Loading...
HomeMy WebLinkAbout20190331 Ver 1_R.76_Permit_Plans_2019-03-01_201903116I � � � � � � 0 _ � � � � a � T � � � � � � m � � � � � � � � c 3 0 � 0 � � 0 .c � } .� � a U .7 oa m �� ��O N T� ��� �/ C M L� � � � � � � � � •� _J � � � V W O � � • � � V � � O V z � � � � � � THIS AROJECT IS NOT WITHIN ANY MUIVICIPAL BOUNDARIES. CLEARING O1Y THIS AROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD 77. GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 0 20 40 PROFILE (HORIZONTAL) DESIGN DATA ADT 2000 = 150 ADT 2025 = 223 DHV = N /A D = N /A T = 7% V = 35 MPH FUNC. CLASSIFICATION: LOCAL ����� �� ����1111 ���� �I ���� �������� �� �������� RO WA1� CO U1�TY LOCATI011t: BRIDGE #81 OVER DEALS CREEK 0111 SR 1926 (HAIVNAH FERRY ROAD) TYPE OF WORK GRADI11tG, PAVI11lG, DRAI11lAGE, £� STRUCTURE STREAM � WETLA11lD IMPACTS ti�`, �P �3 �p,0 8 0' 0' 8 0' Permit Drawing GRAPHIC SCALE Sheet � of s PROJECT LENGTH LENGTH OF ROADWAY PROJECT WBS 17BP.9.R.76 =.I32 MILE LENGTH OF STRUCTURE PROJECT WBS I7BP.9.R.76 =.013 MILE TOTAL LENGTH OF PROJECT WBS 17BP.9.R.76 =.I46 MILE NCDOT CONTACT: MATTHEW JONES, PE Division Bridge Manager PLANS PREAARED FOR THE NCDOT BY: Sr�+c' 100 STV Engineers, Inc. 1`/ 900 West Trade St., Suite 755 �� Charlotte, NC 28202 NC License Number F-0991 2018 S7ANDARD SPEC7F/CAT70NS RIGHT OF WAY DATE: NOVEMBER 5, 2018 NIKKI T. HONEYCUTT, PE PROJECT ENGINEER LETTING DATE: JULY 24, 2019 NARONG PHAL, EI PROJECT DESIGNER 'AT6 STAT6 PRQIBCT R6P6R8NC6 N0. NO ��� 17BP.9.R.76 � STAT6 PROI.NQ P.A.VROI.NQ DBBCRIVTION ,• •. �s^��������14t�� � ����i ����R�+���# �� w���i��►�i� ��'.���� �J� !►�. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HI'DRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DESIGN ENGINEER INCOMPLETE PLANS DO NOT U9E FOR Rf W ACQUI9ITION P.E. ag NOBTy a!`� c''o 4 , o � > _ e SR�r �f YRNMge�e~� See Sheet 1A For Index of Sheets See Sheet 18 For Stondord Symbology Sheet BEGIN PROJECT WBS 17BP.9.R.76 E11iD PROJECT WBS l7BP.9.R.76 SHEET NO. 2 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS an Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design ac ac ac ac ac ac ac ft ft ft 1 14+98.34 / 15+55.66 55' CORED SLAB BRIDGE 0.43 0.03 0.18 0.08 126 TOTALS: 0.43 0.03 0.18 0.08 126.00