Loading...
HomeMy WebLinkAbout_External_ bridge 178 Bladen Corps NWP 3 verificationCarpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Thursday, March 14, 2019 4:39 PM Rerko, James J Steenhuis, Joanne; Price, Gregory W [External] bridge 178 Bladen Corps NWP 3 verification NWP 3 SAW-2019-00309 bridge 178 Bladen- signed.pdf; 2017NWP03.pdf; 20190219_17BP.6.R.90 Bladen 178 Wetland and Surface Water Permit Drawing....pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Jim, Attached please find a signed version of the verification letter, approved plans, and NWP 3 for the following project: Corps Action ID: SAW-2019-00309 Project Name: bridge 178 Bladen This authorization also covers the temporary impacts associate with the bridge replacement project as outlined in the PCN. Please note that this email serves as official notification. A paper copy will not be mailed. Thank you! Liz Hair Regulatory Project Manager Wilmington District US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Sarah.e.hair@usace.army.mil 910-251-4049 1