Loading...
HomeMy WebLinkAboutNCS000037_Compliance_20101020r e' Clariant Clariant Corporation Mt. Holly Plant October 20, 2010 P.O. Box 669246 Charlotte, NC 28266 Ms. Marcia Allocco NC DENR Mooresville Regional Office 610 East Center Ave., Suite 310 Mooresville, NC 28115 Re: Clariant Corporation, Mt. I lolly East Facility, Compliance Evaluation Inspection Report Stormwater Permit No NOR000037 Dear Ms. Allocco: DIVISION ED OF WATER QUALITY OCT 2 2 njo attfD" " - i'ION MOORESVILLE REGIONAL OFFICE This letter is to provide a written response to address the discrepancy noted in the Compliance Evaluation Inspection Report dated October 5, 2010. During the last stormwater analytical monitoring event, the pH measurements were not performed within 15 minutes of collection as required. Samples were tested in the onsite lab after collection; however, the nature of the rain event and representative sample collection requirements did not allow this testing to he. performed in the lah within 15 minutos. We have purchased a new portable pH meter which will be used in future monitoring events to perform the pH measurements in the field as each sample is collected. If you have any questions regarding this report or need more information, please contact me at (704) 822-2702. Sincerely, William M Arcrhor Facilily Mariaclor