HomeMy WebLinkAbout20061321 Ver 1_Triage Comments_20061024i / ~^~
Q`'~ ~ ~ Date i ~ ~~ ~ ~ f f Who Reviewed: -~-~1~
DWC~#~ ~i.'~~. ~~~ 1L.
Plan Detail7ncomplete - ~ C,v"Ix~ ~~~ ~ F,
^ Please provide a looation map for tho project. ~ ~ p~ ~~ ~ ~ t~ ~/` ~ ; ' f
6 y
Please show all stream impacts including all fill slopes, dissipaters, and b ~ s bilization on khe site p
^. Please show all wetland unpacts including fill slopes on tho site plan. ,r'~ ~ ~ ~ ~2. VJ
i ~.
^ Please indicate all buffer unpacts on the site plan. ~' / ~'"~
Please indicate roposed lot layout ea overlays on the site plan. ~" ~ ~/
^ p
^ Pleaso indicate tho location of the protected buffers as overlays on the site plan. \ 1 ~~" 0 ~ ~~ `~-~
K_i ~~~,~j~,
^ Please locate all isolated or non-isolated wotlands, streams and other waters of the State as overlays on the site~~" ""
`~___
^ Please provide cross section details showing the provisions for aquatic life passage. ~R'G " '-~~ ~~
^ Please locate any planned•sewer linos on the alto plea. ~ •
^ Ploase provide tho location of any proposed stormwat~r management practices as raluired by GC
^ Pleaso provide detail for the stormwater management practices as required by (3C ~ .
^ Pleaso specify the portent of project imperviousness aroa based on tho estimated built-out conditions:
^ Please indicate all stormwat ~,o~tfalls on the situ plaq.
^ Please indicate the diffuse flow provision measures do the site plan.
^ Please indicate whether or sot the proposed impacts already been conducted.
Avoidance•and/or Minimization Not Provided
^ • The labeled as ~ on the plena door not appear to bo necessary. Please eliminate the . or provide additional
information as to why it is necessary for this project.. •
• ^ This dfHca baliexres that the labeled on the plans as can be moved. or reconfigured to avoid tho impacts to the
• . Please rovise tho plans to avoid the impacts.
^. This t?ffico believes that the labeled on the plans as can ba moved or reconfigured to.minitnizo tho impacts to'the
• Please rovise the plane to min±*n±z~ the impacts.
^ The stormwater discharges at tho location on the plans labeled will not provide diffuse flow through the buffer becauso
. Please seviae the plans and provide calculations to show that diffuse flow will be achieved through the entirebuffer. If it
is not possible to achieve~diffuse flow through. the ehtiro bufl:'ar then it may bm necessary to provide stormwater manag~nsnt
. practices that remove nutrients before the stormwater can be discharged through the. buffer. _ .
Other ~ ~ ~ .
• ^•. The application feo was insuffieient~because over 150 feat of stream and/or over 1 acre oi`wetland'impacts were requested. Pleaso
provido ~ ~ .This additional fee must be received beforo your application can be reviewed.
^ Please complete Section(s) on the application. -
• ^ Please provide a signed copy of the application.
^ Please provide , copies of the application, . copies of •the situ pleas and other supporting informations
_ ^ • Please submit electronic CAD files showing ~ ;via eix~ai~ to ian.mcmillanQncmail.net and CD:
Mitigation •
• ^ of compensatory mitigation is required for this project. Please provide~e compensatory mitigation plan.. The
- plan must conform to therequirements in 15 A NCAC 2H .0500 and must be appropriate to the type~of impacts proposed.
^ Pleaso indicate which 404 Permit the USACE would use to authorize this project. ~ •