Mr. Todd Walton
Environmental Supervisor
North Carolina State Ports Authority
P.O. Box 9002
Wilmington, North Carolina 28401
RECEIVED
J UN 2 4 2008
Dear Mr. Walton: BY:
Michael F. Easley. Governor
William G. Ross Jr., Secretary
North Carolina Department of Envleorunent and Nat aut Resources
June 16, 2008
Coleen H. SuMm, Director
Division of Water Quality
,SUN 2 4 2008
Subject: Final NPDES Soormwater Permit
Permit NCS000173
NC State Ports Authority — Morehead City
Terminal
Carteret County
In response to your renewal application for continued coverage under NPDES stormwater permit
NCS=173, the Division of Water Quality (Division) is forwarding herewith the subject state - NPDES
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and
the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection agency
dated October 15, 2007 (or as subsequently amended).
This final permit includes the following changes from the draft permit sent to you on April 29, 2008:
• Clarification that the first valid sample during the monitoring period should be compared to
benchmarks. If the facility chooses to take "follow-up" samples during the same period, benchmark
exceedences would not trigger additional tier responses.
• Clarification that qualitative monitoring does'not need to be performed independently on a semi-
annual schedule in addition to analytical monitoring (removal of "and" from text in Part II, Section C).
Qualitative monitoring should be performed at the same time as the analytical sampling. If analytical
monitoring is not required at a stormwater outfall (for example, if representative outfall status is
granted), qualitative monitoring is still required (text added to the final permit to clarify this point).
Revisions to the boiler plate language in Part III (Standard Conditions) to be consistent with the
current NPDES stormwater permit template. Changes include updated references to legal penalties
and signatory requirements. Please note that the permit now requires that Qualitative Monitoring
Report (QMR) forms provided by the Division be used (Section E). The most recently revised QMR
forms are available on our website at:
hfpJ/h2o.ertr state.nc us/su/Forms_Documents.htm#stormwaterGP
• Removal of monitoring at outfall 911A1 from the Vehicle Maintenance Activity Monitoring
Requirements. This deletion is based on redevelopment alterations at the Port since the permit was
first drafted. In addition, specific references to representative outfalls for Vehicle Maintenance have
been removed because you indicated all vehicle maintenance activities are now conducted indoors. If
any vehicle maintenance activities are exposed in the future in drainage areas to outfalls not being
monitored, monitoring at those additional outfalls is required.
North Carolina Division of Water Quality 1617 Mail Service Ginter Raleigh, NC 27699-1617 Phone (919) 733-7015 C usun= Senicc
Irrtemet h2o.enr.sstata nc.ts 512 N. SaHSIXUY St Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An BILW 0ppor4Mify/Atf rmalive Action f T#"r- 50% RecydeM 0% Post Consumer Paper
Mr. T. Walton
NC State Ports Authority - Morehead City Terminal
Permit No. NCS000173
Page 2
• The requirement to monitor SDO 402 remains in the permit. We understand the location of 402 will
change from the original drop inlet (which has been removed /paved over), and that the inlet just to
the northeast will instead be SDO 402. Please ensure the location of the newly designated SDO 402 is
consistent in the facility's Stormwater Pollution Prevention Plan.
Failure to complete the monitoring as required is a violation of the permit and any permit noncompliance
constitutes a violation of the Clean Water Act. Reference Part III, Section A, Item 2 "Duty to Comply", Item 9
"Penalties for Tampering" and Item 10 "Penalties for Falsification of Reports" of your permit for further
information.
If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to
you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following
receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer
27447, Raleigh, North Carolina 27611 -7447. Unless such demand is made, this decision shall be final and
binding.
Please take notice this permit is not transferable. Part III, 13.2. addresses the requirements to be followed in
case of change in ownership or control of this discharge. This permit does not affect the legal requirements
to obtain other permits which may be required by the Division of Water Quality or permits required by
the Division of Land Resources, Coastal Area Management Act or any other Federal or Local
governmental permit that may be required.
If you have any questions or comments concerning this permit, contact Bethany Georgoulias at (919) 733-5083
x 529 or bethany_,georgoulias@ncmail.net.
Sincerely,
U
for Coleen H. S , Director
cc: Wilmington Regional Office, Water Quality Section
Mike Mitchell, EPA Region IV
Stormwater Permitting Unit
Central Files
Attachments
NCSOOO173
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
North Carolina State Ports Authority
is hereby authorized to discharge stormwater from a facility located at
Morehead City Terminal
1] 3 Arendell Street
Morehead City, NC
Carteret County
to receiving waters designated as the Newport River and Harbor Channel, class SC waters in the
White Oak River Basin, in accordance with the discharge limitations, monitoring requirements,
and other conditions set forth in Parts 1, 11, III, IV, V and VI hereof.
This permit shall become effective July 1, 2008.
This permit and the authorization to discharge shall expire at midnight on June 30, 2013.
Signed this day June 16, 2008.
NEMIUME
for Coleen H. Sul1Gs Director
Division of Water Quality
By the Authority of the Environmental Management Commission
Permit No. NCSOOo173
TABLE OF CONTENTS
PART I INTRODUCTION
Section A: Individual Permit Coverage
Section B: Permitted Activities
Section C: Location Map
PART U MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED
DISCHARGES
Section A: Stormwater Pollution Prevention Plan
Section B: Analytical Monitoring Requirements
Section C: Qualitative Monitoring Requirements
Section D: On -Site Vehicle Maintenance Monitoring Requirements
PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL
PERMITS
Section A: Compliance and Liability
1. Compliance Schedule
2. Duty to Comply
3. Duty to Mitigate
4. Civil and Criminal Liability
5. Oil and Hazardous Substance Liability
6. Property Rights
7. Severability
8. Duty to Provide Information
9. Penalties for Tampering
10. Penalties for Falsification of Reports
Section B: General Conditions
1. Individual Permit Expiration
2. Transfers
i
Permit No. NCSOOO 173
3. Signatory Requirements
4. Individual Permit Modification, Revocation and Reissuance, or
Termination
5. Permit Actions
Section C: Operation and Maintenance of Pollution Controls
1. Proper Operation and Maintenance
2. Need to Halt or Reduce Not a Defense
3. Bypassing of Stormwater Control Facilities
Section D: Monitoring and Records
1.
Representative Sampling
2.
Recording Results
3.
Flow Measurements
4_
Test Procedures
5.
Representative Outfall
6.
Records Retention
7.
Inspection and Entry
Section E: Reporting Requirements
1.
Discharge Monitoring Reports
2.
Submitting Reports
3.
Availability of Reports
4.
Non-Stormwater Discharges
5.
Planned Changes
6.
Anticipated Noncompliance
7.
Bypass
8.
Twenty-four Hour Reporting
9_
Other Noncompliance
10.
Other Information
PART IV LIMITATIONS REOPENER
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VI DEFINITIONS
ii
Permit No. NCS004173
PART I INTRODUCTION
SECTION A: INDIVIDUAL PERMIT COVERAGE
During the period beginning on the effective date of the permit and lasting until expiration, the
permittee is authorized to discharge stormwater associated with industrial activity. Such
discharges shall be controlled, limited and monitored as specified in this permit.
If industrial materials and activities are not exposed to precipitation or runoff as described in 40
CFR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater
discharge permit requirements. Any owner or operator wishing to obtain a No Exposure
Certification must submit a No Exposure Certification NOI form to the Division; must receive
approval by the Division; must maintain no exposure conditions unless authorized to discharge
under a valid NPDES stormwater permit; and must reapply for the No Exposure Exclusion once
every five (5) years.
SECTION B: PERMITTED ACTIVITIES
Until this permit expires or is modified or revoked, the permittee is authorized to discharge
stormwater to the surface waters of North Carolina or separate storm sewer system that has been
adequately treated and managed in accordance with the terms and conditions of this individual
permit. All stormwater discharges shall be in accordance with the conditions of this permit.
Any other point source discharge to surface waters of the state is prohibited unless it is an
allowable non-stormwater discharge or is covered by another permit, authorization, or approval.
The stormwater discharges allowed by this individual permit shall not cause or contribute to
violations of Water Quality Standards.
This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
Part I Page 1 of 2
Section C: LOCATION MAP
Permit No. NCSOOOi ,
t YVi yf~•
- 7-Ii-,"N
. ~ �a•�• � r t J
•O ;!. ?' �� xfyN s. y � � Ls;Kt r4•f '+r. � _ -. r ,r s
�� � - } �;'�,•l r- _y .i �S';I._ •k' ^,i5 •c f .i��,.r- M1 �•i - 1 �'4,
•-•,z � r- f �� �^ - ;arm �'4" x?.
North Carolina State Ports
- A = '
Authority - Port of Morehead City
-' T fit. � `�' 'il k-�•..-£ 'j,,.. _� - �.�_
lit
tY �— -'' ?' -b v r . � _ y _ - ''�- Yf- - ` -s. �. s t .err .=.�• a
i` :.r '7' .t `k... d si .. a}'*'fc e"sy 'i%�a`+;G£`y� • ors �� / _y; -
6i r ti k-.. s:' t e t,L • �# .aft � � � c'- t''�r � �i t ♦4 t
NCS000173
N
w E
S�
Map Scale 1:24,000
North Caroilna State Ports Authority -
Port of Morehead City
Latitude: 34° 43' 5° N
Longitude: 76141' 57° W
County: Carteret
Receiving Streams: Newport River Restricted Area/
Morehead City Harbor & Harbor Channel
Stream pass: SC
Sub -basin: 03-05-03 (White Oak River Basin)
Facility Location
Part I Page 2 of 2
Permit No. NCSOQ0173
PART H MONITORING, CONTROLS, AND LIMITATIONS FOR
PERMITTED DISCHARGES
SECTION A: STORMWATER POLLUTION PREVENTION PLAN
The permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as
the Plan. This Plan shall be considered public information in accordance with Part III, Standard
Conditions, Section E, Paragraph 3 of this individual permit. The Plan shall include, at a
minimum, the following items:
1. Site Plan. The site plan shall provide a description of the physical facility and the
potential pollutant sources that may be expected to contribute to contamination of
stormwater discharges. The site plan shall contain the following:
a. A general location map (USGS quadrangle map or appropriately drafted
equivalent map), showing the facility's location in relation to transportation
routes and surface waters, the name of the receiving water(s) to which the
stormwater outfall(s) discharges, or if the discharge is to a municipal separate
storm sewer system, the name of the municipality and the ultimate receiving
waters; and accurate latitude and longitude of the point(s) of discharge. The map
should identify whether each receiving water is impaired (on the state's 303(d)
List of impaired waters) or is located in a watershed for which a TMDL has
been established, and what the parameter(s) of concern are.
North Carolina's 303(d) List can be found here:
http://h2o.enr.state.nc-us/tmd[/General_303d.htm#Downloads
North Carolina TMDL documents can be found here:
http://h2o.enr.state.nc.us/tmdl/TMDL—list.htm#Final—TMDLs
b. A narrative description of storage practices, loading and unloading activities,
outdoor process areas, dust or particulate generating or control processes, and
waste disposal practices. A narrative description of the potential pollutants which
could be expected to be present in the stormwater discharge from each outfall.
C. A site map drawn to scale with the following items:
(1) Distance legend and north arrow
(2) Site property boundary and topography
(3) Location of industrial activities (including storage of materials,
disposal areas, process areas, and loading and unloading areas)
(4) Drainage features and structures
(S) Stormwater discharge points (outfalls)
(6) Delineated drainage areas for each outfall
(7) Drainage area for each outfall in acres and percentage or each
drainage area that is impervious
(8) All on -site and adjacent surface waters and wetlands
(9) Building locations
Part iI Page 1 of 10
Permit No. NCSOOO 173
(10) Existing BMPs and impervious surfaces
d. A list of significant spills or leaks of pollutants that have occurred at the facility
during the three (3) previous years and any corrective actions taken to mitigate
spill impacts.
e. Certification that the stormwater outfalls have been evaluated for the presence of non-
stormwater discharges. The certification statement will be signed in accordance with
the requirements found in Part III, Standard Conditions, Section B, Paragraph 3.
2. Stormwater Management Plan. The stormwater management plan shall contain a
narrative description of the materials management practices employed which control or
rrjini Le the exposure of significant materials to stormwater, including structural and
nonstructural measures. The stormwater management plan, at a minimum, shall
incorporate the following:
a. Feasibility Study. A review of the technical and economic feasibility of changing
the methods of operations and/or storage practices to eliminate or reduce exposure
of materials and processes to stormwater. Wherever practical, the permittee shall
prevent exposure of all storage areas, material handling operations, and
manufacturing or fueling operations. In areas where elimination of exposure is
not practical, the stormwater management plan shall document the feasibility of
diverting the stormwater runoff away from areas of potential contamination.
b. Secondary Containment Requirements and Records. Secondary containment is
required for: bulk storage of liquid materials; storage in any amount of Section
313 of Title III of the Superfund Amendments and Reauthorization Act (SARA)
water priority chemicals; and storage in any amount of hazardous substances to
prevent leaks and spills from contaminating stormwater runoff. A table or
summary of all such tanks and stored materials and their associated secondary
containment areas shall be maintained. If the secondary containment devices are
connected directly to stormwater conveyance systems, the connection shall be
controlled by manually activated valves or other similar devices which shall be
secured closed with a locking mechanism, and any stormwater that accumulates in
the containment area shall be at a minimum visually observed for color, foam,
outfall staining, visible sheens and dry weather flow, prior to release of the
accumulated stormwater. Accumulated stormwater shall be released if found to
be uncontaminated by the material stored within the containment area. Records
documenting the individual making the observation, the description of the
accumulated stormwater and the date and time of the release shall be kept for a
period of five (5) years.
C. BMP Summary. A narrative description shall be provided of Best Management
Practices (BMPs) to be considered such as, but not limited to, oil and grease
separation, debris control, vegetative filter strips, infiltration and stormwater
detention or retention, where necessary. The need for structural BMPs shall be
based on the assessment of the potential of pollutant sources to contribute
Part H Page 2 of 10
Permit No. NCSOo0173
significant quantities of pollutants to stormwater discharges and data collected
through monitoring of stormwater discharges.
3. SpiIl Prevention and Response Plan. The Spill Prevention and Response PIan (SPRP)
shall incorporate an assessment of potential pollutant sources based on a materials
inventory of the facility. Facility personnel (or team) responsible for implementing the
SPRP shall be identified. A responsible person shall be on -site at all times during facility
operations that have the potential to contaminate stormwater runoff through spills or
exposure of materials associated with the facility operations. The SPRP must be site
stormwater specific. Therefore, an oil SPCC plan may be a component of the SPRP, but
may not be sufficient to completely address the stormwater aspects of the SPRP. The
common elements of the SPCC with the SPRP may be incorporated by reference into the
SPRP.
4. Preventative Maintenance and Good Housekeeping Program. A preventative
maintenance program shall be developed. The program shall document schedules of
inspections and maintenance activities of stormwater control systems, plant equipment
and systems. Inspection of material handling areas and regular cleaning schedules of
these areas shall be incorporated into the program.
5. Employee Training. Training schedules shall be developed and training provided at a
minimum on an annual basis on proper spill response and cleanup procedures and
preventative maintenance activities for all personnel involved in any of the facilitys
operations that have the potential to contaminate stormwater runoff. Facility personnel
(or team) responsible for implementing the training shall be identified.
6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific
position(s) responsible for the overall coordination, development, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented
and position assignments provided.
7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in
design, construction, operation, or maintenance that has a significant effect on the
potential for the discharge of pollutants to surface waters. The Stormwater Pollution
Prevention Plan shall be reviewed and updated on an annual basis. The annual update
shall include an updated list of significant spills or leaks of pollutants for the previous
three years, or the notation that no spills have occurred. The annual update shall include
re -certification that the stormwater outfalls have been evaluated for the presence of non-
stormwater discharges.
The Director may notify the permittee when the Plan does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall
submit a time schedule to the Director for modifying the Plan to meet minimum
requirements. The permittee shall provide certification in writing (in accordance with
Part III, Standard Conditions, Section B, Paragraph 3) to the Director that the changes
have been made.
Part 11 Page 3 of 10
Permit No. NCSO00173
S. Facility Inspection Program. Inspections of the facility and all stormwater systems shall
occur at a minimum on a semi-annual schedule, once during the first half of the year
(January through June) and once during the second half (July through December), with at
least 64-days separating inspection dates (unless performed more frequently). The
inspection and any subsequent maintenance activities performed shall be documented,
recording date and time of inspection, individual(s) making the inspection and a narrative
description of the facility's stormwater control systems, plant equipment and systems.
Records of these inspections shall be incorporated into the Stormwater Pollution
Prevention Plan. These facility inspections are different from, and in addition to, the
stormwater discharge characteristic monitoring required in Part H of this permit.
9. Implementation. The permittee shall implement the Plan. The permittee shall document
all monitoring, measurements, inspections and maintenance activities and training
provided to employees, including the log of the sampling data and of actions taken to
implement BMPs associated with the industrial activities, including vehicle maintenance
activities. Such documentation shall be kept on -site for a period of five years and made
available to the Director or the Director's authorized representative immediately upon
request.
Part II Page 4 of 10
Permit No. NCS000173
SECTION B: ANALYTICAL MONITORING REQUIREMENTS
Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All
analytical monitoring shall be performed during a representative storm event. The required
monitoring will result in a minimum of ten analytical samplings being conducted over the term of
the permit at each stormwater discharge outfall (SDO).
A representative storm event is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1
inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation. For example, if it rains for 2 hours without producing any collectable discharge,
and then stops, a sample may be collected if a rain producing a discharge begins again within the
next 10 hours.
Table I. Analytical Monitoring Requirements
'4' �,�C�haracry ^�,
5n�iths'
u
,fLp,T+S%W'V_vtrg�
uen
]kV�
ample—
r_ 76Ltr foa�3A'- :~gfiiti
Chemical Oxygen Demand COD
mgfL
semi-annual
Grab
SDO3
Total Suspended Solids SS
m
semi-annual
Grab
SDO'
Total Phos horus(LP)
m
semi-annual
Grab
SDO 803 & 506A1
Oil and Grease
mE&
semi-annual
Grab
S1303
H
standard
semi-annual
Grab
SDO'
Total Rainfa114
inches
semi-annual i
Rain Gauge I-
Footnotes:
1 Measurement Frequency: Twice per year during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked or rescinded. if at the end of this permiting cycle
the pen ittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
perminee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 if the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge.
3 Sample Location: These samples shall be collected at stormwater discharge outfalls (SDOs) 302, 402, 506A1,
50681, 510, 803, and 907.
4 For each sampled representative storm event the total precipitation must be recorded_ An on -site rain gauge or
local rain gauge reading must be recorded_
The permittee shall complete the minimum ten analytical samplings in accordance with the
schedule specified below in Table 2. A minimum of 60 days must separate Period I and
Period 2 sample dates unless monthly monitoring has been instituted tinder a Tier Two response.
Part 11 Page 5 of 10
Permit No. NCSOOO173
Table 2. Monitoring Schedule
Year 1 — Period 1
1
July 1, 2008
December 31, 2008
Year 1 — Period 2
2
January 1, 2009
June 30, 2009
Year 2 — Period 1
3
July 1, 2009
December 31, 2009
Year 2 — Period 2
4
January 1, 2010
June 30, 2010
Year 3 — Period 1
5
July 1, 2010
December 31, 2010
Year 3 — Period 2
6
January 1, 2011
June 30, 2011
Year 4 — Period 1
7
July 1, 2011
December 31, 2011
Year 4 — Period 2
8
January 1, 2012
June 30, 2012
Year 5 — Period 1
9
July 1, 2012
December 31, 2012
Year 5 — Period 2
10
January 1, 2013
June 30, 2013
Footnotes:
1 Maintain semi-annual monitoring during permit renewal process. The applicant must continue semi-annual
monitoring until the renewed permit is issued.
2 if no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No
Flom' within 30 days of the end of the six-month sampling period.
Monitoring results shall be compared to the benchmark values in Table 3. The benchmark values in
Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater
Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to
increase monitoring, increase management actions, increase record keeping, and/or install
stormwater Best Management Practices (BMPs) in a tiered program. See the descriptions of Tier
One and Tier Two.
Table 3. Benchmark Values for Analytical Monitoring
; ,iD�schargFchakaaristtcs �
�� Units _
A � TBenchmark �
Chemical Oxygen Demand (COD)
mg/L,
120
Total Suspended Solids
mg/L
100
Total Phosphorus (TP)
mg/L
2
Oil and Grease
mg/L
30
PH
standard
6-9
Part 11 Page 6 of 10
Permit No. NCS00O 173
If: The first valid sampling results are above a benchmark value, or outside of the benchmark
for anv parameter at anv outfall.
Then: The permittee shall:
l . Conduct a stormwater management inspection of the facility within two weeks of receiving
sampling results.
2. Identify and evaluate possible causes of the benchmark value exceedence.
3. Identify potential, and select the specific: source controls, operational controls, or physical
improvements to reduce concentrations of the parameters of concern, or to bring
concentrations to within the benchmark range.
4. Implement the selected actions within two months of the inspection.
S. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan.
Include the date and value of the benchmark exceedence; the inspection date, the personnel
conducting the inspection, the selected actions, and the date the selected actions were
implemented.
If: During the term of this permit, the first valid sampling results are above the benchmark values,
or outside of the benchmark range, for any specific parameter at a specific discharge outfall two
times in a row (consecutive);
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. Immediately institute monthly monitoring for all parameters at every outfall where a
sampling result exceeded the benchmark value for two consecutive samples. Monthly
(analytical and qualitative) monitoring shall continue until three consecutive sample results
are below the benchmark values, or within the benchmark range, for all parameters at that
outfall.
3. If no discharge occurs during the sampling period, the permittee is required to submit a
monthly monitoring report indicating "No Flow."
4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan.
Part I1 Page 7 of 10
Permit No. NCS000173
During the term of this permit, if the valid sampling results required for the monitoring periods
exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any
specific outfall on more than four occasions, DWQ may:
a Require that the permittee increase or decrease the monitoring frequency for the
remainder of the permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures; or
require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
This site discharges to waters contiguous to impaired waters experiencing problems with fecal
coliform bacteria. If a Total Maximum Daily Load (TMDL) is approved for this segment of the
Newport River or Bogue Sound, the permittee may be required to monitor for the pollutant(s) of
concern in the future and submit results to the Division of Water Quality. The Division will
consider the monitoring results in determining whether additional BMPs are needed to control
the pollutant(s) of concern to the maximum extent practicable.
If additional BMPs are needed to achieve the required level of control, the permittee will be
required to (1) develop a strategy for implementing appropriate BMPs, and (2) submit a timetable
for incorporation of those BMPs into the permitted Stormwater Pollution Prevention Plan.
Part II Page 9 of 10
Permit No. NCS000173
SECTION C: QUALITATIVE MONITORING REQUIREMENTS
Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of
representative outfall status and shall be performed as specified in Table 4, during the analytical
monitoring event. [If analytical monitoring is not required, the permittee still must conduct semi-
annual qualitative monitoring.] Qualitative monitoring is for the purpose of evaluating the
effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of
stormwater pollution.
In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall
document the suspected cause of the condition and any actions taken in response to the
discovery. This documentation will be maintained with the SPPP.
Table 4. Qualitative Monitoring Requirements
Discharge C6a actertsaftcs
;� Freq%incy� nlVloriitorutg'
Color
semi-annual
SDO
Odor
semi-annual
SDO
Clarity
semi-annual
SDO
Floating Solids
semi-annual
SDO
Suspended Solids
semi-annual
SDO
Foam
semi-annual
SDO
Oil Sheen
semi-annual
SDO
Erosion or deposition at the
outfall
semi-annual
SDO
Other obvious indicators
of stormwater pollution
semi-annual
SDO
Footnotes:
1 Measurement Frequency: Twice per year during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked or rescinded. if at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permitiee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO)
regardless of representative outfall status.
SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS
Facilities which have any vehicle maintenance activity occurring on -site which uses more than 55
gallons of new motor oil per month when averaged over the calendar year shall perform
analytical monitoring as specified below in Table 5. This monitoring shall be performed at all
stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance
PartIl Page 9 of 10
Permit No. NCS000173
areas, and in accordance with the schedule presented in Table 2 (Section B). All analytical
monitoring shall be performed during a representative storm event.
Table S. Analytical Monitoring Requirements for On -Site Vehicle Maintenance
tn-..� .J-�3 �'i'C�- �ee:x S �g
D>scharge Charactenshcs =
"' Sa y - P
� IInats
tat. �iF � S
AMeasurement �
�' :— a'
Sample
e..���,��
-g SamplF:'Z,.
�:�Locahan,..
H
standard
semi-annual
Grab
SDO'
Oil and Grease
m
semi-annual
Grab
SDO'
Total Suspended Solids
mgA
semi-annual
Grab
SDO'
Total Rainfall4
inches
semi-annual
Rain gauge
New Motor Oil Usage
1 gallons/month
semi-annual
Estimate
-
Footnotes:
I Measurement Frequency: Twice per year during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
peninittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur.
4 For each sampled representative storm event the total precipitation must be recorded. An on -site or local rain
gauge reading must be recorded.
Monitoring results shall be compared to the benchmark values in Table 6. The benchmark
values in Table 6 are not permit limits but should be used as guidelines for the perrnittee's
Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the
permittee to increase monitoring, increase management actions, increase record keeping, and/or
install stormwater Best Management Practices (BMPs), as provided in Part H Section B.
Table 6. Benchmark Values for Vehicle Maintenance Analytical Monitoring
i7¢r -V .:.if'
ifip: ha_rge,Characterishcs
Units
i+f:�,i N '� r�
i._� Benchmark t ,
pH
standard
6-9
Oil and Grease
mg/L
30 .
Total Suspended Solids
mg/L
100
Part II Page 10 of 10
Permit No. NCS000173
PART III STANDARD CONDITIONS FOR NPDES STORII+IWATER INDIVIDUAL PERMITS
SECTION A: COMPLIANCE AND LIABILITY
Com liance Schedule
The permittee shall comply with Limitations and Controls specified for stonmwater discharges in
accordance with the following schedule:
Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater
Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the
initial permit and updated thereafter on an annual basis. Secondary containment, as specified in Part 11,
Section A, Paragraph 2(b) of this permit, shall be accomplished within 12 months of the effective date of
the initial permit issuance.
New Facilities applying for coverage for the fast time and existing facilities previously permitted and
applying for renewal under this permit: The Stormwater Pollution Prevention Plan shall be developed and
implemented prior to the beginming of discharges from the operation of the industrial activity and be
updated thereafter on an annual basis. Secondary containment, as specified in Part II, Section A, Paragraph
2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the
industrial activity.
Duty to Comply
The permittee must comply with all conditions of this individual permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit
termination, revocation and reissuance, or modification; or denial of a permit upon renewal application.
a. The permittee shall comply with standards or prohibitions established under section 307(a) of the
Clean Water Act for toxic pollutants within the time provided in the regulations that establish these
standards or prohibitions, even if the permit has not yet been modified to incorporate the
requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil
penalty not to exceed $25,000 per day for each violation. Any person who negligently violates any
permit condition is subject to criminal penalties of $2,500 to 25,000 per day of violation, or
imprisonment for not more than 1 year, or both. Any person who knowingly violates permit
conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or
imprisonment for not more than 3 years, or both. Also, any person who violates a permit condition
may be assessed an administrative penalty not to exceed $10,000 per violation with the maximum
amount not to exceed $125,000. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR
122.41(a).]
C. Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) per violation
may be assessed against any person who violates or fails to act in accordance with the terms,
conditions, or requirements of a permit. [Ref NC General Statutes 143-215.6A].
d. Any person may be assessed an administrative penalty by the Director for violating section 301,
302, 306, 307, 308, 31 S or 405 of the Act, or any permit condition or limitation implementing any
of such sections in a permit issued under section 402 of the Act Administrative penalties for Class
I violations are not to exceed $10,000 per violation, with the maximum amount of any Class I
penalty assessed not to exceed $25,000. Penalties for Class I1 violations are not to exceed
Part III Page 1 of 8
Permit No. NCS000173
$10,000 per day for each day during which the violation continues, with the maximum amount of
any Class II penalty not to exceed 5125,000.
Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this
individual permit which has a reasonable likelihood of adversely affecting human health or the environment.
4. Civil and Criminal Liability
Except as provided in Part III, Section C of this permit regarding bypassing of stormwater control facilities,
nothing in this individual permit shall be construed to relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6A, 143-215.613, 143-
215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
5. Oil and Hazardous Substance Liabili
Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve
the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to
under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
6. Property Rights
The issuance of this individual permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of
personal rights, nor any infringement of Federal, State or local laws or regulations.
7. Severability
The provisions of this individual permit are severable, and if any provision of this individual permit, or the
application of any provision of this individual permit to any circumstances, is held invalid, the application
of such provision to other circumstances, and the remainder of this individual permit, shall not be affected
thereby.
8. Duty to Provide Information
The permittee shalt furnish to the Director, within a reasonable time, any information which the Director
may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the
permit issued pursuant to this individual permit or to determine compliance with this individual permit. The
permittee shall also furnish to the Director upon request, copies of records required to be kept by this
individual permit.
9. Penalties for Tam erin
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate,
any monitoring device or method required to be maintained under this individual permit shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more
than two years per violation, or by both. If a conviction of a person is for a violation committed after a first
conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of
violation, or by imprisonment of not more than 4 years, or both.
Part III Page 2 of 8
Permit No. NCS000173
The permittee shall record the required qualitative monitoring observations on the SDO Qualitative
Monitoring Report (QMR) form provided by the Division, and shall retain the completed forms on site.
Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific
requirement to do so.
Submitting Reports
Duplicate signed copies of all reports required herein, shall be submitted to the following address:
Division of Water Quality
Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal
Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection
at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be
considered confidential. Knowingly making any false statement on any such report may result in the
imposition of criminal penalties as provided for in NCGS 143-215.613 or in Section 309 of the Federal Act.
4. Non-Stoormwater Discharges
If the storm event monitored in accordance with this individual permit coincides with a non-stormwater
discharge, the permittee shall separately monitor all parameters as required under the non-stormwater
discharge permit and provide this information with the stormwater discharge monitoring report.
5. Planned Changes
The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted
facility which could significantly alter the nature or quantity of pollutants discharged. This notification
requirement includes pollutants which are not specifically listed in the individual permit or subject to
notification requirements under 40 CFR Part 122.42 (a).
6. Anticipated Noncompliance
The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted
facility which may result in noncompliance with the individual permit requirements.
7. Bypass
a. Anticipated bypass. If the permittee blows in advance of the need for a bypass, it shall submit
prior notice, if possible at least ten days before the date of the bypass; including an evaluation of
the anticipated quality and affect of the bypass.
b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an
unanticipated bypass.
8. - Twenty-four Hour Reporting
The permittee shall report to the central office or the appropriate regional office any noncompliance which
may endanger health or the environment. Any information shall be provided orally within 24 hours from
Part III Page 7 of 8
Permit No. NCS000173
the time the permittee became aware of the circumstances. A written submission shall also be provided
within 5 days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes; the period of
noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case -by -case basis if the oral report has been received
within 24 hours.
9. Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time
monitoring reports are submitted.
10. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in an application for an
individual permit or in any report to the Director, it shall promptly submit such facts or information.
Part III Page 8 of 8
Permit No. NCSOOO173
PART IV LIMITATIONS REOPENER
This individual permit shall be modified or ahernatively, revoked and reissued, to comply with any applicable
effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and
307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved:
a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual
permit; or
b. Controls any pollutant not limited in the individual permit.
The individual permit as modified or reissued under this paragraph shall also contain any other requirements in the
Act then applicable.
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUFREMENTS
The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by
the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this
Division to initiate action to revoke the Individual Permit.
PART VI DEFINITIONS
1. Act
See Clean Water Act_
2. Arithmetic Mean
The arithmetic mean of any set of values is the summation of the individual values divided by the number of
individual values.
Allowable Nan-Stormv✓ater Discharges
This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the
stormwater conveyance system are:
(a) All other discharges that are authorized by a non-storrnwater NPDES permit.
(b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added
chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant
fleshings, water from footing drains, flows from riparian habitats and wetlands.
(c) Discharges resulting from fire -fighting or fire -fighting training.
4. Best Management Practices (BMPs)
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the
form of a process, activity, or physical structure.
Part VI Page 1 of 5 Pages
Permit No. NCS000173
5. Bypass
A bypass is the known diversion of storrawater from any portion of a stormwater control facility including
the collection system, which is not a designed or established operating mode for the facility.
6. Bulk Storage of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a single above ground
storage container having a capacity of greater than 660 gallons or with multiple above ground storage
containers located in close proximity to each other having a total combined storage capacity of greater than
1,320 gallons.
7. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33
USC 1251, et. seq.
8. Division or DWQ
The Division of Water Quality, Department of Environment and Natural Resources.
9. Director
The Director of the Division of Water Quality, the permit issuing authority.
10. EMC
The North Carolina Environmental Management Commission.
11. Grab Sample
An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively
monitored must be taken within the first 30 minutes of discharge.
12. Hazardous Substance
Any substance designated under 46 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
13. Landfill
A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land
treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or
a surface storage facility.
14. Municipal Separate Storm Sewer System
A stormwater collection system within an incorporated area of local self-government such as a city or town.
15. Now
A condition of no exposure means that all industrial materials and activities are protected by a storm
resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff.
Industrial materials or activities include, but are not limited to, material handling equipment or activities,
Part VI Page 2 of 5 Pages
Permit No. NCSOODI73
industrial machinery, raw materials, intermediate products, by-products, final products, or waste products.
DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a
facility complies with the terms and conditions described in 40 CFR § 122.26(g).
16. Overburden
Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding
topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations.
17. Permtttne
The owner or operator issued a permit pursuant to this individual permit.
18. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch,
channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters
of the state.
19. Representative Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no
storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive
hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then
stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours.
20. Representative Outfall Status
When it is established that the discharge of stormwater runoff from a single outfall is representative of the
discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfalI
status allows the permittee to perform analytical monitoring at a reduced number of outfalls.
21. Rinse Water Discharge
The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse
waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters
utilizing any type of detergent or cleaning agent.
22. Secondary Containment
Spill containment for the contents of the single largest tank within the containment structure plus sufficient
freeboard to allow for the 25-year, 24-hour storm event.
23. Section 313 Water Priority Chemical
A chemical ar chemical category which:
a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title Ili of the Superfund Amendments and
Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right -
to -Know Act of 1986;
b. Is present at or above threshold levels at a facility subject to SARA Title IN, Section 313 reporting
requirements; and
C. That meets at least one of the following criteria:
Part VI Page 3 of 5 Pages
Permit No. NCS000173
(1) Is listed in Appendix D of 40 CFR part 122 on Table II (organic priority pollutants),
Table III (certain metals, cyanides, and phenols), or Table IV (certain toxic pollutants and
hazardous substances);
(2) Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40
CFR 116.4; or
(3) Is a pollutant for which EPA has published acute or chronic water quality criteria.
24. Severe Pro Damage
Means substantial physical damage to property, damage to the control facilities which causes them to
become inoperable, or substantial and permanent loss of natural resources which can reasonably be
expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused
by delays in production.
25. Significant Materials
Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic
pellets; finished materials such as metallic products; raw materials used in food processing or production;
hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to
report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes,
slag and sludge that have the potential to be released with stormwater discharges.
26. Significant Spills
Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities
under section 311 of the Clean Water Act (Ref 40 CFR 110.10 and CFR 117.21) or section 102 of
CERCLA (Ref: 40 CFR 302.4).
27. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately following rainfall or as a
result of snowmelt.
28. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying stormwater and which is
directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities
considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14).
The term does not include discharges from facilities or activities excluded from the NPDES program.
29. Stormwater Pollution Prevention Plan
A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and
is based on an evaluation of the pollution potential of the site.
30. Ten Year Design Storm
The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten
years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control
Planning and Design Manual.
Part VI Page 4 of 5 Pages