Loading...
HomeMy WebLinkAbout20190060 Ver 1_Approval Letter_20190312ROY COOPER co��.�o. MICHAEL S. REGAN secremry LINDA CULPEPPER Direcror � .4ATE �, � a �� �" ;��y 3� ��—�� ; �'��o '� �_ ;..2 i; "...,w,.,�� . NORTH CAROLINA EnvironmenmlQual7ty March 13, 3019 Wake County NCDWR Project No. 20190060 SR 2713 APPROVAL of NEUSE BUFFER AUTHORIZATION wi[h ADDITIONAL CONDITIONS Mr. Chris Johnson, PE, Town Engineer Town of Garner 91d 7'"Avenue Garner, NC 27529 Dear Mr. Johnson: You have our approval, in accordance with the condi[ions lis[ed below, for the following impacts for the purpose of road improvements [o SR 2713 (Vandora Springs Road) in Gamer, Wake County: Site Zone 1 Impact Zone I Buffer Mi[igation Zonc 2 Impact Zone 2 Buffer Mitiga[ion (s ft Re uired usi❑ 3:1 ratio s ft Re uired (usin L5:1 ratio) Totals 1800 N/A I813 N/A ' Na — lbtal tor Srte is less than I/3 acre and I SU linear teet ot �mpact, no mingation reqmretl Total Buffer Impact for Project: 3613 square feet. The project shall be constructed in accordance with your application received January 14, 2019 and revised plans received March 12, 2019. This approval is valid for the Neuse Riparian Buffer Rules (I SA NCAC 2B.0333). In addition, you should acquire any other fedcral, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Wa[ershed regulations. This approval is valid solely for the purpose and design described in your application (unless moditied below). Should your project change, you must notify the NCDW R and submit a new application. If the property is sold, the new owner must be given a copy of this Certitication and approval le[ter, and is [hereby responsible for complying with all the conditions. If total wedand fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the fumre) exceed I50 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0233. For Ihis approval to remain valid, you mus[ adhere to the condi[ions listed in the General Certification and any additional conditions listed below. ,. D_EQ�,� ..::r.Y..._�...� North Carolina Department of Bwironmental Quabry Drvision of Water Resources 512 North Salisbury Street i 16ll Mail Service Center i Raleigh, North Carolina 2 7 699-16 17 919]07.9000 � Conditions uf Certifcation: I. All stormwater runoff shall be direcred as sheetFlow throu,�h stream buffers at non-erosive velocities. unless otherwise approved by this certification. [ISA NCAC 3B.0233) 2. All riparian buffers impacted by the placement oftemporary fill or clearing activities shall be restored ro[he preconstruction contours and reve�e[a[ed. Maintained buffers shall be permanently revegetated wi[h non-woody species by the end of the growino season followin2 comple[ion of construc[ion. For the purpose of this condition, maintained buffer areas are defined as areas within [he transportation corridor that will be subject to reeular NCDOI� maintenance activities including mowing. The area with non-main[ained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construc[ion. [ISA NCAC 2B.0333] 3. Pursuant to I SA NCAC 2B.0233(6), sediment and erosion control devices shall not be placed in Zone I of any Neuse Buffer without prior approval by [he NCDWR. At this time, the NCDW'R has approved no sediment and erosion control devices in Zone I, outside of the approved projec[ impacts, anywhere on this projecL Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the butlers provided that Lone I is not compromised and that discharge is released as diffuse flow. 4. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams, shall be placed below the elevation of the streambed by one foot for all culvens with a diameter greater than 48 inches, and 20 percent of the eulvert diameter for culverts having a diameter less than d8 inches, to allow low Flow passage of warer and aquatic life. Design and placemen[ of culverts and other strucmres including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibriwn of wetlands or streambeds or banks, adjacent to or upstream and down sveam of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. Ifthis condition is unable to be met due ro bedrock or other limitin_ features encountered during construction, please contact the NCDWR for guidance on how [o proceed and to determine whe[her or not a permit modification will be required. [I �A NCAC 02H.0506(b)(3)] 5. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross sec[ion as closely as possible includin: pipes or barrels at flood plain elevation and/or sills where appropriate. Widenin� the stream channel should be avoided. Stream channel widening a[ [he inle[ or outlet end of structures typically decreases warer velocitq causing sediment deposition Iha[ requires increased maintenance and disrupts aquatic life passape. [ISA NCAC 03H.0506(b)(2)] 6. Riprap shall oot be placed in the active thalweo channel or placed in the strcambed in a manner that precludes aquatic life passage. Bioen�ineering boulders or structures should be properly designed, sized and installed. [ I SA NCAC 02f 1.0506(b)(3)] 7. For any streams being impacted due to site dewatering activities, [he site shall be ;raded ro its preconstruction contours and revegetated with appropriate native species. [ISA NCAC 02H.0506(b)(3)] 8. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species. [15A NCAC 02H.0506(b)(3)] 9. If concrere is used durin� cons[ruction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream wa[er. Water [ha[ inadvertendy contacts uncured concrete shall not be discharged to surface waters due to thc porential for elevated pH and possible aquatic Iife and fish kills. [I SA NCAC 02B.0200� 10. During the construction of the projec[, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [I SA NCAC 02H.0506(b)(2)] I I. The dimension, pattem and protile of [he stream above and below the crossing shall not be modified. Diswrbed floodplains and streams shall be restored to natural �eomorphic condi[ions. [15A NCAC 02H.0506(b)(2)] �:�:. � Q��' North Carolina Department of Environmen[ai Quairtr Drvision of Water Resources 512 North Sahsbury Street 1617 Mail Service Center Raleigh, North Carolina 2 7 699-161 7 919707.9000 � '7 I? The use of rip-rap above the Normal High Water Mark shall be minimiced. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passa_e. � I SA NCAC 03H.0506(b)(3)� 13. The Permittee shall ensure [ha[ [he final design drawings adhere to the perniit and to Ihe permi[ drawings submitted for approval. [ISA NCAC 02H .0507 (c) and ISA NCAC 0?11 .0506 (b)(2) and (c)(2)] 14. All work in or adjacent to sueam waters shall be cunducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to preven[ escavation in flowin� watec [ISA NCAC 02H.0506(b)(3) and (c)(3)� 15. Heavy equipment shall be opera[ed from [he banks ra[her than in [he stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [ I SA NCAC 02f 1.0506(b)(3)] 16. All mechanized equipment operated near surface waters must be re�ularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic Fluids, or other toxic materials. [I>A NCAC 02H.0506(b)(3)� 17. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [ I SA NCAC 02H.0506(b)(3)] 18. Dischargin_ hydroseed mixtures and washing out hydroseeders and other equipment in or adjacen[ [o surface wa[ers is prohibited. [ISA NCAC 02H.0506(b)(3)] 19. The permittee and i[s authorized agen[s shall conduct its activi[ies in a manner consis[ent with Sta[e wa[er quality standards (including any requiremen[s resultin� from compliance wi[h �303(d) of the Clean Water Act) and any other appropriate requiremen[s of State and Federal law. If the NCDWR de[ermines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further condi[ions are necessary to assure compliance, the NCDW R may reevaluate and modify this certifica[ion. [ISA NCAC 03B.0200) 20. A copy of this Water Quality Certifica[ion shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the on-site project mana�er. [ I SA NCAC 02H .0507(c) and I SA NCAC 02H .0506 (b)(2) and (c)(2)] 21. The ou[side buffer, wedand or wa[er boundary located within [he construction cortidor approved by this authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencin� are prohibited unless otherwise authorized by this certification. � I SA NCAC 02H.OSOI and .0502] 2? The issuance of this certification does not exempt [he Permittee t}om complying with any and all statu[es, rules, regulations, or ordinances [hat may be imposed by other governmen[ agencies (i.e. local, state, and federal) havingjurisdic[ion, including but not limited to applicable bufler rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 23. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [ I SA NCAC 03B.0506(b)(2)] 24. Upon completion of the project (including any impacts at associated bortow or waste sites), the permittee shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed [I SA NCAC 02H.0502(fl] 25. Native riparian vegetation (i.e., trees and shrubs na[ive to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by [he end of the growing season following completion of construction. [ I SA NCAC 02B.0233 ( I O)� & [ISA NCAC 02B.0506(b)(2)] 36. There shall be no excavation from, or waste disposal into, jurisdictional wedands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation wil l be required since [hat is a direct impact from road construction activi[ies. [ I SA NCAC 02H.0506(b)(3) and (c)(3 )] �. � Q�� North Carolina Departmen[ of Bivironmen[al Qualiry Drvision of Water Resources 512 North Salisbury Sheet 1617 Mail Service Cen[er �. Raleigh, North Carolina 27699-161 i 919707.9000 �- 29. Erosion and sediment control practices must be in full compliance with all specifications governino the proper desi�n, installation and operation and maintenancc of such Bes[ Mana,ement Practices in order to protect surface waters standards [I SA NCAC 02H.0506(b)(3) and (c)(3)]: a. The erosion and sediment comrol measures for the project must be desianed, installed, operated, and maintained in accordance with the most recent version of the Nordv Curulrno Sedimen� and Erosrun Control Plannn�K und Design hl�im�ul. b. The design, ins[alla[ion, operation, and main[enance of [he sediment and erosion control measures mus[ be such that they equal, or exceed, the requiremen[s specified in the mos[ recent version of the Nordi Carolinn Sediment and Erosron Conu•ol hi�murd. The devices shall be maintained on all construction sites, borrow si[es, and was[e pile (spoil) projects, including contractoo-owned or leased borrow pits associated with the project. c. For borrow pit sites, Ihe erosion and sediment control measures must be designed, ins[alled, operated, and maintained in accordance wi[h the most recent version of the North ('nrolina Surface �Lfrnrng ,Llanaal. d. The reclamation measures and implementation mus[ comply with the reclamation in accordance with the requirements of [he Sedimenta[ion Pollution Control Act. 28. Sediment and erosion control measures shall not be placed in wedands or surface waters, or within 5 feet of the top of bank, without prior approval from DW R. [I SA NCAC 02H.0506(b)(3) and (c)(3)] 29. When applicable, all construction activities shall be performed and maintained in fiill compliance with G.S. Chapter I 13A Article 4 (Sediment and Pollulion Control Act of 1973). Regardless of applicability of the Sediment and Pollotion Control Act, all projects shall incorporate appropria[e Best Management Prac[ices for the control of sediment and erosion so that no violations of state water quality standards, statu[es, or rules occur. [I SA NCAC 02H .0506{b)(3) and (c)(3) and ISA NCAC 02B.0200] 30. Design, ins[allation, opera[ion, and maintenance of all sedimen[ and erosion con[rol measures shall be equal [o or exceed the requirements specified in the most recent version of the Nor�h Carolin�i Sedrmem �md Erosion Control h9mvacd, or for linear transportation projects, the NCDOT SecGinen� nnd Erosion Control hlmvual. All devices shall be maintained on all construction si[es, borrow sites, and waste pile (spoil) sites, includina contractor-owned or leased borrow pits associated with the projecL Sufficient materials required for stabilization and'or repair of erosion control measures and stormwater routin,and treatment shall be on sire at all times. For borrow pit sites, the erosion and sedimen[ control measures shall be designed, installed, operated, and maintained in accordance with the most recent version of the Norrh Carolrna SaiJace Minrng h9�mual. Reclamation measures and implementation shall comply with the reclamation in accordance with the requirements of [he Sedimentation Pollution Control Act and the Mining Act of 1971. Iftheprojectoccursin watersorwatershedsclassifiedasPrimaryNurseryAreas(PNAs),SA, WS-I, WS-I I,HighQuality Waters(HQW), or Outstanding Resource Waters (OR W),then the sedimentation and erosion control desiens shall comply wi�h the requirements set forth in ISANCAC 04B.0124, DesignS�andnrds iiaSensitive I1'atershed [ISA NCAC 02H.0506(b)(3) and (c)(3); GC 4135] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form tiom the office of Administrative hearings. You must file the petition with Ihe office of Administrative Hearin�s within sisty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administra[ive Hearings accepts tilings Monday through Friday between [he hours of 8:OOam and S:OOpm, except for official state holidays. The original and one ( I) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearin�s wi[hin five (5) business days followin� [he faxed [ransmission. The mailing address for the Office of Administrative Hearin�s is: Office of Administrative Hearin�s 6714 Mail Service Center Raleigh, NC 27699-671d Telephone: (919) 431-300Q Facsimile: (919) 431-3100 �:�:.,. � Q�,� North Carolina Departmentof Enviromnental Qualitp Diwsion of Water Resources 512 North Salisbury Sheet �. 1617 Mail Service Cen[er i Raleigh. North Carolina 27699-1617 919.707.9000 A copy of the petition must also be served on DEQ as follows: Mr. Bill F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of [he Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Rob Ridings at 919-707-38T. incerely, Linda Ipepper, Dire tor � ' Division of Water Resources Electronic copy only distribution: Mark Kamprath, VHB (mkamprath@vhb.com) File Copy ti. D_E Q�,� .��.:�.��� North Carolina Departmen[ of Environmen[al Qualiry I Division of Water Resources 512 North Salisbury Street I 1617 Mail Service Center Raleigh. North Carolina 2 7 6 99-16 17 919707.9000 ROY COOPER co�e.�o� MICHAELS.REGAN Secremry LINDA CULPEPPER Direcror NORTH CAROLINA Envi�onmentnl Quality NCDWR Project No.: County: Applicant: Projec[ Name: Date of Issuance of 40I Water Quali[y Cer[ification: Certificate of Completion Upon completion of all work approved within the 401 Wa[er Quality Certification or applicable Butler Rules, and any subsequent modihcations, Ihe applican[ is required ro re[urn this certitica[e to the 401 Transporta[ion Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned ro NCDWR by the applicant, the applicanCs authorized a�ent, or Ihe project engineer. II is not necessary to send certificates from all of these. ApplicanYs Certificalion I, , hereby state [ha[, [o the best of my abilities, due care and diligence was used in the observation of [he construction such that [he construc[ion was observed to be built within substantial compliance and in[en[ of [he 401 Water Quality Certifica[ion and Buffer Rules, the approved plans and specifications, and other supportin� marerials. Signature: Date: Agent's Cerlifieulion 1, , hereby state that, to the best of my abilities, due care and dilivence was used in the observation of the construction such tha[ [he construction was observed to be built within substantial compliance and in[ent of [he 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Si�na[ure: Da[e: Engineer's Certifreation Partial Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized [o observe (periodically, weekly, full [ime) the construction of the project for the Permittee hereby state that, to the bes[ of my abilities, due care and diligence was used in the observation of the construc[ion such [hat [he construc[ion was observed to be buil[ within subs[an[ial compliance and in[ent of Ihe 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and o[her supporting ma[erials. Signa[ure Date ��.E�.�. Q�� Regis[ra[ion No. _ __ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury 5[reet i 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.7079000 r —�