project Information Project Name: Layhill Estates Permit No (if known): PLG -001113-2018 Applicant: IC Engineering, Inc Applicant Contact Name: Joe Ogden, P.E. Applicant Contact Number: 919-948-9590 Contact Email: k.alzoubi(@icengineeringinc.com Last Modified Date: Monday, January 14, 2019 Site Data: River Basin: Neuse Regulatory Watershed: Swift Physiographic/Geologic Region: Piedmont Type of Development (Select from Dropdown menu): Residential Zoning: R -40W Total Site Area (Ac): 5.28 Existing Lake/Pond Area (Ac): 0.00 Proposed Disturbed Area (Ac): 1.96 Proposed Impervious Surface Area from DA Sheets (acre): 1.56 Percent Built Upon Area (BUA): 30% Is the proposed project a site expansion? No Number of Drainage Areas on Site (Points of Analysis): 1 Annual Rainfall (in): 45.41 One-year, 24-hour rainfall (in): 3.00 Two-year, 24-hour rainfall (in): 3.60 Proposed Residential Stormwater Details (if applicable): Site Square Footage: 229,997 Total Acreage in Lots: 6.92 Lot Square Footage: 301,435 Number of Lots: 6 Average Lot Size (SF): 51,110 Proposed Impervious Surface Area from DA sheets (SF): 67,954 Proposed Impervious Surface Area Devoted to Lots (SF): 56,628 Total Impervious Surface Area Devoted to Roads (SF): 13,919 Other Impervious Surface Area (SF): 53,143 SITE DATA Page 1 PDF processed with CutePDF evaluation edition www.CutePDF.com W akeCountyStormwaterDesignTooIV2.2 Project Name: Layhill Estates DRAINAGE AREA 1 WAKE STORMWATER PRE -POST CALCULATIONS COUNTY LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 5.50 5.50 Site Acreage within Drainage= 5.28 5.28 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Parking lot Roof Open/Landscaped Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot I I I I I I I I Roof I I I I I I I I Open/Landscaped Transportation Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) I I I I I I I I Rural I I I I I I I I Rural (Grassed Right-of-ways) Sidewalk Misc. Pervious Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Managed pervious (Open Space) Unmanaged (pasture) I I I I I I I I Woods (not on lots) I I I I I I I I Residential Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Roadway 0.24 0.02 ' Grassed Right-of-ways 0.33 0.02 Driveway 0.65 Parking lot 0.02 Roof I 0.02 I I I I 0.65 I I Sidewalk (Includes Patios) I I I I I I I Lawn j 1.94 j 0.22 I I I 1.57 0.22 I I Managed pervious (Open Space) Woods (on lots) 2.71 0.59 ; 1.10 0.35 Land Taken up by BMP 0.31 0.04 ; JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland I I I I I I I I Riparian buffer (Zone 1 only) I I I I I I I I Open water Totals (Ac)=1 0.00 1 0.00 4.69 0.22 0.00 0.00 0.59 1 0.00 1 0.00 t0.00 4.85 0.22 0.00 0.00 0.43 0.00 j DA1 Page 1 W akeCountyStormwaterDesignTooIV2.2 SITE FLOW PRE -DEVELOPMENT T. POST -DEVELOPMENT Tc Sheet Flow Length (ft)= 100.00 100.00 Slope (fUft)= 0.03 0.03 Surface Cover: Woods Grass n -value= 0.40 0.240 T, (hrs)= 0.29 0.19 Shallow Flow Length (ft)= 257.00 134.00 Slope (fUft)= 0.14 0.04 Surface Cover: Unpaved Unpaved Average Velocity (ftlsec)= 6.04 3.23 T, (hrs)= 0.01 0.01 Channel Flow 1 Length (ft)= 106.70 425.00 Slope (fUft)= 0.02 0.07 Cross Sectional Flow Area (ft2)= 8.60 8.60 Wetted Perimeter (ft)= 14.28 14.26 Channel Lining: Weeds Grass n -value= 0.04 0.035 Hydraulic Radius (ft)= 0.60 0.60 Average Velocity (ftlsec)= 3.76 8.04 T, (hrs)= 0.01 0.01 Tc (hrs)= RESULTS 0.30 PRE -DEVELOPMENT 0.22 POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.04 1.56 Lot Impervious Surface Area (Ac) = 0.02 1.30 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft) = 6,886 21,680 Volume change (ft) = 14,794 Runoff (inches) = Q'= 0.3447 1.0859 Peak Discharge (cfs)= Q= 1.2469 6.3817 Composite Curve Number (DA)= 60 73 Composite Curve Number (Site only)= 60 73 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) = 50 Disconnected impervious area (Ac) = 0.78 Drainage Area CN�j,�= 70 Site Only CN�ju_= 71 Post -development peak flow exceeds pre -development peak flow for this DA! DA1 Page 2 WAKE COUNTY NORTH CAROLINA DA SITE SUMMARY STORMWATER PRE -POST CALCULATIONS Wake County SW Hybrid Tool Version 2.2 Project Name: I Layhill Estates SITE SUMMARY DRAINAGE AREA SUMMARIES DRAINAGE AREA: DA1 DA2 DA3 DA4 DA5 DA6 Pre -Development (1 -year, 24-hour storm) Runoff (in)=Q* = 0.345 Peak Flow (cfs)=Qpost= 1.247 Post -Development (1 -year, 24-hour storm) Proposed Impervious Surface (acre) = 1.56 Runoff (in)=Q* = 1.086 Peak Flow (cfs)=Qpost= 6.382 TARGET CURVE NUMBER (TCN) - Residential Only SITE \SOIL COMPOSITION HYDROLOGIC SOIL GROUP Site Area % Target CN A 0.00 0% 41 B 4.85 92% 62 C 0.00 0% 75 D 0.43 8% 80 Total Site Area (acres) = 5.28 Zoning = R -40W Target Curve Number (TCN) = 63 % Impervious = 30% Post Development CNadjusted = 71 Required Volume to be Managed (TCN)= ft3 = 5,551 SITE NITROGEN AND PHOSPHORUS LOADING Nitrogen and Phosphorus Targets (Based on Regulatory Watershed) Target Nitrogen Load (Ib/ac/yr)= 3.6 Target Phosphorus Load (Falls and Jordan Lakes Only) (Ib/ac/yr)= N/A • N Loading Reduction Option for Expansions (Falls and Jordan Lakes Only) = N/A • Loading Reduction Nitrogen Target (Falls and Jordan Lakes Only) (Ib/ac/yr)= N/A • P Loading Reduction Option for Expansions (Falls and Jordan Lakes Only) = N/A % Loading Reduction Phosphorus Target (Falls and Jordan Lakes Only) (Ib/ac/yr)= N/A Pre Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.00 Total Phosphorus (Ib/ac/yr)= N/A Post Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 5.06 Total Phosphorus (Ib/ac/yr)= N/A SITE SUMMARY Page 1 0= WAKE COUNTY NORTH CAROLINA Project Name: Layhill Estates DRAINAGE AREA 1 BMP CALCULATIONS Wake County SW Hybrid Tool Version 2.2 DRAINAGE AREA 1 - BMP DEVICES AND ADJUSTMENTS DA1 Site Acreage= 5.28 DA1 Off -Site Acreage= 0.22 Total Required Storage Volume for Site TCN Requirement (ft)= 5,551 Will site use underground water harvesting? Enter % volume reduction in decimal form= Note: Supporting information/details should be submitted to demonstrate water usage. ENTER AREA TREATED BY BMP Land Use (acres) Sub-DA1(a) (Ac) Sub-DA1(b) (Ac) Sub-DA1(c) (Ac) Sub-DA1(d) (Ac) Sub-DA1(e) (Ac) Commercial Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site Parking lot Roof Open/Landscaped Industrial Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site Parking lot Roof I I I I I Open/Landscaped I I I I I Transportation Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) Rural I I I I I Rural (Grassed Right-of-ways) I I I I I Sidewalk I I I I I Misc. Pervious Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site— Managed pervious Unmanaged (pasture) Woods (not on lots) Residential Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site Roadway 0.26 Grassed Right-of-ways 0.35 I I I I I Driveway 0.65 I I I I I Parking lot I I I I I Roof 0.65 Sidewalk Lawn 1.57 0.22 Managed pervious I I I I I Woods (on lots) 1.45 1 1 1 I 1 Land Taken up by BMP 0.35 1 1 1 1 1 JURISDICTIONAL LANDS Site Off-site Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland Riparian buffer (Zone 1 only) Totals (Ac)=, 5.28 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DA1_BMPs Page 1 Wake County SW Hybrid Tool Version 2.2 Sub-DA1(a) BMP(s) Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow, N (Ib/ac/yr) Outflow p EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) POND Dry Detention Pond 6,095 1.31 5.10 0.29 1.13 1.21 4.71 0.21 0.81 10,613 Outflow Total Nitrogen (Ib/ac/yr)= 4.71 Outflow Total Phosphorus (Ib/ac/yr)= 0.81 Sub-DA7(b) BMP(s) If Sub-DA1(b) is connected to upstream sub-basin(s), select all contributing sub-basin(s from dropdown menus): Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow p EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) 4— Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Sub-DA1 (c) BMP(s) If Sub-DA1(c) is connected to upstream sub-basin(s), select all contributing sub-basin(s): Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow, N (Ib/ac/yr) Outflow p EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Sub-DA1 (d) BMP(s) If Sub-DA1(d) is connected to upstream sub-basin(s), select all contributing sub-basin(s): Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow p EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Sub-DA1 (e) BMP(s) If Sub-DA1(e) is connected to upstream sub-basin(s), select all contributing sub-basin(s): DA1_BMPs Page 2 Wake County SW Hybrid Tool Version 2.2 Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow p EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= DA1 BMP SUMMARY Total Volume Treated (c.f.)= 10613 DA1 Outflow Total Nitrogen (Ib/ac/yr)= 4.71 DA1 Outflow Total Phosphorus (Ib/ac/yr)= 0.81 1 -year, 24-hour storm Pre Development Peak Discharge (cfs)= Ql_year 1.25 Post BMP Peak Discharge (cfs)= Ql_year 0.47 DA1_BMPs Page 3 Wake County SW Hybrid Tool Version 2.2 Project Name: Layhill Estates �V� DA SITE SUMMARY AKI BMP CALCULATIONS COUNTY NORTH CAROLINA BMP SUMMARY DRAINAGE AREA SUMMARIES DRAINAGE AREA: DA1 DA2 I DA3 DA4 DA5 DA6 Post -Development (1 -year, 24-hour storm) Peak Flow (CfS)=Qt_year= 6.38 Post -Development with BMPs (1 -year, 24-hour storm) % Impervious= 30% Volume Managed (CF)= 10,613 Post BMP Peak Discharge (cfs)= Qt -year= 0.47 Have Target Curve Number Requirements been met? YES Pre Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.00 Total Phosphorus (Ib/ac/yr)= N/A Post Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 5.06 Total Phosphorus (Ib/ac/yr)= N/A Post -BMP Nitrogen Loading Outflow Total Nitrogen (Ib/ac/yr)= 4.71 Outflow Total Phosphorus (Ib/ac/yr)= 0.81 Has site met the Target? NO Has site met requirements for offsetting? YES BMP SUMMARY Page 1