Loading...
HomeMy WebLinkAboutNCS000037_Complaince_20101005*;A NCDENR North Carolina Depal lmelil of Envi)onn-ient and Natura Beverly Eaves Perdue Governor Mr. Ken Golder, President Clariant Corporation 4000 Monroe Road Charlotte, North Carolina 28205 Dear Mr. Golder: Division of Water Quality Coleen H. Sullins Director October 5, 2010 FILE Resources Subjcet: Compliance Evaluation Inspection Mount holly Last (MIIL) Facility Stormwater Permit No. NCS000037 Mecklenburg County, N.C. Dee Freeman Secretary Fnc.losed please find a copy of the Compliance Fvaluation Inspection Report for the stormwater inspection conducted at the subject facility on September 24, 2010, by Mr. Wes Bell of this Office. Please inform the Facility Manager of our findings by forwarding a copy of the enclosed report. It is requested that a written response be submitted to this Office by November 2, 2010, addressing the discrepancy noted in the Analytical Monitoring Section of the attached report. In responding to this report, please address your comments to the attention of Ms. Marcia Allocco. The attached report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact Mr. Bell at (704) 663-1699. Sincerely, 4" Robert B. Krebs Surface Water Protection Regional Supervisor Enclosure: Inspection Report cc: Rusty Rozzelle, MCWQP Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 One Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 NOrtrolina Internet: http:/lportal.ncdenr.orglweb/wq (�hC%a"� An Equal Opportunity i Affirmative Action Employer — 50% Recycled,10% Post Consumer paper "' ���I ��� Compliance Inspection Report Permit: NCS000037 Effective: 01/01/10 Expiration: 12/31/14 Owner: Clariant Corporation SOC: Effective: Expiration: Facility: Mount Holly East (MHE) Facility County. Mdc,kleiiL)u1g PO Box 669246 Region: Mooresville Charlotte NC 28266 Contact Person: Bill Archer Title: Facility Manager Phone: 704-822-2702 Directions to Facility: From the intersection of NC Hwy. 27 and NCSR 1666 (Mt. Holly-Huntersville Road), travel west on NC Hwy. 27 approximately 0.2 miles. The entrance to MHE is on the left (south) side of the road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s)• On -Site Representative(s): On -site representative Related Permits: Inspection Date: 09/24/2010 Primary Inspector: Wesley N Bell Secondary Inspector(s): Bill Archer EntryTime: g9:10 AM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: E Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Exit Time: 02:08 PM I01q /' Phone: 704-822-2702 Phone: /04-883-1699 Ext.2192 Inspection Type: Compliance Evaluation Page:1 Permit: NCS000037 Owner Faoility: Clariant Corporation Inspection Date: 09/24/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NUS000037 Owner - Facility: Cladant Corporation Inspection Date: 09/24/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? n n n # Does the Plan include a General Location (USGS) map? n n n # Does the Plan include a "Narrative Description of Practices"? n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? E Cl n n # Does the Plan include a list of significant spills occurring during the past 3 years? E n n n # Has the facility evaluated feasible alternatives to current practices? 0 n n n # Uor_- the fuclllly provide: till necessary s+ colidaty contalimient? E l lI I I I I # Does the Flan Include a BMP suirunary? n n ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 1­1 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n # Does the facility provide and document Employee Training? n n n # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? n n n # Does the Plan include a Stormwater Facility Inspection Program? n n n Has the Stormwater Pollution Prevention Plan been implemented? n n n Comment: The facility's Stormwater Pollution Prevention Plan (SPPP) was organized and well maintained. The SPPP was last updated in March 10 and employee training was last performed on 4/21/10. The facility has also implemented a Spill Prevention Control and Countermeasure (SPCC) Plan. Qualitative Monitoring Yes No NA NE Has the facility conducted its Oualltative Monitoring semi-annually? ❑ ❑ n Commel lt. The last qualitative monitoring event was performed on 2/9/10. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? mn n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n N n Comment: The last analytical monitoring event was performed on 2/9/10. The on -site laboratory (#217) and the contracted services of Pace Analytical Services, Inc. (Cerification #12 and 40) provide analytical support. The stormwater pH analyses were performed outside the 15-minute holding time requirement. The facility staff must ensure all stormwater pH samples are collected and analyzed within 15 minutes. Permit and Outfalis Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site'? n n n Page: 3 Permit: NCS000037 Owner - facility: Clariont Corporation Inspection Date: 09/24/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division'? f 1I f 1I 11 # Has the facility evaluated all illicit (non stormwater) discharges? Comment: The facility staff evaluate six stormwater outfalls (3A, 3F, 5, 8, 9, 10). No discharges were observed at any of these outfalls. Outfalls 3A and 8 are equipped with valves to contain any potential spills and/or discharges. The stormwater runoff from the industrial activities associated with the two on -site tenants is conveyed to the wastewater treatment plant for final treatment/disposal. The stormwater outfalls were last evaluated for the presence of non-stormwater discharges on 3/11/10. Page: 4