The purpose of this document is to provide a comprehensive description of the
means and methods used by South Atlantic Services, Inc. to comply with North
Carolina General Statute 143-215.1 concerning the safe discharge and movement of
stormwater generated at our facility. The facility is located at :
South Atlantic Services, Inc.
US Highway 421 North
Wilmington, NC
New Hanover County
Current Permit No: NCS000084
Effective Date: October 1, 1994
A. SITE PLAN
1) General Location Map - see Attachment 1
2) Storage Practices
a) All storage tanks are non -pressurized and constructed of either carbon steel,
stainless steel, aluminum, or polypropylene depending on the product being
stored.
b) All tankage is above ground and diked.
c) No product shall remain outside unless it can be covered or has secondary
contaiment.
d)Wood pallets are allowed to be stored outside only if there is no chemical
residue present.
e) All usable paper, plastic, and cardboard items shall be stored inside. Only
items that are segregated for recycling purposes shall remain outside and they
shall be properly secured.
f) No gas,LP, or electric lifting devices
g)No rail cars shall remain pressurized
shall remain outside overnight.
or hooked up until prior to usage.
3) Loading and Unloading Activities
a) .All freight trucks are loaded and unloaded under covered docks.
b) All chemical bulk trucks are loaded and unloaded in dyked areas with an
attendant present at all times. These are done outside in an uncovered area.
c) Some but not all rail cars are loaded and unloaded in uncovered areas
depending on the product. Some of the uncovered areas have containment
areas and there is a catch pan on site that can be placed under cars if
necessary.
4) Oudoor Process Areas - There are no outdoor process areas other than the above
mentioned process areas.
5) Waste Disposal Practices - All human waste is handled by an on -site septic
system . All other trash and waste is handled by a local waste management
facility.
6) Site Map - see Attachment 2
7) Outfalls and Potential Pollutants
a) Outfall No. 1 - Only rainwater from roof top of Building No. 8
b) Outfall No. 2 - Rainwater from rooftop of Building No 6 and off top of the
blending sheds. Also contained in this outfall area are above ground storage
tanks containing the following:
Antifreeze, Caustic Soda 50%, Potassium Hydroxide 45%, Phosphoric Acid
7 5 %, Sodium Tolyltriazole 50%, Tween 20, Maleic Anhydride, Sulfuric Acid,
Hydrazine 40%, Ethylene Glycol, and mixtures of Octanol, Decanol; Maleic
Hydrazide and water. All of these tanks are dyked and are exposed to
stormwater.
8) Significant Spills or Leaks - No significant spills or leaks have occurred at the
facility in the past 3 years.
B. STORMWATER MANAGEMENT PLAN
1) Tanks
a) All tanks have a retaining dyke wall around them in the event of a tank
rupture or overfill. The dykes are designed to hold 125% of the volume of
the largest tank in the dyke.
b) A large majority of the tanks have overfill alarms on them to warn operators
of safe filling levels. These are checked on an annual basis for proper
operation.
c) All tank levels are checked and inventoried daily. Any major discrepancies
in the inventories are immediately investigated. Also, a visual inspection
of the piping and overall assessment of the tank farm is performed daily.
d) Any rainwater collected in the dyked areas is checked daily and discharged
ONLY after checking for possible chemical residues. if anything other than
rainwater is present or suspected to be present as evidence from a visual
inspection, a sample is pulled and checked by the lab for pH and other
properties. If evidence of contamination is connrmed, the rainwater shall
not be discharged but rather is collected in appropriate containers and held
for further analysis. The collected water is recycled back into usable
product when at all possible.
e) No underground tanks on site.
2) Processes
a) All process vessels and mixing vessels have a retaining dyke wall around
them.
b) All process areas and loading areas are covered where feasible.
c) All bulk loading stations are dyked.
d) Any outside operations, such as drum filling from a tank truck or rail car,
will keep an employee or supervisor present at all times. In addition, they
will keep absorbent material readily available in the event of any spills.
3) Maintenance
a) Any maintenance work performed on pumps or equipment will be done
inside the shop or a covered area where feasible.
b) Any hydraulic oil and other maintenance fluids are collected in a waste drum
and appropriately disposed of off -site. Any process fluids collected from
maintenance work on equipment will be recycled into product when
possible.
c) It is the responsibility of the Maintenence Supervisor to develop a
preventative maintenance schedule for all equipment and forklifts.
4) General Housekeeping
a) All spills are cleaned up immediately when and if they happen. Any spilled
product is recycled back into good product when not contaminated.
b) An inventory of spill control products are kept on hand at all times.
Absorbent material specific to oils, acids, and caustics and appropriate
neutralizing agents are used when necessary.
c) All outside areas are policed once a week for trash.
d) Dumpsters maintained on site for plant trash and garbage. Picked up at
least twice a week.
e) Cardboard and plastic items are segregated and picked up by local recyclers.
3. SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN (SPCC )
- Maintained as a seperate document (available upon request)
4. EMERGENCY RESPONSE & CONTINGENCY PLAN
- Maintained as a seperate document (available upon request)
S. EMPLOYEE TRAINING
a) Personnel involved with or responsible for proper spill response and cleanup
procedures are trained on an annual basis. The training consists of review of
MSDS and appropriate absorbent material and or neutralizing agents. Also,
the operation and maintenance of equipment used to prevent discharges and
significant changes in the types of products on hand are reviewed. Personnel
have a combination of on-the-job training and continuing education classes.
b) Responsible Training Officer - Walter Kennedy
6. RESPONSIBLE PARTY
The person responsible for the overall coordination, development, implementation,
and revisions of the Stormwater Pollution Prevention Plan for our facility is
Walter Kennedy.
7_ PLAN AMENDMENT
The plan shall be amended whenever there is a change in design, construction,
operation, or maintenance which has a significant effect on the potential for the
discharge of pollutants to surface waters. The Plan is reviewed on an annual
basis and updated as needed.
8. FACILITY INSPECTIONS
a) To be performed at least twice a year by the Plant Manager. Usually is
performed much more frequently during weekly drive arounds the plant_
These are not documented unless problems are noted.
b) Visual Monitoring is performed for the following parameters:
Color
Odor
Clarity
Floating Solids
Suspended Solids
Foam
Oil Sheen
This monitoring is performed twice a year for each outfall. Results of these
' inspections are recorded on a form (See Attachment 3)
o0
VIIAU tit' M5d
I
a
o00 00 0
Sri►►• ...
I • • � wrirehrnrso a
Asf►hnll
j� j
I
Aran nraincil Oy Onli,ill 1' 0
oo 3
11,3. '121 (9a►►Ihbonn(l)
�w
T
Area nralned
BY O►►Ifall 002
I
I Conininor Oulfnn 002
� n►►Ildir►� C
6
� f
Ash
n►►nalnrY i
akr�`�Jj Dui
logend
1� 1. AST— U,w Wt,rlals
(all Are dilred)
WArW 11004Jt l 2. Covered Lnadinn pocks
` 2. Uncovered N11road
i Tanker Station
l....... _ .:... _.. r....._...,.I 4. F.qull)menL
AACP% DRMAICO ►dfall OO1
A1111►or• 11rrtuffily brIffl)•a
7.17-1 1 R i
Iuli Nu, 111ULli-Si(III Firr+rru
Volntennnne
G, Permeable Arens
�. •--'(iullinn of f)utfoll
Discharge Aren
locallon nf Outfall
Otilfnll prninngr. Aren/
l.Inlorfnl Slnralle Mnh
Smith ALlni to Sorvlces
wiliiiinfllon, N01,01 Carnlinn
A4-)C-lr-t., 'new' 3
OUTFALL NO:
COLOR
ODOR
CLARITY
FLOATING SOLIDS
SUSPENDED SOLIDS
FOAM
OIL SHEEN
COMMENTS
MONITORING PERFORMED BY:
DATE: