Loading...
HomeMy WebLinkAbout20190337 Ver 1_PCN Form Submission_20190315D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190337 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Dave Wanucha:eads\djwanucha Information for Initial Review 1a. Name of project: Ashe Bridge #177 1a. Who is the PrimaryContact?* Heath Slaughter 1b. PrimaryContact Email:* hslaughter@ncdot.gov Date Submitted 3/15/2019 Nearest Body of Water BeaverCreek Basin New Water Classification C; Trout + Site Coordinates Latitude: 36.33187 A. Processing Information County (or Counties) where the project is located: Ashe Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: Ve rsion# * 1 Reviewing Office * Winston-Salem Regional Office - (336) 776- 9800 1c. PrimaryContact Phone:* (336)903-9202 Longitude: -81.42885 :: WBS # (�) 17BP.11.R.183 1a. Type(s) of approval sought from the Corps: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 801 Statesville Road Address Line 2 �Y North Wilkesboro Fbstal / Zip Code 28659 2e. Telephone Number: (336)903-9202 2g. Email Address:* r 401 Water Quality Certification - E�ress r Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: x C' Yes R No C' Yes G No hslaughter@ncdot.gov C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/town: West Jefferson 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 ary Fbstal I Zip Code 2b. Property size: State / Aovince / Re3ion Country 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* BeaverCreek 3b. Water Resources Classification of nearest receiving water:* C: Trout + 3c. What river basin(s) is your project located in?* New 3d. Please provide the 12-digit HUC in which the project is located. 050500010206 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Replacing old bridge with new bridge in rural/residential area. 46. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* f Yes �' No r Unknown 4d. Attach an 8 1/2 X 17 excerpt from the most recent version of the USGS topogrephic map indicating the location of the project site. (for DWR) Ashe #177_Topo.pdf 2.06MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 200 4h. Explain the purpose of the proposed project:* Replace shucturally deficient bridge. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* See attached cover letter. 4j. Please upload project drawings for the proposed project. Ashe #177_Final Permit Drawings.pdf 14.84MB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?" � Yes r No r Unknown Comments: Sb. If the Corps made a jurisdictional determination, what type of determination was made?" � Preliminary r Approved � Not Verified � Unknown r WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: RK&K Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands I17 Streams-tributaries r Buffers r Open Waters I� Pond Construction 3. Stream Impacts 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 80 70 3i. Total stream and ditch impacts: 150 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replacing bridge with another bridge. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: See attached cover letter. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: No permanent streambed impacts. I F. Stormwater Management and Diffuse Flow Plan (required by DWR) " I 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes r No If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* F Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* r Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environme ntal Policy Act (NEPAISEPA)? * C' Yes r No Comme nts: * MCDC 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water qualit�/?* C' Yes r No 36. If you answered "no," provide a short narrative description. Replacing existing bridge. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No � WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* � Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes r No Sd. Is another Federal agency involved?* r Yes � No What Federal Agency is involved? Corps Se. Is this a DOT project located within Division's 1-8? f Yes r No Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No Sg. Does this project involve bridge maintenance or removal? F Yes r No Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? f Yes �' No r Unknown r Unknown Sh. Does this project involve the construction/installation of a wind turbine(s)?* � Yes r No Si. Does this project involve (7) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? C' Yes r No Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NHP and visual observation. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?" C' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Project was reviewed by HEU. 7c. Historic or Prehistoric Information Upload 040177 AR16-02-0022noeligiblesites.pdf 040177_Ashe 177 16-02-0022NoSurvey.pdf 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* G Yes r No Sb. If yes, explain how project meets FEMA requirements: Project was reviewed and approved by NCDOT Hydraulics Unit. 8c. What source(s) did you use to make the floodplain determination?* Above Link. Miscellaneous Comments Miscellaneous attachments not previouslyrequested. Ashe #177_Letter.pdf B-5830 NLEB MYGR Ashe.pdf NHP project_report_ashe_bridge_177.pdf Signature * fJ By checking the box and signing below, I certify that: 2.49MB 4.8SMB 982.92K6 274.82KB 3.13MB • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction° subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Heath Slaughter Signature ���tj 25r�rr�/rlr t � � � Date 3/15/2019