HomeMy WebLinkAboutNCS000049_FINAL PERMIT_20090112--STORMVUATER-D1VISfON-CODING-SHEET - - -
PERMIT NO.
NLS L�flO�-/
DOC TYPE
qFINAL PERMIT
❑ MONITORING INFO.
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
❑ ZZD°I 7,
YYYYMMDD
apF WAr
_P
47
Mr, Bill Shaw
Cognis Corporation
PO Box 7044
Charlotte, NC 28241
Dear Mr. Shaw:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H, Sullins, Director
Division of Water Quality
January 12, 2009
Subject: Final NPDES Stormwater Permit
Permit NC5000049
Cognis Corporation
Mecklenburg County
In response to your renewal application for continued coverage under NPDES stormwater permit
NCS000049, the Division of Water Quality (Division) is forwarding herewith the subject state - NPDES
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 743-215 .1 and
the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection agency
dated October 15, 2007 (or as subsequently amended).
This final permit includes no major changes from the draft permit sent to you on October 27, 2008.
The qualitative monitoring strategy remains the same (semi-annual) as the previous term of the permit.
Please note that analytical monitoring is also required in this permit. Failure to complete the monitoring as
required is a violation of the permit and any permit noncompliance constitutes a violation of the Clean Water
Act. Reference Part III, Section A, -Item 2 "Duty to Comply", Item 9 "Penalties for Tampering " and Item 10
"Penalties for Falsification of Reports" of your permit for further information.
If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to
you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following
receipt of this letter, This request must be in the form of a written petition, conforming to Chapter 150B of the
North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer
27447, Raleigh, North Carolina 27611 -7447. Unless such demand is made, this decision shall be final and
binding.
Per the requirements of the Catawba Riparian Buffer Rule, all stormwater drainage from portions of this
site that have been constructed after June 30, 2001 must be discharged through -a correctly designed level
spreader or another device that meets diffuse flow requirements per 15A NCAC 213.0243. Diffuse flow
requirements are described in Chapter 8 of the North Carolina Stormwater BMP Manual, available at:
littp://li2o.eiir.state.nc.us/su/bmp forms.htm
Please take notice this permit is not transferable. Part III, 13.2. addresses the requirements to be followed in
case of change in ownership or control of this discharge. This permit does not affect the legal requirements
to obtain other permits which may be required by the Division of Water Quality or permits required by
ne
nrthCarolina
North Carolina Division of Water Quality 1617 Mail Servico Center Raleigh, NC 27699-I617 Phone (919) 807-6300 Customer Service
Internet: h2o.enr.state.nc.us 512 N, Salisbury St. Raleigh, NC 27604 PAX (919) 807.6494 I-877-623.6748
An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper
1vfr. bill Shaw
Cognis Corporation Y
Permit No. NCS000049
the Division of Land Resources, Coastal Area Management Act or any other Federal or Local
governmental permit that may be required.
If you have any questions or comments concerning this permit, contact Brian Lowther at (919) 807-6368 or
brian.lowtlier@ncmail.net. E
{ Sincerely,
l .
ORIGINAL SIGWb by
KEN PICKLE
fir Coleen H. Sullins, Director
cc: Mooresville Regional Office, Water Quality Section
Mike Mitchell, EPA Region IV
Stormwater Permitting Unit
Central Files
Mecklenburg County
Attachments: Individual Stormwater Permit NC5000049
0�
r
NCS000049
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
PERMIT
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental -
Management Commission, and the Federal Water Pollution Control Act, as amended,
Cognis Corporation,
is hereby authorized to discharge stormwater from a facility located at
Cognis Corporation
3300 Westinghouse Blvd
Charlotte, NC
Mecklenburg County
to receiving waters designated as Steele Creek, a class'C stream in the Catawba River Basin, in
accordance with the discharge limitations, monitoring requirements, and other conditions set
forth in Parts I; II, III, IV, V and VI- hereof.
This permit shall become effective [February 1, 2009].
This permit and the authorization to discharge shall expire at midnight on [January 31, 2014].
Signed this day [January 12, 2009].
ORIGINAL SIGNED BY
KEN PICKLE
for Coleen H. Sullins Director
Division of Water Quality
-By the Authority of the Environmental Management Commission
Permit No. NCSOA49
TABLE OF CONTENTS
PART I
INTRODUCTION
Section -A:
- Individual -Permit Coverage
Section B:
Permitted Activities
Section C:
Location Map
PART II
MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED
DISCHARGES
Section A:
Stormwater Pollution Prevention Plan
Section B:
Analytical Monitoring Requirements
Section C:
Qualitative Monitoring Requirements
Section D:
On -Site Vehicle Maintenance Monitoring Requirements
PART III
STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL
PERMITS
Section A:
Compliance and Liability
1. Compliance Schedule
2. Duty to Comply
3. Duty to Mitigate .
=.
4. Civil and Criminal Liability
5. Oil and Hazardous Substance Liability
6. Property Rights
7. Severability
8. Duty to Provide Information
9. Penalties for Tampering
10. Penalties for Falsification of Reports
Section B:
General Conditions
-
I .' Individual Permit Expiration
2. Transfers
i
Permit No. NCS000049
Section C:
Section D:
Section E:
3. Signatory Requirements
4. Individual Permit Modification, Revocation and Reissuance, or
Termination
5. Permit Actions
Operation and Maintenance of Pollution Controls
1. Proper Operation and Maintenance
2. Need to Halt or Reduce Not a Defense
3. Bypassing of Stormwater Control Facilities
Monitoring and Records
1. Representative Sampling
2. Recording Results
3. Flow Measurements
4. Test Procedures
5. Representative Outfall.
6. Records Retention
7. Inspectiori and Entry .
Reporting Requirements
I . Discharge Monitoring Reports
2. Submitting Reports .
3. Availability of Reports
4. Non-Stormwater Discharges
5. Planned Changes
6. Anticipated Noncompliance
7. Bypass
8. Twenty-four Hour Reporting
9. Other Noncompliance
10. Other Information
PART IV LIMITATIONS REOPENER
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VI DEFINITIONS
ii
Permit No. NCS000049
PART I INTRODUCTION
SECTION A: INDIVIDUAL PERMIT COVERAGE
During the period beginning on the effective date of the permit and lasting until expiration, the
permittee is authorized to discharge stormwater associated with industrial activity. Such
discharges shall be controlled, limited and monitored as specified in this permit.
If industrial materials and activities are not exposed to precipitation or runoff as described in 40
CFR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater
discharge permit requirements. Any owner or operator wishing to obtain a No Exposure,
.Certification must submit a No Exposure Certification N01 form to the Division; must receive
approval by the Division; must maintain no exposure conditions unless authorized to discharge
under a valid NPDES stormwater permit; and must reapply for the No Exposure Exclusion once
every five (5) years.
SECTION B. PERMITTED ACTIVITIES
Until this permit expires or is modified or revolted, the permittee is authorized to discharge
stormwater to the surface waters of North Carolina or separate storm sewer system that has been
adequately treated and managed in accordance with the terms and conditions of this individual
permit. All stormwater discharges shall be in accordance with the conditions of this permit..
Any other point source discharge to surface waters of the state is prohibited• unless it is an
allowable non-stormwater discharge or is covered by another permit, .authorization, or approval.
The stormwater discharges allowed by this individual permit shall not cause or contribute to
violations of Water Quality Standards.
This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
Part i Page 1 of 2
SECTION C: LOCATION MAP
Permit No. NCS000049
NCS000049
S
MW Scale 1.24,000
Cognis Corporation
Latitude; 3518' 9" N
Longitude; 800 5743" W
County: Nle Ienburg
Receiving Stream, Stele Creek
Stream Class; C
Sub -basin: 03-08-34 (Catawba River Basin)
Part F Page 2 of 2
=I
Facility Location
Permit No. NCS006049
PART II MONITORING, CONTROLS, AND LIMITATIONS FOR
PERMITTED DISCHARGES
SECTION A: STORMWATER POLLUTION PREVENTION PLAN
The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as
the Plan. This Plan shall be considered public information in accordance with Part III, Standard
Conditions,.Section E, Paragraph 3 of this general permit. The PIan shall include, at a minimum,
the following items:
1. Site Plan. The site plan shall provide a description of the physical facility and the
potential pollutant sources which may be expected to contribute to contamination of
stormwater discharges. The site plan shall contain the following:
(a) . A general location map (USGS"quadrangle map or appropriately drafted
equivalent map),.showing the facility's location in relation to transportation
routes and surface waters, the name of the receiving water(s) to which the
stormwater outfall(s) discharges, or if the discharge is to a municipal separate
storm sewer system, the name of the municipality and the ultimate receiving
waters,.and accurate latitude.and Iongitude of the point(s) of discharge. The
general location map (or,alternativelythe site map) shall identify whether each
receiving water is impaired (on the state's 303(d) list of impaired waters) or is
located in a watershed for which a TMDL has been established, and what the
parameter(s) of concern are.
North Carolina's 303(d) List can be found here:
http://h2o.enr.state.nc.us/tmdl/Gencral_303d.htm#Downloads
North Carolina-TMDL documents can be found here:
http://h2o.enr.state.nc.us/tmdbTMDL list.htm#Final TMDLs.
(b) A narrative description of storage practices, loading and unloading activities,
outdoor process areas, dust or particulate generating or control processes, and
waste disposal practices. A narrative description of the potential pollutants which
could be expected to be present in the stormwater discharge from each outfalI.
(c) A site map drawn to scale (including a distance Iegend) showing: the site property
boundary, the stormwater discharge outfalls, all on -site and adjacent surface
waters and wetlands, industrial activity areas (including storage of materials,
.disposal areas, process areas, loading and unloading areas, and haul roads), site
topography, all drainage features and structures, drainage areas for each outfall,
-d
irection of flow in each drainage area, industrial activities occurring in each
drainage area, buildings, existing BMPs, and impervious surfaces. The site map -
must indicate the percentage of each drainage area that is impervious.
Part 11 Page I of 10
Permit No. NCS000049
(d) A list of significant spills or leaks of pollutants that have occurred at the facility
during the three (3) previous years and any corrective actions taken to mitigate
spill impacts.
(e) Certification that the stormwater outfalls have been evaluated for the presence of
non-stormwater discharges. The certification statement will be signed in
accordance with the requirements found in Part III, Standard Conditions, Section
B, Paragraph 5. The permittee shall re -certify annually that the stormwater
outfalls have been evaluated for the presence of non-stormwater discharges.
2. Stormwater Management Plan. The stormwater management plan shall contain a
narrative description of the materials management practices employed which control or
minimize the exposure of significant materials to stormwater, including structural and
nonstructural measures. The stormwater management plan, at a minimum, shall
incorporate the following:
(a) . Feasibility Study. A review of the technical and economic feasibility of changing
the methods of operations and/or storage practices to eliminate or reduce exposure
of materials and processes to stormwater. Wherever practical, the permittee shall
prevent exposure of.all "storage areas, material handling operations, and
manufacturing or fueling -operations. In areas where elimination of exposure is
not.practical, the stormwater management plan shall document the feasibility of
diverting the stormwater runoff away from areas of potential contamination.
(b) Secondary Containment Requirements and Records. Secondary containment is
required for:' bulk storage of liquid materials; storage in any amount of Section
313 of Title III of the Superfund Amendments and Reauthorization Act (SARA)
water priority chemicals; and storage in any amount of hazardous substances, in
order to prevent leaks and spills from contaminating stormwater runoff. A table
or summary of -all such tanks and stored materials and their associated secondary
containment areas shall be maintained. If the secondary containment devices are
connected directly to stormwater conveyance.systems, the connection shall be
controlled by manually activated salves or other'. similar devices (which shall be
secured closed with a locking mechanism), and any stormwater that accumulates
in the containment area shall be at a minimum visually observed for color, foam,
outfall staining, visible sheens and dry weather flow, prior to release of the
accumulated stormwater. Accumulated stormwater shall be released if found to
be uncontaminated by the material stored within the containment area. Records
documenting the individual making the observation, the description of the
accumulated stormwater, and the date and time of the release shall be kept for a
period of five years.
(c) BMP Summary. A listing of site structural and non-structural Best Management
Practices (BMP) shall be provided. The installation and implementation of BMPs
shall be based on the assessment of the potential for sources to contribute
significant quantities of pollutants to stormwater discharges and data collected
through monitoring of stormwater discharges. The BMP Summary shall include a
Part II Page 2 of 10
Permit No. NCSOOOd44
written -record of the specific rationale for installation and implementation of the
selected site BMPs. The BMP Summary shall be reviewed and updated annually.
Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP)
shall incorporate an assessment of potential pollutant sources.based on a materials
inventory of the facility. Facility personnel (or the team) responsible for implementing the
SPRP shall be identified in a written list incorporated into the SPRP and signed and dated
by each individual acknowledging their responsibilities for the plan. A responsible
person shall be on -site at all times during facility operations that have the potential to
contaminate stormwater runoff through spills or exposure of materials associated with the
facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill
Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP,
but may not be sufficient to completely address the stormwater aspects of the SPRP. The
common elements of the SPCC with the SPRP may be incorporate_ d by reference into the
SPRP.
4. Preventative Maintenance and Good Housekeeping Program. - •A preventative
maintenance and good housekeeping program shall be developed.: The program shall list
all stormwater control systems, stormwater discharge outfalls, all on-site.and adjacent .
surface waters and wetlands, industrial activity areas (including material storage areas,
material handling areas, disposal areas, process areas, Ioading and unloading areas, and
haul roads), all drainage features.and structures, and existing structural BMPs. The
program shall establish schedules of inspections, maintenance, and housekeeping
activities of stormwater control systems, as well as facility equipment, facility areas, and
facility systems that present a potential for stormwater exposure or stormwater pollution.
Inspection of material handling areas and regular cleaning schedules of these areas shall
be incorporated into the program. Timely compliance with the established schedules for
inspections, maintenance, and housekeeping. shall be recorded in writing and maintained
in the SPPP.
5. Employee Training. Training programs shall be developed and training provided at a.,
minimum on an annual basis for facility personnel with responsibilities for: spill response
and cleanup, preventative maintenance activities, and for any of the facility's operations
.that have the potential to contaminate stormwater runoff. Facility personnel (or team)
responsible for implementing the training shall be identified, and their annual training
shall be documented by the signature of each employee trained.
6. Rspponsible Party. The Stormwater Pollution PreventiorPlan shall identify a specific
position(s) responsible for the overall coordination, development, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented
and position assignments provided.
7. Plan Amendment. The permittee shall amend the Plan whenever there is a change in
design, construction, operation, or maintenance which has a significant effect on the
potential for the discharge of pollutants to surface waters. All aspects of the Stormwater
Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual
update shall include an updated Iist of significant spills or leaks of pollutants for the
Part II Page 3 of 10
Permit No. NCS000049
previous three years, or the notation that no spills have occurred. The annual update shall
include re -certification that the stormwater outfalls have been evaluated for the presence
of non-stormwater discharges. Each annual update shall include a re-evaluation of the
effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management
Plan.
The Director may notify the permittee when the Plan does not meet one or more of the
minimum requirements of the permit. Within 30 days of such notice, the permittee shall
submit a time schedule to the Director for modifying the Plan to meet minimum
requirements. The permittee shall provide certification in writing (in accordance with
Part III, Standard Conditions, Section B, Paragraph 5) to the Director that the changes
have been made.
S. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as
part of the Preventative Maintenance and Good Housekeeping Program at a minimum on
a semi-annual schedule, once during the first half of the year (January to June), and once
during the second half (July to December), with at least 60 days separating inspection
dates (unless performed more frequently than semi-annually). These facility inspections
are different from, and in addition to, the stormwater discharge characteristic monitoring
required in Part II B and C of this permit.
9. Implementation: The permittee shall implement the Plan. Implementation of the Plan
shall include documentation of all monitoring, measurements, inspections, maintenance
activities, and training provided to employees, including the log of the sampling data and
of actions taken to implement BMPs associated with the industrial activities, including
vehicle maintenance activities. Such documentation shall be kept on -site for a period of
five years and made available -to the Director or the Director's authorized representative
immediately upon request....
Part t1 Page 4 of 10
Permit No. NCS000049
SECTION B: ANALYTICAL MONITORING REQUIREMENTS
Analytical monitoring of stormwater discharges shall be performed as specified in Table I. All
analytical monitoring.shall be performed during a representative storm event. The required
monitoring will result in a minimum of ten analytical samplings being conducted over the term of
the permit at each stormwater discharge outfall (SDO).
A representative storm event is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1
inches has occurred, A single storm event may contain up to 10 consecutive hours of no
precipitation. For example, if it "rains for 2 hours without producing any collectable discharge,
and then stops, a sample may be collected if a rain producing a discharge begins again within the
next 10 hours.
Table 1. Analytical Monitoring Rec uirements
�� I ;aDrschargc "w�i',E��`'' w'
;'I �t
`Measurement Frequency-'
�'Sample'''
Sample,''
Characteristics " `'
,
a Units
T e?.
Location
;
BOD-5
m L
semi-annual
Grab
SDO
COD
m /L
semi-annual
Grab
SDO
Total Suspended Solids
m /L
semi-annual
Grab
SDO
H
standard
semi-annual
Grab
SDO
Total Rainfall4
Rain
-
inches
semi-annual
Gau e=
Footnotes!
I Measurement Frequency: Twice per year during a representative storm event, for each year until either.another
permit is issued for this facility or until this permit is revoked or rescinded.' If at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2.fdr schedule of monitoring periods through the end of this permitting
cycle.
2 If the stormwater runoff is controlled -by a stormwater detention pond, a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative
outfall status has been granted.
4 For each sampled representative storm event the total precipitation must be recorded. An on -site rain gauge or
local rain gauge reading must be recorded.
The permittee shall cotnpldte the minimum ten analytical samplings in accordance with the
schedule specified below in Table 2. A minimum of 60 days must separate Period I and
Part If Page 5 of 10
Permit No. NCS000049
Period 2 sample dates unless monthly monitoring has been instituted under a Tier Two
response.
Table 2. Monitoring- Schedule
,Monitoring period�i1:1 ,
�Sample,Numer
- " f
Year 1 — Period 1
1
February 1, 2009.
July 31', 2009
Year 1 — Period 2
2
August 1, 2009
January 31, 2010
Year 2 — Period 1
3
February I, 2010
July 31, 2010
Year 2 Period 2
4
August 1, 2010
January 31, 2011
Year 3 — Period 1
5
February 1, 2011
July 31, 2011 .
Year 3 — Period 2
6
August 1, 2011
January 31, 2012
Year 4 —Period 1
7
February 1, 2012
July 31, 2012
Year 4 = Period 2
8
August 1, 2012 ,
January 31, 2013
Year 5 — Period 1
9
February 1, 2013
July 31, 2013
Year 5 — Period 2
10
August 1, 2013"
January 31, 2014
Footnotes:
1 Maintain scini-annual monitoring during permit renewal process. The applicant must continue semi-annual
monitoring until the renewed permit is issued.
2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No
Flow" within 30 days of the end of the six-month sampling period.
The permittee shall report the analytical results from the first sample with valid results within the
monitoring period. The permittee shall compare monitoring results to the benchmark values in
Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for
the permittee's Stormwater Pollution Prevention Plan (SPPP). Fxceedences of benchmark values
require the permittee to increase monitoring, increase management actions, increase record keeping,
and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the
descriptions of Tier One and Tier Two. .
Table 3. Benchmark Values for Analytical Monitoring
Discharge Cl'aracterts`tics..
Units f14,�:Benchirri'ark�r
BOD-5
mg/L
30
COD
mg/.
120
Total Suspended Solids
m
100
PH
standard
6-9
Part II Page 6 of 10
Permit No. NCS000049
,FL!°h.,r�. i r.� 4,. Lai 1 }..• .I, a`,.. ._ E w '4 a ..One
If:f
If: The first valid sampling results are above a benchmark value, or outside of the benchmark
range, for any parameter at any outfall;
Then: The permittee shall:
l . Conduct a stormwater management inspection of the facility within two weeks of receiving
sampling results.
2. Identify and evaluate possible causes of the benchmark value exceedence.
3. Identify potential, and select the specific: source controls, operational controls, or physical
improvements to reduce, concentrations of the parameters of concern, or to bring
concentrations to within the benchmark range.
4. Implement the selected actions within two months of the inspection.
5. Record.each instance of a Tier One response in the Stormwater Pollution Prevention Plan.
Include the date and value of the benchmark exceedence, the inspection date, the personnel
conducting the inspection, the selected actions, and the date the selected actions were
implemented.
Arl, 7.,' :Tier Two
If: During the term of this permit,.the first valid sampling results are above the benchmark values,
or outside of the benchmark range, for any specific parameter at a specific discharge outfall two
times in a row consecutive);
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. .Immediately institute monthly monitoring for all parameters at every outfall where a
sampling result exceeded the benchmark value for two consecutive samples. Monthly
(analytical and.qualitative) monitoring shall continue until three consecutive sample results
are below the benchmark values, or within the benchmark range, for all parameters at that
outfall.
3. If no discharge occurs during the. sampling period, the permittee is required to submit a
monthly monitoring report indicating "No Flow."
4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan.
Part I[ Page 7 of 10
Permit No. NCS000049
4
During the term of this permit, if the valid sampling results required for the permit monitoring
periods exceed the benchmark value, or are outside the benchmark range, for any specific
parameter at any specific outfall'on more than four occasions, the pennittee shall notify the DWQ
Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results.
DWQ may, but is not limited to:
• require that the permittee increase or decrease the monitoring frequency for the remainder
of the permit;
• require the permittee to install structural stonnwater controls;
• require the permittee to implement other stormwater control measures; or
• require that the permittee implement site modifications to qualify for the No Exposure
Exclusion.
Permit No. NCS000049
SECTION C: QUALITATIVE MONITORING REQUIREMENTS
Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of
representative outfall status and shall be performed as specified in Table 4, during the analytical
monitoring event. [If analytical monitoring is not required', -the permittee still must conduct semi-
annual qualitative monitoring.] Qualitative monitoring is for the purpose of evaluating the
effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of
stormwater pollution.
In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall
document the suspected cause of the condition and any actions taken in response to the
discovery: This documentation will be maintained with the SPPP.
Table 4. Qualitative Monitoring Requirements
`
Dtschar a Cract
ere un
Moni'
toring
�BGr ,I Fy
,Location;
Color
semi-annual
SDO
Odor
semi-annual
SDO
CIari
semi-annual
SDO
Floating Solids
semi-annual
SDO
Suspended Solids
semi-annual
SDO
Foam
semi-annual
SDO
Oil Sheen
semi-annual
SDO
Erosion or deposition at the
semi-annual
SDO
outfall
Other obvious indicators
semi-annual
SDO
of stormwater pollution
Footnotes:
1 Measurement Frequency: Twice per year during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked ar rescinded. If at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will he considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO)
regardless of representative outfall status.
SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS
Facilities which have any vehicle maintenance activity occurring on -site which uses more than 55
gallons of new motor oil per month when averaged over the calendar year shall perform
analytical monitoring as specified below in Table 5. This monitoring shall be performed at all
stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance
Part Il Page 9 of 10
Permit No. NCS000049
areas, and in accordance with the schedule presented in Table 2 (Section B). All analytical
monitoring shall be performed during a representative storm event.
Table 5. Analvtical Monitoring Requirements for On -Site Vehicle Maintenance
Drsctiarge Charactertshcs
,Units
`' Measurement`
;` Sample E
t ;Sample 9
o' f
LiT
H
standard
semi-annual
Grab
SDO
Oil and Grease
m /l
semi-annual
Grab
SDO
Total Sus ended Solids
m l
semi-annual
Grab
SDO
Total Rainfall4
inches
semi-annual
'Rain gauge
-
New Motor Oil Usage
allons/month
I semi:annual
Estimate
-
Footnotes:
1 Measurement Frequency: Twice per year -during a representative storm event, for each year until either another
permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle
the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the
permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until
the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting
cycle.
2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the
pond shall be collected within the first 30 minutes of discharge from the pond.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges
stormwater runoff from area(s) where vehicle maintenance activities occur.
4 For each sampled representative storm event the total precipitation must be recorded. Anon -site or local rain
gauge reading must be recorded.
Monitoring results shall be compared to ,the benchmark.values in Table 6. The benchmark
values in Table 6 are not permit limits but should be used as guidelines for the permittee's
Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the
permittee to increase monitoring, increase management actions, increase record keeping, and/or,
install stormwater Best Management Practices (BMPs), as provided in Part 11 Section B.
Table&
Benchmark Values for Vehicle Maintenance Analytical Monitoring
Discharge Cl aracteristics
,;; 1;, Units M
i,, , ` Ben'chm'ark'„f' k .
pH
standard
6-9
Oil and Grease
mg/L
30
Total Suspended Solids
mg/L
100
Part II Page 10 of 10
Permit No. NCS000049
PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS
SECTION A: COMPLIANCE AND LIABILITY
Compliance Schedule
The permittee shall comply with Limitations and Controls specified for stormwater discharges in
accordance with the following schedule:
Existing Facilities already operating but applying for permit coverage for the first time: The Stormwater
Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the
initial permit and updated thereafter on an annual basis. Secondary containment, as specified in Part 1I,
Section A, Paragraph 2(b) of this permit, shall be accomplished within 12 months of the effective date of
the initial permit issuance.
New Facilities applying for coverage for the first time and existing facilities previously permitted and
applying for renewal under this permit: The Stormwater Pollution Prevention Plan shall be developed and
implemented prior to the beginning of discharges from the operation of the industrial activity and be
updated thereafter on'an annual basis. Secondary containment, as specified in Part I1, Section A, Paragraph
2(b) of this permit shall be accomplished prior to -the beginning of discharges from the operation of the
industrial activity. `
2. Duty to Comply
The permittee must comply with all conditions of this individual permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit
termination, revocation and reissuance, or modification; or denial of a permit upon renewal application.
a. The permittee shall comply with standards or prohibitions established under section 307(a) of the
Clean Water Act for toxic pollutants within the time provided in the regulations that establish these
standards or prohibitions, even if the permit has not yet been modified to -incorporate the
requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil
penalty not to exceed $25,000 per day for each violation. Any person who negligently violates any
permit condition is subject to criminal penalties of $2,500 to 25,000 per day of violation, or
imprisonment for not more than I year,'or both. Any person who knowingly violates permit
conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or
imprisonment for not more than 3 years, or both. Also, any person who violates a permit condition
may be assessed an administrative penalty not to exceed $10,000 per violation with the maximum
amount not to exceed $125,000. [Ref: Section.309 of the Federal Act 33 USC 1319 and 40 CFR
122.41(a).]
Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) per violation
may be assessed against any person who violates or fails to act in accordance with the terms,
conditions, or requirements of,a permit. [Ref- NC General Statutes 143-215.6A).
d.. Any person may be assessed an administrative penalty by the Director for violating section 301,
302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any
of such sections in a permit issued under section 402 of the Act. Administrative penalties for Class
I violations are not to exceed $10,000 per violation, with the maximum amount of any Class I
penalty assessed not to exceed $25,000. Penalties for Class II violations are not to exceed
Part III Page 1 of 8
Permit No. NCS000049
$I0,000 per day for each day during which the'violation.continues, with the maximum amount of
any Class II penalty not to exceed $125,000.
3. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this
individual permit which has a reasonable likelihood of adversely affecting human health or the environment.
4. Civil and Criminal Liabili
Except as provided in Part III, Section C of this permit regarding bypassing of stormwater control facilities,
nothing in this individual permit shall be construed to.relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6A, 143-215.6B, 143-
215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
Oil and Hazardous Substance Liability
Nothing in this individual permit shall be construed to preclude the institution of any legal action or relieve.
the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to
under NCGS 143-215.75 et seq. or Section 311 of the Federal -Act, 33 USC 1321.
6. PropeM Rights
The issuance of this individual permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of
personal rights, nor any infringement of Federal, State or local laws or regulations.
Severabi l ity
The provisions of this individual permit are severable, and if any provision of this individual permit, or the
application of any provision of this individual pen -nit to any circumstances, is held invalid, the application
of such provision to other. circumstances, and the remainder of this individual permit, shall not be affected
thereby.
Duly to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the Director
may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the
permit issued pursuant to this individual permit or to determine compliance with this individual permit. The
permittee shall also furnish to the Director upon request, copies of records required to be kept by this
individual permit.
9. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate,
any monitoring device or method required to be maintained under this individual permit shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more
than two years per violation, or by both. If a conviction of a person is for a violation committed after a first
conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of -
violation, or by imprisonment.of not more than 4 years, or both..
Part III Page 2 of 8
Permit No. NCS000049
10. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement, representation, or
certification in any record or other document submitted or required to be maintained under this individual
permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be
punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years
per violation, or -by both.
SECTION B: GENERAL CONDITIONS
1. Individual Permit Expiration
The permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration' date, the permittee shall submit forms and fees as are
required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any
permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not
have a permit after the expiration and has not requested.renewal at least 180 days prior to expiration, -will be
subjected to enforcement procedures as provided in NCGS § 143-2153.6 and 33 USC 1251.et. seq.
2. Transfers
This permit is not transferable to any person except after notice to and approval by the Director. The
Director may require modification or revocation and reissuance of the permit to change the name and
incorporate such other requirements as may be necessary under the Clean Water Act, The Permittee is
required to notify the Division in writing in the event the permitted facility is sold or closed.
3. Sjoatgry Requirements
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All applications to be covered under this individual permit shall be signed as follows:
(l), In the case of a corporation:' by a principal executive officer of at least the level of vice-
president, or his duly authorized representative, if such representative is responsible for
the overall operation of the facility from which the discharge described in the permit
.application form originates;
(2) . In the case of a partnership or limited partnership: by a general partner;
(3) In the case of a sole proprietorship: by the proprietor;
.(4) In the case of a municipal, stale, or other public entity: by a principal executive officer,
ranking elected official, or other duly authorized employee. ,
b. . All reports required by the individual permit and other information requested by the Director shall
be'signed by a person described above'or by a duly authorized representative of that person. A
person is a duly authorized representative only if:
(1) The authorization is made in writing by a person described above;
'(2) The authorization specified either an individual or a position having responsibility for the
overall operation of the regulated facility or activity, such as the position of plant
manager, operator of a well or well field, superintendent, a position of equivalent
Part III Page 3 of 8
Permit No. NCS000049
responsibility, or an individual or position having overall responsibility for environmental
matters for the company. (A duly authorized representative may thus be either a named
individual or any individual occupying a named position.); and
(3) The written authorization is submitted to the Director.
C. Any person signing a document under paragraphs a. or b. of this section shall make the following
certification:
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and,evaluate the information submitted. Based on my inquiryof the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
4. Individual Permit Modification. Revocation and Reissuance, or Termination.
The issuance of this individual perinit does not prohibit the Director from reopening and modifying the
individual permit, revoking'and reissuing the individual permit, or terminating the individual permit as
allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122
and 123; Title 15A of the North Carolina Administrative Code', Subchapter 2H .0100; and North Carolina
General, Statute 143-215.1 et.al. '
5. Permit Actions
The permit may be modified, revoked and reissued, or terminated for cause. ' The notification of planned
changes or anticipated noncompliance does not stay any individual permit condition.
SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS .
Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and
control (and related appurtenances) which are installed or used by the permittee to achieve compliance with
the conditions of this individual permit. Proper operation and maintenance also includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the operation of
back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation
is necessary to achieve compliance with the conditions of this individual permit.
2. Need to Halt or Reduce Not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the condition of this individual permit.
3.. Bypassing of Stormwater Control Facilities
Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless:
a.. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and
Part III Page 4 of 8
Permit No. NCS000049
b. " There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities,
retention of stormwater or maintenance during normal periods of.equipment downtime or dry
weather. This condition is not satisfied if adequate backup controls should have been installed in
the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal
periods of equipment downtime or preventive maintenance; and ,
C. The permittee submitted notices as required under, Part III, Section E of this permit.
If the Director determines that it will meet the three conditions listed above, the Director may approve an
anticipated bypass after considering its adverse effects.
SECTION D: MONITORING AND RECORDS
I. - Representative Sampling
Samples collected and measurements taken, as required herein, shall be characteristic of the volume and
nature of the permitted discharge. Analytical sampling shall be performed during a representative storm
event. Samples shall betaken on a day and time that is characteristic of the discharge- All samples shall be
taken before the discharge joins or is diluted. by any other waste stream, body of water, or substance.
Monitoring points as specified in this permit shall not be changed without notification to and approval of
the Director.
2. RecordingResults
For each measurement,.sample, inspection or'maintenance activity performed or collected pursuant to the
requirements of this individual permit, the permittee shall record the following information:
a. The date, exact place, and time of sampling, measurements, inspection or maintenance activity;
b. The individual(s) who performed the sampling; measurements, inspection or maintenance activity;
C. The date(s).analyses were performed;
d. The individual(s) who performed the analyses;
C. . The analytical techniques or methods used; and
f. The results of such analyses.
Flow Measurements
Where required, appropriate flow measurement devices and methods consistent with accepted scientific
practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of
monitored discharges.
4. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to
NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant
to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation
40 CFR 136.
Part III Page 5 of 8
Permit No. NCS000049
To meet the intent of the monitoring required by this individual permit, all test procedures must produce
minimum detection and reporting levels and all data.generated must be reported down to the minimum
detection or lower reporting level of the procedure.
5. Representative Outfall
If a facility has multiple discharge locations with substantially identical stormwater discharges that are
required to be sampled, the permittee may petition the Director for representative outfall status. If it is
established that the stonnwater discharges are substantially identical and the permittee is granted
representative outfall status, then sampling requirements may be performed at a reduced number of outfalls.
6. Records Retention
Visual monitoring shall be documented and records maintained at the facility along with the Stormwater
Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on -site. The
permittee shall retain records of all monitoring information, including all calibration and maintenance
records and all original strip chart recordings for continuous monitoring instrumentation, and copies of all
reports required by this individual permit for a period of at.least 5 years -from the date of the sample,
measurement, report or application. This period maybe extended by request of the Director at any time.
7. Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an authorized contractor
acting as a representative of the Director), or in the case of a facility which discharges through a municipal
separate storm sewer system_ , an authorized representative of a municipal operator or the separate storm
sewer system receiving the discharge, upon the presentation of credentials and other documents as may be
required by law; to;
a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted,
or where records must be kept under the conditions of this individual permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of
this individual permit;
C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment),
practices, or operations regulated or required under this individual pennit; and
d. Sample or monitor at.reasonable times; for the -purposes of assuring individual permit compliance
or. as otherwise authorized by the Clean Water Act, any substances or parameters at any location.
SECTION E: REPORTING REQUIREMENTS
Discharge Monitoring Reports
Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on
Discharge Monitoring Report (DMR) forms provided by the Director. Submittals shall be delivered to the
Division no later than 30 days from the date the facility receives the sampling results from the laboratory.
When no discharge has occurred from the facility during the report period, the permittee is required to
submit a discharge monitoring report within 30 days of the end of the six-month sampling period, giving all
required information and indicating "NO FLOW" as per NCAC T15A 0213 .0506.
PartIII Page 6 of 8
Permit No. NCS000049
The permittee shall.record the required qualitative monitoring observations on the SDO Qualitative
Monitoring Report (QMR)',form provided by the Division, and shall retain the completed forms on site.
Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific
requirement to do so.
2. Submittingg Reports.
Duplicate signed copies of all reports required herein, shall be submitted to the following address:
Division of Water Quality
Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617 .
Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal
Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection
at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be
considered confidential. Knowingly making any false statement on any such report may result in the
imposition of criminal penalties as provided for in NCGS 143-215.6.B or. in Section 309 of the Federal Act.
4. Non-Stormwater Discharges .
If the storm event monitored in accordance with this individual permit coincides with a non-stormwater
discharge, the permittee shall separately monitor all parameters as required under the non-stormwater
discharge permit and provide this information with the stormwater discharge monitoring report.
5. Planned Chances
The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted
facility which could significantly alter the nature or quantity of pollutants discharged. This notification
requirement includes pollutants which are not specifically listed in the individual permit or subject to
notification requirements under 40 CFR Part 122.42 (a).
6. Anticipated Noncompliance
The permittee shall give notice to the'Director as soon as possible of any planned changes at the permitted
facility which may result in noncompliance with the individual permit requirements.
7. Bypass
a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit
prior notice, if possible at least ten days before the date of the bypass; including an evaluation of
the anticipated quality and affect of the bypass.
b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an
unanticipated bypass. -
8. Twen -four Hour Reporting
- The permittee shall report to the central office or the appropriate regional office any noncompliance which
may endanger health or the environment. Any information shall be provided orally within 24 hours from
Part III Page 7 of 8
Permit No. NCS000049
the time the permittee became aware of the circumstances. A written submission shall also be provided
within 5 days of the time the permittee becomes aware of the circumstances.
'The written submission shall contain a description of the noncompliance, and its causes; the period of
noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case -by -case basis if the oral report has been received
within 24 hours.
9. Other Noncompliance
The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time
monitoring reports are submitted.
10. Other Information "
Where the permittee becomes aware that it failed to submit any relevant facts in an application for an
individual permit or in any report to the Director, it shall promptly submit such facts or information.
Part III Page 8 of 8
NCS000049
PART IV LIMITATIONS REOPENER ..
This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable
effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and
307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved:
a. Contains different conditions oHslotherwise more stringent than any effluent limitation in the individual
permit; or j
b, Controls any pollutant not limited in the individual permit. .
I E
The individual permit as modified or reissued 'under this paragraph shall also contain any other requirements in the
Act then applicable.
PART V ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by.
the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this
Division to initiate action to revoke the Ind ividual.Permit.
PART VI DEFINITIONS
1. Act
See Clean Water Act.
2. Arithmetic Mean
The arithmetic mean of any set of values is the summation of the individual values divided by the number of
individual values.
3. Allowable Non-Stormwater Discharaes
This permit regulates stormwater discharges. Non-stonnwater discharges which shall be allowed in the
stormwater conveyance system are:
(a) All other discharges that are authorized by a non-stormwater NPDES permit.
(b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added
chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant
flushings, water from footing drains, flows from riparian habitats and wetlands.
(c) Discharges resulting from fire -fighting or fire -fighting training.
4. Best_ Management Practices (BMPs)
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the
form of a process, activity, or physical structure.
. Parts IV, V and VI Page 1 of 5
Permit No. NCS000049
5. Bypass
A bypass is the known diversion of stormwater from any portion of a stormwater control facility including
the collection system, which is not a designed or established operating mode for the facility.
6: Bulk Storm ea of Liquid Products
Liquid raw materials, manufactured products, waste materials or by-products with a single above ground
storage container having a capacity of greater than 660 gallons or with multiple above ground storage
containers located inclose proximity to each other having a total combined storage capacity of greater than
1,320 gallons.
7. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33
USC 1251, et. seq.
8. Division or DW
The Division of Water Quality, Department,of Environment and Natural Resources.
9. Director
The Director of the Division of Water Quality, the permit issuing authority.
10. CMC
The North Carolina Environmental Management Commission.
11. Grab Sample
An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively
monitored must be taken within the first 30 minutes of discharge.
12. Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
13. Landfill
-A disposal facility or part of disposal facility where waste is placed in or.on land and which is not a land -
treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or
a surface storage facility.
14. Municipal Separate Storm Sewer Systern
A stormwater collection system within an incorporated area of local self-government such as a city or town.
15. No Exposure
A condition of no exposure means that all industrial materials and activities are protected by a storm <
resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff.
Industrial materials or activities include, but are not limited to, material handling equipment or activities,
Part VI Page 2 of 5 Pages
Permit No. NCS000049
industrial machinery, raw materials, intermediate products, by-products, final products, or waste products.
DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a
facility complies with the terms -and conditions described in 40 CPR §122.26(g).
16. Overburden
Any material -of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding
topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations.
17. Permittee
The owner or operator issued a permit pursuant to this individual permit.
18. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch,
channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters
of the state.
19. Representative Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no
storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive
hours of no precipitation. For.example, if it rains for 2 hours without producing any collectable discharge, and then
stops, a sample may be collected if a rain producing a'discharge begins again within the next 10 hours.
20. Re resentative'Outfall Status
When it is established that the discharge of stormwater runoff from a single outfall is representative of the
discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall
status allows the permittee to perform analytical monitoring at a reduced number of outfalls.
21. Rinse Water Discharge
The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse
waters from vehicle and equipment cleaning areas are process wastewaters and do not -include washwaters
utilizing any type of detergent or cleaning agent.
22. Secondary Containment
Spill containment for the contents of the single largest tank within the containment structure plus sufficient
freeboard to allow for the 25-year, 24-hour storm event.
23. Section 313 Water Priority Chemical
A chemical or chemical category which:
a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and
Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right -
to -Know Act of 1986;
Is present at or above threshold levels at a facility subject to SARA Title III, Section 313 reporting
requirements; and
c. That meets at least one of the following criteria:
Part VI Page 3 of 5 Pages
t
Permit No. NCS000049
(1) Is listed in Appendix D of 40 CFR part 122 on Table 11 (organic priority pollutants),
Table III (certain metals, cyanides, and phenols), or Tabie'IV (certain toxic pollutants and
hazardous substances);
(2) is listed as a hazardous substance pursuant to section 31 1(b)(2)(A) of the CWA at 40
CFR 116.4; or
(3) Is a pollutant for which EPA has published acute or chronic water quality criteria.
24. Severe Property Damage
Means substantial physical damage to property, damage to the control facilities which causes them to
become inoperable, or substantial and permanent loss of natural resources which can reasonably be
expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused
by delays in production.
25. Significant Materials
Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic
pellets; finished materials such as metallic products; raw materials used in food processing or production;
hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to
-report pursuant to section 313 of Title III of.SARA; fertilizers; pesticides; and waste products such as ashes,
slag and sludge that have the potential to be, released with stormwater discharges.
26. Significant Spills
includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities
under section 311 of the Clean Water Act (Ref: 40 CFR 110,10 and CFR 117.21) or section t02 of
CERCLA (Ref: 40 CFR 302.4).
27. Stormwater Runoff
The flow of water which'results from precipitation and which occurs immediately following rainfall or as'a
result of snowmelt.
28. Stormwater Associated with Industrial Activi
The discharge from any point source which is.used for collecting and conveying stormwater and which is
directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities
considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(I4).
The term does not include discharges from facilities or activities excluded from the NPDES program.
29. Stormwater Pollution Prevention Plan
A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and
is based on an evaluation of the pollution potential of the site.
30. Ten Year Design Storm
The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten
years. Design storm information can be found_ in the State of North Carolina Erosion and Sediment Control
Planning and Design Manual.
: Part VI Page 4 of 5 Pages
I.
Permit No. NCS00004p- '
31. Total Flow
The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be
either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the
amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the
measurement of flow at 20 minute intervals during the rainfall event.
32. Total Maximum Dgily Load (TMDL) -
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet
water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed
water quality assessment that provides the scientific foundation for an implementation plan. The
implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to
restore and maintain water quality standards in all seasons. The Clean Water Act, Section 303, establishes
the water quality standards and TMDL programs.
33. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
34. Upset
Means an exceptional incident in which there is unintentional.and temporary noncompliance with
technology based permit effluent limitations because of factors beyond the reasonable control of the'
permittee. An upset does not include noncompliance -to the extent -caused by operational error, improperly
designed treatment or control facilities,, inadequate treatment or control facilities, lack of preventive
maintenance, or careless or improper operation.
35. Vehicle Maintenance Activit
Vehicle rehabilitation, mechanical repairs, painting,. fue I ing, lubrication, vehicle cleaning operations, or
airport deicing operations.
36. Visible Sedimentation
Solid particulate matter, both mineral and organic, that has been or is being transported by water, air,
gravity, or ice from its site of origin which can. be seen with the unaided eye...
37. 25-year, 24 hour storm event
"The maximum 24-}tour precipitation event expected to be equaled or exceeded, on the average, once in 25
years..
Part VI Page 5 of 5 Pages