HomeMy WebLinkAbout20190325 Ver 1_20190212_B5512 Permit Drawings_20190307Highway North Carolina Department of Transportation `�
�Stormwater
-- ,,,,,,,,,,, Highway Stormwater Program ���
STORMWATER MANAGEMENT PLAN �—�
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 55012.1.FD1 TIP No.: B-5512 County(ies): DURHAM Page 1 of 2
General Project Information
WBS Element: 55012.1.FD1 TIP Number: 65512 Pro"ect T pe: Brid e Re lacement Date: 1/24/2019
NCDOT Contact: Galen Cail Contractor / Desi ner: Steve Bondor
Address: Hydraulics Unit Address: Dewberry
1000 Birch Ridge Drive 2610 Wycliff Rd Suite 410
Ralei h NC 27610 Ralei h NC 27607
Phone: 919-707-6711 Phone: 919-636-6334
Email: cail ncdot. ov Email: sbondor dewber .com
Cit /Town: Durham Count ies : Durham
River Basin s: Neuse CAMA Coun ? No
Wetlands within Project Limits? No
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet : .01 miles Surroundin Land Use: Urban
Pro osed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.9 ac. 0.4 ac.
Typical Cross Section Description: 11' travel lanes with 7'-3" shoulders. 36'-6" clear roadway with 0.02 cross slope normal 0.02 cross slope with 10' travel lanes
crown.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 1600 Year: 2040 Existin : 1100 Year: 2016
General Project Narrative: Replacing the existing 70' bridge with an 100' box beam bridge. The drainage design consist of drainage inlets, shoulder berm gutter, and roadway ditches that tie to existing
(Description of Minimization of Water swales.
Quality Impacts)
,_, . � . '�. ' �_�I� _
Surface Water Body (7): Lick Creek NCDWR Stream Index No.: 27-11-(0.5)
NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV)
Supplemental Classification: Nutrient Sensitive Waters (NSW)
Other Stream Classification:
Impairments:
Aquatic T&E Species? Comments:
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
O�
0
�
0
�
0
i�i
rn
c
.�
a
�
� N
�w�l
omc•i
C3�,
eom
N
�
�
�
�
.,
�
V
W
O
�
�
�
�
• �
�
V
�
�
O
V
See Sheet 9A For Index of Sheets
See Sheet 98 for Conventional Symbols
TO SR 1903
����� �� ����� ��������
�������� �� ��������
D URHAM C� U1�TY
LOCATION: REPLACE BRIDGE #89 OVER LICK CREEK
01V SR 1902 (KEMP RD.)
PERMIT DRAWING
SHEET 1 OF 5
TYPE OF WORK GRADING, DRAI11lAGE, PAVING A111D STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
�q\
8,�2��7
\
BEGIN TIP PROJECT B-5512
-L- POT STA. 12 + 70.00
\ �
��
�,
-L -
____-- - - SR /902- --
(KEMP RD)
BEGIN B
-L- POT Sta. 15+
END TIP PROJECT B-5512
-L- POC STA. 19 + 00.00
END BRIDGE
+
NCDOT CONTACT: LISA B. GILCHRIST, EI
� ��
NG N
-�O
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES
50 25 0 50 100
PLANS
50 25 0 50 100
PROFILE (HORIZONTAL)
DESIGN DATA
ADT 2016 = 1,100
ADT 2040 = 1,600
K = �2 %
D = 70 %
T = 4 % *
V = 50 MPH
* TTST = 1 DUAL 3
FUNC CLASS = LOCAL
SUB REGIONAL TIER
PROJECT LENGTH PI.AIIZS PREPARED FOR 11tCDOT BY:
q 2610 WYCUFF ROAD
,� �� Dewberr HONE:'o919.881 9939
Y NC COA No F-0929
2018 STANDARD SPECIFICATlONS
LENGTH ROADWAY TIP PROJECT B-5512 = 0.100 MILES
LENGTH STRUCTURE TIP PROJECT B-5512 = 0.019 MILES
TOTAL LENGTH TIP PROJECT B-5512 = 0.119 MILES
89
RIGHT OF WAY DATE: DENNIS J. MORY, P.E.
JANUARY 11�ZO�9 PROJECTENGINEElt
LETTING DATE: ANNE MARIE PRIETO, P.E.
OCTOBER 15, �LO�9 PROJECT DES[GN ENGINEER
HI'DRAULICS ENGl1VEER
P.E.
srcivnrur�:
ROADWAY DESIGN
ENGIIVEER
P.E.
OFF SITE DETOUR � � �
�
��� ���
O
-- �--
��y � - - -
I
I �
V � �
I
1
- 1
\
\
I O /
3 �
� � --I
�
DB 2927 PG �
P 129 PG I �
� i I
I
� I
�� l � I --
R�
"o� ENLARGED VIEW
� _ �� , i- _ . ,. .1 - . t .,- s _ ,. . -., r'-W� , .. .. -
TO SR 1903 � - '=�2 KCMP FU I
�-- 24' QST
' - Fiw iAON ._ ._ .� __ __ __ _' __ " __ __ __
'v 8
?o��
�
E%CAVATE TO
ELEV. 274.6
100 CY
� �... SBG FROM
�\ -L- STA.14+73 LT .
' �\TO END OF BRIDGE .� wnnnc
��i � � S �
_ . ""�`�� vJOCI 5 :�� '��\�_.. .
�., [ �s
� �-,ffARTIN � REE �_,' 040 �� �S�
� _ �e�—�._ a, � � _, ., �.:�
.. .��� . . _ W LI)� 2GI FG
F ��
-_ --__F ---_-- V
_,' 4�i, r�.._ .�. . ,1 r �, - _ Fd. y`:. ,i .. � w��2 -r- � _ ,
�F„ --F --_ _
— _ —_ - -L- p 1902 KEMI' �?r -----
N 23° 34' 06J" W �5" RCP-ui
_ — — - - _ -__ — —
F �,
\F _
�� _--_ ---_ . .
. _. .'tt'..L''. .. "�`t,��-�-� �'f �� .} _� _�ry `. ^ �.
L "t
0401 �
w000S CL 8 RIP RP.P 0403 ZGI FG
OUTLET
PROTECTION
1 TONS
5 S.Y. GEOTEXTILE 5BG FROM
-L- STA.14+73 RT
TO END OF BRIDGE
CL II RIP RAP
TO SHOULDER
POINT � �;,fV� �_
O
THE ANNIE H PERRY FAMILY LLC
OB 2927 PG 266
P8 129 PG 106
PARCEL INDEX
PARCEL No. SHEET No. PROPERTY OWNER NAME
1 4 THE ANNIE H PERRY FAMILY LLC
2 4 GARY D CHAMPION AND WIFE TAMMY I CHAMPION
3 4 THE ANNIE H PERRY FAMILY LLC
.....
..... �
�
0
N
O
GARY D CHAMPION AND
WIFE TAMMY I CHAMPION
, — DB i602 PG 639
PB 90 PG 64
_
—
_ _
�
� _
COMPLETELY
REMOVE EXISTING CL. B RIP RAP
CONCRETE PIER 2 TONS
rCL. II RIP RAP /� � 7. S.Y. GEOTEXTILE
I TO SHOULDER ���� TIE DITCH
POINT � � � � �TO EXISTING
�/� � � / SWALE
� � � �
I� �.✓
r
-EXCAVATE TO
ELEV. 275.0
140 CY
-COMPLETELY REMOVE EXISTING CONCRETE ABUTMENTS
BANK STABILIZATION ON BANKS
CL. II RIPRAP
SEE DETAIL 4B
SP. LAT V DITCH WOO�S
SEE DEfAIL 4A
PERMIT DRAWING
\ SHEET 2 OF 5
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
�DENOTES IMPACTS IN
SURFACE WATER
\
oW
� �
i� � �� 9�
\ / �
Y Y� P ,��i�� �/IX'vJ���V,U3 _ r'
��,�, ,�� �M N
sa a
_ -� arw M" ,/� o � j _ JY
/
,= o /
% x,
_, � = �/ ��
�-� � � —
� „ „ ,, �=" ,�
W�ODS
_- -__-� �-� ..�'�
� / �
' j' i
� _ ____ __- _ � _ _ �Nl �`
��SP. L4T V DITCH
SEE DETAIL 4A
TIE DITCH
TO EXISTING
SWALE
CL. B RIP RAP
2 TONS
7. S.Y. GEOTEXTILE
DETAIL 4A DETAIL 4B
SPECIAL LATERAL 'V' DITCH B.4NK STABILIZATION
(No��o 5<ale) �No��o Scole�
a.o•m��.
r�n
�rol p.\ °� Slope �.0'
Gound ?') p F�� e`
d
GEOTE%TILE
Geole.lile Min. �=1.0 Ff.
Type of Linar= CL. B Rip-kap
Max. d=1.0 F. TYpe of Liner= CL. II Rip-Rop
FROM -L- STA. 17+29 TO STA. 19+42 LT FROM -L- STA. 15+18 TO 15+78
FROM -L- STA. 18+65 TO STA. 19+29 RT FROM -L- STA. 16+00 TO 16+36
� UNCLASSIFIED STRUCTURE EXCAVATION
�
W
�W
n" -
�^'
�
. END BRIDGE
5+28.84 -�- POT STA. 16+31.16
-L- PC Sta. /7+27.5t
TYPE III TYPE III GREU TL-
- o � 11'
4' 06.1" � 11'
TY III TYP III GREU TL-3
'ROACH SLAB END APPROACH SL
-L- POT STA. 16+42
fA.15+18.00 BRIDGE No.89
-L- POT STA. 15+80
BRIDGE SKETCH
� _
�
� � �
'� a
� � � `
����
��
�y
�
W
��
��r
�
- � ti�� '� ti , I f
00 ry ��
`L _ /\b � ' �'
, �� � � � � � �
2�9 ry / <n
� ��
v
\ �
� � � P
1 � �I 278 -- I
/'" i �_ �i �
//�/ \ °,
"���/ � �- � � �`z
a` ' �� �0)� � ti � e/ �
�
� y-� u
ti� � q q�
�,
b �
� �^y
�-0�' �� b �
� �
��-- ' S
� .,
�
�
_ �. \
75-. I ^ \
\ / \ I
�
I O w
3 �
- I ` ~ � �
__ � --
- DB 2927 PG � "'
P 129 PG I � _
� i I �Z �
92 � ���
8� --------- � � � �
- , -�� � � ��
� i ��� ��
��z 9 � �� � R� , �, ���
\ � -L- S7
�.�
` �TO END
� �
F
� \ C `�
S6r , n c ___ - ENLARGED aVIEW `z z ; --� ,` F�� �� :-
6 � .. E " 88Z Og = � -'���
__
, 62 ObZ � 9 Z w"
��`� �� �. ` . _
\ \ \ Z _ _ . _ - _ � �
q �.\ Z6Z _l6Z � .. f8Z - a
'E �iPG�,'�y6Z �.��, .. _ - _ _
� rrz� -✓ k��� ' ___�✓`�Z �4� � .
. bZ 66Z . .._�_� ' -68Z `_______ 58Z -_- F - £� ,. _- __
_! - - . " �T ��- � _ _ _
� -L-i�� s, ie,z �2c�r�' no
N 23° 34 06J" W__
- --
38BZ-_
�i "Fs� r^�- ���III
TO � 190� � 5/� .,[2 I
�—/_�1 ; '' �
-, c,.p,��.., . �-�
\9O�
�o� � �
0
M �
O
0���
�� ��� �Oy � /
hQ /
N / �OQ
� / pb O
h M
ii� o �
�'I If I I i I I I I �'':. �i ro
j � N'
'F'
2�
Fin
a�
�/ � ry�/ ry �
( 0�
I ry /
yb \
h D
r
^m //)
�~ !
h
� � �1Q ry � I
PARCEL INDEX
�b
ti
�
PARCEL No. SHEET No. PROPERTY OWNER NAME
1 4 THE ANNIE H PERRY FAMILY LLC
2 4 GARY D CHAMPION AND WIFE TAMMY I CHAMPION
3 4 THE ANNIE H PERRY FAMILY LLC
N
�
A
�����
�---' �S`t ..
c`j `-
�h
� � � a� �
a
275 y i+
� r�
L �+ � �v> 2'j5 ���.
111222���qqq � ^J
I ti n
� / 275
�1i
S'!Z - � �"o ..
_ � y "I �/ �
� � ��
%� / / 9lZ
�1
��
5 �Z � / LL�
� �� �
� � �
a� i o
ti
/-2�5 �o,� � �� � �
N
� n d
/� �
^Q� /
rc+ �
6 �
��ti � � ��� ��ti
v � GARY � �PIkSN ��y
G°i \ WIFE�A�Y I QHl�APy�N
,��a n� � j ' ��g6�'�_�j���
/� bl
� ���� 5LL � / /b�° % �
� � � 6��" ��� � � �
���
� ��
9� �
� �� I
�' ti - z
� �S
� I �
��
M1�
SL
�
a
�
S�t � �
��~ N
/� ��xcnvnre �
LT
/ S.Y\:.GEO TILE o-b�cVm
�-�v -L- STA 1 73 RT
TO END OFIgRIDGE
� --- / CL II'RIP R
� V TO SHQULD
, � �POI
id 1
ANNIE H PO Y F� LLC \
DB 7 PG 266
PBM 9 PG 108 �
-�i w
/ \ I 1 �
-0�
�� �q 1
�
A� I N
�
C� n
^�/ )
�
�
�M
`� J
��4 �ti�
Ql�
V
�^ �
rv�
�b A
np� \
� N
W
ti�Z
�
I z�s �y�,.
MPLETELY
dOYE E ti �
NCRESE"__ER
GL. II RIP'RABLZ ; � /� �
T��HOULDER ���,�,
b /��� '��ye
N� � � � �
� � ��
P� � � .�-.✓ �
,� �s�8
ti�� �-
i
� �ti o
CL �RIP RAP
s � or� i
7 Y.GEOTE
IE DI�Cf� �
�� ���
S�Y�LE / L� /
� /l
6CZ'/ � J
�i��az�
280
�
�9, \
/ �S \
I� EXCAVA� TO �� � � \ �
� ) �, m
�1� ELEV 27 0 --�\ �
140 CY � \
/ N �
�,ti�SMPLETELY REMOVE EXISTING COIV��
�A�IK STABILIUTION ON BA� � � �\ � �
� CL.II IIRAP / � �11�I
� SEE�AIL 4B � �I
�, ` � � I
S, 1 �
�� V �
�\�—,.���� � /A
� ti `�� � �
q� � N
�
� ", , �ql- . ��\.., / � . ; � `r �,
'y�� `, ,� , _ _ �
� ti e
Ob
y"'�--
�bZ
l��
�bZ
/b� � �
�
� dbti
� �
86�� _.
ti��
ti0��'____�.
� `_�
R � ��0� ��C H��y 9�
� i�t,�
:Y �� �nt_>
, i i �i� .� � ��..��, „�q ��/ w0 S I�� y ,
6$ L - t,_+��� � , ' �/ "' 0 � \ �.w,
- �8 T6g -�..i�C/� � . b O�' . 'L � � �.p bO `
/� � b
__� _ _�
! � � - � � 24}/�
�_ .. _ 't-,..,
- 0�
; ��
_ �-� -
N
�,�'�-�� � � ' � � �
� �
/
.n � �,^� �� o
�
� / i
�2 , 9�P. �P.�Y ITCH N `n
� � i '�EE�`9�TiAIL 4A j l �
. � _ lilE 'PIT,Ci'�� �
TO '�E�ISTIl,JG o �Dy �„
� we � � �WA� � � � N �?j) � .
� LT� � �`P '. D,,' / b1' `ao w�w
�.. ���.� I .Y .� <
s.Y. d�d's�craA� �. \ w � � \
I \ ``�, �\. �\ i � �ys ?9� � �,,..,� - � � 11 0 ,
''u� � .� �`� �� �V`'9� � �o�� A V �� � � � ��a �
I � �
_ � � � z z � . � � � �� � . , � �+�
/ �
� � � DETAIL 4A DETAIL 4B � ''�
�l \ BANK STABILIZATION � \\
\ � \ SPECIAL LATERAL'V' DITCH �Ho��o smie�
A�UTM�NiS� \ (No��o 5caie) ` \
l. T82 \ 1 a.o•m��. \ ..
\\ � No� FII \ -
�rol p.\ ° Slope �.0' \
� Ground ?') p F�� e`
d �')O
GEOTE%TILE
�ZaO� Geole.11e Mn �=1.0 Ff.
I �,�9 � Max d=1.0 F. TYpe of Liner- GL. II Rip-Rop \`�
� Type of L CL. B R'p kap \
� FROM -L- STA. 17+29 TO STA. 19+42 LT FROM L- STA.15+18 TO 15+36 ��6 ���
�1, FROM -L- STA. 18+65 TO STA. 19+29 RT �
/
FROM L- STA. 16+00 TO 16
Z / �/ �r i, / � � � i �
l8 / �_ _ yBZ� q0'L � Ob / I ,� � I
/ � / �
/ rj / / j I
ti �b~ 56� �bti
w`D `8Z/�
e
� ��� � ��� � w
o b� �j ��� / )
oyt � /
N
�
m
A
w
� ,
U 9s ?96 \ � `�O7 � � �n ' � �
\
� � � i
� � � o '
N
^' � �9a� �' UN � � �,
2 � w � A � w �'�
r � �SSIFIED STRUCTURE EXC VATIQ
� , � N � � � �
� w I o
- 290
���� ���ti � � � �� � � � SEE SHEET 5 FOR -L- PROFlLE � '�� � �
� � � � � -
PERMIT DRAWING
� i SHEET 3 OF 5
\ � DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
m
0
� DENOTES IMPACTS IN
� SURFACE WATER
/ /
1
�`e� �� . i90ti�j, 0/ \/ � � `b�v � �'
��
■I■ii�
■■■■
■■■■
■■■■
�� R�Q..�'��
�i :���
��1►,��
��11��#_�
��I/%�(i
���■
i�■■
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPA T URFA E WATER IMPA T
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
L 15+88 LT TO
1 L 16+02 RT Bank Stabilization 0.01 < 0.01 87 10
TOTALS*: 0 0 0 87 10 0
*Rounded totals are sum of actual impacts
NOTES:
' Length of concrete pier impact has been accounted for in the riprap on banks quantity
" riprap on banks quantity includes left and right.
�