Loading...
HomeMy WebLinkAboutWQ0040707_Engineering Plans_20190313SURVEY BY: GUISEWHITE PROFESSIONAL LAND SURVEYING, PC. P.O. BOX 680388 GP LS CHARLOTTE, NC. 28216 (704)530-1700 NC.nRM #4411 Survey Notes: 1. UNION COUNTY; TAX PARCEL #08-312-003-E 2. THIS SURVEY WAS CONDUCTED WITHOUT THE BENEFIT OF A TITLE REPORT. 3. DEED REF.#7115/449; 4. ALL DISTANCES ARE HORIZONTAL DISTANCES UNLESS OTHERWISE NOTED. 5. AREA BY THE COORDINATE METHOD. 6. PROPERTY SUBJECT TO ANY VALID & ENFORCEABLE EASEMENTS, RESTRICTIONS & RIGHTS OF WAY OF RECORD. THIS PROPERTY CONTAINS PHYSICAL FEATURES THAT SUGGEST ADDITIONAL EASEMENTS OR RIGHTS -OF -WAY EXIST WITHIN THE BOUNDARIES SHOWN HERIN. THE UNDERSIGNED IS HEREBY DISCLOSING THAT HAVING PERFORMED THIS SURVEY WITHOUT A THOROUGH TOTLE REPORT THAT THESE ITEMS ARE UNABLE TO BE VERIFIED. 7. SUBJECT PROPERTY -IS NOT - LOCATED IN A SPECIAL FLOOD HAZARD ZONE AS DETERMINED BY FLOOD INSURANCE RATE MAP NO. 3710551100L 8. THERE ARE NO ENCROACHMENTS OR PROJECTIONS EXCEPT AS SHOWN. 9. WATERSHED TOPO ACQUIRED FROM USGS, NC.DOT. & GIS DATA AND TRANSFERRED TO PLANS. 10. POTABLE WATER IS SUPPLIED BY A PUBLIC WATER MAIN IN UNION ROAD. 11. N/F NIKOLAY BOIKOVA & NATALYA BOIKOVA. 12. TOTAL SURVEYED AREA: 4.621 ac. 13. AREA IN UNION ROAD R/W: 0.566 ac. 14. NET AREA: 4.055 ac. SYMBOL LEGEND OO REBAR FOUND (RBF) 0 REBAR SET(RBS) O IRON PIPE FOUND (IPF) 0 MONUMENT FOUND (MF) CALCULATED POINT (CP) UTILITY POLE y GUY WIRE 11I,1MIX0011I,1.11 --- - --VA- - - - - PROPERTY BOUNDARY ADJACENT BOUNDARY (NOT SURVEYED) PROPERTY BOUNDARY TIE LINE ONLY RIGHT OF WAY LINE OVERHEAD UTILITY LINES AREA SOILS LEGEND TaB (SITE) TATUM GRAVELLY SILT LOAM 2% TO 8% SLOPES CmB CHANNERY SILT LOAM 1% TO 5% SLOPES TuB TATUM URBAN COMPILES 2% TO 8% SLOPES CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES, LOCATIONS AND ELEVATIONS BEFORE BEGINNING CONSTRUCTION. ANY DISCREPANCIES FOUND SHALL BE REPORTED (3) DAYS BEFORE DIGGING IN NORTH CAROLINA CALL: 1.800.632.4949 NORTH CAROLINA 1 CALL CENTER LEGEND OF SHEETS 1. OVERALL SITE PLAN 2. SITE PLAN WITH SOILS 3. TREATMENT PLAN WITH CALCULATIONS 4. SURFACE DRIP DISPOSAL PLAN 5. DETAIL SHEET SYSTEM NOTES: 1. NORWECO TREATMENT SYSTEM HAS A CONTROLLED DEMONSTRATION WASTEWATER SYSTEM APPROVAL FOR THIS UNIT. CDWS-2007-01-R1. A COPY IS INCLUDED IN THE SUBMITTAL PACKAGE. 2. AN ELECTRICAL LINE (115v Single Phase) NEEDS TO BE PROVIDED FROM THE HOUSE BREAKER THAT COMES OFF A DEDICATED 20 amp CIRCUIT. THIS LINE NEEDS TO BE EXTENDED TO THE LOCATION OF THE CONTROL PANEL.THE OWNER IS RESPONSIBLE FOR THIS ELECTRICAL EXTENSION.THE WASTEWATER CONTRACTOR WILL BE RESPONSIBLE FOR RUNNING THE ELECTRICAL SYSTEMS THROUGH THE CONTROL PANELS AND THE WASTEWATER IMPROVEMENTS. 3. PROPERTY LAYOUT WAS PROVIDED BY OWNER/OWNER'S REPRESENTATIVE. 4. THIS PLAN IS TO SHOW THE LOCATION AND DESIGN OF THE WASTEWATER SYSTEM AND DRIP FIELD ONLY. FOR ALL OTHER IMPROVEMENTS, CONSULT THE ARCHITECT OR OWNER. 5. PROPOSED SYSTEM: PRETREAT AND DRIP TUBING WITH TS-II PRETREATMENT. 6. ALL ELECTRICAL SYSTEMS NEED TO BE 115v/230v SINGLE PHASE. CONSTRUCTION NOTES: 1. THE SITE IS EASILY ACCESSIBLE FOR UNLOADING & EXCAVATING EQUIPMENT. THE PROPOSED CONTOURS HAVE BEEN DESIGNED TO SHED WATER OFF & AWAY FROM UNITS. THE TANKS CAN BE INSTALLED USING AN EXCAVATOR. THE TUBING CAN BE INSTALLED BY HAND OR BY TRENCHER. 2. ALL NORWECO SYSTEMS SHALL BE INSTALLED ACCORDING TO DIRECTIONS PROVIDED IN THE "INSTALLATION MANUAL" AND INSTRUCTIONS FOUND ON THESE PLANS. ALL SYSTEMS AND COMPONENTS NOT OF AMERICAN ONSITE SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS AND MANUFACTURERS INSTRUCTIONS. 3. ALL COMPANIES INSTALLING NORWECO SYSTEMS SHALL BE IN POSSESSION OF ALL NECESSARY PERMITS AND LICENSES BEFORE ATTEMPTING ANY PORTION OF THE INSTALLATION. 4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS, BY MANUFACTURERS REPRESENTATIVE, OR THEIR APPROVED REPRESENTATIVE. 5. SITE IS TO BE CLEARED ACCORDING TO CLEARING NOTE ON SHEET 3 (SHALLOW INSTALLATION). DISPOSAL CONTRACTOR IS NOT TO DESTABILIZE EXISTING SLOPE. 6. THERE ARE NO WELLS TO BE ABANDONED. THE EXISTING WELL, AS SHOWN ON PLAN, IS TO REMAIN. Note: 1. Contractor to install Drip Lines on Contour which may vary from that shown on plan. 2. Conveyance lines (Supply lines / Return line) to be installed below frost depth. All portions of conveyance lines below frost to be below the elevation of all top feed tubing manifolds such that the conveyance lines remain full at pump shut off. Deeper installation of conveyance lines may be necessary or remote zone valves may be required. II IIY J SITE QS 71 o = VICINITY MAP - nts NOTE: 1. ALL PIPE TO BE SCH.40 PVC. (GLUED JOINTS) 2. ALL PIPE TO HAVE WATERTIGHT CONNECTIONS. 3. SECTION OF PIPE FROM CREEK TO ULTRA —VIOLET LIGHT MUST BE CAPABLE OF WITHSTANDING 80 PSI PRESSURE. 4. OUTFALL LOCATION IS TO BE FIELD LOCATED TO AVOID ROCK, TREES, ETC. CHOOSE LOCATION FOR EASY INSTALLATION, MAINTENANCE AND ACCESS. 5. INSTALL TANKS WITH A 4' CLEAR SPACE BETWEEN TANKS AND 15' HOUSE FOUNDATION. 6. TRY TO AVOID PLANTING TREES WITHIN 30' OF TANKS OR PIPING OF WASTEWATER SYSTEM. 7. GRADES AROUND UNITS SHOULD DRAIN STORMWATER AWAY FROM THE TANKS. 15A NCAC 02T .0506 SETBACKS (a) The setbacks for TS II irrigation sites shall be as follows: \ ., \ \ \ N/F Drip � � � \ � � � \\ \ \ PATRICK & LIS.A/OBRIEN Any habitable residence or place of public assembly under separate ownership \ PIN #-0� 312-012—A or not to be maintained as art of the project site (100, \ \\ `` ,� \ �` \ '�'9 \\ \ \ _ DB 6074 PG 062 * An habitable residence or lace of public assembly owned b the ermittee F TRACT 1 PB G PG 68 / Y P P Y Y P �\ \\ \ \\ \ �/� \� �l \ to be maintained as part of the project site 5 \ \ ( JJ \ Any private or public water supply source 100 \ \ \ F/ ■ \ R W / I N/F Surface waters (streams — intermittent and perennial (WS-1), perennial \ \ \ \ \\ / / 1 /\ waterbodies and wetlands) 100 \ \ \ \ \ \ \ \ \ / PATRIC & LI— OBRIEN I Groundwater loweringditches where the bottom of the ditch intersects the SHWT 100 \ \ \ \ \ PIN # 0 3120�2 B Surface water diversions (ephemeral streams, waterways, ditches) 25 \ \ \ 1 \ / /0 4 * Any well with exception of monitoring wells 100 \ \ \ 1 TRACT,,, PB G PG 68 * Any property line 50 \ \ \ I \ \\ \ \ �% \ / i 1 \ / �v) Top of slope of embankments or cuts of two feet or more in vertical height 15 Any water line from a disposal system 10 � 1 I I \ \ I _ Subsurface groundwater lowering drainage systems 15 1 \ I 1 1 \ v I \ \ / Any swimming pool 15 ' 1 I I \ 1 I i — C I \ N/F \ / *Public right of way 50 WI&S PROPERTIE \ Nitrification field 10 I I I I 1 \\ I I /� / \ / * Any building foundation or basement 5 I I i I \\ \ I / ; / �5,•� \/ \ PIN # 08— 012\ \ DB 61 Z PG 322 *Setbacks for this site and are shown. I TRAC PB G PG 68 I I \ I I . SETBACK REQUIREMENTS: DESCRIPTION REQUIRED PROVIDED 1. New Water Well: 100 ft. 100 ft.+ 2. Foundation: 15 ft. 15 ft.+ A. There are no stormwater ditches within 50' of Wastewater system. House and system are located on a ridge so that drainage naturally is shed away from wastewater system and \ house. pQ 5\ti' �0Gti 'P \\Q l000l SOILS INFORMATION: DESCRIPTION SfB — Sedgefield Sandy Loam VaD — Vance Sandy Loam Classifications are provided from Soils by US Dept.of Agriculture. Soil Pits & Boring information provided by. Thompson Environmental Consulting Geometric Mean Calculations: Area #1 Ksat# KSAT(in./hr) K1 0.014 K2 0.015 K 3 0.017 K 4 0.013 K5 0.026 K6 0.078 Geometric Mean=0.015 4"x4" Precut ringers —Post Guard �-1"x4" Post \-YxY Galvanized Posts Buried Guard (Over Hog —wire 18" Minimum Hog —wire) Fastened On 4' NOTES: Front View centers. Side View 1. Comer Posts & Gate Posts set 24" Deep 2. All Material To Be White Vinyl Posts. I All Piping to be inside fence (Protected Area). Disposal Field Restricted Access Fence Other Fence Types can be considered. Submit Fence Cut —Sheets for Approval by Engineer and Owner. 5 \\ \ \ \\ \� /, /� /ham• \\ 0e8�O \ F \ / iC \ 1i00VER/DO � ON ��;' / \/ 1 1 \ �i � N'Qp �\ \ \1 PN # 08-312-0U F �� , , \�\ d 1 I / \ / I `DB 1011 PG 653 oafl ;-7 1 I CONIROL P ELS 4xa' Post 1 \ \ NI7R ROUSE �cb I \ , PANas , 1 1 \ / PROPOSED FAalm11 I g N I I o PROPos®iousE a —PROPOSEI� DISPOSAL J- \ � I M PRE `1312 0�1 �62 \ \ PW # p8 pG 8g6 Vol 56 p F _4 SETBACK OFF HOUSE \GATE 990' 890' S A� p�OMTY PROPOSED FENCE I I / S 8112' 03" ti I rn (See Detail —This I / o / Sheet) ,\ /— rn 96. N/F / \ \ \ \ \ � to HDND A \ \ Li/ / N A VA I N C / I / / / / PIN # 08-312-003fC _ / N/F \ LLI / DB 7111 PG 14'7 / \\ \ \ p1N # p8�31G2 2 / SARAH MEADOWS \ I / / / PB E PG 71'7 / \\ \ \ 55p151 P 9 p / PIN # 08-312-003—I \ — I / / / 1 10p54, pB P pG DB 503 PG 783 L I Q /, / / / 1 1 \ — _ — I 40 0 40 80 120 Scale 1" = 40' �o SITEn,t/ �9 ;o 'Po = 0 VICINITY MAP — nts HOUSE GROUND FLOOR ELEV.=627.50 -y Gravity I Min. 1% Slope PreTreatment NORWECO CONTROL PANEL 120 VOLT - 10 - 60 Hz - 20AMP SERVICE LIDS TO BE 3" to 6" ABOVE GRADE. GRADE GROUND TO SLOPE AWAY FROM UNITS. 00 (O-r oc�s�a 619.10 !r Contractor to install compacted material under Extended Airation Chamber Final Clarification Clarifier prior to install fill Chamber around remainder of unit. Singular Green Bio-Kinetic BioFilm Reactor Unit SECTION VIEW Singular Green Bio-Kinetic Unit Lei Lei 4" GRAVITY 4 4 I pll a I CONTROL PANEL I L NOTE: 1" Sch.40 PVC RETURN LINE FROM HYDRAULIC UNIT TO SEPTIC TANK PORTION OF PRE -TREAT. mLUTLTEEAEBATo"IsUsTA«EOANDREALIT-E-NEONTNN1E"A,. "E.�=Eo ,,;ram m R-ET"EAE-Y1.OBERATwc W.E. T"E EncwTv 1s O-REo. �•• 0 T"e LocnL, uceHseo 11-10 w'Ll Puce Tne neanTOR wTo seav�ce. NOTE: 1 J" Sch.40 PVC RETURN LINE FROM HYDRAULIC UNIT TO SEPTIC TANK PORTION OF PRE -TREAT. LINE IS TO FLOW BY GRAVITY (2% min.) L 00 0 0 0 N N N I I cfl C Bio-Film Reactor NORWECO PRE-TREATMENT CONTROL PANEL 32" RISERS MIN. (typical) �� 6% (O-T I I+ 1 SCH.40 PVC LINE PUMP TANK NOTE: TANKS TO BE SET ON A 6" STONE BED. AMERICAN PUMP TANK/ DRIP SYSTEM CONTROL PANEL HYDRAULIC UNIT BOTTOM EL628 32" MI.N. HYDRAULIC UNIT SEE SHEET 4 OF 5 ZONE 1 HIGHEST EL. 631 ZONE 1 UPPLY TO HEADWORKS UNIT RETURN Elevations are based on referenced survey. During installation elevations must be checked to verify that system will function as designed. There must be at least 1 % gravity fall from House Sewer main to Tank inlet. The off float in the pump tank should not exceed 8' vertical elevation from base of Hydraulic Unit. Float elevations are dimensioned from the bottom of tank. 4" GRAVITY 4" GRAVITY 1 2" GRAVITY EFFLUENT DISCHARGE DISCHARGE PUMP DISCHARGE SEE SECTION VIEW FN 3,000gal. PUMP TANK PROPOSED NORWECO 500 gpd WASTEWATER UNIT 1°ELECTRICAL CONDUIT F 1 "CON DUIT- 1 "CONDUIT 1 "CONDUIT - f - CONTROL HYDRAULIC PANEL UNIT SCHEMATIC LAYOUT PLAN (NTS) 1. UV Light needs to be mounted in the vertical posit UV Light access is from the top so provision for easy removal needs to be accommodated from the Lid. 2. The light is to be monitored by the Control Panel. Should a failure occur the Control Panel is to cut off power to the unit, dispach a signal for immediate maintenance, and turn off the effluent pump for discharging to the disposal site. No untreated effluent to be discharged. 3. UV Light is to be located on the discharge side of Kinetic Unit. Install UV Light with 10" Cast iron Box top) with Concrete Collar. Service Pro 311 Control Panel 115 VAC @ 15 amps; Single Phase Simplex Capacitor Start/Run Panel can control three single phase pump in water and sewage applications: ■ NEMA 4X enclosure ■ Control and alarm fuse power and replacement indicators ■ HOA switch, float status and pump run indicators ■ Optional display board shows system information and has ETM and cycle counter indicators CONCRETE COLLAR Model 1500 UV Package ust %"PVC PIPE 1"RETURN LINE ZONE #1 ZONE #2 ZONE #3 PROPOSED USE: 1 NEW SINGLE-FAMILY HOUSE Proposed: 3 bedrooms REQUIRED FLOW CALCULATIONS: 2 1 - 3 BEDROOM HOUSE @ 120 gpd/bdm = 360 gpd. TOTAL FLOW FOR SYSTEM = 360 gpd. ULTRAVIOLET LIGHT Gravity fed through UV Light LENGTH OF RUN CALCULATIONS: 3 360 gals 365 days 12 in. 1 cf. 1 yr• - 11,634 sf. day yr. ft. 7.48 gals 18.12 in. - 11,634 sf./(50"/12") = 2,793 ft. Required Tubing 2,793 ft/155' = 18.0 or 18 runs Each Run = 155 ft.avg. Total of 3 Zones with 3 to 5 Laterals per zone & 2 Runs per Lateral. SUPPLY LINES TO ZONES CONSTRUCTION SEQUENCE (for Installation & Backfill of Tanks) 1. TANK TO BE INSTALLED 6"THICK PEA STONE BED. USE A DEWATERING PIT (IF REQUIRED) 2. USE NATIVE MATERIAL FOR BACKFILL WITH NO ORGANICS, PROPERLY PLACED AND COMPACTED. KEEP EXCAVATION FREE OF WATER AT ALL TIMES. 3. INSTALL FILL IN 61IFTS, MATERIAL MUST BE ABLE TO FILL-IN BETWEEN RIBS OF TANK, FILL ON SIDES FIRST; THEN THE BULKHEADS. 4. USE A HAND TAMPER TO ACHIEVE SIDEWALL COMPACTION THROUGH THE COMPACTED BACKFILL. 5. SIDEWALL COMPRESSION IS ESSENTIAL FOR SIDEWALL RESTRAINT. 6. BACKFILL BETWEEN RISERS FIRST. COMPLETE BACKFILLING, GRADE DRAINAGE AWAY FROM TANK. NOTE: 1. ALL TANKAGE AND CONTROL PANELS SHALL BE SECURED WITH LOCKS 2. KEYS SHALL BE SECURED WITH OWNER AND SERVICE REPRESENTATIVE. i � V o \ 0 \ \\ TETEN YT \\ o 0 11,R)AULIC UNIT \ TRA-VIOLET LIGHT \ IMP TANK \ ILM REACTOR I ULAR GREEN , DI NETIC UNIT ----' \ \ o , 11 E RN LINE \ 4 E R L TERAL \ C N OL NELS 1 I \ J / / / / FLUSH CYCLE 4 INITIALLY SET SYSTEM TO FLUSH AT EVERY 10 CYCLES PER ZONE. MINIMUM PUMP RATE = 10 gpm. for 3 mins. 1 o ' o I , 0 AL TE II 3 i One I One z I w � I _ I L� 9jo ) 992 _1 110' I \ 1 20 FLOW CALCULATIONS: per ZONE 5 DOSING FLOW CALCULATION PER ZONE: NUMBER OF EMITTERS = DRIPPER LINE LENGTH / 2' EMITTER SPACING = 930'/2 = 465 EMITTERS ABSORPTION FIELD DOSING RATE IN gph = NUMBER OF EMITTERS X 0.61 = 465 X 0.61 = 284 gph ABSORPTION FIELD DOSING RATE IN gph = gph / 60 mins = 284 / 60 = 4.7 gpm FLUSHING FLOW CALCULATION: FLUSHING FLOW = NO. OF LATERALS PER ZONE X 1.6 = 3 X 1.6 = 4.8 gpm TOTAL FLOW = FLUSHING FLOW + DOSING FLOW =4.7+4.8=9.5gpm 1 Zone dosing: 60.4 gal/cycle, 3.6 total average cycles per day, 6.0 total peak cycles per day. Pump will run for -675.4 seconds per cycle. Pump will rest for 403 min in average mode and 241.8 min. in peak mode. Average mode shall be 216 GPD. Peak mode shall be 360 GPD. - - 1 I I I I I I I I I I I i I I- I- I l i _ - 0 26 40 60 Scale 1" = 20' S 5 DAY STORAGE REQUIREMENT 6 PEAK FLOW = 360 gpd STORAGE = 5 x 360= 1,800 gals. PUMP TANK = 43.95 g/in. REQ'D STORAGE = 1,800/43.95 = 40.96". PROVIDED STORAGE FROM Inlet Elev TO Pump Off = 622.90-618.90 = 48.0" 48.0" * 43.95 g/in.=2,110g 2,110g > 1,800g => therefore: "OK" VAW IX18 RJBH3 OFilONB AiIAIABLE 24 2 CONTRACTOR TO USE ROUND EZSet RISERS. MODEL: MS NON -TRAFFIC 30DO PT NON TRAFFIC MID SEAM PUMP TANK SHOAF PRECAST SEPTIC INC. 41$0 WEST US HWY 54 LEXINGTON, NC 2728b PHONE (336) 78744M FAX (338) 787-2828 Ir&D&hodprscwL xn www.shoslprsans .com - INC APPROVAL # : PT-2104 - LIQUID CAPACITY- 3.033 GALLONS - GALLONS PER INCH-43.86 - PIPE PENETRATIONS - (MEETS AST114 C40) - CONCRETE - 50DO PSI MIN - TANK WEIGHT - 17.34 # - TOP - 9,320 * - BOTTOM - SAW # - REINFORCEMENT PER ENGINEER SPECS -1 r BUYTL SEALANT CONTINUOUS IN JOINTS MODEL: MS3500 PUMP TANK (non OUTDOOR WALL J 1 RAIN BIRD ESP-4M OUTDOOR WALL MOUNT RAIN BIRD ESP-4Mi INDOOR WALL MOUNT @JUNCTION BOX 01/72-INp(CIHWFP2VCS��SpCpH 40 CONDUIT O6 120 VAC.0609*gXTt1tNA y PLUG-IN TRANSFORMER - NOTES: 1. FOR BEST PERFORMANCE, THE CONTROLLER INTERFACE 6 RED OR GREEN SHOULD BE INSTALLED AT LEAST FIVE FEET ABOVE THE GROUND. BLACK OR T THE CONTROLLER 2 IIRES iFROM TO HERE ® WHITE WIRES BESINSTALLED AWAY SOURCES OF ELECTRICAL TO HERE INTERFERENCE (SUCH AS TRANSFORMERS, GENERATORS, PUMPS, FANS, ELECTRICAL METER BOXES) AND METAL OBJECTS TO MAXIMIZE Z COMMUNICATION RANGE. (D > U TITLE1 N TITLE2 (OUTDOOR) REVISED D SCALE TITLE3 - - - - J TITLE4 DWG -NAME FREEZE -RAIN SENSOR WIRING DETAIL AIR RELEASE VALVE CHECK VALVE�� /AIN KtLtHJt CHECK VALVE CHECK AIR RELEASE VALVE CHECK VALVE�� RER VARIES VARIES JUNCTION BOX SCH 80 UNION (BY OTHERS) PUMP TANK- SHOAF FLOAT BAR TANK MANUFACTURER 3,033 PROVIDED 43.95 CHECK VALVE GALLON TANK GALS/INCH 4 11=11_II_I1= i II. 4"INLET EL 622.90� 77" 64" FLOW COLLAR ATTACHED - TO P MP TANK RISER 32"-High Level Alarm - 2 INSIDE DIMENSION 73" 26"-Peak Enable rnI - 144" 19"-Dose Enable - 16"-Pump OFF - 618.90 000 0000 o o o INVERT 3" EL. 617.57 LSCH40 PVC GA1 VALVE LIMIT OF EXCAVATION FOR PUMP/SEPTIC TAN EL.628.0 / 1 z , DIA PIPE. DRIP PUMP TANK DETAIL MODEL: MS3000 PUMP TANK (non) N TS �• • • now --.- ••,::!IIIIIIIIIIIIIIII . , � 1111►11111111111111 1111111111111111111111 ■�1111111111111111 ' 11111111101111111111 - 11,Illlllllla�llllll11 92.3' TDH 80 0 73• 60 0 50 40 30 20 10 7D PROPOSED SYSTEM -- 0 ' 1 1 1 I16 ' 1' I 1 I' 1 1 1 I40' 1 2 8 24 32 12 20 28 36 44 allons Per Minute 4.7 gpm \�9.5 gpm Elev. 631.0 TO CENTRAL UNIT ZONE SUPPLY PIPE MUST BE SLEEVED FROM PUMP TANK TO UNDISTURBED EARTH WITH 4" SCH 40 PVC AS SHOWN. BOTH ENDS OF 4" PIPE SHOULD BE BE SEALED. 30' MAXIMUM DISTANCE 4" PVC SCH 40 SLEEVE - WATERTIGHT SEAL \\UNDISTURBED \\,\\EARTH,\\, w TIGHT 11=11=11=11= NOTE: SEAL 11=11=11=11= NO WEEP HOLE IN PUMP DISCHARGE. 11;11.11.11� 11=11=11=1' 11,11,11=; *1. PEAK ENABLE FLOAT HAS A DELAY TIMER SUCH -11.11; .11= PUMP W/ THAT IF THE FLOAT HAS NOT "SHUT OFF" IN A FLOW COLLAR , ;_ ,_ , CERTAIN PERIOD OF TIME THEN THE ALARM SOUNDS OFF. DELAY TIME IS TYPICALLY SET AT .11,11.11.11; REST TIME SO THAT IF PROBLEM IS NOT SOLVED WITHIN A DOSE CYCLE THEN THE ALARM IS 1=11=�I=11=11=11=11�1 " SOUNDED. 2. FLOAT ELEVATIONS SHOWN ARE FOR INITIAL SETTING. SERVICE REP SHALL ADJUST ELEVATIONS TO FIT CONDITIONS. HEADLOSS CALCULATIONS: Length of Longest Lateral = 310' Dose Flow = 4.7 gpm; Flush Flow = 4.8 gpm Total Flow = 9.5 gpm Required Safety Factor = 23.1' Headloss through unit = 8.0' Elevation Change =5.5' (Pump ON to Highest Grade) 5.5' 170' for 1" Supply & 1" Return Line 5.1'*170/100' = 8.7' Headloss through laterals = 37' Minor Losses (use 10') = 10' Total Headlosses = 92.3' FA PRESSURE REGULATING CALCULATIONS: 81 Length of Longest Lateral = 310' Dose Flow = 4.7 gpm Headloss through unit = 4. 0' Elevation Change = 5.5' (Pump ON to Upper GRADE) 5.5' 1" Supply & 1" Return Line (21/100') = 3.7' Total Headlosses => 170/100(2.2)= 13.2' From CulI flow @ 4.9 => 155'-13.2'= 141.7'/2.31=61.4psi. 61.4 psi < 65 psi so no Pressure Regulating Valve is Required or Provided. 42' ± DRIP FIELD: 3 ZONES; 3 or 5 LATERALS per ZONE, 2 RUNSAAT. Elev. ZONE 1 Z152 Total Length Req'd: 930' Total Length Provided: 881' 630.0 LATERAL #1 LATERAL #2 LATERAL #3 LATERAL #4 LATERAL #5 Run #1 73' Run #1 83' Run #1 92' Run #1 94' Run #1 94' Run #2 78' Run #2 87' Run #2 92' Run #2 94' Run #2 94' Elev. 630.0 33'± Elev. 629.0 Elev. 629.0 24'± Elev. 628.2 Total Lateral Total Lateral Total Lateral Total Lateral Total Lateral = 151' = 170' = 184' = 188' = 188' ZONE 2 Z142 Total Length Req'd: 930' Total Length Provided: 992' LATERAL #1 LATERAL #2 LATERAL #3 LATERAL #4 Run #1 113' Run #1 117' Run #1 131' Run #1 135' Run #2 113' Run #2 117' Run #2 131' Run #2 135' Total Lateral Total Lateral Total Lateral Total Lateral = 226' = 234' = 262' = 270' ZONE 3 Z132 Total Length Req'd: 930' Total Length Provided: 930' LATERAL #1 LATERAL #2 LATERAL #3 Run #1 155' Run #1 155' Run #1 155' Run #2 155' Run #2 155' Run #2 155' Total Lateral Total Lateral Total Lateral =310' =310' =310, Total Length of Drip Line (Required) = 2,793' Total Length of Drip Line (Provided) = 2,803' All Lateral Lengths are within the Manufactures' Recommendation of +20%. ©0 /© / / / / / / / WASTEWATER SYSTEM DRAWING LEGEND A = 4" Wastewater Pipe from House. B = SINGULAR GREEN BIO KINETIC UNIT C = BIO-FILM REACTOR D = MODEL 1500 UV PACKAGE E = 3,500 gal. Precast Pump Tank with Riser. F = NORWECO Control Panel Operates Pretreat Unit G = AMERICAN Control Panel operates (Pump Tank, Hydraulic Unit & Disposal Valves). The Hydraulic Unit has a 24v field flush valve, 24v backwash valve, and a remote 24v zone valve that the Control Panel will manage. Install Control Panel next to House. H = Drip system Headworks Unit with insulated valve box enclosure. I = 1W PVC Backwash Gravity Line from Headworks Unit to Septic Tank. J = 1" PVC Return Line from Drip System Return Manifold to Headworks Unit. K = 1" PVC Supply Line from Drip Headworks to Supply Manifold. L = Drip System Supply Manifold with Air -Release Valve & Clean -out. M = Drip System Return Manifold with Air -Release Valve, Clean -out and Check Valve. N = Drip tubing installed at grade, 50 inches on center between rows. 0 = Black Sch.40 Flex hose and fittings. P = %" Schedule 40 PVC Supply & Return lines to each Lateral. Q = 1%" Supply Line from Drip System Pump to Headworks Unit. / / / / / / / / 4'wide I nnllriklo I 1 I I I I I I I I I I I I I I I I I -- _ I� � I l i COLD WEATHER INSTALLATION NOTES (Check all that apply) Minimum construction techniques for all American "Perc-Rite" Drip systems in cold weather climates: "Top feed" manifolds should be used on all sites with a discernible slope to allow for proper drainage of the manifolds and the 3/4" and 1/2" lateral connectors into the drip tubing. The main supply and return lines shall be installed below the frost line and shall feed the shallow "top feed" manifolds with a single vertical section of insulated sch 40 PVC pipe. Insulation shall be minimum 1/2" thick foam insulation (or equivalent). On flat sites where "top feed" manifolds will not drain therefore requiring the use of side feed manifolds, 12" cover is recommended between highest point of 1/2" black flexible PVC pipe (non loop connections) and final grade. On drip tubing installations less than 12" this would require additional cover over the header ditch area to create the 12" separation. Any additional cover is it to be graded and tapered into landscape. Please see note on loop connections below. Dense vegetation turf cover to be established over supply trench, return trench and tubing prior to 1st exposure to cold weather. If vegetation cannot be established, then trenches and tubing to be covered with a thick layer (minimum 6") of mulch, straw/hay, etc. until such turf cover is established. Cover must be stabilized and maintained until dense vegetative turf is established. Amount of cover may need to be adjusted to account for settling. All valve boxes that house "remote zone valves" shall be insulated by contractor. Insulation to consist of either blue board, bagged Styrofoam peanuts or equivalent. If fiberglass insulation is used it must be sealed to prevent it from becoming saturated. The "remote valves" shall be placed on a bed of gravel or screenings (4"-6"). Positive grade away from valve boxes is encouraged to reduce the volume of groundwater that may collect in valve box. Certain sites may require positive drains to daylight. All loops connecting drip runs with 1/2" flexible PVC shall be slightly elevated (minimum 1"-2") so that they drain into the drip tubing after the pump shuts off. It is contractors responsibility to ensure these loops stay elevated during and after the loops are backfilled. All main supply and return trenches to be installed below the local frost line. If this is not possible due to site restrictions then adequate soil must be added over the top of the trenches so that the effective depth remains below the frost line after settling occurs. The added soils must be prepared for turf cover and stabilized. If vegetation cannot be established then trenches are to be covered with an additional layer (minimum 6") of mulch, straw/hay, etc. until such turf cover is established. Sufficient ground cover around the hydraulic unit is required to insulate the unit. All pipes entering and leaving the hydraulic unit shall elbow vertically down 90 degrees to a depth below the frost line prior to extending away from the unit horizontally. Additional insulation inside the hydraulic unit is encouraged. Insulation to consist of either blue board, bagged Styrofoam peanuts or equivalent. If fiberglass insulation is used it must be sealed to prevent it from becoming saturated. All conduit entering into the control panel shall be sealed to prevent condensation inside the panel. Established vegetation height shall be minimum 4"-6" throughout winter months. Air release valves shall be placed below the ground surface inside a valve box but at an elevation above the highest drip line in that particular zone. GENERAL CONSTRUCTION NOTES AMERICAN MANUFACTURING "Perc-Rite®" Drip 1. All installation and construction techniques shall conform to state and county codes pertaining to on site sewage systems and the permit for this site. 2. The installation of this system shall be in accordance with specifications and procedures as supplied by the Manufacturer of the equipment. 3. The drip tubing shall be installed using a vibratory plow, trencher, or by hand. 4. All tubing to be installed along contour. 5. All PVC pipe and fittings shall be PVC SCH 40 Type 1 rated for pressure applications. All glued joints shall be cleaned and primed with purple (dyed) PVC primer prior to being glued. 6. All cutting of PVC pipe, flexible PVC and dripper tubing of size 1 1/2" or smaller shall be accomplished with pipe cutters approved by American Manufacturing Company, Inc. No sawing of PVC, flexible PVC or dripper tubing of size 1 1/2" or smaller allowed. 7. All PVC pipe, flexible PVC and dripper tubing in the work area shall have the ends covered with duct tape to prevent construction debris from entering the pipe. Prior to gluing, all joints shall be inspected for and cleared of any construction debris. 8. All automatic valves (zone valves & field flush return valves) shall be installed with isolation valves, bypass valves, and disconnects (i.e. unions, flanges) for manual field operation during field maintenance events. All valves must be provided with at -grade access. 9. Drain field supply and return lines and manifolds to be installed at adequate depth to prevent freezing. Horizontal spacing between the dripper lines and the installation depth to be as specified. 10. No activity on drain field area other than minimum required to install system. Do not park equipment, drive large equipment over or store materials on drain field area. 11. No wet weather installation is permitted. 12. The contractor shall be certified by American Manufacturing Company, Inc. to install this type of system and shall hold a pre -construction meeting with the individuals responsible for soil evaluation, permitting and inspections prior to site work beginning to insure protection of the site conditions and to ensure the system is installed according to design. 13. If site conditions are determined to require the installation of the system to deviate from these plans, all work shall stop immediately and the designer shall be notified. Any ongoing work shall be at the sole responsibility of the contractor. 14. All force mains shall be tested for leaks prior to drip tubing installation and prior to system startup. Uncovered force mains shall be visibly inspected for leaks. If a leak is suspected in covered force mains then the force main shall be re -tested at a minimum pressure of at least percent above the design operating pressure, for at least 30 minutes. There shall be no discernible leakage. 15. ASD15 & 25 Hydraulic units to be placed on a bed of gravel for drainage. 16. If standing groundwater is a problem a screened drain to daylight is required. SITE CLEARING GUIDELINES (Check all that apply) General guidelines for preparing/clearing a site for installation of an American Mfg. "Perc-Rite@" Drip System: GENERAL REQUIREMENTS: The preservation of the original structure of the soil in the absorption area is essential to maintaining the percolative capacity of the soil. No activity other than the construction of the system is permitted within the absorption area. On sites where a majority of the vegetation needs to be removed, care must be taken to minimize the impact on the soils natural permeability. There shall be no cutting, filling, or storage of material on or within 20' of the adsorption area. Site clearing and preparation shall be performed by the installation contractor for the wastewater dispersal system. The absorption system is not to be constructed during periods of wet weather when the soil is sufficiently wet at the depth of installation to exceed its plastic limit. The plastic limit is exceeded when the soil can be rolled between the palms of the hands to produce threads 1/8 inch in diameter without breaking and crumbling. After installation of the dispersal system, or if after clearing installation is not to be performed for 60 days, seed the area liberally with native grasses. The standard Department Of Transportation specification is acceptable consisting of perennial rye and fescue. At all times protect the installation area from erosion. Local codes shall apply for best management practices to control runoff. * SHALLOW INSTALLATIONS (Surface to 8"):* Clearing and removal should be by hand with minimal machine assistance and under optimum soil moisture conditions. Track machines are preferred to those with rubber tires and should only be used around edges of installation. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. MID RANGE INSTALLATIONS (12" TO 24"): All trees and brush, as necessary, should be "pulled out" (grubbed out) or cut flush with the ground surface. Stumps may be ground to two inches below the installation depth and the hole backfilled with sandy material to 6" above installation depth and the remainder with natural soil. When the soil is disturbed at the installation depth by pulling a stump, backfill the hole with sandy material to 6" above installation depth and the remainder with natural soil. Digging and pushing over trees may be more detrimental to the soils infiltrative characteristics. Track machines are preferred to those with rubber tires and should only be used during optimal soil moisture conditions. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. DEEP INSTALLATIONS ( 30" and deeper): All trees and brush, as necessary, should be removed. When the soil is disturbed at the installation depth, backfill the hole with sandy material to 6" above installation depth and the remainder with natural soil. Stumps may be ground to two inches below the installation depth and the hole backfilled with sandy material to 6" above installation depth and the remainder with natural soil. Digging and pushing over trees may be more detrimental to the soils infiltrative characteristics than "pulling" and are not recommended. Track machines are preferred to those with rubber tires and should only be used during optimal soil moisture conditions. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. LARGE SCALE INSTALLATION TESTING: Larger systems typically do not have water available for zone installation testing on a timely manner. It is desirable to water test an installed zone while the supply and return manifold header ditches are exposed to better inspect for leaks. In order to facilitate site and equipment protection and erosion control, the installation contractor shall provide sufficient water and the means to deliver and monitor the water to both flush and leak test each zone or subzone prior to backfill. The flushing volume shall be five times the volume of the piping network being flushed. The flushing velocity shall be in excess of 2-1/2 feet per second. The leak testing volume shall be at least 3 times the volume of the pipe. The leak test shall continue until steady state flow is achieved and the flow rate is within 6% of the design flow rate or as approved by the manufacturer or engineer. After successful testing and inspection the supply and return pipe connection points shall be sealed and protected from dirt and debris from entering prior to final connection. DRIP TUBING SHALL BE: 1. AMERICAN PERC-RITE SUBSURFACE DRIP SYSTEM by American Manufacturing Company in accordance with Innovative Wastewater System Approval No. IWWS-93-R6B 2. NETAFIM PC DRIPLINE with pressure compensating emitters spaced uniformly in the tubing at 24" o.c. 3. Each run of tubing must be installed dead level. Lateral/run locations may need to be spread out further to keep lines more on contour. The location of the field lines must be field -staked (at least every 4 lateral "runs" along contour), and field verified to be acceptable, and acceptable depth range kept within field -specified tolerances. NOTES FOR FILL MATERIAL: THE FILL MATERIAL SHOULD CONSIST OF MINERAL SOIL WITH A TEXTURAL CLASSIFICATION OF SANDY LOAM. IT SHALL CONSIST OF NO MORE THAN 10 PERCENT OF ROCK FRAGMENTS (> 2 MM IN SIZE), ORGANIC MATERIAL, ETC. ONCE A SOURCE OF FILL MATERIAL IS FOUND, A SAMPLE SHOULD BE SUBMITTED TO TEC PERSONNEL SO THAT A PARTICLE SIZE ANALYSIS CAN BE CONDUCTED. NOTE: BEFORE ANY EARTH MOVING ACTIVITIES ARE CONDUCTED ON SITE, TEC SHOULD BE CONTACTED TO MARK THE FILL AREA BOUNDARY AND INSPECT THE MOISTURE CONTENT OF THE SOIL. IF THE SOILS ARE TOO SATURATED, NO TILLAGE MAY OCCUR. THIS INSPECTION IS TO AVOID COMPACTING THE APPLICATION AREA. ALL SITE WORK SHOULD BE CONDUCTED BY MACHINERY WITH TRACKS INSTEAD OF PNEUMATIC TIRES. 1. THE EXISTING GROUND SURFACE SHOULD BE LIGHTLY TILLED/SCARIFIED LIGHTLY AND SHOULD EXTEND AT LEAST FIVE (5) FEET BEYOND THE INTENDED IRRIGATION AREA ON ALL SIDES. 2. THREE (3) INCHES OF APPROVED FILL MATERIAL SHOULD BE APPLIED TO THE DISPOSAL AREA AND TILLED INTO THE APPLICATION AREA AND THEN LIGHTLY ROLLED WITH A LAWN ROLLER FILLED APPROXIMATELY ONE QUARTER (1/4) OF WATER (OR EQUIVALENT TECHNIQUE). THE SOIL SHOULD NOT BE OVERLY COMPACTED DURING THIS PROCESS. 3. AT THIS POINT, THE TOTAL DEPTH OF FILL SHOULD BE AT LEAST THREE (3) INCHES ABOVE THE INITIAL GROUND SURFACE. IF THREE (3) INCHES HAS NOT BEEN ACHIEVED, CONTINUE APPLYING FILL AS OUTLINED IN STEP 2 UNTIL A MINIMUM OF THREE (3) INCHES IS PRESENT. 4. THE FILL MATERIAL SHOULD EXTEND FIVE (5) FEET BEYOND THE PROPOSED DISPOSAL AREA. FROM THIS POINT, THE FILL SHOULD BE TAPERED DOWN TO THE SURROUNDING GROUND SURFACE WITH A BERM SLOPE NOT TO EXCEED A 1:4 RISE TO RUN RATIO. IN OTHER WORDS, THERE SHOULD NOT BE ANY MORE THAN ONE (1) INCH OF RISE FOR EVERY FOUR (4) INCHES OF RUN, MAKING THE BERM ONE (1) FOOT WIDE AT A MINIMUM FOR THE PROPOSED THREE (3) INCHES OF PROPOSED FILL. TURF OPTION: THE ENTIRE AREA SHOULD BE TEMPORARILY SEEDED WITH AN APPROPRIATE TURF SPECIES FOR THE AREA, COVERED WITH HAY OR OTHER SUITABLE TEMPORARY COVER THAT WILL BOTH PROTECT THE SEED AND SOIL FROM EROSION WHILE THE PINE/HARDWOOD DUFF LAYER IS REGENERATED. TEMPORARY IRRIGATION SHOULD BE PROVIDED TO THE AREA SO THAT A SUITABLE STAND OF TURF TAKES ROOT. CARE SHOULD BE TAKEN NOT TO ERODE THE INSTALLED FILL. ORIGINAL EXISTING - SURFACE INTERFACE MIXED TO A 4"(min.) DEPTH RCJ I All, I I VC ZONE NEW SOIL MATERIAL EXISTING USEABLE UNDISTURBED MATERIAL SEEDBED PREPARRTI011111 & SEED RATE SPEaRCOON 1. All disturbed areas for the Disposal Area are to be graded +/- 2/10" for positive drainage and into approved drainage swales and basins. 2. After Fill has been installed and prior to seeding, all areas that are to be seeded, shall be scarified 4-6" deep with a rototill or tined machined. 3. Soil PH shall be measured by an approved soil testing method. Soil test results will be shared with the property owner and the contractor will amend the soil according to the soil test analysis recommendations. A PH of between 6 and 7 is recommended for maximum success of Fescue seeding. Fertilizer with the soil analysis recommendation of the proper formulation of N, P & K shall be applied and added to the soil prior to final grading to ensure mixing 1-2" into the soil layer. 4. Final grading shall be completed once the Soil has been properly treated. Final grading may be completed utilizing fine grading tractor implements or by dragging a fence across the soil for a smooth surface. 5. After final grade, seed and fertilizer may be applied. Turf Type tall fescue shall be applied at a rate of 6-7lbs per 1000 sq feet of area (or as recommended). Fertilizer shall be applied as per the recommendation of the soil analysis testing. All seed shall be tagged certified and at least 98% pure and free of noxious weed seed. 6. To keep moisture in the soil and promote good seed growth after initial germination, either clean fresh wheat straw mulch shall be applied at 2 bales per 1000 sq feet or wood fiber hydromulch. If straw is used, then it shall be coated with Hydromulch to tack the straw to prevent excessive blowing in windy weather. 7. Water shall be applied to the seed at least every other day for a period of two weeks to maximize germination. 8. If soil temperatures drop below 58 degrees, mix in 25% annual rye grass into the seeding mixture. Fescue may need to be overseeded in the spring as the rye dies. DRIP TUBING TO BE STAPLED TO GROUND PER MANUFACTURER'S RECOMMENDATIONS. NATIVE-/ UNDISTURBED SOIL Ml SUPPLY MANIFOL RETURN MANIFOLD CHECK VALVE SHUT-OFF VALVE SHUT-OFF VALVE INSULATED PIPE SEE GRASS SPECIFICATION FOR SEEDING, FERTILIZER, AND GROUND PREPARATION. SURFACE DRIP INSTALLATION SCHEMATIC DRIPPER LINE STANDARD RESIDENTIAL DRIP SYSTEM DETAILS FOR SITES WITH DISCERNIBLE SLOPES (SUPPLY AND RETURN ON SAME SIDE) AIR RELEASE (AIR RELEASE VALVES MUST VALVE BE CONTINUOUS ACTING) //' Supply ** it PRESSURE Manifold DRIPPER TUBING �O 1" Supply (TYP) L COMMON RETURN PIPE ALL VALVES TO BE INSTALLED W/ VALVE BOXES W/ CAST IRON COVERS. (TYPICAL) 1/2" PVCf/ " \FINISHED GRADE RIG D1 /2" PV DRIP TUBING F INSTALLATION DEPTH FORCE MAIN INSTALATION DEPTH MAIN SUPPLY PIPE BELOW FROST LINE Patent No. 5,984,574 1/2" FLEX PVC (4' typ. PVC FI P ADAPTER RAM INSERT ADAPTER 6" MIN r SEPARATION'S TURN UP THE LOOP END SO THAT EFFLUENT WOULD DRAIN BACK TO TUBING AND NOT SIT IN LOOP. BURIED DRIP LOOP CONNECTION NTS 'eturn -YP) Return 1/2" Field Manifold 1/2" Supply Return TOP FEED SUPPLY MANIFOLD AND 1/2" LATERAL SUPPLIES TO BE PLACED ABOVE DRIP TUBING AND MUST DRAIN INTO THE DRIP TUBING AFTER EACH DOSE. DUE TO NECESSARY LINE DEPTH VARIATIONS (in order to "fit" site constraints and to keep each lateral dead level), THE MINIMUM INSTALLATION DEPTH COULD BE REDUCED TO 3" (requiring cover to be added over any areas where the drip tubing depth is less than 6"deep). STANDARD RESIDENTIAL DRIP SYSTEM DETAILS CHANGE OVER CH.40-SOLID 1/2" FLEX TUBE F-CHANGE OVER DRIP TUBING 8' DIAMETER BLANKING AREA (as shown on plan) Disposal Field Tree Blanking Detail M AMERICAN MANUFACTURING 1-800-345-3132 * www.americanonsite.com ^ � FLOWMETER DISC FILTERS NORMALLY OPEN SUPPLY VALVES BACKFLUSH VALVES SUPPLY FROM PUMP TANK AMERICAN MFG. COMPANY PERC-RITE DRIP SYSTEM TWO -FILTER - 15 GPM HYDRAULIC UNIT NORMALLY CLOSED ZONE VALVES NORMALLY CLOSED FIELD FLUSH VALVE RETURN TO SEPTIC TANK DRIP SYSTEM SCHEMATICS INSULATION AND HEATER KIT SHOULD BE ORDERED WITH THE HEADWORKS UNIT FOR FREEZE PROTECTION. CONTRACTOR TO INSURE THAT SURFACE DRAINAGE FLOWS AWAY FROM HW UNIT. I*( AMERICAN ONSITE CONTROLS AMERICAN MANUFACTURING COMPANY INC. P.O. BOX 97 ELKWOOD, VA 22718 (800) 345-3132 www.americanonsite.com IIIE SFNiT PUMP ONSITE ONSITE �j 7ww► CONTROLS U..0. B0. 07. aNN000. �. 1?)1.-W., ....NEPoCNIM9,E.COY L I N 1 11 1 12 13 14 IS I6 17 IB L I N 1 11 1 1 I 14 (3417) SIEMENS �► [LOGOA (3441) 19 K a�inn•ve PROGRAMMABLE RELAY CONTROLLER BM1 a52-IF OB�9 , 02 B001O f BI® 2 3 4 BI® ®® 0,3. PCB P1 TB1 P2e P1CB 1L1e 2aNE 1 X-a-� ® C1 Za11E 2 1 T1® 1 T2® A ® T6115VAC �24VAC� ZONE 41 2 3 4 5 6 7 8 9 10 24 12 13 14 15 16 17 18 1920 Q ANTI- HIGH LEVEL PEAK ENABLE DOSE ENABLE REDUNDANT OFF 3-4" TETHER ALL BRANCH CIRCUIT PROTECTION PROVIDED BY OTHERS CONTROL SUPPLY 115 VOLTS ONLY 10AMP MIN PROTECTION PUMP SUPPLY 1PH 60HZ 115 or 30 VOLTS 20AMP MIN PROTECTION LEVEL ALARM ITS PUMP MOTOR RATING 115V/.5hp/16A max 230V/ 2hp /16A max H I' GND 0o 06, F2 �� o. i a Z1 a. zz Z3 4 ZONE HYDRULIC UNIT WIRE COLORS 4 WHITE -COMMONS INTO 24- ZR=(BK)-8LACK (WH/BKS)-WHITE/BLACK STRIPE SOLENOID VALVES F7=(PP)-PURPLE (WH)-WHITE ZR = ZONE RETURN F2=(OR)-ORANGE (BR) -BROWN F1 = FILTER #1 Z1=(BL)-BLUE (WH/BLS)-WHITE/BULE STRIPE F2 = FILTER #2 Z2=(RD)-RED (WH/RDS)-WHITE/RED STRIPE Z7 = ZONE #1 Z3=(GR)-GREEN (WH/GRS)-WHITE/BULE STRIPE Z2 - ZONE #2 Z4=(YL)-YELLOW (WH/YLS)-WHITE/YELLOW STRIPE Z3 - ZONE #3 Z4 = ZONE #4 TORQUE SETTINGS: TERMINALS: WIRE SIZE: TORQUE: P7: 4-6awg 27 in-Ibs 8aw9 25 in-Ibs 10-14aw 20 in-Ibs 11_7-11_2 4-6awg 27 in-Ibs Maw 25 in-Ibs - aw 20 in-Ibs 8-18aw 22 in-Ibs T61 P2 8-22aw 18-20 in-Ibs TB1 1-20 1 10-22awg 1 7-8 in-Ibs NOTES: I PUMP I 1. PLEASE REVIEW ALL PAGES AND INSERTS IN THIS MANUAL BEFORE ATTEMPTING TO INSTALL ANY CONTROL EQUIPMENT. 2. DASHED LINES REPRESENT OPTIONAL EQUIPMENT 3. TIME DOSING IS CONTROLLED BY A SIEMENS LOGOI SEE ADDITIONAL MANUAL FOR PROGRAMMING `► U� US I 4. BF=BACKFLUSH, AND ZR=ZONE RETURN COPYRIGHT © 2007 AMERICAN MANUFACTURING COMPANY, INC. FII S' 4 ZONE TIME DOSING "QUALITY MONITORING" INSTALLATION GUIDE FOR "DPO" SERIES TIME DOSE "QM" CONTROL NEMA 4X, I PHASE, OPTIONS: A,J,L,X(DLO-RS) MODEL#: DP024-SAB124-AJLX(DLO-RS) DWG#: X9114-4Z-DLO-RS REVISION DATE. 11 DRAWN BY: APPROVED 11 15 / / SPC T/SUMIT/ColdSpringsRd NC/ 1 (9114-4ZXDLO-RS.dw9 Revisions: 1. ENGINEERING Consulting Civil Engineer/Planner 1104 Cindy Carr Drive Matthews, N.C. 2&105 Phone: 704/&47-3031 email: mikel0lashengineering.com License #C-2433 0;1. S L 14265 z¢�q AG cW.1110111100 �? PROJECT ENGINEER: MICHAEL LASH, P.E. THESE DRAWINGS AND THE DESIGN SHOWN THEREON ARE INSTRUMENTS OF LASH ENGINEERING, INC. THE REPRODUCTION OR UNAUTHORIZED USE OF THE DOCUMENTS WITHOUT THE CONSENT OF LASH ENGINEERING, INC. IS PROHIBITED. CLIENT: Nikolay & Natalya Bolkova 1020 Yellow Bee Road Indian Trail, N.C. 28079 Phone: (704)876.8256 PROJECT: Wastewater Facility for: BOIKOVA RESIDENCE UNION ROAD MATTHEWS, INC 28104 Union County Pin #08-31 >2-003-E DESCRIPTION: SURFACE DRIP -WASTEWATER TREATMENT SYSTEM DETAIL SHEET STATUS: 'PRELMNARY DESIGN' SUBMITTED TO: CLIENT Scale: 1' = 200' Dote: 214/2019 SHEET NO.