Loading...
HomeMy WebLinkAbout20151256 Ver 3_Approval Letter_20190318ROY COOPER Governor MICHAEL S.REGAN Secretary LINDA CULPEPPER Director Scannell Development Company Attn: Mr. Joel Scannell 1800 Diagonal Rd, Suite 600 Alexandria VA 22314 NORTH CAROLINA Environmental Quality March 18, 2019 DWR # 20151256 v3 Wake County Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions Hodge Road Warehouse Park — "Eastgate 540" USACE Action ID. No. SAW -2014-02127 Dear Mr. Scannell: Attached hereto is a copy of Certification No. WQC004180 issued to Mr. Joel Scannell and Scannell Development Company, dated March 18, 2019. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 1506 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. North Carolina Department of environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 isnain cv+a ^p+^^�^'E^•^^^^-��M 919.707.9000 Hodge Rd Warehouse Park — "Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 2 of 8 Mailing address for the OAH: if sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: James Spangler, Spangler Environmental Inc (via email) Jean Gibby, USACE Raleigh Regulatory Field Office (via email) Maria Dunn, NCWRC (via email) Todd Bowers, EPA, (via email) DWR RRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 151256v3HodgeRd WarehousePark(Wake)_401_IC Hodge Rd Warehouse Park — "Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 3 of 8 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION # WQC004180 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500 and 15A NCAC 026 .0200, to Mr. Joel Scannell and Scannell Development Company, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on December 13, 2018 (updated version of application submitted on October 9, 2017 and returned as incomplete on September 21, 2018) and subsequent information on January 31, 2019 and February 21, 2019, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on October 27, 2017. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)]: Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands D1 0.008 (acres) 0 (acres) D2 0.039 (acres) 0 (acres) D3 0.002 (acres) 0 (acres) D4 1.104 (acres) 0 (acres) D5 0.007 (acres) 0 (acres) E 0.008 (acres) 0 (acres) F 0.162 (acres) 0 (acres) Total 1.33 (acres) 0 (acres) Hodge Rd Warehouse Park—"Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 4 of 8 2. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the Wildlands Holdings Mitigation Bank - Grantham Branch Mitigation Site to meet this mitigation requirement. Until the Wildlands Holdings Mitigation Bank -Grantham Branch Mitigation Site receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the Wildlands Holdings Mitigation Bank -Grantham Branch Mitigation Site to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: 3. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H.0501 and .0502] 4. All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (e.g. orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 5. Upon completion of the fencing/flagging required in Item #4 adjacent to the location of Building #6 and adjacent post construction stormwater ponds 3 and 4, the Permittee shall conduct a preconstruction meeting between the Division and the construction contractor prior to any ground disturbing activities within this immediate area. The Permittee shall also request that staff from the appropriate Erosion Control Program attend the meeting. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0502 (e)] 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification. [15A NCAC 02H.0501 and .0502] No removal of vegetation or other impacts of any kind shall occur to state regulated riparian buffers. [15A NCAC 02B .0200] 7. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Compensatory Mitigation Required River and Sub -basin Number Wetlands 1.33 (acres) Neuse River Basin03020201 3. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H.0501 and .0502] 4. All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (e.g. orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 5. Upon completion of the fencing/flagging required in Item #4 adjacent to the location of Building #6 and adjacent post construction stormwater ponds 3 and 4, the Permittee shall conduct a preconstruction meeting between the Division and the construction contractor prior to any ground disturbing activities within this immediate area. The Permittee shall also request that staff from the appropriate Erosion Control Program attend the meeting. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0502 (e)] 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification. [15A NCAC 02H.0501 and .0502] No removal of vegetation or other impacts of any kind shall occur to state regulated riparian buffers. [15A NCAC 02B .0200] 7. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Hodge Rd Warehouse Park — "Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 5 of 8 8. Sediment and erosion control measures shall not be placed in wetlands or waters except within the footprint of temporary or permanent impacts authorized under this Certification. [15A NCAC 021-1.0501 and .0502] 9. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. [15A NCAC 02B .0201] 10. An NPDES Construction Stormwater Permit (NCG010000) is required for construction projects that disturb one (1) or more acres of land. The NCG010000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If the project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506(b)(5) and (c)(5)] 11. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. [15A NCAC 02B .0200 and 15A NCAC 02B.0231] 12. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. [15A NCAC 0213 .0200] 13. No temporary impacts are allowed beyond those included in this Certification. All temporary fill and culverts shall be removed and the impacted area shall be returned to natural conditions within 60 calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed profile. All temporarily impacted sites shall be restored and stabilized with native vegetation. [15A NCAC 02H .0506(b)(2) and (c)(2)] 14. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this Certification. [15A NCAC 02H .0506(b)(2) and (c)(2)] Hodge Rd Warehouse Park — "Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 6 of 8 15. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 16. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shall not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuels and oils. [15A NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 0213 .0211 (12)] 17. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance. [15A NCAC 02H .0506(b)(3) and (c)(3)] 18. In accordance with 143-215.85(b), the applicant shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. 19. Mr. Joel Scannell and Scannell Development Company shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B .0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Joel Scannell and Scannell Development Company and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Joel Scannell and Scannell Development Company in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. Hodge Rd Warehouse Park— "Eastgate 540" DWR Project #20151256 v3 Individual Certification # WQC004180 Page 7 of 8 20. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. 21. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this certification in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this Certification. A copy of this Certification shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H.0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 22. Upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return a certificate of completion (available on the DWR website httpsJ/edocs.deg.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0502(f)] 23. If the property or project is sold or transferred, the new Permittee shall be given a copy of this Certification (and written authorization if applicable) and is responsible for complying with all conditions. [15A NCAC 02H .0501 and .0502] 24. This Certification neither grants nor affirms any property right, license, or privilege in any waters, or any right of use in any waters. This Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Certification does not create any prescriptive right or any right of priority regarding any usage of water. This Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Certification to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. 25. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] 26. Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. Hodge Rd Warehouse Park — "Eastgate 540" D W R Project #20151256 v3 Individual Certification # WQC004180 Page 8 of 8 27. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .02001 including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .02001. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case-by-case basis. This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506] This the 18`h day of March 2019 Karen Higgins, Supervisor 401 & Buffer Permitting Branch KAH/slh WQC004180