Loading...
HomeMy WebLinkAboutNCS000218_Permit (Issuance)_20070706STORMWATER DIVISION CODING SHEET PERMIT NO. DOC TYPEFINAL PERMIT MONITORING INFO El APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ 2C2-i o 7 D (e YYYYMMOD 19 of warF,� � Y Mr. Jim Seufert 2801 East Beltline NE Grand Rapids, MI 49525 Dear Mr. Seufert: �..•%6b�- r. yr CIVV Ci aeI F. Easley, Governor AND NATURAL RESOURCES of North Carolina MOORESVILLE RE(31ONA><vit &h10,rRoss, Jr., secretary RP art`rneht'of Environ'ment anB Natural Resources y Coleen H Sullins, Director 9 1 2007 July 6, 2007 WATER QUALITY SEA I Subject: Final NPDES Stormwater Permit Permit NCS000218 Universal Forest Products Rowan County In response to your renewal application for continued coverage under NPDES stormwater permit NCS000218, the Division of Water Quality (Division) is forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated May 9,1994 (or as subsequently amended). This final permit includes no major changes from the draft permit sent to you on May 8, 2007. The qualitative monitoring strategy remains the same (semi-annual) as the previous term of the permit. Please note that analytical monitoring is also required in this permit. Failure to complete the monitoring as required is a violation of the permit and any permit noncompliance constitutes a violation of the Clean Water Act. Reference Part III, Section A, Item 2 "Duty to Comply", Item 9 "Penalties for Tampering " and Item 10 "Penalties for Falsification of Reports" of your permit for further information. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the -Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611 -7447. Unless such demand is made, this decision shall be final and binding. Please take notice this permit is not transferable. Part III, B.2. addresses the requirements to be followed in case of change in ownership or control of this discharge. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. North Carolina Division of Water Quality (919) 733-7015 1617 Mail Service Center FAX (919) 733-0719 Raleigh, North Carolina 27699-1617 On the Intempt at httn:llh?n.Pnr.ctata.nr iicl Mr. Jim Seufert Universal Forest Products Permit No. NCS000218 Page 2 If you have any questions or comments concerning this permit, contact Kelly Johnson at (919) 733-5083 x 376 or kelly.p.johnson®ncmail.net. Sincerely, ORIGINAL SIGNED BY BRADLEY BENNETT for Coleen H. Sullins, Director cc: Mooresville Regional Office, Michael Parker Stormwater Permitting Unit Central Files Attachments 0 14 NCS000218 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Universal Forest Products Eastern Division, Inc. is hereby authorized to discharge stormwater from a facility located at Universal Forest Products Eastern Division, Inc. 358 Woodmill Road Salisbury, NC Rowan County to receiving waters designated as Town Creek, a class C stream in the Yadkin Pee -Dee River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI hereof. This permit shall become effective July 6, 2007 This permit and the authorization to discharge shall expire at midnight on July 5, 2012. Signed this 6 h day of July 2007 ORIGINAL SIGNED BY BRADLEY BENNETT for Coleen H. Sullins, Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000218 TABLE OF CONTENTS PART I INTRODUCTION Section A: Individual Permit Coverage Section B: Permitted Activities Section C: , Location Map PART II MONITORING, CONTROLS, AND LIMITATIONS FOR -PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: Qualitative Monitoring Requirements Section D: On -Site Vehicle Maintenance Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section B: General Conditions 1. Individual Permit Expiration 2. Transfers i Permit No. NCS0002IS 3. Signatory Requirements 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Permit Actions Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring and Records 1. Representative Sampling . 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges` 5. Planned Changes 6. Anticipated Noncompliance 7. Bypass 8. Twenty-four Hour Reporting 9. Other Noncompliance 10. Other Information PART IV LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS ii Permit No. NCS000218 PART I INTRODUCTION SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to discharge storm -water to the surface waters of North Carolina or separate storm sewer system which has been adequately treated and managed in accordance with the terms and conditions of this individual permit. All discharges shall be in accordance with the conditions of this permit. Any.other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization or approval. The discharges allowed by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. Part 1 Page 1 of 2 SECTION C: LOCATION MAP Permit No. NCS000218 Latitude: 35135'53" N NCS000218 Faeili Longitude: 80132 27 W ty County: Rowan Universal Forest Location Stream Class: C Products Receiving Stream: Town Creek Sub -basin: 03-07-04 (Yadkin Pee -Dee River Basin) a ff0tt/t NOT TO TCALF Part 1 Page 2 of 2 Permit No. NCS000218 PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part III, Standard Conditions, Section E, Paragraph 3 of this individual permit. The Plan shall include, at a minimum, the following items: Site Plan. The site plan shall provide a description of the physical facility and the potential pollutant sources which may be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: a. A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters, the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters; and accurate latitude and longitude of the point(s) of discharge. . b. A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. C. A site map drawn to scale with the following items: (1) Distance legend and north arrow (2) '� Location of industrial activities (including storage of materials, -disposal areas, process areas and loading and unloading areas) (3) 'Drainage structures (4) Delineated drainage areas for each outfall (5) Drainage area for each outfall in acres and percentage of each drainage area.that is impervious (6) Building locations (7) Existing BMPs and impervious surfaces (8) For each outfall, a narrative description of the potential pollutants that could be expected to be present in the stormwater discharge. d. A list of significant spills or leaks of pollutants that have occurred at the facility during the 3 previous years and any corrective actions taken to mitigate spill impacts. e. Certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part III, Standard Conditions, Section B, Paragraph 3. Part I I Page -I of 7 Permit No. NCS000218 2. Stormwater Management Plan. The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater, including structural and nonstructural measures. The stormwater management plan, at a minimum, shall incorporate the following: a. Feasibility Study. A review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. Wherever practical, the permittee shall prevent exposure of all storage areas, material handling operations, and manufacturing or fueling operations. In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. b.. Secondary Containment Schedule. A schedule to provide secondary containment for bulk storage of liquid materials, storage of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority chemicals, or storage of hazardous substances to prevent leaks and spills from contaminating stormwater runoff. If the secondary containment devices are connected directly to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices [which shall be secured with a locking mechanism] and any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by the material stored within the containment area. Records documenting the individual making the observation, the description of the accumulated stormwater and the date and time of the release shall be kept for a period of five years.. C. BMP Summary. A narrative description shall be provided of Best Management. Practices (BMPs) to be considered such as, but not limited to, oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential of sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. 3. Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or team) responsible for implementing the SPRP shall be identified. A responsible person shall be on -site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, a SPCC plan may be a component of the SPRP, but may not -be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. . Part 11 Page 2 of 7 Permit No. NCS000218 4. Preventative Maintenance and Good Housekeeping Program.. A preventative maintenance program shall be developed. The program shall document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and systems. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. 5. Employee Training. Training schedules shall be developed and training provided at a minimum on an annual basis on proper spill response and cleanup procedures and preventative maintenance activities for all personnel involved in any of the facility's operations that have the potential'to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified. 6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position assignments provided. 7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters. The Stormwater Pollution Prevention. Plan shall be reviewed and updated on an annual basis. The Director may notify the permittee when the Plan does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the Plan to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part III, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. 8. Facility Inspection Program. Facilities are required to inspect all stormwater systems on at least a semiannual schedule, once in the fall (September -November) and once in the spring (April - June). The inspection and any subsequent maintenance activities performed shall be documented, recording date and time of inspection, individual(s) making the inspection and a narrative description of the facility's stormwater control systems, plant equipment and systems. Records of these inspections shall be incorporated into the Stormwater Pollution Prevention Plan. Stormwater discharge characteristic monitoring as required in Part II of this permit shall be performed in addition to facility inspections. 9. Implementation. The permittee shall document all monitoring, measurements, inspections and maintenance activities and training provided to employees, including the log of the sampling data and of activities taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on -site for a period of five years and made available to the Director or his authorized representative immediately upon request. Part 11 Page 3 of 7 Permit No. NCS000218 SECTION B: ANALYTICAL MONITORING REQUIREMENTS During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater subject to the provisions of this permit. Analytical' monitoring of stormwater discharges shall_ be performed as specified below in Table 1. All analytical monitoring shall be performed during a representative storm event. The required monitoring will result in a minimum of ten analytical samplings. being conducted over the term of the permit at each stormwater discharge outfall (SDO). The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified below in Table 2. Monitoring results shall be compared to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). The permittee shall evaluate the sources of any benchmark exceedances and evaluate the effectiveness of any site BMPs. The permittee shall review and/or update the SPPP and document any efforts to address stormwater contamination. Table 1. Analytical Monitoring Requirements fl Yi � I' I�Discharge i it f lii �1„ � li -1"I -1'. z Frequency) --i Sample,; �� Sample �;,�'- y�11t j fy jEll�17 4'�;`; 3Mteasureiment k��z!I.i� sLocation3 Total Suspended Solids mgAL, Semi-annually Grab SDO Total Recoverable Copper m Semi-annually Grab SDO H standard Semi-annually Grab SDO Total Rainfall inches Semi -Annually _ Rainfall Event Duration minutes Semi -Annually Footnotes: I Measurement Frequency: All analytical monitoring will be performed two times per year for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle, the permittee has submitted the appropriate paperwork for a renewal application before the submittal deadline, the permittee will be considered for a renewal permit. The applicant must continue semi- annual analytical monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the pond shall be collected within the first 30 minutes of discharge. If the detention pond discharges only in response to a storm event exceeding a ten year design storm, then no analytical monitoring is required and only qualitative monitoring shall be performed. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status has been granted. Part I I Page 4 of 7 - Permit No. NCS000218 Table 2. - Monitoring Schedule ;. 4 .rS- t Mo norm er�od g P,. i IH ,� i Sam `1c'Nu riber''� k P._ i ti � �y� - Start �! I�i 1�.>.�d�i� i. ���{"L, .{:.��;i �. ., n.d p. PM y �� I E �� ° �� Pi;o Year 1 —Fall 1 September 1, 2007 November 30, 2007 Year 1 — Spring 2 April 1, 2008 June 30, 2008 Year 2 — Fall 3 September 1, 2008 November 30, 2008 Year 2 — Spring 4- April 1, 2009 June 30, 2009 Year 3 — Fall 5 September 1, 2009 November 30, 2009 Year 3 — Spring 6 April 1, 2010 June 30, 2010 Year 4 — Fall 7 September 1, 2010 November 30, 2010 Year 4 — Spring 8 April 1, 2011 June 30, 201 Year 5 — Fall 9 September 1, 2011 November 30, 2011 Year 5 - Spring 10 April 1, 2012 June 30, 2012 Footnotes: l Maintain semi-annual monitoring during permit renewal process. Table 3. Benchmark Values for Analytical Monitoring 1DischargeChracterts .kUns F Be-n0i chmb kN �, 5 Total Suspended Solids mg/L 100 Total Recoverable Copper mg/L .007 PH standard 6-9 This site discharges to impaired waters experiencing problems with biological integrity. If a . Total Maximum Daily Load (TMDL) is approved for this segment of Town Creek, the Permittee may be required to monitor for the pollutant(s) of concern in the future and submit results to the Division of Water Quality. The Division will consider the monitoring results in determining whether additional BMPs are needed to control the pollutant(s) of concern to the maximum extent practicable. If additional BMPs are needed to achieve the required level of control, the Permittee will be required to (1) develop a strategy for implementing appropriate BMPs, and (2) submit a timetable for incorporation of those BMPs into the permitted Stormwater Pollution Prevention Plan. SECTION C: QUALITATIVE MONITORING REQUIREMENTS Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified below in Table 4. Qualitative monitoring is for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stormwater pollution. No analytical tests are required. Qualitative monitoring of stormwater outfalls is performed when stormwater discharge occurs but does not need to be performed during a representative storm event. Part 1I Page 5 of 7 Permit No. NCS000218 In the event an atypical condition is noted at a stormwater discharge outfall, the Permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation will be maintained with the Stormwater Pollution Prevention Plan. All qualitative monitoring will be performed twice per year, once in the spring (April - June) and once in the fall (September - November). Table 4. Qualitative Monitoring Requirements E 1h Y 1 t Rll "y F !& i Discharge Characteristics r "y� A > KKIIiM IY s za regpenppcyE ..�Location1r�.. W 15.:a „IMonitoring °, Color Semi-annually SDO Odor Semi-annually SDO Clarity Semi-annually SDO Floating Solids Semi-annually SDO Suspended Solids Semi-annually SDO Foam Semi-annually SDO Oil Sheen Semi-annually' SDO Other obvious indicators of stormwater ollution 1.Semi-annually SDO Footnotes: I Measurement Frequency: All analytical monitoring will be performed two times per year for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle, the permittee has submitted the appropriate paperwork for a renewal application before the submittal deadline, the permittee will be considered for a renewal permit. The applicant must continue semi- annual analytical monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS Facilities which have any vehicle maintenance activity occurring on�sit uses m than SS gallons � motor roil per month when averaged over the calendar year shall perform analytical monitoring as speci ied�belo�w in Table 5. This monitoring shall be performed at all outfalls which discharge stormwater runoff from vehicle maintenance areas. All analytical monitoring shall be performed during a representative storm event. The required monitoring will result in a minimum of ten analytical samplings being conducted over the term of the permit at each stormwater discharge outfall (SDO) which discharges stormwater runoff from vehicle maintenance areas. The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified in Table 2 (Section B): Monitoring results shall be compared to the benchmark values in Table 6. The benchmark values in Table 6 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). The permittee shall evaluate the sources of any Part I1 Page 6 of 7 Permit No. NCS000218 benchmark exceedances and evaluate the effectiveness of any site BMPs. The permittee shall review and/or update the SPPP and document any efforts to address stormwater contamination. Table S. . Analytical Monitoring Requirements for On -Site Vehicle Maintenance Discharge Cliaracterishcs i '. ga r k fir._ 3 d a * ,r,i � 5 + ; ,. Lt, a j .IF Units s x ; r , h i,5a ' r Measurement " e'uenc 1: i1SAmp le a�F ` -5N - 4 it IT'. ;,e2 ! �'r'd. Sample „Location3:;', H standard Semi-annually Grab SDO Oil and Grease m Semi-annually Grab SDO Total suspended Solids mg/L Semi-annually ' Grab SDO New Motor Oil Usagegallons/month Semi-annually Estimate - Total Rainfall inches Semi-annually Rainfall Event Duration minutes Semi-annually Footnotes: 1 Measurement Frequency: All analytical monitoring will be performed two times per year for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. if at the end of this permitting cycle, the permittee has submitted the appropriate paperwork for a renewal application before the submittal deadline, the permittee will be considered for a renewal permit. The applicant must continue semi- annual analytical monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the pond shall be collected within the first 30 minutes of discharge. If the detention pond discharges only in response to a storm event exceeding a ten year design storm, then no analytical monitoring is required and only qualitative monitoring shall be performed. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur. Table 6. Benchmark Values for Vehicle Maintenance Analytical Monitoring r; Discharge Characteristics °�,i ,,;�„.`x 'Units „Benchma:rk pH standard 6-9 Oil and Grease mg/L 30 Total Suspended Solids mg/L 100 Part II Page 7 of 7 Permit No. NCS000218 PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS SECTION A: COMPLIANCE AND LIABILITY 1. Compliance Schedule The permittee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule: Existing Facilities: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the initial permit and updated thereafter on an annual basis. Secondary 'containment, as specified in Part II, Section A, Paragraph 2(b) of this permit, shall be accomplished within 12 months of the effective date of the initial permit issuance. Proposed Facilities: The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis. Secondary containment, as specified in Part II, Section A, Paragraph 2(b) of this permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity. 2. Duly to Com 1 The permittee must comply with all conditions of this individual permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of a permit upon renewal application. a. The pennittee shall comply with standards or prohibitions established under section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement. b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed $27,500 per day for each violation. Any person who negligently violates any permit condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or imprisonment for not more than I year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. AIso, any person who violates a permit condition may be assessed an administrative penalty not to exceed $11,000 per violation with the maximum amount not to exceed $137,500. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] c. Under state law, a daily civil penalty of not more than twenty-five thousand dollars ($25,000) per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [Ref: North Carolina General Statutes 143- 215.6A) d. Any person may be assessed an administrative penalty by the Director for violating section 301, 302, 306, 307, 308, 318, or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act. Administrative penalties for Class I violations are not to exceed $11,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $27,500. Penalties for Class II violations are not to exceed $11,000 per day for each day during which the violation continues, with the maximum amount of any Class II penalty not to exceed $137,500. Part I It. Page 1 of 8 Permit No. NCS000218 Duty to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this individual permit which has a reasonable likelihood of adversely affecting human health or the environment. 4. Civil and Criminal Liability Except as provided in Part Ill, Section C of this permit regarding bypassing of stormwater control facilities, nothing in this individual permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,143-215.6A, 143-215.613, 143- 215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. Oil and Hazardous Substance Liability Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. 6. Property Rights The issuance of this individual permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations. 7. Sevcrability The provisions of this individual permit are severable, and if any provision of this individual permit, or the application of any provision of this individual permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this individualpermit, shall not be affected thereby. 8. Duty to Provide Information The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit issued pursuant to this individual permit or to determine compliance with this individual permit. The permittee shall also furnish to the Director upon request, copies of records required to be kept by this individual. permit. 9. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this individual permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of violation, or by imprisonment of not more than 4 years, or both. 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this individual Part III Page 2 of 8 Permit No. NCS000218 permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. SECTION B: GENERAL CONDITIONS Individual Permit Expiration The permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS §143-2153.6 and 33 USC 1251 et. seq. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. Permittee is required to,notify the Division in writing in the event the permitted facility is sold or closed. 3. Signatory Requirements -'All applications, reports, or information submitted to the Director shall be signed and certified. a. - All applications to be covered under this individual permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official. b. All reports required by the individual permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental Part III Page 3 of 8 Permit No. NCS000218 matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director. C. Any person signing a document under paragraphs a. or b. of this section shall make the following certification: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathenand evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4. Individual Permit Modification, Revocation and Reissuance. or Termination The issuance of this individual permit does not prohibit the Director from reopening and modifying'the individual permit, revoking and reissuing the individual permit, or terminating the individual permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H A 100; and North Carolina General Statute 143-215.1 et. al. 5. Permit Actions The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any individual permit condition. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 1. Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this individual permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a pennittee only when the operation is necessary to achieve compliance with the conditions of this individual permit. . Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this individual permit. 3. Bynassing of Stormwater_Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry Part III Page 4 of 8 Permit No. NCS000218 weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. The permittee submitted notices as required under, fart III, Section E of this permit. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS 1. Representative Sampling Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Analytical sampling shall be performed during a representative storm event. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. Monitoring points as specified in this permit shall not be changed without notification to and approval of the Director. ` 2. Recording Results For each measurement, sample, inspection or maintenance activity performed or collected pursuant to the requirements of this individual permit, the permittee shall record the following information: a. The date, exact place, and time of sampling, measurements, inspection or maintenance activity; ' ' - b. The individual(s) who performed the sampling, measurements, inspection or maintenance activity; C. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. To meet the intent of the monitoring required by this individual permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. Part ill Page 5 of 8 Permit No. NCS0002I S Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 6. Records Retention Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on -site. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all reports required by this individual permit for a period of at least 5 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. Insnection and En The permittee shall a]low the Director, or an authorized representative (including an authorized contractor acting as a representative -of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to; a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this individual permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of . this.individual permit; F C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this individual permit; and d. Sample or monitor at reasonable times, for the purposes of assuring individual permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. SECTION E: REPORTING REQUIREMENTS 1. Discharge Monitoring Reports Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on Discharge Monitoring Report forms provided by the Director. Submittals shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. 2. Submitting Reports Duplicate signed copies of all reports required herein, shall be submitted to the following address: Division of Water Quality Surface Water Protection Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Part III Page 6 of 8 Permit No. NCS000218 3. Availability of Reports Except for data determined to be confidential- under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be . considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.6B or in Section 309 of the Federal Act. 4. Non-Stormwater Discharges If the storm event monitored in accordance with this individual permit coincides with a non-stormwater discharge, the permittee shall separately monitor all parameters as required under the non-stormwater discharge permit and provide this information with the stormwater discharge monitoring report. 5. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the individual permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticipated Noncomplian= The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the individual permit requirements. 7. Bypass a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of . the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. 8. Twenty-four Hour Reaortina The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. - The Director may waive the written report on a case -by -case basis if the oral report has been received within 24 hours. 9. Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted. Part I I I Page 7 of 8 Permit No. NCS000218 10. Other Information Where the permittee becomes aware that it failed to submit any relevant facts in an application for an individual permit or in any report to the Director, it shall promptly submit such facts or information. Part III Page 8 of 8 NCS000218 PART 1V LIMITATIONS REOPENER This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual permit; or b. Controls any pollutant not limited in the individual permit. The individual permit as modified or reissued under this paragraph shall also contain any other requirements in the Act then applicable. PART V ADMINISTERING'AND COMPLIANCE MONITORING FEE REQUIREMENTS The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Individual Permit. PART VI DEFINITIONS 1. Act See Clean Water Act. 2. Arithmetic Mean The arithmetic mean of any set of values is the summation of the individual values divided by'the number of individual values. 3. Allowable Non-Stormwater Discharges This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: (a) All other discharges that are authorized by a non-stormwater NPDES permit. (b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (c) Discharges resulting from fire -fighting or fire -fighting training. 4. Best Management Practices (BMPs) Measures or practices used to reduce the amount of pollution entering surface waters. SMPs may take the form of a process, activity, or physical structure. Parts IV, V and VI Page I of 5 Permit No. NCS000218 5., Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 6. Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. 8. Division or_DW4 The Division of Water Quality, Department of Environment and Natural Resources. 9. Director The Director of the Division of Water Quality, the permit issuing authority. 10. EMC The North Carolina Environmental Management Commission. 11. Grab Sample An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively monitored must be taken within the first 30 minutes of discharge. 12. Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 13. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility. 14. Municipal Separate Storm Sewer System A stormwater collection system within an incorporated area of local self-government such as a city or town. 15. Overburden Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations. Part VI Page 2 of 5 Pages Permit No. NCS000218 16. Permittee The owner or operator issued a permit pursuant to this individual -permit. 17. Point Source Discharge of Storrnwater Any discernible, confined and discrete conveyance including, but not specifically limited to, any, pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. 18. Representative Storm Event A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up'to 10 consecutive hours of no precipitation., For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. 19. Representative Outfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 20. Rinse Water Discharge The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters utilizing any type of detergent or cleaning agent. 21. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. 22. Section 313 Water Priority Chemical A chemical or chemical category which: a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Ameridments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; Is present at or above threshold levels at a facility subject to SARA Title 11I, Section 313 reporting requirements; and C. That meet at least one of the following criteria: (1) Is listed in Appendix D of 40 CFR part 122 on either Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 3l 1(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. Part VI Page 3 of 5 Pages Permit No. NCS000218 23. Severe Property Damage Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 24. Significant Materials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. 25. Significant Spills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.21) or section 102 of CERCLA (Ref. 40 CFR 302.4). 26. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. 27. Stormwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 28. Stormwater Pollution Prevention Plan A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. 29. Ten Year Design Storm The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control Planning and Design Manual. 30. Total Flow The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. Part VI Page 4 of 5 Pages Permit No. NCS000218 31. Total Maximum Daily Load (TMDL) A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed water quality assessment that provides the scientific foundation for an implementation plan. The implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to restore and maintain water quality standards in all seasons. The Clean Water Act, section 303, establishes the water quality standards and TMDL programs. 32. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 33, UP —Set Means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment or control facilities, inadequate treatment or control facilities, lack of preventive maintenance, or careless or improper operation. 34. Vehicle Maintenance Activity Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing operations. 35. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 36. - 25-year, 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Part VI Page 5 of 5 Pages