Loading...
HomeMy WebLinkAboutNCS000167_MONITORING INFO_20180430-'--STORMINATER"DIVISIONCODING-SNEETi PERMIT NO. NGSOO,o � b� DOC TYPE ❑FINAL PERMIT �O MONITORING INFO ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ ziloy3o YYYYMMDD 1' Perdue Farms Incorporated P.O.Box 460 Lewiston Woodville, NC 27849 www. perdue.come Office (252)348-4200 Certified Mail # 7011 0470 0001 0820 1446 April 16, 2018 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit # NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: Please find enclosed duplicate copies of our stormwater analytical monitoring for the above - mentioned permit. This sampling is for (January 1 - June 30, 2016). A renewal application for this permit was mailed March 9, 2015 . We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, Robert Rawls Perdue Agribusiness l« F" RECEIVED APR 8 0 201$ CENTRAL, FILES ')WR SECTION A Family Commitment to Quality Since MOO STORMWATER DISCHARGE OUTEALL ( SDO j MONITORING REPORT Permit Number NCS000167 FACILITY NAME : Perdue Farms Cofield PERSON COLLECTING SAMPLE(S) : Joey Baggett CERTIFIED LABORATORY(S):Environment 1, Incorporated Lab Lab #10 Part A: Specific Monitoring Requirements 2018 (This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY: Hertford PHONE NO# - 252-287-5196 Cf USig s ature of ermittee or IDnee ) By t s signiture, I certify that this report is accurate & mplete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH3 COD BOD Ph mo/dd/yr MG Inches 001 1 3/20/2018 0.1032 0.3 96 <5 2.09 3.9 3.68 0.53 51 20 7.7 002 3/20/2018 0.0322 0.3 100 <5 0.86 3.52 3.3 0.21 65 12 7.7 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall O/G TPH 1664A TSR Ph mo/dd/yr MG Inches gal/mo 003 3/20/2018 0.0362 0.3 <5 20 6.5 60 No 4 STORM EVENT CHARACTERISTICS: Date 03/20/2018 Total Event Precipitation ( inches } :.80 Event Duration ( hours ) : 10 ( if more than one storm event was sampled Date Total Event Precipitation ( inches } Event Duration ( hours ) Mail original and one copy to: Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that Cher are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " re of � -/?-/$ ( Date) Perdue AgriBusiness LLC Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4364 Certified Mail: 7017 2680 0000 0941 1350 March 7, 2018 Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Permit No. NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. . Included are updates on our SWPPP Improvement Plan. No outfall at this facility has been in Tier One or Tier Two during this reporting period. Aithough our renewal application for this permit was mailed March 11, 2015 we have yet to receive a new permit so we are complying with the old one. We hope these actions meet with your approval and should you have any questions or comments please call et 252-287-5196. Sincerely, oey #3aggett Regional Environmental Manager Perdue Agribusiness "oe .ba ett erdue.com We Believe In Responsible Food and Agriculturerm Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2017. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signatu RF�E�V�p`�cb� MARIa�o l Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material froi entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. S. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent inoff of organic material froi entering outfalls. Wastewater/Maint BMPs 1. Operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage tc prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to -event spills while performii scheduled or unscheduled maintenance. 4. Sweep unloading & loadout 4. Daily care route inspection areas on a daily basis. I of ponds and sprayfields. S. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. 5. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. Prompt attention to spills in all areas. Garage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cleanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly_ 16. Drums kept under roofing. Grain Storage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all ,tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. S. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or REC ced�-• . 61-.-. i nsir-te DslVn MAR 12 2018 Alater Quali1y Regional Operaiicns 3eciicn Washington Regional C':', Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2017 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed 2. The t-traps on SW outfall No. 001 have been replaced and new gears installed. 3. The ditch between the feed -mill and boilers has been reworked as well. These efforts have contained stormwater on site longer and helped keep any contaminant that might be present from leaving via the Stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4.Two bechmarks were exceeded at Qutfall # 1 during the summer sampling. During follow up inspection vegetation debri in the ditch was a suspected cause. Both parameters were within benchmarks during the next sampling. 5. SW drains and all filters installed are inspected on a quarterly basis and changed if needed. These work orders are filed and kept on site. 6. Maintenance at the Feedmill has made it hard to use the sweeper at some spots so more hand sweeping has been done. MAR 12 2d18 Q c I tea.` W STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) I SPPP Annual Update DATA REVIEW FORM; Calendar Year 2017 <^y l Individual NPDES Permit No. NCS 000167 or Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑ P� This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: Perdue Grain and Oilseed, LLC County: Hertford Phone Number( 252 ) 287-5196 Total no. of SDOs monitored 3 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Yes ❑ No Yes ❑ No Total Rainfall ' incites 50050 00530 00556 00400 00665 00600 00625 00610 00340 00310 Total Plow MG TSR O1G Ph Total Phosphorus Total Nitrogen TKN NH3 COD BOD Benchmark N/A I N/A 100 30 6-9 2 30 20 7.2 120 30 Date Sample Collected, mndddlyy 5123117 1.5 .3095 132 <5 6 1.07 4.03 3.29 .47 102 48 11/9/2017 1.5 1.1032 1 8.4 <5 7.7 1.15 2 1 1.79 .53 48 1 10 SWU-264 - Generic Annual DMR Last revised 5/17/2013 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR)/ SPPP Annual Update DATA REVIEW F Calendar Year 2017 Individual NPDES Permit No. NCS 000167 or Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑ This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: Perdue Grain and Oilseed. LLC County: Hertford Phone Number: 25L 2—287-5196 Outfall No. 002 Is this outfall currently in Tier 2 (monitored monthly)? Total no. of SDOs monitored 3 Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Yes ❑ No Yes❑ No® �QyM, 50060 00530 00556 00400 00665 00600 00625 00610 00340 00310 Total Rainfall ' inches Total Flow MG TSR OIG Ph Total Phosphorus Total Nitrogen TKN NH3 COD BOD BenchmarkON01AONIA f00 30 6-9 2 30 20 7.2 120 30 Date Sample Collected, mmlddlyy5123/17 60 <5 6.1 .78 3.7 2.75 .47 79 17 11/9/2017 1.5 .0322 60 <5 7.7 1.1 1.44 1." .44 48 10 SWU-264 - Generic Annual DMR Last ►evised 5/1712013 Additional Outfall Attachment Outfail No. 003 Is this outfall currently in Tier 2 (monitored monthly)? Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ® Mph Yes❑ No® Yes ® No ❑ Total Rainfall, inches Total Flow MG Date Sample mmlddiyy SWU-264 - Generic Annual DMR Last revised 5i17/2013 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sig Dat vor questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASHEVILLE REGIONAL"OFFICE FAYETTEVILLE REGIONAL OFFICE MOORESVILLE;REGIONAL OFFICE 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 910 433-3300 RALEIGH REGIONAL OFFICE WASHINGTON REGIONAL OFFICE WILMINGTON:REGIONAL OFFICE 3800 Barrett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 WINSTON-SALEM REGIONAL OFFICE CENTRAL.OFFICE 1617 Mail Service Center "To preserve. prated 585 Waughtown Street Winston-Salem, NC 27107 Raleigh, NC 27699-1617 Oi�and enhance (336) 771-5000 (919) 807-6300 NforffiCam na'swater..• SWU-264 - Generic Annual DMR Last revised 5✓1712013 Perdue Farms Incorporated P.O.Box 460 Lewiston Woodville, NC 27849 www.perdue.come Office I25211348-4200 Certified Mail # 7015 3430 0000 0173 7706 December 13, 2017 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit # NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: JAN 0f 7f118 DVIR 6hu I ION INFORMATION PROCESSING UNIT RRni=I1/pR JAN 09 20i8 D'AIR SECTION I%ro"ATION PROCESSING UNIT Please find enclosed duplicate copies of our stormwater analytical monitoring for the above - mentioned permit. This sampling is for (July 1 -December 31, 2017 ). A renewal application for this permit was mailed March 9, 2015 . We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, iA�4vis/1 Robert Rawls Perdue Agribusiness i A Family Commitment to Quality Since 19200 0�) Permit Number NCS000167 STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT FACILITY NAME :Perdue Farms Cofield PERSON COLLECTING SAMPLE(S) : Joey Baggett CERTIFIED LABORATORY($):Environment 1. Incorporated Lab #10 Lab # Part A: Specific Monitoring Requirements 2017 (This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY:Hertford PHONE NO#:252-287-5196 ( Signature of Permittie or Designee ) By this signature, I certify that this report is accurate & complete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH 3 COD BOD Ph mo/dd/yr MG Inches 001 11/9/2017 0.1032 0.5 8.4 <5 1.15 2 1.79 1 0.53 <20 10 7.7 D02 11/9/2017 0.0322 0.5 60 <5 1.1 1.44 1.44 0.44 48 10 7.7 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Ph Motor Oil Usage Total Flow Total Rainfall 0/G TPH i664A TSR mo/dd/yr MG Inches gal/mo 003 1 11/9/2017 1 0.0362 0.5 <5 1 7.7 1 6.5 1 60 STORM EVENT CHARACTERISTICS: Date 11/09/17 Total Event Precipitation ( inches) :.50 Event Duration ( hours ) : 8 (if more than one storm event was sampled Date Total Event Precipitation ( inches ) : Event Duration ( hours ) : Mail original and one copy to: Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " ittee ) k ( Date ) STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT Permit Number NCS000167 FACILITY NAME :Perdue Farms Cofield PERSON COLLECTING SAMPLE(S) : Joey Baggett CERTIFIED LABORATORY(S):Environment 1, Incorporated Lab 410 Lab # Part A: Specific Monitoring Requirements 2017 (This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY:Hertford PHONE NO#:252-287-5196 ( Signature of PermittSe or Designee ) By this signiture, I certify that this report is accurate & complete to the best of my knowledge. Outfall Date 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 No. Sample Collected Total Flow Total Rainfall TSR O/G TPH ]664A Total Phosphorus Total Nitrogen TKN NH 3 ' COD BOD Ph mo/dd/yr MG Inches 001 11/9/2017 0.1032 0.5 8.4 <5 1.15 2 1.79 0.53 <20 10 7.7 002 11/9/2017 0.0322 0.5 60 <5 1.1 1.44 1.44 0.44 48 10 7.7 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall 0/G TPH 1664A TSR Ph mo/dd/yr MG Inches gal/mo 003 11/9/2017 0.0362 0.5 <5 7.7 6.5 60 2R STORM EVENT CHARACTERISTICS: Date 11/09/17 Total Event Precipitation ( inches) :.50 Event Duration ( hours ) : 8 { if more than one storm event was sampled i Date Total Event Precipitation ( inches) Event Duration ( hours ) : Mail original and one copy to Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. i am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " Unc./1" ittee t ( Date ) FiECE1VEDINCDENRMWFl Perdue Farms Incorporated P.O.Box 460 MAR 10 2017 Lewiston Woodville, NC 27849 www. perdue. come Water Quality Regional operations Sefton Office (252)348-4200 Washington Regional Oft41x0 Certified Mail: 7015 3430 0000 0173 8925 March 8, 2017 Division of Water Quality Washington Regional Office 943 Washington Square Mali Washington, NC 27889 Permit No. NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. No outfall at this facility has been in Tier One or Tier Two during this reporting period. Although our renewal application for this permit was mailed March 11, 2015 we have yet to receive a new permit so we are complying with the old one. We hope these actions meet with your approval and should you have any questions or comments please call et 252-287-5196. Sincerely, Jo y �Baggett vironmental Manager Perdue Agribusiness ioev.baggett@perdue.com A Family Commitment to Quality Since 19200 Management Certification herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2016. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signature A Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2016 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed. 2. The t-traps on SW outfall No. 001 have been replaced and new gears installed. 3. The ditch between the feed -mill and boilers has been reworked as well. These efforts have contained stormwater on site longer and helped keep any contaminant that might be present from leaving via the stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4.No bechmarks were exceeded at any of the three SW outfalls during 2016. 5. SW drains and all filters installed are inspected on a quarterly basis and changed if needed. These work orders are filed and kept on site. 6. Maintenance at the Feedmill has made it hard to use the sweeper at some spots so more hand sweeping has been done. Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. I4. Sweep unloading & loadout I areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. Operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to event spills while performir scheduled or unscheduled maintenance. 4. Daily care route inspection of ponds and sprayfields. 5. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. Prompt attention to spills in all areas. Garage BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cleanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly. 16. Drums kept under roofing. Grain Storage BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. I4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR)1 SPPP Annual Update DATA REVIEW FORM Calendar Year 2016 Individual NPDES Permit No. NCS 000167 or Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑ This monitoring report summary of the calendar year should be kepi on file on -site with the facility SPPP. Facility Name: _ Perdue Grain and Oilseed, LLC County: Hertford Phone Number: 25i_� 287-5196 Total no. of SDOs monitored 3 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No 0. - \..'�j`` ;y� ,.W 1 f[ � 1 Y.1 A ! }' - -�✓ Z J .�L ik� •- _.,Lti' :. Y a� 1 x--#':9� JZi Pk Elb-S-T -..•� -.'�",¢�y�%� G • a-i f � ' ye � o o E � �{�`.. 3! l£]G Y _•tip- r- 0 r{�57`; yf'`�'f-l�J _ �.t _ • F.. � � � ��. $ 'ti-, .Y d1 ���5_aFd`•.4�' x. a:ft.:ib :.-'s.b � � -': -� SWU-264 - Generic Annual DMR Last revised 5/172013 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) I SPPP Annual Update DATA REVIEW FORM Calendar Year 2016 Individual NPDES Permit No. NCS 000167 or Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑ This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: Perdue Grain and Oilseed, LLC County: Hertford Phone Number: 252 287-5196 Total no. of SDOs monitored 3 Outfall No. 002 Is this outfall currently in Tier 2 (monitored monthly)? Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Yes No® Yes ❑ No Total Rainfall ' inches 50050 00530 00556 00400 00665 00600 00625 00610 00340 00310 Total Flow MG TSR OIG Ph Total Phosphorus Total Nitrogen TKN NH3 COD BOD Benchmark NIA NIA 100 30 6-9 2 30 20 7.2 120 30 Date Sample Collected, mmlddlyy .25 . 116 4.4 <5 7.5 .84 .64 .49 .42 20 7.5 6f7116 12/612016 .7 .046 3.5 <5 8.2 .79 .89 .56 .46 28 4.6 SWU-264 - Generic Annual DMR Last revised &11712013 Additional Outfall Attachment Outfall No. 003 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ® No ❑ . Rainfall, inches it r . Flow MG— • " SWU-264 - Generic Annual DMR Last revised 5/17/2013 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sign Date VVI yuVa&Ia,rna, 4LPI]LO .L yLPUr local Regional Office: DWQ Regional Office Contact Information: ASHEYILLE REGIONAL OFFIOB FAYETTEVILLE REGIONAL OFFIC•D MOORESVILLE REGIONAL OFFlicia 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RALEIGH REGIONAL OF,F,I ] WASHINGTON REGIONAL OFFICI] WILMINGTON REGIONAL OFFICE 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 WINS ON-SALEM REGIONAL OFFICE _LIEN, TRAL QFFICF, 1617 Mail Service Center Raleigh, NC 27699-1617 `Tu andenhance ha 00 585 Wau htown Street Winston-Salem, NC 27107 (336) 771-5000 (919) 807-6300 North CafOam's water SWU-264 - Generic Annual DMR Last revised 5/1712013 7 STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT RECEIVED JAN 17 20f., Permit Number NCS000167 2016 CENTRAL ( This Monitoring Report shall be received by the Division no later than 30 days from DWR SECTION the date the facility receives the sampling results from the laboratory. } FACILITY NAME: Perdue Farms Cofield COUNTY: Hertford PERSON COLLECTfNG SAMPLES) : Joev Baggett PHONE NO. 252-287-5196 CERTIFIED LABORATORY(S): Environment 1 Lab # 10 Lab # Part A: Specific Monitoring Requirements ( Signature of Permittee or Designee ) By this signiture, I certify that this report is accurate & complete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR 0/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH3 COD BOD Ph mo/dd/yr MG Inches 001 12/6/2016 0.147 1 0.71 1 4 1 <5 1 0.74 1 0.91 1 0.57 1 0.44 1 28 1 <4.4 18.3 002 12/6/2016 0.046 0.71 3.5 <5 0.79 0.89 0.56 0.46 28 <4.4 8.2 Does this facility performVehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Ph Motor Oil Usage Total Flow Total Rainfall O/G TPH 1664A TSR mo/dd/yr MG Inches gal/mo 003 12/6/2016 0.051 0.71 <5 14 7.9 60 No STORM EVENT CHARACTERISTICS: Date 12/06/16 Total Event Precipitation ( inches) :.71 Event Duration ( hours ) : 6 ( if more than one storm event was Sampled) Date Total Event Precipitation ( inches) Event Duration ( hours ) Mail original and one copy to: Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " Gt ture of // / Z { Date ) STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT Permit Number NCS000167 FACILITY NAME: Perdue Farms Cofield PERSON COLLECTING SAMPLE(S) : Joey Baggett CERTIFIED LABORATORY(S): Environment 1 Lab # 10 Part A: Specific Monitoring Requirements 2016 1 This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. ) COUNTY: Hertford PHONE NO. 252-287-5196 ( Signature of Permittee or Designee ) By this signiture, I certify that this report is accurate & complete to the best of my knowledge. Outfall Date 50050 00530 00556 00665 1 00600 00625 00610 00340 00310 00400 No. Sample Collected Total Flow Total Rainfall TSR 0/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH3 COD BOD Ph mo/dd/yr MG Inches 001 1 12/6/2016 0.147 0.71 1 4 1 <5 L 0.74 1 0.91 1 0.57 1 0.44 1 28 1 <4.4 8.3 002 12/6/2016 0.046 0.71 3.5 <5 0.79 0.89 0.56 0.46 28 <4.4 $.2 Does this facility performVehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B. VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall O/G TPH 1664A TSR Ph mo/dd/yr MG Inches gal/mo 003 12/6/2016 0.051 0.71 <5 14 7.8 60 No STORM EVENT CHARACTERISTICS: Date 12/06/16 Total Event Precipitation ( inches) :.71 Event Duration ( hours ) : 6 ( if more than one storm event was sampled) Date Total Event Precipitation ( inches j Event Duration ( hours ) Mail original and one copy to: Division of Water Quality ATt'N: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " of Permittee ) / - ( Date ) Cofield Analytical Monitoring for Permit # NCS000167 1 /7 S--7'tQJ Autfall9 2 10 2005 6/7/2006 2006 6/1412007, 10/24/2007 S/78/2008 11/5/2008 5 7 2009 11/11/2009 Tot21 Flow MG 0.171 0.103 0.062 0.103 0.474 0.052 0.124 0.153 0.969 TSS 11 49 21 22 7.1 3.2 21 34 45 PH 6.9 6.86 7.75 7.54 8.1 8.5 7.8 8.3 7 COD 29 90 105 ® 38 14 61 32 50 BOD 15 ® ® (fSE) 6.1 2.9 12 13 22 TKN 1.8 4.73 4.31 6.46 1.07 1.07 2.01 2.06 3.47 Total Phosphorus 0.82 1.18 1.09 40P 0.38 0.5 0.42 1.1 0.76 Temp. Celsius 24.3 25.5 25.2 21.9 24.6 30.6 15.9 30.2 21.1 Total Nitrogen 2.64 5.35 4.45 6.95 2.26 1.12 2.25 2.24 4.24 Total Rainfall inches 0.83 0.5 0.3 0.5 2.3 0.25 0.6 0.74 4.7 Event Duration mins. 1440 60 120 90 2880 75 960 960 2160 Outfall# 3 10M2005 6 006 9/14/2006 6/14/2007 10/24/2007 5/28/2fl08 JJ S/2008 7 009 11/11/20QS Total Flow MG 0.046 0.028 0.016 dry 0.128 0.014 0.33 0.041 0.261 TSS 40 7.7 1�1l� dry 77 47 37 26 16 PH 6.7 5.2 6.58 dry 6.21 ® 7 6.8 6.5 COD C�MD 89 5.44 dry 16 59 2 BOD CIP 14 C� dry 28 53 TKN 3.09 3.93 14.6 dry 7.23 7.78 5.76 6.89 Total Phosphorus 1.2 1.24 cg> dry 1.32 1.22 1.31 1.47 1.3 Temp. Celsius 23.5 24.7 23.1 dry 21.9 18.9 15.6 20.5 14.6 Total Nitrogen 10.75 4.55 14.69 dry 7.7 22.76 12.25 6.08 7.78 Total Rainfall inches 0.83 0.5 0.3 dry 2.3 0.25 0.6 0.74 4.7 Event Duration mins. 1440 60 120 dry 2980 75 960 960 2160 MOO 9 4 1 005 6nn006 9/14/2 6/1412007 10/24/2007 28 i 1 5 2008 51712OD9 11/11/2009 Total Flow MG 0.097 0.059 0.035 0.059 0.27 0.029 0.07 0.087 0.551 Oil & Grease 4.06 < 2 < 2 7.06 S.9 < 5 < 5 < 5 < 5 TS5 cpb 1.32 37 89 74 60 54 3.3 PH c9?--, csa:�:, 6.27 7.34 6.4 6.5 7 6.1 6.4 New motor oil useage COD 66.7 67 67 67 67 563 67 16 67 67 67 BOD ® 35 < 36 57 TKN 3.09 12.52 25.7 8.08 18.82 7.78 4.8 6.97 Total Phosphorus 1.2 <�M> C <02 (29) 1.31 1.24 1.35 Temp. Celsius 23.5 23.3 22.8 20.3 24.2 17.7 15.6 20.2 14.3 Total'Nitrogen 4.07 13.66 25.89 8.36 20.24 CM32) 8.38 5.29 7.84 Total Rainfall inches 0.83 0.5 0.3 0.5 2.3 0.25 0.6 0.74 4.7 Event Duration miss. 1440 60 120 90 2880 75 960 960 2160 0 Perdue Farms Incorporated P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com�D Office (252)348-4200 Certified Mail # 7015 3430 0000 0173 9151 June 19, 2017 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit # NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: Please find enclosed duplicate copies of our Stormwater analytical monitoring for the above - mentioned permit. This sampling is for ( Jan 1 -June 30, 2017 ). A renewal application for this permit was mailed March 9, 2015, We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, goey Saggett erdue Agribusiness Environmental Manager r� f•'l�M.•�i2e'R'r -3 A Family Commitment to Quality Since 19200 STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT Permit Number NC5000167 FACILITY NAME :Perdue Farms Cofield PERSON COLLECTING SAMPLE(5) : Joey Bag eg_tt CERTIFIED LABORATORY(5):Environment 1, Incorporated Lab #10 Lab # Part A: Specific Monitoring Requirements 2017 (This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY:Hertford PHONE NO#:252-287-5196 ( Signature of PermitteeAt Designee ) By this signature, I certify that this report is accurate & complete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total !Nitrogen TKN NH 3 COD BOD Ph mo/dd/yr MG Inches 001 5/23/2017 0.3095 1.5 132 <5 1.07 4.03 3.29 0.47 102 48 6 002 5/23/2017 0.0965 1.5 60 <5 0.78 3.7 2.75 0.47 79 17 6.1 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Ph Motor Oil Usage Total Flow Total Rainfall O/G TPH 1664A TSR mo/dd/yr MG Inches gal/mo 003 5/23/2017 0.1087 1.5 1 <5 1 5.7 1 63 60 0 STORM EVENT CHARACTERISTICS: Date 05/23/17 Total Event Precipitation ( inches) : 1.5 Event Duration ( hours ) : 8 ( if more than one storm event was sampled ) Date Total Event Precipitation ( inches } Event Duration ( hours ) Mail original and one copy to Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " i certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that then are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " ature of Perrrktee ) ( Date ) Perdue AgriBusiness LLC Environmental Services P.O. Sox 460 Lewiston Woodville, NC 27849 www.perdue.comm Office 1252)348-4364 Certified Mail # 7014 1820 0001 7603 7379 June 27, 2016 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit # NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: RECEIVED JUN 29 Z016 CENTRAL. FILES DWR SECTION Please find enclosed duplicate copies of our stormwater analytical monitoring for the above - mentioned permit. This sampling is for ( January 1 - June 30, 2016 ) of our permit monitoring schedule. No benchmarks were exceeded in this sampling. A renewal application for this permit was mailed March 9, 2015 We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, Joey Baggett Perdue Agribusiness Environmental Manager We Believe In Responsible food and Agricullurerm STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT Permit Number NCS 000167 2016 ( This Monitoring Report shall be received by the Division no later than 30 days from RECEIVED the date the facility receives the sampling results from the laboratory. I FACILITY NAME: Perdue Farms Cofield COUNTY: Hertford JUN PERSON COLLECTING SAMPLE(S) : Joey Baggett PHONE NO. 252-287-5196 CENTRAL ALES CERTIFIED LABORATORY(S): Environment 1 Lab # 10 OWR SECTION Lab # r ?By at�eofPermittee or esignee ) signiture, I certify that this report is accurate Part A: Specific Monitoring Requirements & complete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH3 COD BOD Ph mo/dd/yr MG Inches 001 6/7/2016 1 0.0515 1 0.25 1 5.4 1 5 1 0.82 1 0.7 1 0.54 1 0.9 1 - <20 1 <7.5 1 7.6 002 6/7/2016 0.016 0.25 4.4 < 5 0.84 0.64 0.49 0.42 20 <7.5 7.5 Does this facility performVehickle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes No ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Out -fall N9- 1.. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall O/G TPH i664A TSR Ph mo/dd/yr MG Inches gal/mo 003' 1 6/7/2016 1 0.0181 1 0.25 <5 5.2 1 7.5 1 60 STORM EVENT CHARACTERISTICS: Date 06/07/16 Total Event Precipitation ( inches) :.25 Event Duration ( hours ) : 6 ( if more than one storm event was sampled) Date Total Event Precipitation ( inches) Event Duration ( hours ) Mail original and one copy to: Division of Water Quaiity ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " re of Permittee ) 6i;L?- Date ) Perdue AgriBusiness LLC Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com' Office (252)348-4364 Certified Mail:7011 2970 0000 4209 1188 January 27, 2015 Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Permit No. NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, fiECZWD/NODEN FEB 2 2015 Water Quaitiy Regional opera ww mwivi�asgioft. AN — 4 2015 The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. No outfall at this facility has been in Tier One or Tier Two during this reporting period. We hope these actions meet with your approval and should you have any questions or comments please call et 252-348-4383. Sincerely, Joey Bagg t Environmental Manager Perdue Agribusiness ioev. bapgett@perdue.com i A Family Commitment to Quality Since 19200 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) I SPPP Annual Update DATA REVIEW FORM Calendar Year 2014 Individual NPDES Permit No. NCS 000167 or Certificate of Coverage (COC) No. NCG❑❑❑❑❑❑ This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: _ Perdue Grain and Oilseed, LLC County: Hertford Phone Number: 252 287-5196 Total no. of SDOs monitored 3 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total Rainfall, inches 50050 00530 00556 00400 00665 00600 00625 00610 00340 00310 Total Flow MG TSR OIG Ph Total Phosphorus Total Nitrogen TKN NH3 COD BOD Benchmark N/A N/A 100 30 6-9 21 30 1 20 1 7.2 1 120 1 30 Date Sample Collected, mmiddlyy No M, MMMMMIM 5/1/2014 1.2 .25 2.6 <5 7.7 .61 1.44 1.37 .37 23 4.7 11/26/2014 1.44 .297 92 <5 7.7 1.4 4.92 4.49 .32 56 20 SWU-264 - Generic Annual DMR Last revised 5/17/2013 Additional Outfall Attachment Outfall No. 002 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total Rainfall, inches 50050 00530 00556 00400 00666 00600 00625 00610 00340 00310 Total Flow MG TSR OIG ph Total Phosphorus Total Nitrogen TKN NH3 COD BOD Benchmark NIA N1A 100 30 6 1 2 1 30 1 20 1 7.2 1120 30 Date Sample Collected,Mmmim mmlddlyy 5/1/2014 1.2 .08 3.7 a5 8.3 .59 1.42 1.35 .35 25 3.2 11/26/2014 1." .092 96 a5 7.8 1.37 3.74 3.37 .3 1 61 18 SWU-264 - Generic Annual DMR Last revised 5/17)2013 Additional Outfall Attachment Outfall No. 003 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total Flow MG • Date Sample mmiddlyy SWU-264 - Generic Annual DMR Last revised &1172013 " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature Date 1— X) - -JL* V% For questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASHEVILLE REGIONAL OFFICE FAYETTEVILLE REGIONAL OFFICE MOORESVILLE REGIONAL OFFICE 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RALEIGH REGIONAL OFFICE} WASHINGTON REGIONAL-OFFIC_ 9 WILMINGTON REGIONAL OFFICD 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 WINSTON-SALEM REGIONAL OFFICE] CENTRAL OFFICE{) 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 807-6300 i 'Topmwrve, pmtect andenhance North Cam na^a wafer...' 585 Waughtown Street Winston-Salem, NC 27107 (336) 771-5000 SWU-264 - Generic Annual DMR Cast revised 5Y17/2013 Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2014. Name Wayne Black Prink Title Director Perdue Agribusiness Environmental Signature Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent inoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. Operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to prevent spills while performing scheduled or unscheduled maintenance. 4. Daily care route inspection of ponds and sprayfields. S. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. Prompt attention to spills in all areas. Garage BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cleanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly. 1 6. Drums kept under roofing. Grain Storage BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent inoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. S. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2014 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed. 2. The t-traps on SW outfall No. 001 are being replaced and new gears installed. 3. The ditch between the feefmill and boilers has been reworked as well. These efforts have contained stormwater on site longer and helped keep any contaminant that might be present from leaving via the Stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4.No bechmarks were exceeded at any of the three SW outfalls during 2014. 5. SW drains and all filters installed are inspected on a quarterly basis and changed if needed. These work orders are filed and kept on site. 6. The Grain Storage department of the facility has received more grain than in previous years which makes dry clean up and sweeping more important than ever. We have been challenged this past year because of the overly wet conditions which restrict usage of the sweeper. 7. Maintenance at the Feedmill has made it hard to use the sweeper at some spots so more hand sweeping has been done. Perdue AgriBusiness LLC Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office 1252i348-4364 Certified Mail: 7010 3090 0000 6840 5922 February 7, 2014 Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, r ...� ram» Fa.. w►• �� ' r"rr F E B 10 2014 The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. We are looking for other ways to improve our BMPs as a group at Cofield. We hope these actions meet with your approval and should you have any questions or comments please call et 252-348-4383. Sincerely, oey Bag ett Perdue Agribusiness Environmental 252-287-5196 A family Commitment to Quality Since 19200 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR)1 SPPP Annual Update DATA REVIEW FORM Calendar Year o& Q 0 Individual NPDES Permit No. NCS1 Certificate of Coverage (COC) No. NCG This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: County: Phone Number: Total no. of SDOs monitored Outfall No. O]— Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No 2� Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total Rainfall, inche inches Parameter, (units) 7v7W r VS% �'�S �� Tr� � i cixr L � j vhp3 5 % ��i� �— ry" fpi wh i1 /i / `� j 1 �1 3 /�7 l_()p h Benchmark N/A Date Sample Collected, mmlddlyy 1, x-x fig5� r 3�T Ill , i,a 4441, 16 9 1/7 SWU-264 - Generic Annual DMR Last revised 5/172013 Additional Outfall Attachment Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No [y}- Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No [Z�� If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No MTotal MITT4111711111 Date Sample! mmiddlyy _ I SWU-264 - Generic Annual DMR Last revised 5117)2013 Additional Outfall Attachment Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No 0--," If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total Rainfall, inches Parameter, (units) �, f L yn {", l7 ? 9 7-5 9 �n Benchmark N/A Date Sample Collected, mm/ddlyy M M M - 3 , SWU-264 - Generic Annual DMR Last revised 511712013 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature Date a- 6 - Q0 14 For questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASHEVILLE REGIONAL OFFICE FAYETTEVILLE REGIONAL OFFICE MOORESVILLE REGIONAL OFFICE 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 910) 433-3300 RALEIGH REGIONAL OFFICE WASHINGTON REGIONAL OFFICE WILMINGTON REGIONAL OFFICE 3800 Barrett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 7914200 (252) 946-6481 (910) 796-7215 WINSTON-SALEM.REGIONAL OFFICE CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 27699-1617 585 Wau htown Street Winston-Salem, NC 27107 -To and enhance (336 771-5000 919 807-6300 Caidina's water...' SWU-264 - Generic Annual DMR Last revised &1712013 Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2012. Name wavne Black Print Title Director Perdue Agribusiness Environmental Sign ature• Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. Operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to prevent spills while performing scheduled or unscheduled maintenance. 4. Daily care route inspection of ponds and sprayfields. S. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. Prompt attention to spills in all areas. Garage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. ! 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cleanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly. 1 6. Drums kept under roofing. Grain Storage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2013 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed. 2. The ditch going into outfall # 2 has been dug out and re- planted with matted grass. 3. The ditch between the feefmill and boilers has been reworked as well. These efforts have contained stormwater on site longer and helped keep any contaminant that might be present from leaving via the stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4.Two benchmarks were exceeded during the 11/27/2013 sampling. This sampling was taken during a very hard rain event which had folwwed several weeks of rain. We believe this caused the TSS and BOD to be just slightly their benchmarks. Of couse this was recorded in our Tier One documentaion. 5. SW drains all have filters installed that are inspected on a quarterly basis and changed if needed. These work orders are filed and kept on site. 5. The Grain Storage department of the facility has received more grain than in previous years which makes dry clean up and sweeping more important than ever. We have been challenged this past year because of the overly wet conditions which restrict usage of the sweeper. STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR)1 SPPP Annual Update DATA REVIEW FORM Calendar Year o`l Q 1.3 Individual NPDES Permit No. NCSM©QnW or Certificate of Coverage (COC) No. NCG❑❑❑❑mg This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. 'Facility Name: County: Phone Number: (A)2�:a 6� 1 q 6 Total no. of SDOs monitored _ t� Outfall No. OD Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No 2/ Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑, No [� SWU-264 - Generic Annual DMR Last revised "72013 Additional Outfall Attachment Outfall No. ' IDDA Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No Q/ If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ . No 0--' SWU-264 - Generic Annual DMR Last revised &1712013 Additional Outfall Attachment Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No SWU-264 - Generic Annual DMR Last revised 5/i712013 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonmenf for knowing violations." Signature Date JL - 6 - Qe N For questions, contact your local Regional Office: DWO Re Tonal Office Contact Information: ASHEVW LE:REGIONAL OFFICE FAVETTEVILCKREGIONAti OFFICE MOORESVILLE:REGIONAI OFFICE 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systei Building Suite 714 Mooresville, NC 28115 - (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 3800 Barrett Drive 943 Washington Square Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 IICKNTRAI "OFFICE (910) 796-7215 5TON AI EM REGIONAL -OFFICE' 585 Waughtown Street 1617 Mail Service Center s "To Amy, i Winston-Salem, NC 27107 Raleigh, NC 27699-1617 !FW andent+w= 33 771-5000 919 807-6300 ' caraft's waw..` I SWU-264 - Generic Annual DMR Last revised 5r1712013 Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2012. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signature `�, — Permit Number NCSS 000167 FACILITY NAME : Perdue Farms Cofield PERSON COLLECTING SAMPLE(S) : Joey Baggett CERTIFIED LABORATORY(S): Environment 1 Lab # 10 Part A: Specific Monitoring Requirements STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT . rrri 2014 I This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. j COUNTY: Hertford 0 P NE NO. 252-348-4383 r= s� # nature f Permitte Designee ) r By this signature, I certify that this report is accurate Wcomplete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665. 00600 00625 00610 00340 00310 00400 Total Flaw Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH 3 COD BOD Ph mo/dd/yr MG Inches 001 11/26/2014 0.297 1.44 92 < 5 1.4 4.92 4.49 0.32 56 20 7.7 002 11/26/2014 0,092 1.44 96 < 5 1.37 3.74 3.37 0.3 61 18 7.8 1 Does this facility performVehickle Maintenance Activities using more than 55 gallons of new motor oil per month ? X - Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall O/G TPH i664A TSR Ph mo/dd/yr MG Inches gal/mo 003 111/26/20141 0.104 1 1.44 1 <5 9.7 1 7.8 1 60 No STORM EVENT CHARACTERISTICS: Date 11/26/2014 Total Event Precipitation ( inches) : 1.44 Event Duration ( hours ) : 8 ( if more than one storm event was sampled j Date Total Event Precipitation ( inches) Event Duration ( hours ) Mail original and one copy to Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " re of 4# -. ( Date ) R EADmusnq % hcuppo m%6 PERDUE FARMS, INC. (COFIELD) MR. WAYNE BLACK P.O. BOX 460 LEWISTON ,NC 27849 Outfall Outfall PARAMETERS 001 002 BOD, mg/1 20 18 COD, mg/l 56 61 Total Suspended Residue, mgll 92 96 Ammonia Nitrogen as N, mg/1 0.32 0.30 Total Kjeldahl Nitrogen as N,mg/l 4.49 3.37 Nitrate -Nitrite as N, mg/I 0.43 0.37 Total Phosphorus as P, mg/l 1.40 1.37 Total Nitrogen, mg/I 4.92 3.74 TPH (1664B), nag/l < 5.0 < 5.0 ID#: 114 DATE COLLECTED: 11/26/14 DATE REPORTED : 12/09/14 REVIEWED BY: r Outfall Analysis Method 003 Date Analyst Code 11/26/14 TRB 521OB-01 12/08/14 TRB H9000-79 9.7 12/01/14 KKF 2540D-97 12/02/14 KDB 350.1 112-93 12/04/14 AKS 351.2 R2-93 12/03/14 BJC 353.2 R2-93 12/04/14 KDB 365.4-74 <5.0 12/02/14 SEJ EPA1664B Perdue AgriBusiness LLC Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4364 Certified Mail 9 7011 2970 0000 4209 1119 January 7, 2015 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit #i NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: RECEIVED ,BAN 12 2015 CENTRAL. FILES DWR SECTION Please find enclosed duplicate copies of our stormwater analytical monitoring for the above - mentioned permit. This sampling is for Year five, Period one ( July, 1 -December, 31, 2014 ) of our permit monitoring schedule. No benchmarks were exceeded in this sampling. We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, A. J ey Baggett erdue Agribusiness Environmental Manager A Family Commitment to Quality Since 19200 W_ \ Perdue Agribusiness LLC Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.como Office (252)348-4364 Certified Mail # 7010 3090 0000 6840 9944 May 19, 2014 Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Analytical Monitoring Permit # NCS000167 Perdue Farms Incorporated, Cofield To Whom it May Concern: Please find enclosed duplicate copies of our stormwater analytical monitoring for the above - mentioned permit. This sampling is for Year four, Period two ( January, 1 -June, 30, 2014 ) of our permit monitoring schedule. No benchmarks were exceeded in this sampling. We hope this meets with your approval and if you should have any questions please contact me at 252-287-5196. Sincerely, Joe agget erdue Agribusiness Environmental Manager a tl� A Family Commitment to Quality Since 19200 Permit Number NCS 000167 FACILITY NAME: Perdue Farms Cofield PERSON COLLECTING SAMPLES): Joey Bamett CERTIFIED LABORATORY(S): Environment 1 Lab # 10 Lab # Part A: Specific Monitoring Requirements STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT Samples Collected During Calendar Year: 201 2014 ( This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. ) COUNTY: Hertford PHONE NO. 252-348-4383 t- 1� gnature Permittee or Des'g ee } y this signiture, I certify that this report is accurate & complete to the best of my knowledge. RECEi�ilzl MAY 2 CENTRAL r1LF - DWQ/B0c Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall TSR O/G TPH 1664A Total Phosphorus Total Nitrogen TKN NH3 COD BOD Ph mo/dd/yr MG Inches 001 5/1/2014 10.25 1.2 2.6 1 < 5 1 0.61 1.44 1 1.37 1 0.37 1 23 1 4.7 1 8.3 002 5/1/2014 0.08 1.2 3.7 < 5 0.59 1.42 1.35 0.35 25 3.2 8.1 Does this facility performVehickle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( If yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 OOS56 00530 00400 New Ph Motor Oil Usage Total Flow Total Rainfall O/G TPH 1664A TSR mo/dd/yr MG Inches gal/mo 003 5/1/2014 0.09 1.2 <5 9.3 7 60 No RECEIVED MAY 2 3 2014 CENTRAL FILES DWYROG 'A' k STORM EVENT CHARACTERISTICS: Date 5/1/2014 Total Event Precipitation [ inches) : 1.2 Event Duration ( hours ) : 7 { if more than one storm event was sampled j Date Total Event Precipitation ( inches) Event Duration ( hours ) : Mail original and one copy to: Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " I certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that they are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. " of Perm — % ;I- E ( Date ) STORMWATER DISCHARGE OUTFALL (SDO ) MONITORING REPORT . Permit Number NCS 000167 _ _ Samples Collected During Calendar Year: 201 2014 ( This Monitoring Report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. ) FACILITY NAME: Perdue Farms Cofield COUNTY: Hertford PERSON COLLECTING SAMPLES): Joey Baggett PHONE NO. 252-348-4383 - ~ CERTIFIED LABORATORY(5): Environment 1 Lab # 10 Lab #6� ! G gnature Permittee or De gee ) y this signiture, I certify that this report is accurate Part A: Specific Monitoring Requirements & complete to the best of my knowledge. Outfall No. Date Sample Collected 50050 00530 00556 00665 00600 00625 00610 00340 00310 00400 Total Flow Total Rainfall T5R O/G TPH 1664A Total Phosphorus. Total Nitrogen TKN NH 3 COD BOD Ph mo/dd/yr MG inches 001 5/1/2014 0.25 1.2 2.6 1 < 5 0.61 1.44 1.37 0.37 1 23 4.7 8.3 002 5/1/2014 0.08 1.2 3.7 < 5 0.59 1.42 1.35 0.35 25 3.2 8.1 Does this facility performVehickle Maintenance Activities using more than 55 gallons of new motor oil per month ? X Yes ( if yes complete Part B ) Part B: VEHICKLE MAINTENANCE ACTIVITY MONITORING REQUIREMENTS Outfall No. Date Sample Collected 50050 00556 00530 00400 New Motor Oil Usage Total Flow Total Rainfall O/G TPH i%4A TSR Ph mo/dd/yr MG Inches gal/mo 003 5/1/2014 1 0.09 1 1.2 1 <5 1 9.3 1 7 1 60 No STORM EVENT CHARACTERISTICS: Date 5/1/2014 Total Event Precipitation ( inches) : 1.2 Event Duration( hours) : 7 I if more than one storm event was sampled j Date Total Event Precipitation ( inches) Event Duration ( hours ) Mail original and one copy to: Division of Water Quality ATTN: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 " 1 certify under penalty of law, that this document and all attachments were prepared under my direction or supervisionin accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or the persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther are significant penalties for submitting false information, including the possibility of fines and inprisionment for knowing violations. ( Signattte of Perm { Date } Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www. perdue.com' Office (252)348-4364 Certified Mail: 7009 3410 0000 4514 0345 February 7, 2013 Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, RF70F1:VED FEB 1 Z 2013 DIVii('�=VIfARO The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. The improvements implemented in 2011 seem to be paying off. We are looking for other ways to improve our BMPs as a group at our Cofield facility. We hope these actions meet with your approval and should you have any questions or comments please call et 252-348-4383. Sincerely, Joe�Ba gett Perdue Agribusiness Environmental 252-287-5196 1celebYatS ng90 yecr,$ J Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2012 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed. 2. The ditch going into outfall # 2 has been dug out and re- planted with matted grass. 3. The ditch between the feefmill and boilers has been reworked as well. These efforts have contained Stormwater on site longer and helped keep any contaminant that might be present from leaving via the Stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4. No benchmarks were exceeded in 2012. We believe the SW improvements implimented in 2011 have made a difference. 5. SW drains all have filters installed that are inspected on a quarterly basis and changed if needed. These work orders are filed and kept on site. Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. { 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. Operate and maintain wastewaters pray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to prevent spills while performing scheduled or unscheduled maintenance. 4. Daily care route inspection I of ponds and sprayfields. 5. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. Prompt attention to spills in all areas. Garage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cieanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly. 6. Drums kept under roofing. Grain Storage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent inoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Additional Outfall Attachment Outfall No. TV J Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No P9-' Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No E4-'- If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWO to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yeses-- No ❑ Total Rainfall Date Sample mm/ddlyy 5W U-264-Generic-25 May201 0 Additional Outfall Attachment Outfall No. [)1�^ Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWO to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No F Total Parameter, (units) `==A Date SamplemmiII .. MMM MM� SW U -264-Generic-25May201 0 Individual NPDES Permit No. Certificate of Coverage (COC) No. STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year or This monitoring report summary of the calendar year is due to the DWO Regional Office no later than March 10 of the following year. Facility Name: Br—R0Ir-- O R a; n Z rl L _ County:--HEgzi� oP, � - Phone Number: (aS' ,j o`Z ? 7 -- r5 % 9 A Total no. of SDOs monitored Outfall No. - ) 01 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No [� Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWO to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No Total M"r Date Sample mmtdd/yy SW U-264-Generic-25May2010 Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2012. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signature I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for Knowing violations." Signature I,-, Date I-7 - .aoi3 Mail Annual DMR Summary Reports to: DWQ Regional Office Contact Information: ASHEVI LLE REGIONAL OFFICE FAYETTEVILLE REGIONAL OFFIC19 MOORESVILLE AEGIONAE OFFICE 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 2964500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RALEIGA NNONAL OFFICE WASHINGTON REGIONAL OFFICEI "n MINGTON REGIONAL OFFICE 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 7914200 (252) 946-6481 (910) 796-7215 WINSTQN=SALEM.REGIONAAL,OFFICE CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 276994617 Ta anesen++e, pra?ed andenhanm 585 Wau htown Street 8 Winston-Salem, NC 27107 (336) 771-5000 (919) 807-6300 N&M Camuna's waW. 5W U-264-Generic-25May2010 4 JA i NCDER North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakiid, PE RECEIVEDDeeFreeman Governor Director Secretary October 3, 2012 OCT - 4 2012 Mr. Wayne Black Perdue Farms Inc D� f � jQ-`�//� RO PO Box 460 11 Y Y Y/'� Lewiston, NC 278490460 Subject: NPDES Stormwater Permit Coverage Renewal Lewiston Mill Permit Number NCS000166 Bertie County Dear Permittee: Your facility is currently covered for stormwater discharge under NPDES Permit NCS000166. This permit expires on 5/31/2013. To assure consideration for continued coverage under your individual permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit. Enclosed you will find an individual permit Renewal Application Form, Supplemental Information request, and Stormwater Pollution Prevention Plan Certification for your facility. Filing the application form along with the requested supplemental information will constitute your application for renewal of this permit. Until your permit renewal is completed and you receive a new permit, please continue to comply with all conditions and monitoring requirements in your expired NPDES stormwater permit. The application and supplement must be completed and returned to DWQ by December 2. 2012, Failure to request renewal within this time period will result in delay of your permit renewal and may result in a civil assessment. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions regarding permit renewal procedures please contact Bradley Bennett of the Stormwater Permitting Unit at (919)-807-6376 or brad]ey.bennett@ncdenr.gov. Sincerely, Bradley Bennett, Supervisor Stormwater Permitting Unit Cc: Central Files SPU Files Washington Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807.63001 FAX: 919-807.6492 Internet: www.ncwalerquality.org o e NCarofina Naturally An Equal Opportunity h Affirmative Action Employer 0I3 V,U : - ,('3 OS1AVi/-QUUC1 Perdue AgriBusiness Inc. Environmental Services P.Q. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4364 February 14, 2012 Certified Mail: 7010 2780 0000 3948 0049 Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, RECEIVED F E 8 16 2012 DWQ-WARD The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. We have implemented more rigorous dry cleanup procedures and are looking for other ways to improve our BMPs as a group at our Cofield facility. We hope these actions meet with your approval and should you have any questions or comments please call et 252-348-4383. Sincerely, Joey Ba gett Perdue Agribusiness Environmental 252-287-5196 •- `=��; . / �F� tom,.,,_ ��leb� 6 it'9' 90 y�a,s I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature �r Date a- 4 — aw a. Mail Annual DMR Summary Reports to, DWQ RecOonal Office Contact Information: ASHEVILLE REGIONAL OFFICE FAYETTEVILLE REGIONAL OFFICE MOORESVILLE REGIONAL OFFICE 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RAI EIGHAEGIONALDFFICIE ,WA SHINGTON,_REGIONAL.OFFICE WIL:MINGTON REGIONAL .OFFICE 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 MMSTON-SALEM":REGIONAL OFFICE CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 27699-1617 1 (919) 807-6300 pmted oi�To aWerdonce N10fffi Camfims wafer--` 585 Wau htown Street Winston-Salem, NC 27107 (336) 771-5000 SW U-264-Generic-25May2010 STORMWATER DISCHARGE OUTFALL (SDO) RECEIVED ANNUAL SUMMARY DATA MONATORING REPORT (DMR) Calendar Year '0 [ L FE0 16 2012 Individual NPDES Permit No. NCSU [6Q -7 or ®liNCC -WARO Certificate of Coverage (COC) No. NCG❑1❑❑1❑ This monitoring report summary of the calendar year is due to the DWQ Regional Office no later than March l' of the following year. Facility N County: Phone Number: Total no. of SDOs monitored 3 Outfall No. PC) I Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No [!� Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No TotalParameter, Raini i (units) N ' ►� i ■ Collected, SW U-264-Generic-25May2010 Additional Outfall Attachment Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Pa-" Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes KK No ❑ If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency V Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SOO monitored because of vehicle maintenance activities? Yes ❑ No Total ' r Date Sample Collected, • �i7i7 iiIM119M.Mm"MA �M�hll7 MM r.M- n �. � MV MI II► : :__� NMI (),ir-A t 4Mee;, d&4- mo?%4 ?) SAImp 1;„5 'IC-RF-f(4c-ftCy 19--r=-7LtR_ 3 511mp1;�4 •'> W I' �1A n0 �Pivhc�4YAAJRK iEXC,,EUdtHL, udT5i:Lu4V t- 5W U-264-Generic-25May2010 Additional Outfall Attachment Outfall No. 3 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No © " If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWO to reduce monitoring frequency ❑ Other ❑ _, Was this SDO monitored because of vehicle maintenance activities? Yes Lam" No ❑ Total Rainfall, inches Parameter, (units) :T.v{ A L FL c W O j r C i 6A AL Tj S Benchmark N/A 100 Date Sample Collected, mm/ddlyy 0 -- - L SW U-264-Generic-25May2010 3+too 2 Cofield Stormwater Tier One Response . - 1. Benchmark .. Date Identification of Cause management Options for Improvement1- • � � • . i • / 1,211+ i jDO D, _ PO?-- i D4� Cofield Stormwater Tier Two Response Benchmark Re- Cofield Annual Stormwater Polullution Prevention Plan Update Report for 2011 1. BMPs listed in the SPCC Plan & Stormwater Improvement plan for all areas of the facility are being followed. 2. The ditch at going into outfall # 2 has been dug out and re- planted with matted grass. This area no longer holds water as it did before that become stagnant and in our opinion caused most of the Cod & Bod problems. 3. The ditch between the feefmill and boilers has been reworked as well. These efforts have contained stormwater on site longer and helped keep any contaminant that might be present from leaving via the stormwater conveyance system thus reducing the chance of contaminants not caught by filtering or other preventive BMPs implimented form leaving our site. 4. Although outfall # 2 benchmarks were exceeded as seen in the Annual Report for two consecutive samplings, since the ditches have been reworked there have not been any benchmark exceedences. Therefore we believe these efforts have improved our Stormwater management. Cofield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BM Ps 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. Operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandalisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to prevent spills while performing scheduled or unscheduled maintenance. 4. Daily care route inspection of ponds and sprayfields. 5. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. 6. Drums kept under roofing. j Prompt attention to spills in all areas. Garage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to be inspected weekly/ if cleanout is needed dispose of properly.Trucks are to be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5. Waste oil & rags handled only by trained personel and disposed of properly. [ 6. Drums kept under roofing. Grain Storage BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent moff of organic material from entering outfalls. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Management Certification I herby certiy that stomwater oufalls 001, 002, and 003 have been evaluated for the presence of non-stormwater discharges during year 2011. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signature ���� reruue rarms incorporarea P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4200 2/27/2011 Hand Delivered Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 NCS000167 Subject: Annual Stormwater Summary Perdue Farms Inc. Cofield Hertford County Dear Sir, RECEIVED MAR 1 2011 D-VV("" VVAR0 The enclosed information and reports are to fulfill our requirements for Annual Stormwater Data Monitoring Reports listed in our Stormwater permit issued November 1, 2010. Included are updates on our SWPPP Improvement Plan. We have implemented more rigorous dry cleanup procedures and are looking for other ways to improve our BMPs as a group at our Cofield facility. We hope these actions meet with your approval and should you have any questions or comments please call et 252-348-4383. S cerely, J y Baggett r Perdue Agribusiness Environmental 252-287-5196 NORzoos6aaa "V A Family Commitment to Quality Since 1920 r'" RCOV ,. � <: Ai MAR 1 2011 Management Certification I herby certiy that stomwater oufalls 002, 003, and 004 have been evaluated for the presence of non-stormwater discharges during year 2010. Name Wayne Black Print Title Director Perdue Agribusiness Environmental Signature ��� STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS fz_7 FACILITY NAME & ay 2 L EaF? ms L? F- ,-tjd PERSON COLLECTING SAMPLE(S) CERTIFIED LABORATORY(S) Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY. g ONE NO. (�) N!� I ATURA OF PERM O DESIGNEE) lijAhis signature, I certifq that this report is accurate complete to the best of my knowledge. Outfall r : ; No.= Date - ..fa Sample ' 50050 -. Total : ; r = Total > r , , r Collected Flow.' [f a s` ; Rainfall ;" ; r _ mWild/vr - . MG 1 inches - I � MTMii �ir7l7 R79 00-- � Mi.! _ � MFAR>1fL-ti �7� W-- ]W"Mff� Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? yes �rio (if yes, complete Part B) Part R! Vebirle Maintrnnnce Artioity Monitnrinu RennirrmenN Outfall .: - No:'' Date'.----..-' ` :.• = Sample'. Collected ­ ,., 50050 t< - 00556 00530 00400 Total Flow _ (if applicable). Total Rainfall Oil &Grease . _ (if pl.), -]; Non -polar O&t,/TPH J`.: (Method 1664 =: SGT'HEM) if-• Total Suspended T vt Solids rr : la pH , ; p �;y' _ a�G'+' New Motor; Off Usage , A r r - mo/dd/ MG_ : �. , : ' inches 3 - _. w m + umtt Form SWU-247-052310 Page 1 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS PDQ l C. 7 FACILITY NAME PERSON COLLECTING SAMPLE(S) �r ' t CERTIFIED LAHORATORY(S) R b # /T D Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: r�1mL (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY I T ?.R 'L -r, cZ P1Wkj4E NO.L211) 8*R—�� 2P;� SI A OF PERNIT rM OWDESIGNEE) this signature, I certify that this report is accurate complete to the best of my knowledge. '- 1I � �i l�1i1�1!/J�� •. i ���� �� STa7MOrk: KNWWFT Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? • es _no (if yes, complete Part B) Part S: Vehicle Maintenance A 'vity Monito Requirements Outfall :;.. .. Date'---', 50650 :... .., --:', :• ,, 00556 :... -: - ., .=. :: 00530 >-:,. 00400 :! Noi ' Sample`:: Total Flow`:`-;=_. Total Oil &Grease.::. Non»polar Total pH. w . New.Motor�,; Collected (if apphcable); Rainfall (if appal 4&G/TPH t ' Suspended ? Oil Usage (Method 16 _ SGT HEM), ifl: .Salida=` i .7rf �- »;- .fJ ..N• a'l'tie v mold MG =. i -:;- inches :-, unit-i mo Form SWU-247-0623 is Page t of 2 lyILA r3 y Individual NPDES Permit No. N Certificate of Coverage (COC) No. N STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING• REPORT (DMR) Calendar Year �k rQ or This monitoring report summary of the calendar year Is due to- the DWQ Regional roffice no later than March 7s' of the following year. Facility N County: Prone Number: Total no. of SDOs monitored! Outfall No. p Q4 Is this outfall currently In Ter 2 (monitored monthly}?. Yes ❑ ' No R' Was this outfall ever In Tier 2 (monitored monthly). during the, past year? Yes ❑ No If this outfall'was In Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? -Yes 2/No ❑ To Ril p � � � � �»'%:,'�.!'-'s^ 1�kS�i,ry 7'�=�'-th,ii}i'�'°.'��`4`,�t�p-.%��`f^{;.:-�:.T.;.rj5. u)nn�Pe� �7n 3]9 ,tt�u'.5F.�.5ti:.ti'e:- _f, ..>. tli,_4,J �.�l�-F r �•7 t'}f"r -�a. r6t}tFt"es7eAX... 3 ��,�,,P31..',-..al-�i..�' �:.qY:- ta..x1 - .,'}_r -"- µ'S';*4v;.L.-'aA�,<r. e<f7R •.�� `»at.E'f�'SA�L)j.��z.0..�-,i:.`s:+u"� E.;'=i'3°,n•`T•�:�'.-i.'�,i.+.7�7.+�f����FFp"'r"`_.�1" 5'�ti�f�lA.-__._..:;a� lw�:a.`+:e-�,3�x-K3!'._l"_ _'-r��;_�ET-1'2_,-:- .�._Yz.xYr'7}S�jv.< "s_[J!'.7�:T,-.�:. ��-HS.`Aqd { [°I�::f=;3\_rti6k'.16�34��°.x'.-z3�L�,S�}:ii� ,7 1 .a��.erww-s-'- �-.xr.i>_3l�rf"._R:.2",_�:.ys�'i•'-r7'Y.:Y.fa`F'-�i'+^� t„r..Yx�. �c- ]- .�-.,53r-_;�-�s,��5- s , v�:Ci:.�:-s�,..(.-='•~'S JtSr.bx i.r�r,.xt.eyY,`..• j. xi MXt�-t�1_i-! .' _,t., �t+�!n^.`u�.�91r'i'��i"'cpirt[r�''4iom.St�'Ni,.H .yf�`:�:Y}�.. �-'! } dr- .�.-_$. '�.�'csy .`t'1�r e��-- s��-l`y.: . cY_,...t$'.i � _ ,�.�4s°��iR{'Tz'2T -}�4. !RlS�55��yk'�l.9`'t �y� �?'�-.q�arr"k� .?nyf`i'.�,.•�'�, ;. . ,i :AD I I SW U-2t34-Generic-25May2010 MY+ Individual NPDES Permit No. N Certificate of Coverage (COC) No. N STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year 2- D1V or This monitoring report summary of the calendar year Is due to -the DWO Regional Office no later than March 16' of the following year. r Facility Name: County: Z-9 -1 -f, 0 R Phone Number: ( 3 `t Total no. of SDOs monitored Outfall No. Is this outfall currently in Tier 2 (monitored monthly)?- Yes ❑ - No ga'� Was this outfall ever In Tier 2 (monitored monthly). during the, past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? - Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No • �Y, � •. • - — 'fi.,:r� • <:i�`�F. .XSN w_ � �` � .?y � ��� t-� r�xlz_-. '' nA -•'Y� .�etii��'z � ' .�. ' . �".� �.l'1 F334 � 2� R:'s�m`i.iFS.0 •.'.f� '�-3��Y :};T -�.t - f - �'k.�u t�..._.::�.W:s.�.,...i{ae;:i ;_�?9:�'?`�'-�'�" �i lI iL %-' 'S... y�S J'S!Ye .: '}h 4.s .){ �/S.-W - _ b� {S .w _Ee� - ,.. .G -... 'S Sys .i...s r�p3q.�`�'wF r�, s _ `�' .t..: '�;. C.� i�" f_ : YL � '�ar -5... ... "'Z�'�'-jS.-.'fY_'- e-- 3 :iiY 1�'a�- r F' ,L�s : kia.f..' ;A, f_,:x•�.t"39 �'�%��� ?..((�� ..kbk ri - F {�:reY :i�� .vl.'!CX _ 4 "C N, :S_' �, _'y � ib a f�� =:.:.r,�a"'.:i�rS:' �3 :ii t�.,��:7u^ i'.'.-Y. -. �S ,�!�.�fi -.k �S,(.,. - M. ll, '.'9 iY: ^I fi - ..fit _ 1-a.?!•`=.mn:#...:�.4Lr.:'iiHrr � +, •� fi. .'V.:C.... .. A!h- � f :..Yi.13.A e��....y.. i - -�:R Sr {.�'+n.+ .� .y -_-- C.'i r•n' a .�'°'r�s��—,m,�-'��ii�;a�z 1W. .. 3,. ... -Pf.1 ', Y' "F�Y4� h.�-iW Lt iv}.r -Y - C 7 -rk h' ii°P%:.is�i-'_ r� �^•a - :iY.� � 94.,,..:wi+%. a -:.R: T�., r4�ti�:P: }i�.i�...7.::1• 'f'? { 1. t. 1 3L E y.�g.� `.. 1277 ma SW U-264Generic-25 May2010 2 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING- REPORT (DMR) Calendar Year,�l_6 f D, _ Individual NPDES'Permit No. NCSJ Certificate of Coverage (COC) No. NCG or This monitoring report summary of the calendar year Is due to=the DWO Regional Office no later than March V" of the following year. Facility Name: County: H Phone Number: Total no. of SDOs monitored Outfall No. 0 OR Is this outfall currently In Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever In Tier 2 (monitored monthly) during the,past year? Yes ❑ No [ ; If this outfall'was in Tier 2 last year, why was monthly monitoring 'discontinued? " Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No TotalRainfali",r _ • ■ ■ • • rrvn;^,:- �'�3- s'=s.^, t i%" .1, '„ors•- •:� F=�`�.-c-.zjL. x+ �_r% '+�a':'� 3�`•Rss'S'r.., ..rc_,•' s„A A...�.r,;n y"-- .....��_S ',`a. �'?';��r�rk'-� • e . 3'�_ ��� - °r.- s x--.""i'i�='ts'-+»K6ks:?',;.4--rrx;"y;.4 3,c ;-u., i"'e- ty3 � �.'"' � .,„.!n.,-- i �h „-..� M1 4 ...�:SG:a�. �ar.l �,17-"�SiC' .�{ .'r.,i#�:s: L-xit"' •.14.:_f:�'s'"i•ry - „ ��y�• r"'y' y,:?,� Y. .3g Yc t. �j] �s.• - •f�JF- 3i,-. -'lR'= ri's•_ tot � - g_ .'�S � ' ?U �^..�4ra�...•i.� x s r f. '...-��s��h.� -"`.'—. �'i .-7." S 3i+"e4..:.i nos - ,�a:�c� Sr' �-:. � t ? ?'t=' y'''., } ,},••.s5� 'i/.iMl=" .. rd i"Si'�33 irtl'�'.K ,^a": ,.5 ..: f 1 .e4`f.!-. T-J ,.,�: s �v-��:..:» - T,y'.,4,- .a' ' _i�^`sYkf�.._:st.' e.'.. ._.�..1'�.3fYCY �_'.T... '--�-...'34,$s..0.'.°_t ^'ie '.ter. f3 rys£. 7,�,a± r_. !�-")!"-�,» .ss" 'l�t.: �iq'S'.��,,,... i, i=_"ii.- t.�ti''f,,a;;,-� •i2.: A�?Pi��l,'3y TSu �a2:.i �... t a'. 11._ K 'f MUM�� . z WON ,•.m air i SWU-264-Generic-25May2010 "I certify, under penalty of law, that this document and all. attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sign Date Mail Annual DMR Summary Reports to: DWO Reg lonal Office Contact informationz tL-T�E T Ili O A W16? ttl WO �V_ I _ RE IU A r� FFICE 2090 US Highway 70 225 Green Street 610 East Center Avenue/Suite 301 Swannanoa, NC 28778 Systel Building Suite 7141 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 - GSA ICf G I+i][iEGiQ UF't'I--=_� G iYREGiON _ZC 3800 Barrett Drive 943 Washington Squafe Mall 127 Cardinal Drive Extension Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-721-5 k� _ STO -5A IQNf ° - � : D" 1617 Mail Service Center �„Ff 585 Waughtown Street Winston-Salern, NC 27107 Raleigh, NC 27699-1617 (336) 771 500Q 919 807-6300 r. srlfr GarTllJi rs. vatef y SW U-264-Generic-25May2010 .---- , ,..� ,�., a},,7 �i x i= .. ��, a, � � . Stormwater Improvement Plan Cofield Facility 1. Attention to malfunctions of processing equipment that would lead to release of particulates with the potential to leave the site via stormwater 2. Clean jet and evacuate stormwater drain. 3. Muck out ditch and restore proper drainage to stormwater conveyance system. 4. Use new technology filters in storm drains (REM TRITON BFTG). 5. Dedicated individuals in charge of maintaining pollution prevention equipment and dry clean up 6. Locate sample points as outlined on enclosed site map. Implementation Time Line for Above items 1. These practices are already part of our SOP and SPCC plans. Our Storm water Team has met And the need for more attention to these practices should be stressed to all associates. In place August 1, 2010. 2. All storm drains at the facility were jetted and vacuumed out by Eastern Environmental Inc. in October 2010. 3. This was done after the drains were cleaned out. 4. Two filters have been installed. S. This individual has been picked and will be the lead in all these improvement practices. Completed August 21, 2010. 6. 001 sampling point will be on the east side of four 20 inch diameter corrugated plastic T-traps located on the northwest side of the site map that can be closed if needed. 7. 002 sampling point will be on the east side of four 20 inch diameter corrugated plastic T-traps located on the southwest side of the site map that can be closed if needed. 8. . 003 sampling point will be relocated at the south east corner of the Vehicle Maintenance area. r] Co#ield Stormwater Best Management Practices Soybean Plant BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish vegetative cover to prevent runoff of organic material from entering outfaIIs. 4. Sweep unloading & loadout areas on a daily basis. 5. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Feedmill BMPs 1. Train associates in house- keeping, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of . drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/establish vegetative cover to prevent runoff of organic material from entering outfalls. �4. Sweep unloading & loadout areas on a daily basis. S. Utilize witch hats/ booms to prevent organic material from entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils are transferred or stored on site. Wastewater/Maint BMPs 1. operate and maintain wastewater spray irrigation system in a way to prevent runoff. 2. Maintain security in area utilizing fencing and signage to prevent vandaIisim or accidents by indivivuals not trained or authorized to be in area that may lead to a runoff situation. 3. Train associates on good housekeeping practices to -event spills while performir scheduled or unscheduled maintenance. ` 4. Daily care route inspection Iof ponds and sprayfields. S. Periodic inspection of Stormwater outfalls for problems over and above permit requirements. Garage BMPs 1. Train'associates in house- keep€ng, dry cleanup and containment inspection / upkeep to eliminate runoff posibilities. 2. Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Collection pits at Garage to - be inspected weekly/ if . cleanout is needed dispose of properly.Trucks are to"be washed only in designated area where water can be collected and seperated. 4. Silt fencing to be used between dithch and garage. 5.•Waste oil & rags handled only by trained personel and disposed of properly. 6. Drums kept under roofing. 16. Drums kept under roofing. Prompt attention to spills in all areas. Grain Storage BMPs 1. Train associates In house- keeping, dry cleanup and containment inspection / upkeep to.eliminate runoff posibilities. 2: Regular inspection of all tanks, containment piping and overfill protection. Train of drivers / associates on proper procedures. 3. Utilize silt fencing in problem areas/ establish. vegetative cover to prevent runoff of organic material from entering outfaIIs. 4. Sweep unloading & loadout areas on a daily basis. S. Utilize witch hats/ booms to prevent organic material from . entering drains. Witch hats inspection or changeout on a scheduled wo/order. 6. Signage warning anyone entering areas to be aware that oils -are transferred or stored on site. SW3P & SPCC Training Agenda FY04 Cofield Feedmill 1. Introduction a. Purpose of SW3P & SPCC Plans 2. Site SW3P & SPCC Plans a. Locations of stormwater outfall points affected by operations 3. Actions that potentially affect stormwater quality a. Review inspections (major occurrences) b. Review spills and releases - none 4. Stormwater Pollution & Spill Prevention Methods (SW3P/SPCC) a. Identify potential spill pollution sources and review BMPs b. Review spill prevention methods L Complete routine inspections of tanks, transfer lines and pumps and document on storage tank inspection form. ii. Inspection procedures iii. All chemicals labeled and kept in appropriate storage area. iv. Fuel oil delivery 1. Deliverers should stay with their truck. ,2. Perdue associate must be present during deliveries of fuel oil. 3. Complete oil transfer form. v. Develop/maintain good housekeeping program 1. All tank rust spots should be cleaned and painted to prevent corrosion and protect metal. 2. Repair leaks. vi. Drainage of secondary containment 1. Place locks on drainage valves 2. Second containment holding stormwater should be inspected by responsible personnel prior to drainage. 5. Video 6. Spill Response a. Action, Reporting, Spill Control b. Oil spill reporting procedure G. Review spill control materials d. Review clean up procedures L Material handling practices 7. Changes to the SW3P & SPCC Plans 8. Upcoming Training Sessions (annual) SPILL VIOLATION REPORT { _ Ae'Federal Water Pouution Control Act, as ameaded by Public it Law 92-500 enacted October 18, 1972 }r:pe - gpollutaatg.iato vaatex;N y m_4,poiascurccmn1ess his discharge is = =- q, E 'by ayermitlaud: either by -the U.S, Envirantnenjuj*'Frotection Agency or by an approved State _ me 'u� es' -soli waste; incinerator residue, sewage,, garbage, sludge, muni ions, chemical - er-•..a..__. —... w s, io ogic ma en s11 r oahv�tets;al reeked cr discarded equipment; rock, sand, cellar dirt, al;".ml�tcsp.: :�i.-� 3. wa"s a isc ge - o waiter. IT as: spilled?.. ---.Qy ►-� ..._....y _.......... _.._....._.. _ _- How much was spilled? VDG 6)f S a e,.1 --• i Ia!&prodgct was spilled? ------ Who spilled it?-Ta,.Jc- auger _ Why..was it spilled?-M6vw.1L. w t s k.,.,.. -" CYA { _1 0 'e- s A ^ C9 Jl j"' � Who cleaned it up? j� How was it cleaned up -man hours and materials? �� cs� , CEL p�,5 . 1 , art4- ..--.Wo;lcorder #• r in F„ . 'Nnonresponsible for spill: v� , (�JY 4 nt �j 'Zc.�(L j ❑-1 Superintendent of Site of 517_z� revlud 3/94 MNT1083 ♦1 SPILL VIOLATION REPORT Water Pollution Control Act, as amended by Public a Law 92-500 epacfed October 18, 1972 rdfilff6iii:dikohatking.-pollutantr!.-into- awater-way.. from a point sourco"u'nless his discharge is y -th-e US-.Envirommentat-Protection Agency'or'by-an:-approved State ride I "so rdvos 6; r C residue, sewage, garbage, sludge, munitions, chemical F,watmals."m.dioadtive ma erial8, ME, wrecM-of dikkrded equipment, rock, sand, cellar dirt, cult ural w a ste -i-nro—*&dr. T� ....... . . ... owin was-sti spilled?'` pp^ a W Who 'i'Pr6ditct.*as.-sPfiled?,-.. Who spilled it? ciy.was it spilled? ::[(Zv,-IL I)Jal— .-Who...cleaned itup? 14� /Y\444 LZ(A:s ....... . .... . ... .. 8 How was it cleaned up -man hours and materials? A .,...Worlmrder Oo� cZ 6 3 3 D --NmQhn-responsible for spill; ieriEteIibnt of site of SPILL VIOLATION REPORT The Federal Water Pollution Control Act, as amended by Public a Law 92-500 enacted October 18, 1972 prohibits any person from discharging pollutants into a water way from a point source unless his discharge is authorized by a permit issued either by the U.S. Environmental Protection Agency or by an approved -State Agency. A ` ut '' includes solid waste, incinerator residue, sewage, garbage, sludge', munitions, chemical wastes, biological materials, radioactive .materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, and industrial, municipal and agricultural waste discharged into water. What was spilled? _ !S d N - - �2 4 ^3 -- -� � U How much was spilled? 20p �'D who's product was spilled? Is 6 P Who spilled it? -Ti2*A _ (-, Why was it spilled? v<r h- - Who cleaned it up? CkLtd( CpsS J_ a- �_ �{ VA K�I,�a.•, �; ti �� —1 rA1„ _La+.�rt� t How was it cleaned up - man hours and materials? C3 0� Pe s Workorder M L4 .1 Person responsible for spill: Date: Y Superintendent of Site of spill: X 6 �4 revised 3/94 MNT/0s3 ENVIRONMENTAL ACTIVITY REPORT Verbal Notification within 3 hours Written Re ort within 8 hours INSTRUCTIONS: Ann Environmental Activity Report must be Completed and submitted to the Perdue AgdBusiness Environmental Incident tF Department within 8 hours for any of the follow1no occurrences Identified below 1 I I Spills/ Releases Y 1 1 - Notification of Complaint 1 3 Agency inspection 1 4 1 Enforcement Notttication BUSINESS UNIT I Feed MITI PLANT -LOCATION (City, States Cofleld, North Carolina STREW OR 06DY OF WXTM= 11/23/2009 1:00 PM I 'Wets Ditch between RR Tracks LOCATION WHERE INCIDENT OCCURRED # 3 Fat tank Inside the containment wall, REPORTED To Agency Ttma Reported: Respond? response? Name of Responder UNREPORTED H Not Reported Eaplaln why the 8plil! Release was not Reported Yea Spill was contalned and cleaned from the ditch. Additional oil booms are In the ditch for any rain that will wash out the ,drain lines. The total release was less than 10 gallons. Verbal Notification within 3 hours ENVIRONMENTAL ACTIVITY REPORT Written Report within 8 hours INSTRUCTIONS: Ann Environmental Activity Report must,be completed and submitted to the Perdue AgriBusiness Environmental r.,I�A Glfti, g,1 n1# Department within 8 hours for an of the followin occurrences Identified below: 1f' X i' SpHts'1.Reieasea:' :: "" 2 tiffcatioa Coptaln Agncy n pec'tionjj ¢ 'En(orsemMAottifc'tlo BUSINESS UNIT PLANT -LOCATION (City, State) Cofleld Complex DATE TIME SPILL! RELEASE TO: NAME OF RECEIVING STREAM OR BODY OF WATER s 3/2/2010 4:00 pn Soil • NIA <` LOCATION WHERE INCIDENT OCCURRED Soy bean lant yard. 'REPORTED T,r* To Agency Time Reported: Respond? response? .. W YE5 Perdue Envlranment.1 4:00 PM ' UNREPORTED Not Reported Explain the Spill! Release was Reported 'If not !� ASSOCIATES INVOLVED OUTSIDE PEOPLE INVOLVED ya At Les Evans LIST OF SUBSTANCES INVOLVED ESTIMATED AMOUNT LIST OF SUBSTANCES INVOLVED ESTIMATED AMOUNT mineral oil aplH : 200ga-1. J'. Describe events leading to Incident ' 0 Associate was movlh a 300 al tote of mineral oil and fork on left side of forklift puntur6d the tote • �. t- C] F co 0 ty 4 st Target Date t. z What corrective action has been taken or needs to betaken to prevent a recurrence? Complete Date Complete Z. . O yw Associate needs SPCC trainin . Anyone handlingre ufated oils Is re lred to receive annual trainingin 3/4/2010 the handlingof those ails. Associate instructed onproperhandlin of totes. LU Z> Q a ill receive more SPCC training -at annual traininp event. = DATE TIME TYPE OF INSPECTION AGENCY NAME OF RECEIVING STREAM OR BODY OF WATER W : U.N is a response or corrective C Nature of action required complaint LLI 12 Target Date If Yes what action Is required: complete Date complete DATE TIME NAME OF INSPECTING AGENCY PURPOSE OF INSPECTION Z.. AGENCY IRESPONSE TO A COMPLAINT? IIF YES Who reported AREA TO BE INSPECTED NAME OF ASSOCIATE ACCOMPANYING INSPECTIOR WW , PICTURES REQUESTED/ TAKEN TYPES OF SAMPLES TYPE OF ANALYSIS TO BE PERFORMED LOCATION OF ANALYSIS �8 SPLIT SAMPLES i iW DATE TIME MReceived: X,Wt rid .Notice of Violation =Summons and complaint ,p Notice of Administrative order Notice of non-compliance �w �Z =Compliance Order =Other enforcement directives ATTACH A COPY TO ENVI-RONMENTAL ACTIVITY REPp COMPLETED BY: DATE COMPLETED REVIEWED DATE REVIEWED Car! Sartin 3/4/2010 <' _ ,� — � �/ r� 3lete the following and submit with form 1 (verbal report) Addresses are given on List 1. Attach additional pages when necessary 1 Complete Name and address of facility where release occurred is as follows: c Dfield soybean plant 242 oerdus road. cofield no. 77922 2 Factors contributing to the release included the following: all 3 Actions taken to respond, contain, cleanup, and dispose of the spilled material is described in efts me to this form. J oil ►ate pume out of the oontaiment Dlq J411'n rQl 1r� = 3 `u h �RC a g Df b�r'rrc c I9/�e x� 4 Atta is a s showing the pathway through yvh the d ergs to the ernnronment u nm,p Fei.'S.i k t c;"�R 1+ttt3 w!'4ov_, a AYtX 5 Known or anticipated health effects of release are as follows: none B Total injuries resulting from release: none 7 Total Hospitalization resulting from release: none 8 Additional advice to exposed Individuals none necessary 9 AD pertinent prevention and response plans were reviewed and it was concluded that some changes were necessary all shine are to know how much room they have in the oil storage tank and If close to full no all Is to be pumped to unless someone is there to watch tank while It Is being pumped to storage. 10 Measures to be taken to prevent a discharge of this type in the future are: look at putting an alarm on the tank when there is a high level in tank. until then the lank will be watched and all employees Is to be irrformed of the tank level. COMPLETE THE FOLLOWING ONLYIF THE RELEASF WAS FROM AN UNDERGROUND STORAGE TANK 11 The results from a tank tightness teat*tbonvironame ached 412 The tank tightness test Indicated that ak place 13 The reason for suspecting release Mal 14 A efts check performed and attached e 49, �f (Site check only required if envirgnmental contamination is noted) � ''g�I der�en'' rl.4 tfSa�ELVrso' tQ06PxdMner 'and�,%mi'liar�? the' lnfoonnKa ioln submitted t �/ and believe the submitted information Is true, accurate and complete. Signature Date ,y WE Complete the following and submit with form 1 (verbal report) Addresses are given on List 1. Attach additional pages when necessary 1 Complete Name and address of facility where release occurred is as follows: Cofield Crush Plant 242 Perdue Rd Cofield. Nc 27922 2 Factors contributing to the release included the following: 3 Actions taken to respond, contain, cleanup, and dispose of the spilled material is described in attachments to this form. 4 Attached is a sketch showing the pathway through which the discharge to the environment occurred 5 Know_ n or anticipated health effects of release are as follows: NA . 8 Total injuries resulting from release: Nona 7 Total Hospitalization resulting from release: None 8 Additional advice to exposed individuals None necessary 9 All pertinent prevention and response plans were reviewed and it was concluded that No- changes were necessary 10 Measures to be taken to prevent a discharge of this type in the future are: COMPLETE THE FOLLOWING ONLY IF THE RELEASE WAS FROM AN UNDERGROUND STORAGE TANK 11 The results from a tank tightness test attached 12 The tank tightness test indicated that a took place 13 The reason for suspecting release due to environmental 14 A site check performed and attached (Site check only required if environmental contamination is noted) I certify under penalty of law that I have personally examined and am familiar with the information submitted and believe the submitted information is true, accurate and complete. 10/21 /2010 Signature of STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualiTred personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is; to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possmbility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Form SWU-247-062310 2of2 :- Stormivater. Discharge Outiall (SDQI Mori tcsring %port Permit Number: NCG 060097 Samples Collected During Caiendar Year: 2010 (This monitoring report shall be'recelved by the Dlvlslon Facility Nance Fe us Farms Ntrshvffle no later than 30 days from receipt of sampling results.) Person Collecting Samples Joey Baggett _ County: Nash Certified Laboratarles Perdue Farms Inc. Lab # 246 . Phone Number: 252-3484326 Environment1, Incorporated Lab# 10 SIONA " RIs` QF TTE6 ESIGNEE Part A - Snf"fi,- Mnn1mrinn R.nuirnrnanta ■ � . �.IfJ�T:f1��+'.+4-kT�l�1+..S+pt�>ti;+;t�s+!l;�.������� ��rr•.c r. rrri��71»�l�P.1����e��: Does this facility perform Vehicle Maintenance Activitla usirtg more than 55 gallons of now motor on per numth 7 YES x NO If yes, complete Part D. Part R ' Vahlyda Malntannnra Ar*ivitu Mnnitnrinn R&mdramanta ■: �I�al',+A�1��:7:Cf:»�!;+i•�9+�SiA'1G4i���� err.+rrliia���T.[J•�CLl��� e• '1, i . 1 ..1 1 Storm Event Characteristics: Mail Original and one copy to: Date : 6I3012010 Division of Water Quality Total Event Precipitation ( Inches) : 0.19 Attn: Central Files Event Duration (hours) : 4 1617 Mall Service Center . ( If more than one storm event was sampled) Raleigh, North Carolina 27699-1617 Dote: ' Total Event Precipitation ( inches) Event Duration (hours): 'I certify, under penaley of law, that this do umerit and all attachments were prepared under MIF direction or zuparvlclon in accordsooce with at syftm dazigned to accura thae gneldfled personnel properly gnthar and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those directly responsible for gathering the Information, the Infontlation submitted Is, to the hest of my knowledge and bellef, true, accurate, and complete. I am aware that there are significant penalties for submitting fame information, Including the ponlIblllty of finds and Imprlalonment for knowlnq.vlolaSi ne :, ,�1 lgnstrire • PGMite)I Date } r a P r WV+10 A& ALI� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 29, 2010 Mr. Wayne Black NOV B 2010 Perdue Farms, Inc. PO Box 460 0 VY0 _1TVA R0 Lewiston, North Carolina 27849 Subject: —Final NPDES Stormwater Permit Permit No. NCS000167 Perdue Grain and Oilseed, LLC Cofield Hertford County i Dear Mr. Black: . t In response to your application for continued coverage under your NPDES stormwater permit and subsequent mootings and submittals, the Division of Water Quality is forwarding herewith the subject state - NPDES permit, NCS000167, This permit is issued pursuant to the requirements of North Carolina General Statute 143.215 .1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This final perrrit includes no major changes from the draft permit sent to you on September 1, 2010. Please note that failure to complete the monitoring as required is a violation of the permit and any permit Noncompliance constitutes a violation of the Clean Water Act. Reference Part 111, Section A, Item 2 "Duty to Comply", Item 9 "Penalties for Tampering " and Item 10 "Penalties for Falsification of Reports" of your permit for further information. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 271511 -7447. Unless such demand is made, this decision shall be final and binding. Please take notice this permit is not transferable. Part 111, 8.2, addresses the requirements to be followed in case of change in ownership or control of this discharge. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. Wetlands and Slormwater Branch Q11C 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 N 11C Caro 1 i na Location: 5 Salisbury SI. Raleigh, North Carolina 27604 ,%�lltllrll��f Phone: 919-8-807.63001 FAX: 919.607-64941 Customer Service: 1-877-623.6748 Internet: www.ncwalerquality,ofg An ={ujal Ccr,o.iun.w', Af umal 1, Aciion F.rnc4rn>� Mr.' Wayne Black Perdue Farms, Inc. Permit No. NCS000167 If you have any questions or comments concerning this permit, contact Cory Larsen at (919) 807-6365 or cory.larsen@ncdenr.gov. cc:.Washington Regional Office, Bill Moore Mike Mitchell, EPA Region IV SPU Files Central Files Attachments Sincerely, forColeen H. Sullins, Director 2 NCS000167 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PERDUE FARMS INCORPORATED is hereby authorized to discharge stormwater from a facility located at Perdue Grain & Oilseed, LLC — Cotield NCSR 1403 Cofield, NC. Hertford County to receiving waters designated as Deep Creek, a class C; NSW stream in the Chowan River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, I1, III, IV, V and VI hereof. This permit shall become effective November 1, 20 i 0. This permit and the authorization to discharge shall expire at midnight on October 31, 2015. Signed this day, October 22, 2 010. .for Coleen H. Sullins Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000167 TABLE: Oh CONTENTS PART 1 INTRODUCTION Section A: Individual Permit Coverage Section B: Permitted Activities Section C: Location Map PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: Qualitative Monitoring Requirements Section D: On -Site Vehicle Maintenance Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability l . Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability S. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section B: General Conditions 1. Individual Permit Expiration 2. Transfers 3. Signatory Requirements 11 Permit No. NCS000167 r 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Permit Actions Section C: Operation and Maintenance of Pollution Controls l . Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring; and Records i. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring, Reports 2. Submitting Reports 3. Availability of Reports 4. Nan-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9. Twenty-four Hour Reporting 10. Other Noncompliance 11. Other Information PART IV - LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS 151 Permit No. NCSooQ 167 PART I INTRODUCTIOFN SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR §I22.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Certification must submit a No Exposure Certification NO[ form to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must reapply for the No Exposure Exclusion once every five (5) years, SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or'revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina or separate storm sewer system that has been adequately treated and managed in accordance with the terms and conditions of this individual permit. All stormwater discharges shall be in accordance with the conditions of this permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval.: The stormwater discharges allowed by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. Part 1 Page 1 of 2 SECTION C: LOCATION MAP Permit No. NCS000167 >1 ` r �r•� •ice.. y.r �.L� r ;, - f. y ';, -.: 'w�,. ` .. .,� _y. t. —__. yy�' — _ •� �•—'rTi: 1. �..= •'tt J�, ��� < � •� +a. 1 fit// �.r �.4' r _ ^, '_,1,� 'S r � �-jr.,+� ` .. ..�. �v -y- k•S A�: ti . + �. �y �� �• � �':+r Y F•'.w; � -1 fr a � t y fA 1:�� �, }I }... ... +`. .�_.. .: ,�,. »�- _...•.. — I Y r �; Y, ,fir, �'! _..,N`., �a -..,_ ^.. �y, i „�,- 'i. p;`,`....� ,y-�J � .. � I Hy 1 t ' � ,•I�' i�r1 '� {��� ' - I �i rr•�.',^`Kl.h��'a � � • . :'�-�r.� __ _ ;'� k k3QK �-; [ �--{ frt j- ��� 1l i iapt,' ti ` %F 4•^'il+ • �..,,.� ' ,. r .: .0 _.� _ ,+\`,� I:. GII IJ tS/. -d ��„'1 \jf ' L _ �'.',. -� , r �:r r ,,C. • �.'• , -T'_u- .•r'+ a- - �.^ ':' - _. -tin 5 2' j �. � , L)1^(!Jj � ; �:,; : �'�� ! �.� .. � (/ arc , ��h c�'�Y" .r.. .. �� _ � .•r- _ '. � �� ,t� 'iY �I ��`7 f �J�. '., l .`r •f ice./ / •�--.-.\�y 4-' .Lu .� r. � _'y'_ i i ' 4 +� � f'�'!J'�.d•- +1 �1�/ � 1` �h ��J'�+(!(���+N f' 'l • '1'.': 'j" '�.� ': '�' �`'.-� r�j 4 J � + r r 3 I?� � ,7 � r '�_,` ~ J `4�,l� "�`jJ � � •!�'.• IL '''c �,'�!' ..�h�rll�" �-t r�1St'181 �lia5 S•:. .. �•1. Y �'� 11 �� t i + i `.l I i [ � ^ �� � ^f�'� - 1 �' s ��� '�1r P�:� -�. ..`3l� �� ppS Y� .r Iiix1 •;'•��1SlT �_ -4 �aJ t� 1 ii f` r ^�n, '� �TuniS01 ?,,'" (S�_'�Y,�1���.��i=. J,j .• � + "J1 / i7 4s,y .•I � :r I� _. ,.^ �I .(. � - t r•7,+ 1�y g� d�._ v1 i �i� .",i``u r I'� 1 4 �€'� ' E'1 0 • J ' I i ,•-,'S `.'LY' c'. .=.,S::L'. =a LPerdue Grain and Oilseed, LLC - Cofield ��_ s Cerri a" i •� i : ; , .�•,^ - f , , : � � u,agp � rr� 4 INC I1. JlI,' II1 ll7 V .��'�'�li�'-.•.',� ,• - 1p � I+...+�`�,,/J/f-,,j• ,, .I. .-... - fl ,' ^ `�I' � � ., •"//mow J a'... I k M. T' "�.L'ti �` Y --.i - _ --`,P A y I,`±+f/ „•���' AW+ iYll�i ;�.T,`�i�k , �� l 1'ff��r' . !~ ' } + r ~'I � �f � � • ?�I k *. .. 4 ` �.-.•tip; �.t� �+� _Y "� "'�'-� � f � 7," Ann i :!' "► ^1 NCS0001 f 7 II 117 Fes. leap Scale 1.'20,000 PERDUE GRAIN & OILSEED, LLC - COFIELD Lati tude : _:6° 21' 48" N Longitude: 761153' 50" W County: Hertford ReceMng :streams: Deep Creek Stream Class: C; NSW Sub -basin: 03-01-01 (Chowan River Basin) Facility Location Permit No. NCSOOO 167 PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORIIIWATER POLLUTION PREVENTION PLAN The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part III, Standard Conditions, Section E, Paragraph 3 of this individual permit. The: Plan shall include, at a minimum, the following items: Site Plan. The site plan shall provide a description of the physical facility and the potential pollutant sources which may be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters, the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters, and accurate latitude and longitude of the point(s) of discharge. The general location map (or alternatively the site map) shall identify whether each receiving water is impaired (on the state's 303(d) list of impaired waters) or is located in a watershed for which a TMDL has been established, and what the parameters) of concern are. (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants which could be expected to be present in the stormwater discharge from each outfall. (c) A site map drawn to scale (including a distance legend) showing: the site property boundary, the stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads), site topography, all drainage features and structures, drainage areas for each outfall, direction of flow in each drainage area, industrial activities occurring in each drainage area, buildings, existing BMPs, and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious. (d) A list of significant spills or leaks of pollutants. that have occurred at the facility during the three (3) previous years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part-lll, Standard Conditions, Section Part 11 Page I of 10 Permit No. NCS000167 B, Paragraph 5. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. 2. Stormwater Management Plan. The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater, including structural and nonstructural measures. The stormwater management plan, at a minimum, shall incorporate the following: (a) Feasibility Study. A review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations,'and manufacturing or fueling operations. In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. (b) Secondary Containment Requirements and Records. Secondary containment is required for: bulk storage of liquid materials; storage in any amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority chemicals; and storage in any amount of hazardous substances, in order to prevent leaks and spills from contaminating stormwater runoff. A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected to stormwater conveyance systems, the connection shall -be controlled by manually activated valves or other similar devices (which shall be secured closed with a locking mechanism), and any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by any material. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMI') shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. 3. Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or the team) responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible Part 11 Page 2 of 10 Permit No. NCS000167 person shall be on -site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP.. 4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance and good housekeeping program shall be developed. The program shall list all stormwater control systems, stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs. The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems,'as well as facility equipment, facility areas, and facility systems that present a potential for stormwater exposure or stormwater pollution. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Timely compliance with the established schedules for inspections, maintenance, and housekeeping shall be recorded in writing and maintained in the SPPP. Employee Training. Training. programs shall be developed and training provided at a . minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. 6. Responsible Party. 'The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position assignments provided. 7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the Stormwater Pollution Prevention Plan (SPPP) shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include written re -certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. Each annual update shall include a documented re-evaluation of the effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management Plan. A summary report of the annual SPPP update shall be submitted to DWQ by March I of each year in accordance with Part III, Section E: Reporting Requirements, Item 2. Submitting Reports. Part.11 Page 3 of 10 Permit No. NCSOOO167 The Director may notify the permittee when the Plan does not.meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the Plan to meet minimum requirements. The.permittee shall provide certification in writing (in accordance with Part III, Standard Conditions, Section B, Paragraph 5) to the Director that the changes have been made. 8. Facility Inspections._ Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule, once during the first half of the year (January to June), and once during the second half (July to December), with at least 60 days separating inspection dates (unless performed more frequently than semi-annually). These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring required in Part II B and C of this permit. 9. Implementation. The permittee shall implement the Plan. Implementation of the Plan shall include documentation of all monitoring, measurements, inspections, maintenance activities, and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on -site for a period of five years and made available to the Director or the Director's authorized representative .immediately upon request. Part II Page 4 of 10 Permit No. NCS00016 7 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a representative :storm event. The required monitoring will result in a minimum of ten analytical samplings being conducted over the term of the permit at each stormwater discharge outfall (SDO). A representative storm event is a storm event that measures greater than 0.1 inches of rainfall. The time between this storm event and the previous storm event measuring greater than 0.1 inches must be at least 72 hours. •A single storm event may have a period of no precipitation of up to 10 hours. For example, if it rains but stops before producing any collectable discharge, a sample may be collected if the next rain producing a discharge.begins within 10 hours. Table 1. Analytical Monitoring Requirements Discharge Characteristics Units Measurement Fre uenc 1 Sample Type2 Sample Location3 Total Suspended Solids m L semi-annual Grab SDO 1 and 2 Biochemical Oxygen Demand 1T1 L semi-annual Grab SDO 1 and 2 Chemical Ox en Demand m L semi-annual Grab SDO I and 2 Oil and Grease m L semi-annual Grab SDO 1 and 2 Total Nitrogen m2ZL semi-annual . Grab SDO 1 and 2 Total K'eldahl Nitrogen (TKN) m L semi-annual Grab SDO 1 and 2 Ammonia, Total as Nitrogen m L semi-annual Grab SDO 1 and 2 Total Phosphorus m r L' semi-annual Grab SDO 1 and 2 H standard semi-annual Grab SDO 1 and 2 Total Rainfal14 inches semi-annual Rain Gauge - Rainfall Event Duration4 hours semi-annual Rain Gauge - Footnotes: I Measurement Frequency: Twice per year during a representative storm event. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at all specified stormwater discharge outfall (SDO) locations unless representative outfall status has been granted by the Washington Regional Office. 4 For each sampled representative storm event the total precipitation (inches; and duration of precipitation (hours) must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified below in Table 2. A minimum of 60 days must separate Period I and Period 2 sample dates unless monthly monitoring has been instituted under a Tier Two . response. Part Il Page S of 10 Permit No. NCSOOO 167 able 2. Monitoring Schedule Monitoring period t'2 Sample Number Start End Year 1 — Period 1 l November 1, 2010 March 3I, 2011 Year 1 — Period 2 2 i April 1, 2011 June 30, 2011 Year 2 — Period 1 3 July I, 2011 December 31, 2011 Year 2 — Period 2 4 January 1, 2012 June 30, 2012 Year 3 — Period 1 5 July 1, 2012 December 31, 2012 Year 3 — Period-2 6 January 1, 2013• June 30, 2013 Year 4 — Period 1 7 July 1, 2013 December 31, 2013 Year 4 — Period 2 8 January 1, 2014 June 30, 2014 Year 5 —Period 1 9 July 1, 2014 December 31, 2014 Year 5 — Period 2 10 January 1, 2015 October 31, 2015 Footnotes: 1 Maintain semi-annual monitoring during permit renewal process. If at the expiration of the Individual --Permit;'the permittee has submitted an application for renewal of coverage before the submittal deadline, the permittee will be considered for renewed coverage. The applicant must continue semi-annual monitoring until the renewed permit is issued. 2. If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the six-month sampling period. The pennittee shall report the analytical results from each sample within the monitoring period. The pennittce shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One and Tier Two. Table 3. Benchmark Values for Analytical Monitoring Discharge Characteristics Units Benchmark Total Suspended Solids mg/L 100 Biochemical Oxygen Demand rng/L, 30 Chemical Oxygen Demand mg/L 120 Oil and Grease mg/L, 30 Total Nitrogen mg/L, 30 Total Kjeldahl Nitrogen (TKNI) mg/L 20 Ammonia, Total as Nitrogen mg/L. 7.2 , Total Phosphorus mg/L 2 pH standard 6-9 Part II Page 6 of 10 Permit No. NCS000167 Tier One If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any parameter at any outfall; Then: The permittee shall: l . Conduct a stormwater management inspection of the facility within one week of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedence. 3. Identify potential and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, or to bring concentrations within the benchmark range. 4. Implement selected actions within 30-90 clays of the inspection. Note: Minor changes should be made within 30 days -of the inspection while major changes, such as modifications to BMPs or construction of additional BMPs, should be implemented within 90 days unless an extension has been requested and received from the DWQ Regional'Office. 5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected.actions were implemented. Tier Two If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are above the benchmark values, or outside of the benchmark range, 1.7or any specific parameter at a s 2ecific discharge outfall; Then: The permittee shall: I. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the -benchmark values or within the benchmark range. 3. If no discharge occurs during the sampling period, the permittee is required to submit a monthly monitoring report indicating "No Flow" to comply with reporting requirements. 4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan. During the term of this permit, if the valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may but is not limited to: • require that the permittee revise, increase, or decrease the monitoring frequency for the remainder of the permit; • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; or • require that the permittee implement site modifications to qualify for the No Exposure Exclusion. Part II Page 7 of 10 Permit No. NCSOOO 167 SECTION C: QUALITATIVE MONITORING REQUIREMENTS Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified in Table 4, during the analytical monitoring event. [If analytical monitoring is not required, the permittee still must conduct semi- annual qualitative monitoring.] Qualitative monitoring -is for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stormwater pollution.. In the'event an atypical• condition is noted at a stormwater discharge outfall, the permittee shall document the'suspecfed'cause of the condition and any actions taken in response to the discovery. This documentation will be maintained with the SPPP. Table 4. . . Qualitative Monitoring Requirements Discharge Characteristics Frequency) Monitoring Location2 Color semi-annual All SDOs . Odor semi-annual All SDOs Clarity semi-annual All SDOs Floating Solids semi-annual All SDOs Suspended Solids semi-annual All SDOs Foam semi-annual All SDOs Oil Sheen semi-annual All SDOs Erosion ordeposition osition at the outfall semi-annual All SDOs Other obvious indicators of stormwater pollution semi-annual All SDOs Footnotes: l , Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered fora renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. , SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS Facilities which have any vehicle maintenance activity occurring on -site which uses more than 55 gallons of new motor oil per month when averaged over the calendar year shall perform analytical monitoring as.speci:Eed below in Table 5. This monitoring shall be performed at all stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance areas Part 11 Page 8 of 10 Permit No. NCS000167 and in accordance with the schedule presented in 'rable ? (Section B). All analytical monitoring shall be performed during a representative storm event. Table S. ' Analytical Monitoring Rcgttiremerits for On -Site Vehicle Maintenance Discharge Characteristics Units _ :Measurement Frequency] Sample Type2 Sample Locations H standard semi-annual Grab SDO 3 Total Petroleum Hydrocarbons [EPA Method 1664 (SGT-HEM) mg/l, setrti-annual Grab SDO 3 Total Suspended Solids MO, semi-annual Grab SDO 3 Total Rainfal14 ..inches semi-annual Rain gauge . - Rainfall Event Durations hours semi -.annual Rain Gauge New Motor Oil Usage gallons/month semi-annual Estimate - Footnotes: I Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. if at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application.'The applicant must'continue semi-annual monitoring until the renewed pennit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the pond shali be collected within the first 30 minutes of discharge from the pond. 3 Sample Location: Samples shall be collected at each specified stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur unless instructed otherwise by the Washington Regional Office. 4 For each sampled representative storm event the total precipitation (inches) and duration of precipitation (hours) must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. Monitoring results shall be compared to the benchmark values in Table 6. The benchmark values in Table 6 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs), as provided in Part I1 Section B. Table 6. Benchmark Values for Vehicle Maintenance Analytical Monitoring Discharge Characteristics f Units Benchmark PH I standard 6-9 Total Petroleum Hydrocarbons [EPA Method 1664 (SGT-HEM)] rng/L 15 Total Suspended Solids mg/L 100 Part 11 Page 9 of 10 Permit No. NCS000167 PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS SECTION A: COMPLIANCE AND LIABILITY Comnliance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the initial permit and updated thereafter on an annual basis. Secondary containment, as specified in Part II, Section A, Paragraph 2(b) of this permit, shall be accomplished within 12 months of the effective date of the initial permit issuance. New Facilities applying for coverage for the first time and existing facilities previously permitted and applying for renewal under this permit: The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified in Part II, Section A, Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. 2. Duty to Comply The permittee must comply with all conditions of this individual permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal application. a. The permittee shall comply with standards or prohibitions established under section 307(a) of the Clean Water Act far toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement. b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 per day for each violation. Any person who negligently violates any permit condition ii subject to criminal penalties of $2,500 to 25,000 per day of violation, or imprisonment for not more than 1 year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. Also, any person who violates a permit condition may be assessed an administrative penalty not to exceed $10,000 per violation with the maximum amount not to exceed.$125,000. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] C. Under state law', a daily civil penalty of not more than ten thousand dollars ($10,000) per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [Ref: NC General Statutes 143-215.6A]. d. Any person may be assessedan administrative penalty by the Director for violating section 301, 302, 306, 307, 303, 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act. Administrative penalties for Class I violations are not to exceed $10,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $25,000. Penalties for Class II violations are not to exceed Part III Page 1 of 8 Penrit No. NCS000167 $10,000 per day for each day during which the violation continues, with the maximum amount of any Class H penalty not to exceed'$ 12 5,000. Duty to Mitigate, The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this individual permit which has a reasonable likelihood of adversely affecting human health or the environment. 4. Civil and Criminal Liability Except as provided in Part IIi, Section C'of this permit regarding bypassing of stormwater control facilities, nothing in this individual permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.-";, 143-215.6A, 143-215.613, 143- 215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore„ the permittee is responsible for consequential damages, such as fish kills, even though -the responsibility for effective compliance may be temporarily suspended. 5. Oil and Hazardous Substance Liability Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. Property Rights The issuance of this individual permit does not convey any property rights in either seal or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations. 7. Severability The provisions of this individual permit are severable, and if any provision of this individual permit, or the application of any provision of this individual permit to any circumstances; is held invalid, the application of such provision to other circumstances, and the remainder of this -individual permit, shall not be affected thereby. Dutv to Provide Information The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit issued pursuant to this individual permit or to determine compliance with this individual permit. The permittee shall also furnish to the Director upon request, copies of records required to be kept by this individual permit. Penalties for Tamperin The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to'be maintained under this individual permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of violation, or by imprisonment of not more than 4 years; or both. Part III Page 2 of 8 Permit No. NCS000167 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this individual permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. SECTION B: GENERAL CONDYTIONS Individual Permit Expiration The permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS § 143-215.36 and 33 USC 1251 et. seq. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. Sinnatoty Requirements All applications, reports, or information submitted to the Director shall be signed and certified. a. All applications to be covered under this individual permit shall be signed as follows: (1) In the case of a corporation: by a principal executive officer of at least the level of vice- president, or his duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge described in the permit application form originates; (2) In the case of a partnership or limited partnership: by a general partner; (3) In the case of a sole proprietorship: by the proprietor; (4) In the case of a municipal, state, or other public entity: by a principal executive officer, ranking elected official, or other duly authorized employee. All reports required by the individual permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility.or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent Part III Page 3 of 8 Permit No. NCS000167 responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director. Any person signing a document under paragraphs a. or b. of this section shall make the following certification: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel . properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system', or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4. Individual Permit Modification, Revocation and Reissuance, or Termination The issuance of this individual permit does not prohibit the Director from reopening and modifying the individual permit, revoking and reissuing the individual permit, or terminating the individual permit as allowed by the laws,.rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123, Title 15A of the North Carolina Administrative Code, Subchapter 2H .0100. and North Carolina General Statute 143-215.1 et al. 5. Permit Actions The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any individual permit condition. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 1. Proper Operation and Maintenance The permittee shall at ali times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the: permittee to achieve compliance with the conditions of this individual permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permitter only when the operation is necessary to achieve compliance with the conditions of this individual permit. 2. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with thy; condition of this individual permit. 3. Bypassing of Stormwater Control, Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and Part III Page 4 of 8 Permit No. NCSOOO 167 b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and C. The permittee submitted notices as required under, Part 111, Section E of this permit. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS Representative Sampling Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Analytical sampling shall be performed during a representative storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. Monitoring points as specified in this permit shall not be changed without notification to and approval of the Director. 2. Recording Results For each measurement, sample, inspection or maintenance activity performed or collected pursuant to the requirements of this individual permit, the permittee shall record the following information: a. The date, exact place, and time of sampling, measurements, inspection or maintenance activity; b. The individual(s) who performed the sampling, measurements, inspection or maintenance activity; C. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and £ The results of such analyses. 3. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. 4. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136, Part III Page 5 of 8 Permit No. NCS000167 To meet the intent of the monitoring required by this individual permit, all test procedures must produce minimum detection and reporting levels and all data generated must he reported down to the minimum detection or lower reporting level of the procedure. Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 6. Records Retention Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on -site. The permittee shall retain records of all monitoring information, including; all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all reports required by this individual permit for a period of at least 5 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. 7. Inspection and Entry The permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to; a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this individual permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this individual permit; C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this individual permit; and d. Sample or'monitor at reasonable times, for the purposes of assuring individual permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. SECTION E: REPORTING REQUIREMENTS l . Discharge Monitoring Reports Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on Discharge Monitoring Report forms provided by the Director. Submittals shall be delivered to the Division no later than 34 days from the date the facility receives the sampling results from the laboratory. The permittee shall submit an Annual Summary Data Monitoring Report to the appropriate DW_ Q Regional Office in February of each year. The submittal shall be on forms supplied by the Division. Part III Page 6 of 8 Permit No. NCS000167 i . . _ ;. tr, '.W' When no discharge has occurred from the facility during the report period, the permittee is required to submit a discharge monitoring report, within 30 days of the end of the six-month sampling period, giving all required information and indicating "NO FLOW' as per NCAC T15A 02B .0506. The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division, and shall retain the completed forms on site. Visual monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do SO. 2. Submittine Reports Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to: Central Files Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 In addition, an annual Stormwater Pollution Prevention Plan update report and separate signed Annual Summary DMR copy shall be submitted to the Washington DWQ Regional Office (RO) by March I of each year. Addresses for each RO and the counties covered by each RO can be found here: htip.//wwiv.enr.state.ne.us/html/regionaIofflces.htnil. The permittee shall retain the completed originals on site. Visual monitoring results should not be submitted to the Regional Offices or Central Files unless specifically requested by D'WQ. 3. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.613 or in Section 309 of the Federal Act, Non-Stormwater Discharees If the storm event monitored in accordance with this Individual Permit coincides with a non-stormwater discharge, the permittee shall separately monitor all parameters as required under the non-stormwater discharge permit and provide this information with (lie stormwater discharge monitoring report. Planned Changes The permittee shall give noiiee to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the Individual Permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticipated Noncompliance The perniittee shall give notice to the Director as soon as possible of any,planned changes at the permitted facility which may result in noncompliance with the Individual Permit requirements. Part III Page 7 of 8 Permit No. NCS000167 7. 5nills The permittee shall report to the local DWQ Regional Office, within.24 hours, all significant spills as defined in Part VI of this permit. Additionally, the permittee shall report spills including: any oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface waters, and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours. 8. Buss a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. Twenty-four Hour Re ortin The.permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Director may waive the written report on a case -by -case basis if the oral report has been received within 24 hours. 10. Other Noncompliance The permittee shall report all instances of noncompliance not.reported under 24 hour reporting at the time monitoring reports are submitted. it. Other Information Where the permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to be covered under this Individual Permit or in any report to the Director, it shall promptly submit such facts or information. Part I I I Page 8 of 8 NCSOOO 167 PART IV LIMITATIONS REOPENER This individual permit shall be tnodifled or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under provisions of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: Contains different conditions or is otherwise more stringent than any effluent limitation in the individual permit; or Controls any pollutant not limited in the individual permit. The individual permit as modified or reissued under this paragraph shall also contain any other requirements in the Act then applicable. PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS The pertnittee must pay the administ-tring and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Individual Permit. PART VI DEFINITIONS 1. Act - See Clean Water Act. 2. Allowable Non-Stormwater_Discharges This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: (a) All other discharges that are authorized by a non-stormwater NPDES permit. (b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (c) Discharges resulting from fire -fighting or fire -fighting training. Best Management Practices BMPs Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the form of a process, activity, or physical structure. More information on BMPs can be found at: http://cfpub.epa.gov/npdes/,,tormwater/menuofbmps/index.cfm. 4. Bveass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 5. Bulk Storaee of Liquid Products Liquid raw materials, manwactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. Parts IV, V and VI Page I of Permit No. NCSOOO167 6. Certificate of Coverage The Certificate of Coverage (COC) is the cover sheet which accompanies the Individual Permit upon issuance and lists'the facility name, location, receiving stream, river basin, effective date of coverage under the permit and is signed by the Director. 7. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. 8. Division or DWG The Division of Water Quality, Department of Environment and Natural Resources. 9. Director. The Director of the Division of Water Quality, the permit issuing authority. 10. EMC The North Carolina Environmental Management Commission. 11. Grab Sample An individual sample collected instantaneously. Grab samples that will be analyzed (quantitatively or qualitatively) must be Taken within the first 30 minutes of discharge. 12. Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. B. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility, 14, Municipal Separate Storm Sewer Syqte A stormwater collection system within an incorporated area of local self-government such as a city or town. 15. - No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a facility complies with the terms and conditions described in 40 CFR § 122.26(g) 16. Notice of Intent The state application form which, when submitted to the Division, officially indicates the facility's notice of intent to seek coverage under an Individual Permit. 17. Permittee The owner or operator issued a certificate of coverage pursuant to this Individual Permit. 18. Point Source Discharge of Stormwater Any discernible, confined and discrete conveyance including, but nor. specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. Part -VI Page 2 of4 Pages Permit No. NCS000167 19. Representative Storm Event A storm event that measures greater than 0.1 inches of rainfall. The time between this storm event and the previous storm event measuring greater than 0.1 inches must be at least 72 hours. A single storm event may have a period of no precipitation of up to 10 hours. For example, if it rains but stops before producing any collectable discharge, a sample may be collected if the next rain producing a discharge begins within 10 hours. 20. Representative Outfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall status allows the permittee Eo perform analytical monitoring at a reduced number of outfalls. 21. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. 22. Section 313 Water Priority Chemical A chemical or chemical cat. -gory which: a. Is listed in 40 CFP. 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; b. Is present at or above threshold levels at a facility subject to SARA title III, Section 313 reporting requirements; and c.- Meets at least one of the following criteria: (1) Is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table IIl (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. 23. Severe Property Damage Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property'damage does not mean economic loss caused by delays in production. 24. Significant Materials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. 25. Significant Spills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311, of the Clean Water Act (Ref 40 CFR 110.10 and CFR 117.21) or section 102 of CERCLA (Ref: 40 CFR 302.4). 26. Stormwater Discharge_Out f'all (SDO) The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection areas, from which stormwater flows directly or indirectly into waters of the State of North Carolina. Part VI Page 3 of 4 Pages Permit No. NCS000167 27. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. 28. Stormwater Associated with Industrial Activi The discharge from any point source which' is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage ,areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 24. Stormwater Pollution Prevention Plan A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the. site. 30. Total Maximum Daily Load MDl.) TMDLs are written plans for attaining and maintaining water quality standards, in all seasons, for a specific water body and pollutant. (A list of approved TMI)Ls for the •state of North Carolina can be found at http://h2o.enr.siate.ne.us/tmdl/) 31. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 32. Vehicle Maintenance Activi�r Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing, operations. 33. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice 6-om its site of origin which can be seen with the unaided eye. 34. 25-year. 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Part VI PageA of 4 Pages Ad' , AR".= NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coieen H. Sullins Governor Director September 1, 2010 1i' I Mr. Wavns .-8lack Perdue Farms, Inc. PO Box 460 Lewiston, North Carolina 27849 Subject: Draft NPDES Stormwater Permit Permit No. NCS000167 Perdue Grain and Oilseed, LLC - Cofield Hertford County Dear Mr. Black: Dee Freeman Secretary Si C 7 On August 16, 2010, the Division of Water Quality (DWQ) received an updated site plan and stormwater improvement plan (Plan) for the subject facility as requested during our meeting held July 22, 2010 at the Washington Regional Office. The Plan's major components included modifications to exisiting stormwater outfall locations as shown on the revised site plan, improvements to exisiting BMPs, and implementation of new BMPs to address contaminated stormwater discharges from the facility. DWQ anticipates these changes will significantly improve the quality of stormwater runoff discharging from the site. The Plan's proposed changes should be implemented as soon as possible and no later than 90 days following the effective date of the renewed permit (enclosed in draft form), DWQ shall be notified in writing upon completion of Plan activities. In accordance with the permit. monitoring schedule, a representative storm event shall be sampled within 60 days following Plan completion of the proposed BMPs and DWQ shall be notified in writing of the analytical results. Enclosed with this letter is a copy of the draft stormwater permit for your facility. Please review the draft carefully to ensure thorough understanding its conditions and requirements. The draft permit contains a number of changes from this facility's current permit including: Analytical monitoring chances: 1. Analytical monitoring parameter changes include the addition of oil and grease (0&G) and ammonia - nitrogen to the current list of required parameters. O&G was added based on the onsite use, storage and production of various petroleum hydrocarbons and soybean oil. Ammonia was added to evaluate what portion of TKN discharges orginate from organic nitrogen sources versus ammonia -nitrogen. 2. Routine analytical monitoring is to be performed at stormwater discharge outfall (SDO) locations 1 and 2. Vehicle maintenance monitoring is to be performed at SDO #3. Qualitative monitoring is to be performed at'all SDOs. 3. Ri3,ir'ifa it {:vent Duration has been added back as a reporting requirement for monitoring events. 4. All zinalyi:ical monitoring has been set to sami-annual during a representative storm event as defined in Part II Section B. The permittee must also document the total precipitation for each event. If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating Wetlands and Stormwater branch One 1617 Mail Service Center, Raleigh, North Carolina 27699•1617 North Caro 1 i na Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807.63001 FAk 919.807.64941 Customer Service: 1.877•623.6748 Naturally InlerneL www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer Mr. Wayne Black Perdue Farms, Inc. Permit No. NCS000167 "No Flow" within 30 days of the end of the sampling period. Additionally, samples must be taken a minimum of 60 days apart. 5. A tiered response system been added to this draft permit. Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. 6. All analytical and qualitative monitoring samples must be collected during representative storm events as defined in Part II Section B. 7. The permittee is responsible for all monitoring until the renewal permit is issued. 8. Vehicle maintenance monitoring has been revised to semi-annually and requires the collection of Non - polar oil & grease / TPH with a revised benchmark value of 15 mg/L. 9. An annual DMR summary and Stormwater Pollution Prevention Plan update report is due to the Washington Regional Office by March 1 of each year. Other permit changes: 1• Additional guidance is provided about Site PIrIn requirements. The site map must now identifytffhe receiving stream is impaired and if it has a Tt~ 'X established. It must also describe potential pollutants in each outfall. The map requirements are stated more explicitly. And, the sip: plan must contain a list of significant spills that have occurred in the past three years and also must certify that the outfalls have been inspected to ensure that they do not contain non-stormwater discharges. Additional information is provided in Part II Section A. 2. Additional requirements for the Stormwater Management Plan have been specified in Part II Section A. More details regarding secondary containment are provided. 3. Additional requirements for the Stormwater Pollution Prevention Plan have been specified in Part II Section A. The plan must also be updated annually to include a list of significant spills and to certify that the outfalls do not contain non-stormwater discharges. 4. The facility must now implement a semi-annual Facility Inspection Program of the site's stormwater management controls as specified in Part II Section A. 5. Information regarding the No Exposure Exclusion has been added to this draft permit. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Additional information is provided in Part I Section A. Please submit any comments on the draft permit to my attention no later than thirty (30) days following your receipt of the draft. Comments should be sent to the address listed at the bottom of page one of this letter. If no adverse comments are received from the public or the permittee, this permit will likely be issued within two months. If you have any questions or comments concerning this draft permit, feel free to contact me at (919) 807- 6365 or cory.larsen@ncdenr.gov. cc: Washington Regional Office, Bill Moore Stormwater Permitting Unit Attachments Sincerely, trae Environmental Engineer Stormwater Permitting Unit 2 fl Perdue Fanns Ircorporated' P.O-Box 460 Lewiston Woodville, NC 27849 www. perdue.com® Office {252}348-4200 9/3/2010 SEP 3 2010 Certified Mail # : 7009 3410 0000 4514 0734 Division of Water Quality Stormwater Permitting knit Attn: dory Larsen , 1617 Mail Service Center ' Raleigh N,C. 27699-1617 Subject: Permit Renewal # 14CS000167 Perdue Farms Inc. Hertford County Dear Mr. Larsen: Per my phone conversation with Bill Moore of the Washington Regional DWQ on August 31, 2010 I'm forwarding to your office an updated Stormwater Improvement Plan for Perdue Farms Inc. located at Cofield, North Carolina. Also enclosed please find the analytical monitoring results from the last sampling. hope this information meets your approval. If you should have any questions or concerns please contact me at 252-348-4383. Sincerely, Joey Ea gett . Perdue Agribusiness Environmental 252-287-5196 •;� a. .ice t±OoS rc:-'.x k rOMUy COMnl7 tment to Quafky 9117ce 3520111 , SEP 3 2010 Sto rmwate r Improvement Plan ►;C� j t . Cofield Facility 1. Attention to malfunctions of processing equipment that would lead to release of particulates with the potential to leave the site via stormwater 2. Clean jet and evacuate stormwater drain. 3. Muck out ditch and restore proper drainage to stormwater conveyance system. 4. Use new technology filters in storm drains (REM TRITON BFTG). 5. Dedicated individuals in charge of maintaining pollution prevention equipment and dry clean up 6. Locate sample points as outlined on enclosed site map. implementation Time Line for Above Items 1. These practices are already part of our SOP and SPCC plans. Our Storm water Team has met And the need for more attention to these practices should be stressed to all associates. In place August 1, 2010. 2. We are in the process of receiving bids from two environmental companies for this. To be completed by October 31, 2010. 3. This will be done right after the stormwater drains are cleaned out and vacuumed up.To be completed by October 31, 2010. 4. Two filters are being ordered. To be installed within 30days. S. This individual has been picked and will be the lead in all these improvement practices. Completed August 21, 2010. 6. 001 sampling point will be on the east side of four 20 inch diameter corrugated plastic T-traps located on the northwest side of the site map that can be closed if needed. 7. 002 sampling point will be on the east side of four 20 inch diameter corrugates! plastic T-traps located on the southwest side of the site map that can be closed if needed. 8. . 003 sampling point will be relocated at the south east corner of the Vehicle Maintenance area. I I . 7 T.V. 111�rvw to a a SWO; be I 'A Ica pri'ape,... ;.., n3ifmq.i,*,,", !� ad! 3vsw w !Wn 7q an! ARM ee%-11jOj2,F--q S, 0- Ti PFI kl:],lr ;;.41: 0 on, Vet vvsn O-CP ij qj Isola kj'114,nk. 0 iF 'd iuO.a,-,;q rnns, 002 mo I M ALAS mimu?\ (,T -Ot 101 ir",(1, "'o ni 014 rVv v?doj -.0 vd A, hqu Ymmon W 'o i -&I z mnad- 110 ldfl -nob Sd .0h; ? T A AIL OM 4,0 Z V K 10 n 0, FmWo LVT p 9 m so a 1 q m I S z 9 110 rh h A, 6 " 1 v/ b, rl f: h � J 0 li, Li 1 i v mi -, I i r pqml TONCh bsmhmlm Imm"m ek A K WOO Ad not Sid 10 4 Nw InQ pwmnmkw� xi klmsn I WX A r " " qc i� w W eqn; I vnIq hwknm, i, nmul, Om u' W to AN lw4 sh Pq A NO ti nu ;NQUMF TO i on nto 15M v mi c ­0 ,6916 s3noneyniGryl td, U.0 dumni, li7, jr"Icu Cofield Analytical Monitoring for Permit # NCS000167 Outfall # 2 3 24 2010 Benchmark Values Total Flow MG 0.054 TKN - 20 mg/L TS5 <1 Total Nitrogen - 30 mg/L PH 7 Total Phsphorus - 2 mg/L COD 17 SOD - 30 mg/L SOD <2 COD -120 mg/L TKN 0.56 TS5 -100 mg/L Total Phosphorus 0.41 pH - 6-9 Temp. Celsius 30.1 Oil & Grease - 30 mg/L Total Nitrogen 0.65 Total Rainfall inches 0.26 Event Duration mins. 420 Outfall # 3 5 4 2010 Total Flow MG 0.014 T5S 13 PH 6.5 COD 89 SOD 16 TKN 2.37 Total Phosphorus 0.2 Temp. Celsius 20.7 Total Nitrogen 2.37 Total Rainfall inches 0.26 Event Duration mins. 420 Outfall # 4 5 24 2010 Total Flow MG 0.025 Oil & Grease <5 TSS 12 PH 6.5 New motor oil useage 67 COD 90 SOD 16 TKN 2.3 Total Phosphorus 0.22 Temp. Celsius 20.9 Total Nitrogen 2.3 Total Rainfall inches 0.26 Event Duration mins. 420 9 S.} PW r tfi� - , •1� �1 r�•r ..y�r ifs �Y r ti ti BEST MANAGEMENT PRACTICES {BMPs) A narrative description of Best Management Practices (BMPs), to be considered such as, but not Iimited to, oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention where necessary.' The • need for structural BMPs shall be based on the assessment of potential sources contributing significant quantities of pollutants to stotnn�ater discharges and data collected through monitoring of stormwater discharges. All fat, oil and petroleum tanks along with all water priority chemicals will be located within secondary containments. The Stormwater Pollution Prevention Team will evaluate the use of the maintenance yard sweeper on the entire complex. In addition, the Stormwater Pollution Prevention Team will evaluate the possibility of erecting silt fencing near outfalls #2 and #4 to ensure capture of dust and organic materials.. • The Stormwater Pollution Prevention Team will submit all recommendations to Corporate Management or the level of management in charge of the operation. • The Stormwater Pollution 'Prevention Team has recommended at least one associate be employed fail time for clean up at all facilities. • The Stormwater Pollution Prevention Team has recommended action be taken to collect water from equipment washing operations and that proper maintenance and housekeeping be performed on a daily basis. • The Stonnwater Pollution Prevention Team has recommended erecting a roof over the Feed Mill liquid containment, area. • The Storm,,eater Pollution Prevention Team has recommended proper. associate training and regular inspection of the site to ensure compliance with stormwater guidelines: • The Stonnwater. Pollution Prevention Team has recommendedthat all storm drains be equipped with filters or appropriate screening to prevent organics from .entering exiting stormwater. • The Stormwater Pollution Prevention Team has recommended that associates employ dry -cleanup to remove debris'and organics from areas that cannot be reached u}i mechanical sweeper.' Pollution Source Identification Area Evaluation Cofield Complex Soybean Plant C'ontlVeted By: SIVPP Team Date: 071201201.0 In7structlon: List all identif ed slorims,alet• pollulant sources. ht the second column, list BA1P olitions that can be incoym-aled into the plan to adth-ess remaining sources of pollutants. Stormwater Pollutant Sources Description of BMP Options Train associates and drivers in housekeeping and proper Soybean Oil Filling Station loading procedures. Add mcter to ensure proper loading of materials. Rework curbing to ensure containment of any spillage. Regular inspections of collection system, and look to Bean Conditioner eliminate procedure from process. Train associates on proper handling procedures. Erect silk fencing strategically in problem areas to prevent Spillage of Grain and Meal runoff of organic. material from entering ditches. Train (Meal Loadout) associates.in housekeeping and clean up procedures. Sweep load out areas as needed. Have stormwater drains flushed and vacuumed quarterly to $tormwater Drains ensure minimal buildup of•organics and to ensure proper ' flow. Install new drain filters, inspect weekly, and change filter media when blindin occurs. Pollution Source Identification Area Evaluation Cofield Complex Feedmill Completed Bj1: SIITP Team Date: 0712012010 Instruction: .List all identified storntivater pollutatit sources. In the second column, list BA1P options that can -be incot7,wrated into the plan to address remaining sources ofpollulants. Stormwater Pollutant Sources Description of BMP Options Feed and Litter Fueling Station Roof over fueling station and train associates in management of overfill protection and response tine. Dicsel Tanks Containment Regular inspections of containment, piping system and overfill protection. Collection Ditch Regular inspection and clean up. Erect silk fencing to prevent organic material from entering ditch. Erect silk fencing to prevent organics from entering Spills of Fecd and Grain storinwater conveyance system, sweep areas as needed, and maintain fence free from debris. Liquid Feed Ingredient Containment Propose new containment roof and routine inspection to address collected stormwatcr. -Organic Material Erect silk fencing strategically to prevent runoff from entering ditch. Truck and Rail Pit Clean area after every product delivery to prevent build up and runoff of organics. Loadout Areas Sweep and clean entire area 3 days a week, or more often, as needed to prevent build up and runoff oforganics. Have stormwatcr drains flushed and vacuumed quarterly to 'tormwater Drains ensure minimal buildup of organics and to ensure proper flow. Install new drain filters, inspect weekly, and change filter media when blinding occurs. Pollution Source Identification Area Evaluation Cofield Complex Wastewater/Boiler Rooni/Mamtenance Cotnpleled By: SIVPP Team Date: 0712012010 Instruction:' List all idetttifed storrrtti7ater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address restraining sources of pollutants. Stormwater Pollutant Sources Description of BMP Options Spray Irrigation Operate and maintain wastewater spray irrigation fields to revent runoff: Stormwater Outfalls/Ditch Conveyance Inspect and clean regularly, as appropriate. Regular inspections of perimeter to ensure aesthetic conditions, spills are cleaned tip, and all drums arc Site Conditions contained. Implement use of filter system in all storm drains and scheduled replacement of filter media or any device used to keep organic material out of stormwater during a rain event. (Fhis is for all areas of the facility.) Boiler Fucl Contaimncnt Tank has secondary containment. • Pollution Source Identification Area Evaluation CofieId Complex Garage Completed Bj>: S11'PP Team Date: 0 712 012 010 Jnstruction: List all identified storim Paler pollutant sources. In the second column, list-BMP options that can be incotlJOrated Into the plat? to address remaining sources a ollutants. Stormwater Pollutant Sources Description of BMP Options Place portable drip pans where needed. All leaks Miscellaneous Oil and Grease from Parkcd Trucks contained and disposed of as'appropriate until repairs have been completed. Truck Wash Station Collection pits need to be inspected daily -and cleaned weekly or as often as needed. Ensure adequate maintenance of truck wash station to Gulley to Ditch prevent oil from entering the ditch: Silt fence and oil absorbent boom inspected daily and changed as needed. Miscellaneous Metal Drwns with Chemicals Containment area with roof for storage of drums. Area inspected daily. Pollution Source Identification Area Evaluation Cofield Complcx Grain Storage Completed By: SWPP Tecrin Date; 07/2oaoio 17AII'IICIi0II: List all identified stornni,ater pollutant sources. In the second colunin, list BAIP options that can be incolliorated into the plan to address remaining sources ofpollutants. Stormwater Pollutant Sources Description of BM1' Options Cover boot end of drags to prevent grain/dust irons Truck and Rail Receiving Pits/Drags comingling with stormwater. Clean up grain spills promptly. Train associates in dry clean up and proper housekee in ractices. Utilize railroad rope in problem areas to ensure dust and organic material does not comingle with stormwater Dust and Organic Material conveyance. Clean spillage promptly and sweep area 3 times a week. Collected stormwater to be removed at receiving pit shall be evaluated for contamination and handled appropriately. Have stormwater drains flushed and vacuumed quarterly to Stormwater Drains ensure minimal buildup of organics and to ensure proper flow. Install new drain filters, inspect weekly, and change filter media when blinding occurs. D�jst Suppression System (Soybean Oil} Movement of oil containment for dust suppression, as to eliminate potential for stormwater contamination. Perdue AgriBusiness Inc. Environmental Services P.O. Box 460 Lewiston Woodville, NC 27849 www.perdue.com® Office (252)348-4364 Certified Mail # , 7009 3410 0000 4514 0659 Attn: Bill Moore Division of Water Quality 943 Washington Square Mall Washington, N.C. 27889 Subject: Permit Renewal # NCS000167 Perdue Farms Inc. Hertford County Dear Mr. Moore: 8/4/2010 Per the meeting held at the Washington Regional Office on July 22nd. ,please find enclosed the requested updated Site Map, Site Activity Chart, and BMPs for our Perdue Farms Inc. Cofield, N.C. complex. If we can provide any further materials or information for the Stormwater Permit Renewal process, please let us know. AUG 16 -2010 I hope this information meets your approval. If you should have any questions or concerns please contact me at 252-348-4326. Sincerely, Joey Ba ett Perdue Agribusiness Environmental 252-287-5196 51AN re, t, r' 90 year$ F,C ZP, r L — AUG Z 0 ;e0lu Perdue AgriBusiness lnc. Environmental Services P.O. Box 460 �►fi�r>���r �`� Lewiston Woodville, NC 27849 1t 7 www. perdue. corn® Office'i252]348-4364 8/4/2010 Certified Mail # : 7009 3410 0000 4514 0642 Division of Water Quality Stormwater Permitting Unit Attn: Cory Larsen 1617 Mail Service Center Raleigh N.C. 27699-1617 Subject: Permit Renewal # NC5000167 Perdue Farms Inc. Hertford County Dear Mr. Larsen: Per the meeting held at the Washington Regional Office on July 22nd. ,please find enclosed the requested updated Site Map, Site Activity Chart, and 9MPs for our Perdue Farms Inc. Cofield, N.C. complex. if we can provide any further materials or information for the Stormwater Permit Renewal process, please let us know. I hope this information meets your approval. If you should have any questions or concerns please contact me at 252-348-4326. . Sincerely, 7f oey Ba gett Perdue Agribusiness Environmental 252-287-5196 .y�!�:.}-• t�:.L-,tom.-,-��,.�:f;- �.�.:_. 1,2 ��, ems_ zs MA AUG 15 2010 -Stormwater Improvement Plan cafield- Facility 1. Attention to malfunctions df processing equipment that would lead to release of particulates with the potential to leave the site via stormwater 2. Clean jet and evacuate stormwater drain. 3. Muck out ditch and restore proper drainage to stormwater conveyance system. 4. Use new technology filters in storm drains (REM TRITON BFTG). 5. Dedicated individuals in charge of maintaining polluticn prevention equipment and dry clean tip 5. Locate sample paints as outlined on enclosed -site reap. 7 Implementation Time Line for Above Items P Z. These practices are already part of our SOP and SPCC plans. Our Storm v"Pater Team has met and need for more attention to these practices should be stressed to all associates. 2. We are in the process of receiving bids from two environmental companies for this, . 3. This will be done right after the stormwater drains are cleaned out and vacuumed up. 4. Two filters are being ordered. S. This individual has been picked and will be the lead in all these improvement practices. k44)6. Samplirs a' for Oaf, and 003 twill be the backcf the T-traps. 002 sarnpll�tg point vAll be in the d�itch beside the Garage. SE7003 . r� a 5. � roc �•.,.t- Cog/ Gw,,,�.e- $�✓ �� i • SITE MAP A site map drawn to scale with the distance Iegend indicating location of industrial activities (including storage of material, disposal, process and loading and unloading areas), drainage structures, drainage areas for each outfall and activities occurring in the drainage area, building locations and impervious surfaces, and the percentage of each drainage area that is -impervious. For each outfall, a narrative description of the pollutants that could be expected to be present in the stormwater discharge is given. The Feedmill, Garage, Soybean Plant and Grain Receiving are shown on the map on pages 12. Fuel storage and other petroleum products are listed by location and capacity on page I5. All outfalls except outfall 003 are subject to contamination from grain dust, spillage of grain, feed dust anti spillage from vegetable oils. Site Activity ACTIVITY OUTFALL(S) AFFECTED Drainage Areas Affected by Activity Feedmill Processing 001,002 . Drainage Area(s) -- I & 2 Soybean Processing 001,002 Drainage Area(s) — 1 &2 Maintenance Shop 002 Drainage Area(s) — 2 & 4 Gasoline Fueling 002 Drainage Area(s) - 2 &4 No. 2 Diesel Fuel (fueling) 001 Drainage Area(s) — I Soybean Crude Oil Loadout 002 Drainage Area(s) — 2 Soybean Crude Oil Tank 001 Drainage Area(s) -- 1 No. 6 Fuel Oil (Boilers FM/CP) 002 Drainage Area(s) — 2 Garage Vehicle Maintenance 003 Drainage Area(s) — 2. Grain Storage 002 Drainage Area(s) — 2 AUG 16 2010 DIN Q- VIAR0 SITE MAP A site map drawn to scale with the distance legend indicating location of industrial activities (including storage of material, disposal, process and loading and unloading areas), drainage structures, drainage areas for each outfall and activities occurring in the drainage area, building locations and impervious surfaces, and the percentage of each drainage area that is impervious. For each outfall, a narrative description of the pollutants that could be expected to be present in the stormwater discharge is given. The Feedmill, Garage, Soybean Plant and Grain Receiving are shown on the map on pages 12. Fuel storage and other petroleum products are listed by location and capacity on page 15. All outfalls are subject to contamination from grain dust, spillage of grain, feed dust and spillage from vegetable oils. Site Activity ACTIVITY OUTFALL(S) AFFECTED OUTFALLS AFFECTED BY DRAINAGE AREAS Feedmill Processing 002,004 Drainage Area ( One ) Outfalls — 002, Soybean Processing 002,003 Drainage Area( Two) Outfalls -.004 Maintenance Shop 003 Drainage Area ( Three) Outfalls - 004 Gasoline Fueling 003 Drainage Area ( Four) Outfalls — 003 �` T No. 2 Diesel Fuel (fueling) 002 Drainage Area ( Five) Outfalls — NIA Soybean Crude Oil Tanks 002, 003,004 Drainage Area ( Six ) Outfalls -- 003,004 No. 6 Fuel Oil (Boilers FM/CP) 004 ;`yW1-V Garage Vehicle Maintenance 004 Grain Storage 003,004 I W, EV 2010 ARO } _� � k! � � � •' 4 n O � � c LA f v I p• Y i I ■ z ` i ii.kA �1 Avg a/,70/rlv ow e7 Stormwater Improvement Plan Cofield Facility 1. Attention to malfunctions of processing equipment that would lead to release of particulates with the potential to leave the site via stormwater 2. Clean jet and evacuvate stormwater drain. 3. Muck out ditch and restore proper drainage to stormwater conveyance system. 4. Use new technology filters in storm drains (REM TRITON BFTG). 5. Dedicated individuals in charge of maintaining pollution prevention equipment and dry clean up 6. Locate sample point as a combined sampling at the back of outfalls #3 and #4, which will now be outfall #3, exiting at T-traps. j /ice. 5c4--,t/. BEST MANAGEMENT PRACTICES (BMPs) A narrative description of Best Management Practices (BMPs) to be considered such as, but not limited to, oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention where necessary. The need for structural BMPs shall be based on the assessment of potential sources contributing significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. All fat, oil and petroleum tanks along with all water priority chemicals will be located within secondary containments. The Stonmwater Pollution Prevention Team will evaluate the use of the maintenance yard sweeper on the entire complex. In addition, the Stormwater Pollution Prevention Team will evaluate the possibility of erecting silt fencing near outfalls #2 and #4 to ensure capture of dust and organic materials. • The Stormwater Pollution Prevention Team will submit all recommendations to Corporate Management or the level of management in charge of the operation. • The Stormwater Pollution Prevention Team has recommended at least one associate be employed full time for clean up at all facilities. • The Stormwater Pollution Prevention Team has recommended action be taken to collect water from equipment washing operations and that proper maintenance and housekeeping be performed on a daily basis. • The Stormwater Pollution Prevention Team has recommended erecting a roof over the Feed Mill liquid containment area. • The Stormwater Pollution Prevention Team has recommended proper associate training and regular inspection of the site to ensure compliance with stormwater guidelines. • The Stormwater Pollution Prevention Team has recommended that all storm drains be equipped with filters or appropriate screening to prevent organics from entering exiting stormwater. • The Stormwater Pollution Prevention Team has recommended that associates employ dry -cleanup to remove debris and organics from areas that cannot be reached by mechanical sweeper. Pollution Source Identification Area Evaluation Cofield Complex Soybean Plant Completed By: SWPP Team Date: 0712012010 Instruction: List all identified stormwater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address remaining sources ofpollutants. Stormwater Pollutant Sources Description of BMP Options Train associates and drivers in housekeeping and proper Soybean Oil Filling Station loading procedures. Add meter to ensure proper loading of materials. Rework curbing to ensure containment of any spillage. Regular inspections of collection system, and look to Bean Conditioner eliminate procedure from process. Train associates on proper handling procedures. Erect silk fencing strategically in problem areas to prevent Spillage of Grain and Meal runoff of organic material from entering ditches. Train (Meal Loadout) associates in housekeeping and clean up procedures. Sweep load out areas as needed. Have stormwater drains flushed and vacuumed quarterly to Stormwater Drains ensure minimal buildup of organics and to ensure proper flow. Install new drain filters, inspect weekly, and change filter media when blinding occurs. Pollution Source Identification Area Evaluation Cofield Complex Feedmill Completed By: SWPP Team Date: 0712012010 Instruction: List all identified stormwater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address remaining sources ofpollutants. Stormwater Pollutant Sources Description of BMP Options Feed and Litter Fueling Station Roof over fueling station and train associates in management of overfill protection and response time. Diesel Tanks Containment Regular inspections of containment, piping system and overfill protection. Collection Ditch Regular inspection and clean up. Erect silk fencing to prevent organic material from entering ditch. Erect silk fencing to prevent organics from entering Spills of Feed and Grain stormwater conveyance system, sweep areas as needed, and maintain fence free from debris. Liquid Feed Ingredient Containment Propose new containment roof and routine inspection to address collected stormwater. Organic Material Erect silk fencing strategically to prevent runoff from entering ditch. Truck and Rail Pit Clean area after every product delivery to prevent build up and runoff of or anics. Loadout Areas Sweep and clean entire area 3 days a week, or more often, as needed to prevent build up and runoff of organics. Have stormwater drains flushed and vacuumed quarterly to Stormwater Drains ensure minimal buildup of organics and to ensure proper flow. Install new drain filters, inspect weekly, and change filter media when blinding occurs. Pollution Source Identification Area Evaluation Cofield Complex Wastewater/Boiler Room/Maintenance Completed By: SWPP Team Date: 0712012010 Instruction: List all identified stormwater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address remaining sources of pollutants. Stormwater Pollutant Sources Description of BMP Options Spray Irrigation Operate and maintain wastewater spray irrigation fields to prevent runoff. Stormwater Outfalls/Ditch Conveyance Inspect and clean regularly, as appropriate. Regular inspections of perimeter to ensure aesthetic conditions, spills are cleaned up, and all drums are Site Conditions contained. Implement use of filter system in all storm drains and scheduled replacement of filter media or any device used to keep organic material out of stormwater during a rain event. (This is for all areas of the facility.) Boiler Fuel Containment Tank has secondary containment. Pollution Source Identification Area Evaluation Cofield Complex Garage Completed By: SWPP Team Date: 07120120I0 Instruction: List all identified stormwater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address remaining sources of pollutants. Stormwater Pollutant Sources Description of BMP Options Place portable drip pans where needed. All leaks Miscellaneous Oil and Grease from Parked Trucks contained and disposed of as appropriate until repairs have been completed. Truck Wash Station Collection pits need to be inspected daily and cleaned weekly or as often as needed. Ensure adequate maintenance of truck wash station to Gulley to Ditch prevent oil from entering the ditch. Silt fence and oil absorbent boom inspected daily and changed as needed. Miscellaneous Metal Drums with Chemicals Containment area with roof for storage of drums. Area inspected daily. Pollution Source Identification Area Evaluation Cofield Complex Grain Storage Completed By: SWPP Team Date: 0712012010 Instruction: List all identified stormwater pollutant sources. In the second column, list BMP options that can be incorporated into the plan to address remaining sources ofpollutants. Stormwater Pollutant Sources Description of BMP Options Cover boot end of drags to prevent grain/dust from Truck and Rail Receiving Pits/Drags comingling with stormwater. Clean up grain spills promptly. Train associates in dry clean up and proper housekeeping practices. Utilize railroad rope in problem areas to ensure dust and organic material does not comingle with stormwater Dust and Organic Material conveyance. Clean spillage promptly and sweep area 3 times a week. Collected stormwater to be removed at receiving pit shall be evaluated for contamination and handled appropriately. Have stormwater drains flushed and vacuumed quarterly to Stormwater Drains ensure minimal buildup of organics and to ensure proper flow. Install new drain filters, inspect weekly, and change filter media when blinding occurs. Dust Suppression System (Soybean Oil) Movement of oil containment for dust suppression, as to eliminate potential for stormwater contamination. Cofield Analytical Monitoring for Permit # NCS000167 Outfall # 2 5 4 2010 Benchmark Values Total Flow MG 0.054 TKN - 20 mg/L TSS <1 Total Nitrogen - 30 mg/L PH 7 Total phsphorus - 2 mg/L COD 17 BOD - 30 mg/L BOD <2 COD -120 mg/L TKN 0.56 TSS -100 mg/L Total Phosphorus 0.41 pH - 6-9 Temp. Celsius 30.1 Oil & Grease - 30 mg/L Total Nitrogen 0.65 Total Rainfall inches 0.26 Event Duration mins. 420 Outfall # 3 5&4L2010 Total Flow MG 0.014 TSS 13 PH 6.5 COD 89 TSS - 2 800 16 BOD -18 TKN 2.37 COD - 15 Total Phosphorus 0.2 Phosphours - 7 Temp. Celsius 20.7 TKN - 3 Total Nitrogen 2.37 pH - 3 Total Rainfall inches 0.26 O/G - 0 Event Duration mins. 420 Total Nitrogen -1 Outfall # 4 5 24 2010 Total Flow MG 0.025 Oil & Grease <5 TSS 12 PH 6.5 New motor oil useage 67 COD 90 BOD 16 TKN 2.3 Total Phosphorus 0.22 Temp. Celsius 20.9 Total Nitrogen 2.3 Total Rainfall inches 0.26 Event Duration mins. 420 �- .. , �. '�' .r � ,. � � � l � - I I �.W ::' :.;t �� �� i ' • - '� .. 1 ' } ,_� r' . 1_h ' �� 1 r � 1 n � r i ' J Cofield Analytical Monitoring for Permit # NCS000167 Outfall it 2 10 2005 6 7 00 1 2 1 2 7 10/24/2007 5 28 2 1 2 5/7/2009 11,111/2009 Total Flow MG 0.171 0.103 0.062 0.103 0.474 0.052 0.124 0.153 0.969 T55 11 49 21 22 7.1 3.2 21 34 45 pH 6.9 6.86 7.75 7.54 8.1 8.5 7.8 8.3 7 COD 29 90 105 141 38 14 61 32 50 SOD 15 48 44 50 6.1 2.9 12 13 22 TKN 1.8 4.73 4.31 6.46 1.07 1.07 2.01 2.06 3.47 Total Phosphorus 0.82 1.18 1.09 14.3 0.38 0.5 0.42 1.1 0.76 Temp. Celsius 24.3 25.5 25.2 21.9 24.6 30.6 15.9 30.2 21.1 Total Nitrogen 2.64 5.36 4.45 6.95 1.26 1.12 2.25 2.24 4.24 Total Rainfall inches 0.83 0.5 0.3 0.5 2.3 0.25 0.6 0.74 4.7 Event Duration mire. 1440 60 120 90 2880 75 966 960 2160 Outfail # 3 10 2 6 2 9 14 2 6 6 4 00 10/24/2007 5 ?.8 008 11 5 zoo 11/11/2009 Total Flow MG 0.046 0.028 0.016 dry 0.128 0.014 0.33 0.041 0.261 T55 40 7.7 119 dry 77 47 37 26 16 pH 6.7 6.2 6.58 dry 6.21 3.8 7 6.8 6.5 COD 196 89 5.44 dry 148 316 159 128 202 SOD 32 14 270 dry 60 128 102 53 43 TKN 3.09 3.99 14.6 dry 7.23 22.66 7.78 5.76 6.89 Total Phosphorus 1.2 1.24 2.9 dry 1.32 1.22 1.31 1.47 1.3 Temp. Celsius 23.5 24.7 23.1 dry 21.9 18.9 15.6 20.5 14.6 Total Nitrogen 10.75 4.55 14.69 dry 7.7 22.76 12.25 6.08 7.78 Total Rainfall inches 0.83 0.5 0.3 dry 2.3 0.25 0.6 0.74 4.7 Event Duration miss. 1440 60 120 dry 2880 75 960 960 2160 Outfall # 4 0 7 005 6nl2Mfi 211#12006 611§LZM 10124/2007 5/28/2008 111W= 5/7/20D9 11/U/ZWl Total Flow MG 0.097 0.059 0.035 0.059 0.27 0.029 0.07 0.087 0.551 Oil & Grease 4.06 < 2 < 2 7.06 5.9 < 5 < 5 < 5 < 5 T5S 112 278 1.32 37 89 74 60 54 3.3 PH 5.8 5.68 6.27 7.34 6.4 6.5 7 6.1 6.4 New motor oil useage 66.7 67 57 67 67 67 67 67 67 COD fit 381 740 168 563 716 159 140 195 SOD 32 120 350 < 36 245 340 102 57 40 TKN 3.09 12.62 25.7 8.08 18.82 59.44 7.78 4.8 6.97 Total Phosphorus 1.2 3.64 4.91 2.02 3.25 2.24 1.31 1.24 1.35 Temp. Celsius 23.5 23.3 22.8 20.3 24.2 17.7 15.6 20.2 14.3 Total Nitrogen 4.07 13.66 25.89 9.36 20.24 59.52 8.38 5.29 7.84 Total Rainfall inches 0.83 0.5 0.3 0.5 2.3 0.25 0.6 0.74 4.7 Event Duration rains. 1440 60 120 90 2880 75 960 960 2160 �, - .i - � � t r i __� 1 :' ' Y- f '1 { ,� .5 -�, �9 ��, i - _; f tl • �' �� , . �� 4 I 1 � • J C t t 4 Ai, �1 L t •4 ' ; ' Kv i ♦' � C L A NCDEE R North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director April 21, 2010 Resources Individual NPDES Stormwater Permit Renewal Transmittal Cover Page To: Washington Regional Office, Mr. Thom Edgerton Subject: NPDES Stormwater Permit No. NCS000167_ ;Perdue Grain & Oilseed, LLC — Cofield Cofield, NC (Hertford County)--. Attachment Description Staff Report Draft Permit Renewal Application Thom, Dee Freeman Secretary RGEIVED APR 2 6 2010 Please provide comments on the facility and draft permit and sign/return the staff report if acceptable. Th_e facility ha ers q ested'to combine'Oukfalls 3 a_nd and move the_sarnplrigt location downstream. Th rsi equest_w lhneed,aukharization_from your 6ffice.- hppears that site activities are different for Outfalls 3 and 4 and analytical monitoring results are not favorable at either outfall. There is also a permitted spray irrigation system at the facility so it may be beneficial to coordinate with Aquifer Protection Section for the site visit. Please let me know what you find onsite. Thanks. Cory Return to Cory Larsen at the Central Office by May 24, 2010, if possible. Cory Larsen Division of Water Quality Stormwater Permitting Unit '1617 Mail Service Center Raleigh, NC 27699-1617 Wetlands and Slormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699•1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807.63001 FAX: 919.E07-64941 Customer Service: 1.877.623-6748 Internet: www.ncwaterqualit .org An Equal Opportunity S Affirmative Actioi Employer One NorthCarolina Natura!!if NCS0001 G7 NCDENR North Carolina Department of Environment an.d Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary STAFF REVIEW AND EVALUATION NPDES Stormwater Permit Facility Name: _ Perdue Crain & Oilseed, L1:C='Coiiel" NPDES Permit Number: NCS000167 Facility Location: NCSR 1403, Cofield, NC (Hertford County) See Figure I Type of Activity: Soy bean processing and animal feed mfg. SIC Code (if applicable): 2048: Prepared Feed & Feed .Ingredients for Animals/Fowl, excluding Dogs/Cats Receiving Streams: Deep Creek River Basin: Chowan River Basin, Sub -basin 03-01-01 Stream CIassification: C; NSW Proposed Permit Requirements: See attached draft permit. Monitoring Data: See attached summaries Response Requested by (—ate): May 24, 2010 Central Office Staff Contact: Return to Cory Larsen, (919) 807-6365; cory.laarsen(tncdenr.gov Special issues: Issue Rating Scale: 1(easy) to 10 hard! Compliance history 4 Benchmark exceedance 4 Location (TMDL, T&E species, G etc Other Challenges: l • Contacting facility personnel Difficulty Rating: (15)/40 Description of Onsite Activities: * This facility has four primaiy industrial activities: 1) Soybean extraction plant, 2) Animal reed mill, 3) Grain storage, and 4) Maintenance garage. Page 1 of 10 �'NCS0001 C7 Documents Reviewed: SPU Piles •"��' • EPA TRl Data &: MSGP ,aT :' ? • 2008 303(d) List • NC TMDLs • 2007 Chowan Basitiwide.Plan (BWP) + NC Natural Heritage Program for T&E History: • Last Permit Issued: 08/15/2005 . Permit Expires: 08/31/2010- . Renewal Stibmitted: 02/24/2010 Page 2 of 10 w: NCS000167 �-- � �s f's 6 „", +e*v ZtY y r4 � k `` t v ♦ �' max. ..�. �r . 3 7 -� y � r.� •!w"^•``. i"t�3�'Fl aS ° ;r"r. � r���;rI�L .1,wrT� �Ig *• °#r',: a,� 'Fa % w-� �� � ��! 14 � • � • i fit. ,��,�.,,, y �'b" -� ,+L,r"- �. •,�k �k � +! � .'.QIA� L� � � � /• � } �.'1 _ ����Gs"_��--�•� i � 1 1�6,� •�,,� v'-- ,,,c �i- `, " ,✓ a a+�r �Iar 'ray- .,_ �,t "'k_ --w. w� •+k-: Jxr �,. --;. �w.:�,P��,� ����`� •$,5�, +1}1'�`�`'�aJ�.� `'�'x ...w",'.4"''� �s 'Wi � �'ir� s, '�r � �"-e��.v.#` ;; .-Lo, 1 k ^..4 �tiy Jji' ��� � is L 5 --. _ a....^-`.....�,• fly;'' il��-aa�, u'"' .'a"'r.V,^� _: �^* �Fi�r �u3 �. � nI' ' .k�- ti .r�S��' ..�f. �l1i • 5" ,�„� � '{��`� � y••_ •,k2•. � r/�: � ;r� f .1` �a 5fd �r w C '. I+ls � � 4;� ?t'f� (L �--•�C� � 4hri � 1`� i^....�-•--,� i �t `s4 �'��.hF rIi�.4 ��i�-- h� �„' T r �� r-Y-• ��. few 54S r i�-w�l '¢'afr '� '�4_ ^s�'"'"-' i�• ,kr f �''ti .r.*"` ` x •� , — `. o CO-JISE 1 Ytlf 7�" 1 � r. .+..• rY't4"�y �..�. }» a ....i'31.. -^r•�: ,.y, ,". i4"..;.L- ,4,•.r..q y A9� GG t ii 1.ti1/3}' i ;f �v � �� '` � ,. �� /� j p ��• _ �-,,,... �` ,�" ""`� i .�, I i � �.=� . � � �/ � +1� r � ` 1� ..% (r � • t r���.1 `v �`' � "(.�y, �, :4hy=�'qp, .�.�; J\j� fr rli�, 77 "�} S it - .�\Jf i�j�'' �1�I� (F li;��` �' :^''s 's, w' •. •*- �u;:: r ;(.�'F �-`� 1 j,` ..f.i 2�. %'•�y l ; ✓� ,;\ f J+` GC" 7 i ! �"y... f 81 4,�., ,� ..I{. ��, 1 �+ � �� - �a ]° 'f "�s.5 � .. Y a r ��^� !"�� iF���•. � � J.,,.cY, r•.. -+rJ i` W97 iV avl yE e4 < � r ;,r'•, c.. ,� Il4i. J„�'r,hk�, �,* ,,;d•`1 , . • jib 4��r '(� S ' A' r 1 Perdue Grain and Oilseed LLC - cofield <„ aWTS .Ik,j f r F• ,i�.8rt7r+ I ... r `'Y f .�.��.+ } ,+r^y` •+�-��� -� �� � erd � L.WRQ.. � �� f '�% 1 II 15r l�.•i +i r • v�! ( 1_ F` ¢� ,�'' _' JGj(� ` 9' � ,pier y ( �i {a�9 .!R ,? 5 - l 'M M ( t � ' r-•.,�•,. r• 9 � I ,��. 'i {•T! � 1r � •r `4 1 �'� ���s,N _ •.r. ':� %4 ;.%r�� w r r\,� `, t ,�,�� %R y�7V it �• •• � .i-. ---W !tee r{` e ` Y � .: ` � - F' •. � mot. � d .l � � 0 -i5 ry � •�. �' CQrnfJ .�5�•;. `.`*.+ y,r.. r k V�a,E fIl zl�, r `!-- r, NCS000167 li Nlap Scale f, 20,000 PERDUE GRAIN & OILSEED, LLC - COFIELD Lad bade: 36° 21' 48" N Longitude: 760 53' 50" W County: Hertford Receiving Streams: Deep Credo Stream Class: C; NSW Sub -basin: 03-01-01 (Chowan River Basin) Figure 1: Location Map of Facility Page 3 of 10 Facility Location NCS000167 Central Office Review Summary: 1. Owner's Other Permits: • WQ0001536 Surface Irrigation ��-�-� '• NEC ..r�n.c�rlt c _ i r i ater BoderBlo��do� as ew Di ih�li:" l;x��ireti (l. a 2. General Observations: • Medium sized facility with approximately 30-40% impervious area, C • 'I'hree (3) SDW currently monitored (Outfalls 2-4), ermi li S �skecl to moc mOC t�� . 'sr pl y ;l?o-i is f ;r U t t due lr`� osc'pr i ity.. WARD needs to evaluate if request is appropriate during site inspeetleo. 3. Impairment: o Deep Crc -k is not listed as impaired on the 303(d) list or mentioned in the Chowan BWP for i n1p„i rment; o Deep Creek drains a short distance to a section of the Chowan River which is listed for 1-1g standard violation and has a fair benthic rating down from Good in 2000. The :13WP does not elaborate on causes of the worsened rating. 4. Threatened and.Endangered (within 2 miles): o Four state -threatened mussels were found near the facility: Eastern Lampnlussel, Tidewater Mucket, Eastern Pondmussel, and Triangle Floater. 5. Location: o The facility is locat A northeast of Colield, NC in a heavily agriculturai area. 6. Industrial Changes Since Previous Permit: o No major claan-es. 7. Analytical Monitoring Notes: 0 9 of 9 monitoring events performed as .required. See Appendix A for Analytical Summary; o In �gentral, I tilti 1p e be ighii) rtt e� ceedances-fcsr'tnos#; al�parameter fat Oi t 11.3 nd_C)trtf"I o Outfall 1 had fewer exceedances — primarily BOD/COD. 8. Qualitative Monitoring Notes: o Qualitative monitoring performed twice per year as required. See Appendix. B for Visual. Summary; o Some color noted consistently alone with decrease clarity. Page 4 of 10 NCS000167 Revised Permit Recommendations: Analytical Monitoring: 1. Proposed strategy: All parameters to remain basedon benchmark exceedances and/or significant levels of concern. Frequency to remain at semi-annual. Adding parameters as follows: a. A�ffli Z arame S a�1c]11bws: i. NI-13-N (ammonia) — analytical results have shown significant nitrogen concentrations and that. TKN accounts for the majority of the total nitrogen 1oad-in the facility's discharges. TKN = organic N + Ammonia N. Currently, it is unknown what portion of'FKN is actually ammonia nitrogen vs organic nitro�.�en'so it -is worth -investigating when considering the high toxicity of ammonia to aquatic life and the occurrence of four threatened mussel species nearby. Since, TN = TKN + NO3 4- NO3, nitrates and nitrite are not considered to be p.robleniatic based on revie", of the data. 2. T e Tierc`Ice monitoring�yst-erth-has-been=kdded.to-4tiis draft permit. 3. Analytical and qualitative monitoring required during representative storm events. Qualitative monitoring required regardless of representative outfall status. Qualitative monitoring to be performed semi-annually. Other Proposed Changes to the Previous Permit: 1. See draft permit for full details. Discussion with Permittee: Joey Baggett, Facility Contact, Messages left April 15, 2010, (252) 348-4383. • General description of facility products, activities, etc? o Four stain activities: Soy Bean Plant (extraction), Feed Mill (poultry feed), Grain Storage, and Maintenance Garage (farm machinery). • Source of nitrogen in runoff'? o Most likely from wxrain storage/soybeans breaking down/fermentation and amino acids associated with that. Sweeping-.qf area-and-witeh Ilaat$-eonPIIDWd:tb min=cElica-fttitl:luiloff: • Wastewater treatment onsite for what, _just for cooling water? Where is it Located? What type of treatment? Are Lagoons Part of WW"l'I' for facility? . o Wastewater treatment of process water from soybean crush plant (lagoons) and discharge of non - contact cooling water. So one spray irrigation permit and one NPDES permit in addition to the stormwater NPDES permit. • ratEia bo,ut�danes_ die u�ult t�sge'pi ma -pi_ u ? o r7xplained to ine while both looking at the site plan. 1-low many acres is the facility? o Over 20 acres. if you include open area on the west side past cooling towers. Page 5 of 10 NCS000167 lb - Recommendations: Based on the documents reviewed, the application information submitted on February 22, 2010 is sufficient -to issue an' Individual Stormwater Permit. Prepared by (Signature) - _- Date Stormwater Permitting Unit Supervisor ,Gal Date 9 1 G �1 a for Bradley nett Concurrence by Regional Office Date ld Water Quality Supervisor ���J 7� /`t HO dram_ Date Regional Office Staff Comments Page 6 of 10 0, Moore, Bill From: Larsen, Cory Sent: Monday, August 30, 2010 10:33 AM To: Moore, Bill Cc: Hodge, AI Subject: RE: Perdue Cofield Facility - NCS000167 Permit Renewal Thanks very much Bill. I'll incorporate your comments in the new permit. If you would, please send back to me the signature page of the staff report. You can reference this email in the comments section and. I'll attach it. From: Moore, Bill Sent: Thursday, August 26, 2010 5.08 PM To: Larsen, Cory Cc: Bodge, Al Subject: RE: Perdue Cofield Facility - NCS000167 Permit Renewal Good Afternoon Cory, We received Perdue's revised site plan and supporting info on 08/16/10. As you know, this facility has provided monitoring data, collected over a period of several years, that indicates significantly polluted stormwater runoff leaving their site. Perdue has taken our suggestions and proposed changes to their site & their SMP that should correct the problems associated with stormwater contamination from their industrial activities. Once these changes are implemented, future monitoring data should show significant improvements. I reviewed their revised stormwater package this week & spoke with Joey Baggett, Perdue Rep, today regarding some minor changes, which they will submit next week. The following comments & recommendations are provided regarding this facility and their NCS000167 stormwater permit: (1) Revised site plan shows (3) stormwater Discharge Outfalls that correspond to (3) drainage basins. A fourth drainage basin has limited BUA/activity & no discrete outlet. The (3) proposed 5DOs should provide representative sampling based on current operations. (2) The proposed monitoring, benchmarks, & Tiered requirements in the draft permit appear to be reasonable. (3) Draft Permit, Section B, Monitoring Requirements: Rainfall Event Duration should be included in Table 1. This info can be useful in evaluating monitoring data & should be included. (4) Table 2: adjust dates to coincide with permit effective date. (5) Tier One: If a facility exceeds a benchmark, I think an inspection should be conducted within one week, not two. Also, item #4, minor changes should be implemented within 30 days, major changes, such as modifications to BMPs and/or construction of additional BMPs, should be implemented within 90 days. The WARO recommends that NC5000167 be reissued. From: Larsen, Cory Sent: Thursday, August 19, 2010 2:57 PM To: Moore, Bill Subject: RE: Perdue Cofield Facility Hi Bill, I'm in receipt of Perdue's revised site plan and proposed stormwater improvement plan. Have you been able to review this information? I think it is sufficient for now and enough for us to move ahead with the permitting process. To do this, I'll need to have your staff report comments returned so I can go ahead and make some changes to the draft permit and send to Perdue for comments. Please return the staff report at your earliest convenience. 16. From: Moore, Bill Sent: Monday, July 19, 2010 9:59 AM To: Larsen, Cory Cc: Hodge, Al Subject: Perdue Cofield Facility Good Morning Cory, We have a meeting with Mr. Black, Perdue Rep, on 7/22, Thursday, 2:00pm, at the WARQ. At this point, I'm thinking changes to the number & locations of the outfalls is needed (not sure this would change draft permit ?) Also, we should require additional sampling, at least until the numbers drop below benchmark levels. Can we draft the permit to include this requirement; maybe as a special provision/condition that would require monthly monitoring that could drop back to normal monitoring schedule after (3) favorable sets of data ? Hope you can make the meeting on Thursday, if not, I will follow-up with you after our meeting, NCS000167 ANALYTICAL MONITORING SUMMARY 0 4% Page 7 of 10 Cofield Analytical Monitoring for Permit # NC5000167 9whil # 19012005 617/229 9/14/2006 6/14/2007 10/24/2007 51281900$ Total Flaw MG 0.171 0.103 0.062 0.103 0.474 0,052 TSS 11 49 21 22 7.1 3.2 PH 6.9 6.86 7.75 7.54 8.1 8.5 4WD- 29 90 105 38 14 BCD 15 ® (: 6.1 2.9 TKN 1.8 4.73 4.31 6.46 1.07 1.07 Tato0hospkioau a.82 ilia 1.09 4E-p 0.38 0.5 Temp, Celsius 24.3 25.5 25.2 21.9 24.6 30.6 Total Nitrogen 2.64 5.36 4.45 6.95 1.26 1.12 Total Rainfall inches 0.83 0.5 0.3 0.5 213 0.25 Event Duration mans. 1440 60 120 90 2980 75 QutFall93 10/.7/2005 6/7/ZOQS 9 4 2 6L1412007 10j24/2007 5/28/20M Total Flow MG 0.046 0.028 0.016 dry 0.128 0.014 asses 40 7.7 cz-=> dry 77 47 pH - 6.7 6.2 6.58 dry 6.21 COD c5w�, 89 5.44 ? dry <:-]�- Si BCD cip 14 ciiV dry CFa) 28 ,:RN, 3.09 3.93 14.6 dry 7123 i0tal•P.hosphorus 1.2 1.24 dry 1.32 1.22 Temp. Celsius 23.5 24.7 23.1 dry 21.9 i8.9 Total Nitrogen 10.7=- 4.55 14.69 dry 7.7 22.76 Total Rainfall inches 0183 0.5 0,3 dry 2.3 0.25 Event Duration miss. 1440 60 120 dry 2880 75 Outfali1114 0 7 00 6/7/2006 4 2006 6 7 20/24/2007 5/28/2008 Total Flow MG 0.097 0.059 0.035 0.059 0.27 0.029 Oil & Grease 4.06 < 2 < 2 7.06 5.9 < 5 �T54=. 1.32 37 89 74 PH of 6.27 7.34 6.4 6.5 New motor oil uSeage CCQ&. 66.7 62 67 a 67 �_BCD 67 67 � t5� <36ZTKNT 3.09 12.62 8.08 18.82 clou"10sphorus 1.2 <9PD ® - Temp, Celsius 23.5 23.3 22.8 20.3 24.2 17.7 Totai Nitrogen 4.07 13.66 25.89 8.36 20.24 Total Rainfall inches 0.83 0.5 0.3 0.5 2.3 0.25 Event Duration miss. 1440 60 120 90 2880 75 • ----> f3,-tk d -LJ4 . /7 11/5/292 SL71ZOD9 111(1&1220 0.124 0.153 0,969 21 34 45 7.8 8.3 7 61 32 50 12 13 22 2.01 106 3.47 0.42 1.1 0.75 15.9 30.2 21.1 2.25 2.24 4.24 0.6 0,74 4.7 950 960 2160 1 5 2 5/ /2009 1/11112009 0.33 0.041 0.261 37 26 16 7 i 6.8 J 6.5 7.78 5.76 6.89 1.31 1.47 1.3 15.6 20.5 14,6 1125 6.08 7.78 0.6 0.74 4.7 960 960 2160 116/2008 0.07 SL7txao9 0,087 11/11/2009 0.55i <5 <5 <5 60 54 3.3 7 6.1 6.4 67 67 S7 67 7.78 4.8 6.97 1.31 L24 1.35 15.6 20.2 14.3 8.38 5.29 7.84 0,6 0.74 4.7 960 960 2160 • NCSOOO16! APPENDIX B VISUAL MONITORING SUMMARY r Page 9of10 r Cofield Visual Monitorong Results Permit # NCS000167 Outfall# 2 10 7 2005 6 6 2006 1015 2006 4 12 2007 10/1212007 5 28 2009 Color green/brown clear clear light/brown clear clear Odor No No No No No No Clarity 2 1 3 6 2 1 Floating Sol ids 2 2 2 6 1 1 Suspended Solids 2 2 2 5 2 1 Foam No No No No No No Oil Sheen No No No No No No Other Polutants No No No No No No Outfali# 3 10 7 2005 6 6 2006•• 10 15 2006 4 12 2007 10 11 2007 28 200 Color green/brown no flow light/brown light/brown no flow lig4,Ibrown Odor No no flow No No no flow No Clarity 2 no flow 5 4 no flow 4 Floating Solids 2 no flow 5 4 no flow 2 Suspended Solids 2 no flow 5 4 no flow 2 Foam No no flow No No no flow No Oil Sheen No no flow No No, no flow No Other Polutants No no flow No No no flow No Outfall# 4 10 7 2005 fi 6 2006 10/15/2006 4 12 2007 10/21/2007 5 28 8 Color light/brown no flow brown light/brown no flow Ilght/brown Odor No no flow No No no flow No Clarity 6 no flow 6 6 no flow 5 Floating Solids 2 no flow 5 5 no flow 3 Suspended Solids 6 no flow 6 5 no flow 3 Foam No no flow No No no flow No Oil Sheen No no flow No No no flow No Other Polutants No no flow No No no flow No Clarity, Floating Solids and Suspended Solids measured on a scale of 1-10 with 1 being the least and 10 the most. ti i 11 5 2048 5 7 2009 clear light/brown No No 2 1 1 No No No No No No 11 5 200 5 7 2009 brown light/brown No No 3 5 2 2 2 3 No No No No No No 11 5 2008 5 7 2009 brown light/brown No No 3 7 2 2 2 5 No No No No No No 11111/2009 clear No 3 3 3 No No No 11 31 2009 light/brown No 8 7 8 No No No 11/11/2009 light/brown No 8 6 7 No No No